Comparison between Three Off-Grid Hybrid Systems (Solar Photovoltaic, Diesel Generator and Battery Storage System) for Electrification for Gwakwani Village, South Africa

1
Faculty of Technology, De Montfort University, Leicester LE1 9BH, UK
2
Institute of Energy and Sustainable Development (IESD), De Montfort University, Leicester LE1 9BH, UK
3
Engineering College, Al-Muthanna University, Samawa, NA, Iraq
*
Author to whom correspondence should be addressed.
Environments 2018, 5(5), 57; https://doi.org/10.3390/environments5050057
Submission received: 12 March 2018 / Revised: 26 April 2018 / Accepted: 2 May 2018 / Published: 8 May 2018

Abstract

:
A single energy-based technology has been the traditional approach to supplying basic energy needs, but its limitations give rise to other viable options. Renewable off-grid electricity supply is one alternative that has gained attention, especially with areas lacking a grid system. The aim of this paper is to present an optimal hybrid energy system to meet the electrical demand in a reliable and sustainable manner for an off-grid remote village, Gwakwani, in South Africa. Three off-grid systems have been proposed: (i) Photovoltaic (PV) systems with a diesel generator; (ii) Photovoltaic systems and battery storage; and (iii) Photovoltaic systems with diesel generator and battery storage. For this analysis, different size of photovoltaic panels were tested and the optimal size in each scenario was chosen. These PV sizes were 1, 0.8, 0.6 and 0.4 kW. The optimization between these sizes was built based on three main objectives. These objectives are: (i) energy demand satisfaction; (ii) system cost; and (iii) pollution. For the first and second system scenarios, the optimal size was the 1 kW with battery and 1 kW with diesel generator; the third scenario results did not sufficiently match the three objectives. A general comparison has been carried out between the two optimal systems when the diesel generator is used and when the battery is applied. Both scenarios can sufficiently meet the demand without any considerable interruption, but disparities exist between them in relation to cost and technical optimization. There is a huge difference in the cost between these scenarios. The total cost in PV-Battery system (Scenario 1) represents only 26% of the entire PV system. Also, the PV and Battery system does not release any harmful emissions compared with nearly 6 tCO2/year in the PV with Diesel system (Scenario 2). Also, Scenario (3) is a viable option in terms of energy production but costs more and is proposed to be more beneficial using an economies-of-scale analysis.

1. Introduction

Recently, Hybrid Renewable Energy Systems (HRES) have gained reputable popularity, and garnered momentum among research studies for modelling, simulation, and optimization. This is a system which combines two or more renewable and/or non-renewable energy sources. The main drivers of a HRES are costs associated with conventional/traditional energy systems, reduction of emissions, negative impact on health and environment and optimization of systems [1,2]. The current global deviation from fossilized remains of dead plants and animals (which are considered non-renewable resources) formed over extensive heat and pressure formation on the earth over millions of years [3] to renewable resources has further enhanced research in this area. The use of fossil fuel is widespread in South Africa, for electrification, cooking, daily living and practical uses and its emission of toxic gases into the atmosphere accounts for global warming issues and challenges. The key contributing factor of the HRES is deviation from overexertion of fossil fuel sources and its negative impact to the environment, in relation to the financial costs, commitments and access associated with it. The burden of costs of installation of large energy plants and equipment is reduced (which is often borne by the government on a macro level) and passed on to a lower-cost alternative solutions using renewable resources [4]. The overall system reliability and performance levels is higher for areas with an abundance of solar irradiation, HRES and resources [5].
The HRES also have the potential for energy balancing of systems, stability, and reliability for areas with little or no access to electricity, with the design and modelling of the HRES unique to each case study. Ongoing research and investigation persists in improving its efficiency, performance, and integration with renewable energy sources such as solar, wind and other renewable energy technologies. However, the design is usually aimed at solving an optimization problem. An exact one-size-fits-all solution is not realistic, due to the number of dynamic variables, complexities, and non-linearity in performance of systems. Therefore, the defining terms for optimal solution in a case study vary as a function of energy balance and management, support of existing infrastructure, optimal sizing of system and component parts, control strategies, and so on as stipulated by location and researcher [3,6,7]. The process of achieving optimal conditions, through operation and component part selection, can be determined through multiple techniques. There is a numerical algorithm-based technique for unit sizing and cost analysis, an algorithm-based energy technique to size the photovoltaic (PV) elements, a software modelling technique, a linear programming technique, a probability technique, an iterative technique, analytical model, dynamic technique, and multi-objective genetic algorithm technique, etc. [2,4,8,9,10,11].
In the development of the HRES using wind and solar PV, the state of design, operation, control requirement, performance analysis of demonstration systems and development of efficient power converters was examined, and it was observed that the total life costs were significantly reduced. The combination of energy sources proved to be a more reliable source of electricity supply and this reduced the battery bank and diesel requirements all together [10]. In another study of the HRES, the design process was leveraged using different component parts for minimizing lifecycle costs, and a criteria selection was determined to produce a combination of trade-off between reliability, costs, and minimum use of diesel generator sets [6,7,8,12,13,14,15,16]. The optimal combination point was determined at a unit cost of Rs. 6.5/kWh for the case area where the micro-wind-hydro system was found to be the optimal combination for electricity. This maintains a 100% renewable energy source while eliminating the diesel generator [17].
The feasibility analysis of a wind-hydrogen system for Grimsey Island to generate electricity for the location is examined for optimal system solution in another three scenarios: design analysis of wind-diesel, wind-diesel-hydrogen and wind-hydrogen systems. The overall result suggests the order of installation of scenarios in succession from a wind-diesel system, to a wind-hydrogen-diesel system and then a wind-hydrogen system, with that hierarchy [18,19]. It is observed that in a 20-year period, the system running costs were significantly reduced, although not without substantial investments at the onset. From a practicality standpoint, the wind-hydrogen-diesel system had the lowest operational cost from the configuration design of the three scenarios [20]; also, speculation on changes in oil price and costs of renewable technology is cited as a major determinant for the future direction of renewables systems, progressively or otherwise. The roadmap of the study highlights the practical application of the system to real-life situations, with the result of achieving 100% renewable electricity less likely, for now, due to other contending factors examined simultaneously within the system design. In multiple studies of the techno-economic feasibility of hybrid systems, optimizations techniques and modelling, the most viable option is predetermined by examining and evaluating the potential of available energy sources to location. The specific details of the results are not mentioned here but overall the result indicates strong potential for renewable energy production especially—from solar energy for electrification to wind power for hydrogen production [21,22,23,24,25].
The slow adoption of the HRES has been attributed to its high costs [26]; it is essential to select the appropriate system size in a techno-economic analysis to determine the costs associated with this.
Though the HRES is considered a more sustainable option to fossil fuel resources as it has less negative environmental impact and greater reductions of global warming. The HRES is also considered very challenging in its design, especially for PV, wind, diesel generators and energy storage systems due to many variable factors and much uncertainty [11,27]. The renewable resources are argued to be unpredictable in some areas in relation to its intensity and energy-generating component, such as sunshine and wind speed and wind direction; the major concern lies within its ability to satisfy demand which is often cushioned with energy storage units as backup.
Despite the measures taken to ensure accuracy, this unpredictability makes it necessary to run a feasibility and performance design for each case area. In the optimization of PV/Wind/Diesel Generator and energy storage units, the first step was a design to optimize all the component parts to achieve minimum costs while satisfying energy demand [11]; it manages the customer demand side response for energy demand effectively and efficiently, as it often requires an estimation of the HRES when compared to the standalone traditional energy systems to further ensure its cost effectiveness. This is the case for Barwani, India where the stability and cost effectiveness of the PV/Wind/Biomass hybrid solution was achieved through a practical application of system where the control strategy, techno-economic analysis and social effects were considered [28].
In the optimization of PV-biomass-diesel and grid base hybrid energy systems for rural electrification using HOMER Pro Software tool developed by the National Renewable Energy Laboratory (NREL), Golden, CO, USA, this study examined the economic impact of a decentralized renewable energy base system with no grid extension for Jhawani village, Tezpur area, India. The design was optimized by configuring different load profiles, costs of energy at different peak loads, energy demand profile and grid availability [29,30]. The electricity costs depend on load factor, which has an inverse relationship between peak load/energy demand and cost of electricity generation. The comparison between grid extension and off-grid is a matter of economic perspective in decision-making. Overall, the hybrid energy system is a feasible reliable source, and the result shows the optimal scenario to be the biomass gasification system rather than a photovoltaic system. There is also an emphasis on the unforeseen challenges that may arise from practical application of proposed configurations. An analyzed performance rate of off-grid wind-PV-diesel-battery hybrid energy system was feasible for remote areas of Selangor, Malaysia. The system design considers a load size profile of 33 kWh/day and peak load of 3.9 kW, net present economic costs, available energy sources and size, and CO2 emissions. The net present costs and CO2 emission can be reduced by 29.65% and 16 tons per year in comparison to the conventional power plants; it can be applicable to areas with similar climatic conditions. It is environmentally and economically feasible in the long-run to replace the conventional plants with the renewable plants [31].

2. Materials and Methods

The central energy source for this study is Solar PV, though there are different factors which determine the PV outcome such as solar irradiance level, intensity, optimization of PV, energy load, design spacing of PV cells, tilt, angle, etc. These factors must be considered as PV efficiency decreases with an increase in cell temperature and solar irradiance and areas of concentration [18]. Detailed analysis and test conditions of various PV arrays was not considered in this study; a generic flat panel PV is used as configured within the HOMER Pro software (Version 3.11.1) developed by NREL, Golden, CO, USA. The functional operation can be further analyzed in a comparative assessment of the performance levels of solar PVs and other resources in a standalone system, for grid connection and HRES. The PV system as a standalone is time sensitive and seasonal unit which yields considerable output when the solar irradiance is highly intense and reliable, depending on the design of PV array. When the PV standalone system is compared with a stand-alone biomass energy system, the biomass system has a higher efficiency and lower costs in rural areas while the PV system decreases in its performance output with a significant difference in its levelized cost of energy (LCOE) for certain areas [18,32].
In the PV system for a grid-connected system, it reduces its dependence on a diesel generator and utilizes the power generated by saving energy in a storage unit. PV/diesel generator/battery is considered more economical more beneficial for electrification as seen in a study of northern Nigeria, [31] but this is not the case for Gwakani village.
The provision of electricity and energy by the South African government prioritizes by demographics, geographical regions and areas of higher economic value which perpetuates trade, commerce, and industry [33]. With the growing population of South Africa and interconnectedness of the global community at large, this makes the demand for electrification imminent. This is not only a major concern for cities and urban areas but also rural, local communities and small villages in South Africa which require energy resources and electrification for daily living. In a forecast projection of electrification for South Africa from 2014 to 2050 [34], the supply and demand pattern from electrification and the driving forces are unique and particular to South Africa, part of which remains socio-cultural and socio-political. Despite the challenges, local communities are continuously embracing technological advancements and seeking alternative solutions. This is predominantly evident with the various users of HRES at household level [35]. This framework designs the optimal functional and cost-beneficial system model for Gwakwani village, by estimating the energy demand and time constraints for optimality, costs incurred and overall benefits. The use of renewable resources, though beneficial in the long run, usually require an investigation into the framework for design and establishment. It is important to understand HRES scenario dynamics, reliability, expected outcomes, possibilities, and potential before fully investing into HRES. The flexibility it offers ensures for easier calibration of the system.

2.1. Data Collection

The collection of data is derived from primary and secondary sources—literature reviews and demographical distribution the case study. Data for renewable energy sources are retrieved from NASA, 2017 accessed within the NREL Database System in real time.
Gwakwani is a small rural village in the northern part of the Limpopo province in South Africa located on latitude 22°34.3′ S and longitude 30°48.2′ E. There are between 70 and 100 people living in the village and this is projected to decrease gradually due to socio-economic strain, and challenges with electricity and telecommunications as people migrate to urban settlements where their needs are met. There is very little information about this rural village; however, the relevant data collected via literature indicates the demand need for electrification to the village, particularly for sustenance. The data collection of solar energy availability potential energy requirement and cost assumptions were determined [36,37,38].

2.1.1. Solar Radiation

Solar radiation data for specific location can be extracted by different means; for example, solar radiation can be obtained from metrological stations that are distributed across the country in question or it can also be extracted by transporting the latitude and longitude figures of the region into the NASA (2017) portal found on the website. The same steps are applied for calculating the PV watts as provided by the NREL, the U.S. Department of Energy, 2017 and the South African Weather Service, 2017. Solar radiation for the region of study are obtained from South Africa Meteorological Organization, 2010 [39,40]. The global solar radiation data for Gwakwani is shown in Figure 1 which highlights the pattern by hour of the day and day of the year. It shows January to March and September to December as the peak months for solar radiation while from April to August exhibits the lowest solar radiation [41,42,43].
There are between 70 and 100 people living in this village with no electricity and a very simple lifestyle. This village has few activities that require electricity beyond a few hours of lighting for houses (preferably during night time hours), mobile phone charging and water pumping for water production. Figure 2 below is a background into the simple lifestyle in Gwakwani area.
The village is assumed to have on average 17 houses. The size of houses are unknown, therefore simple arithmetic assumptions are made to enable the demand estimation. It is assumed that this village runs community-based living and the rules of engagement within a community apply and are imposed. The local type of employment is predominantly simple agriculture which requires minimal irrigation and animal husbandry. The electrical demand will be required for lighting, mobile phone charging and water pumping. One mobile cell phone is assumed for each household, and one lamp per household is assumed for electricity supply. One water pumping device is assumed for the entire village and this is run for 3 h.
Table 1 below will summarize the energy demand during the day based on the above appliances and their time of operation.
The hourly demand of the village is shown in Figure 3 below. As it is presented, the electricity required will be operational during two periods of the day—morning and evening time. Adding more appliances such as a television set as a communal social gathering for the village is a plausible option due to the surplus power generated.

2.1.2. Energy Demand

In the Morning between the hours of 7 a.m. and 10 a.m. (3 h) the total demand is 4863 W/h/day and in the Evening the total demand is 1700 W/h/day (as shown in Table 1 above).
The average energy consumption is 1.2 kW. This is required for Mobile Charging and Water Pumping; while in the Evening between the 17:00 and 21:00 (4 h), the average energy consumption is 0.35 kW (this is required for Lighting purposes).

2.1.3. System Components and Cost Assumptions

In this paper, two different scenarios of operations will be applied to cover the electricity demand of this village. These scenarios are built based on three main points which are: (i) Reduce the system cost to the lowest possible value—the priority of the production will be given to renewable energy sources to decrease the system cost (ii) and reduce the emissions—considering the environmental impact on life and welfare; (iii) and providing electricity to consumers efficiently without interruptions. Based on these aforementioned conditions, two systems are suggested which are:
  • Photovoltaic system plus diesel generator for the time shortages and night time (for daily usage).
  • Photovoltaics system plus battery storage to store the excess energy produced via PV system and meet any deficiency periods and during the night (for daily usage).

2.2. Simulation

HOMER energy software from NREL is applied for the system simulation. The software can be used for different energy management scenarios such as off-grid, on-grid, and mini-grid systems. The main points of the paper can be investigated running this software as it assesses the system based on a techno-economic view. In this paper, three different systems are designed using the main energy source (PV) and applied in a scenario to verify the best optimal solution for the village in a cheaper sustainable way [23].
  • In the first scenario the PV system with battery to store excess energy is used to meet any demand shortages. Four PV sizes are tested, and the optimal sizing is selected and compared with the second scenario.
  • In the second scenario the PV system and diesel generator is added. The shortages during operation are matched using a diesel generator. The same four PV sizes used in the first scenario are applied and tested here and the optimal sizing is also selected and compared with the first scenario.
  • In the third scenario, the PV system and both the diesel generator and battery storage unit are added, and four PV sizes are tested. The load following dispatch strategy ensures that the generator produces only enough power to meet the load as the optimal system is more efficient in renewable powered systems which exceeds the load. HOMER automatically turns the generator off, if the load is supplied by other renewable sources [10,16,37].
Finally, a comparison between the optimal solutions in the first, second and third scenarios have been presented. The criteria established between those two scenarios are: (a) the system cost; (b) the renewable energy penetration; and (c) the demand satisfaction. The figures below show the three model scenarios.
(a) Photovoltaics System plus Battery Storage
This scenario consists of PV system and battery storage without any conventional electricity sources such as a diesel generator. Different sizes of PV system are tested and the optimal solution selected to compare with other scenarios. The PV will satisfy different purposes at the same time to satisfy the demand and to charge the battery for Evening time or periods with shortage of PV power. In this scenario the total energy supply to village is supplied via PV system either directly from the PV to the load or indirectly from the battery to the load. Technical and economical details of all components including battery and PV inverter are presented in Table 2 below. This scenario has two advantages in comparison with the previous scenario, which are environmental friendliness and being totally self-dependent since there is no need to travel long distances to buy diesel fuel. The autonomous hybrid PV/battery power system considered is a combination of a PV array, battery bank, direct current DC/DC and alternating current AC/DC converter, DC/AC inverter, DC, and AC load as shown in Figure 4.
(b) Photovoltaic System plus Diesel Generator
This scenario consists of a photovoltaic system plus diesel generator, with different PV system sizes tested. These sizes are 1 kW, 0.8 kW, 0.6 kW and 0.4 kW. Then the optimal PV size is compared with the optimal PV size of other scenarios. The PV system supplies the demand during the daytime and any other surplus power is wasted because of the absence of energy storage. Any deficiency in meeting the demand leads to the diesel generator being run, even during the daytime. In this case, the diesel generator has the potential to meet the total demand load due to full rate operation of diesel generator while all PV power production is curtailed or dissipates. Technical and economical details of diesel generator and PV are presented in Table 2 below. The autonomous hybrid PV/diesel power system considered is a combination of a PV array, diesel generator, direct current DC/DC and alternating current AC/DC converter, DC/AC inverter, DC, AC load as shown in Figure 5.
(c) Photovoltaics system, Diesel Generator plus Battery Storage
This scenario consists of photovoltaic system plus diesel generator and battery storage unit. The autonomous hybrid PV/diesel power system considered is a combination of a PV array, diesel generator, battery storage unit, direct current DC/DC and alternating current AC/DC converter, DC/AC inverter, DC, and AC load as shown in Figure 6. This scenario consists of a photovoltaic system plus diesel generator and battery storage which analyzes the different PV system sizes of 1 kW, 0.8 kW, 0.6 kW and 0.4 kW. The Load Following (LF) dispatch strategy is used as this enables the production of only enough power to meet the primary demand load of (6663 Wh/day) while the generator is in operation. The lower priority objectives such as storage bank and serving the deferrable load are left to the renewable power sources [12,16,17]. The deficiency in meeting the demand load activates the diesel generator which runs continuously until the storage unit is full (which usually requires an increase in storage unit size).

2.3. System Components

1- PV Module
In HOMER, the PV panels generate DC electricity in direct proportion to the solar radiation, independent of its temperature and voltage to which it is exposed. The output power of PV can be computed using the equation below.
P P V = W P V f P V G T G S
where W P V the peak output power of PV system is ( kW ) , f P V is the PV panels derating factor ( % ) , G T is the solar radiation incident on the PV system in the current hour ( kW / m 2 ) , and G S is the incident radiation under standard conditions ( 1   kW / m 2 ) .
2- Diesel Generators
Diesel generators are used to meet the peak demand, mainly when there is no output power from the PV system. It is important to note that the Gwakwani residents usually travel long distances of approximately 5 miles to buy fuel which leads to an increase in the fuel price above the normal rates. As of 2017, the fuel price in South Africa is fixed at around 1 $/L. So, the price of 1.75 $/L is considered to cover the transportation cost. Capital cost, maintenance cost and replacement cost are presented in Table 2.
3- Battery
In this study, the lead acid battery model is utilized, which provides good features combined with low cost. The lifetime and efficiency of the battery are set as five years and 85%, respectively. More details are presented in Table 2.
4- Inverter
A converter purpose is to convert the dc power obtained from PV panel to ac power. Usually, a converter is rated based on the power of PV system selected and the typical convertor efficiency of 85%. Technical and economical details of the converter are given in Table 2.
Since the objective aim for PV-Battery (in Scenario 1) is to satisfy the demand load regardless of the source, the PV simultaneously operates two goals: meeting the demand and charging the battery for later use. Due to the absence of a diesel generator, the PV system is running most of time except for three plausible periods: (i) when there is no demand load in the Afternoon (between the hours of 11:00 and 16:00); (ii) When there is not enough solar radiation (which can potentially occur between March to September and (iii) when there is not enough storage space within the battery size capacity. In second scenario, if the PV system cannot meet the demand, the diesel generator should be operated. Once the diesel generator is running, there is no need to operate the PV system at the same time since the power will be dissipated. The diesel generator is running at full capacity at any time and its capacity is sized according to the demand which can easily meet the demand without PV system production. Stop running the PV system when the production cannot meet the demand due to two main points: the absence of the storage system in this scenario and reduce the PV cost and increase the system lifetime.
The characteristics of the component parts for the hybrid systems are summarized in Table below:

2.4. Net Present Cost of the System and CO2 Emission Cost

The net present value can be calculate using Equation (2) below.
C N P C = C a n n , t o t C R F ( i , R p r o j )
where C a n n , t o t : Total annualized cost; C R F : Capital recovery cost; R p r o j : Project lifetime; i : Interest rate.
The total CO2 emissions from hybrid system can be computed using Equation (3) below.
t C O 2 = 3.667 × m f × H V f × C E F f × X c
where t C O 2 : Total amount of carbon dioxide; m f : Fuel quantity; H V f : Fuel heating value; C E F f : Carbon emission factor (ton carbon/TJ); X c : Oxidized carbon fraction; Another point that should be taken into account is that every 3.667 g of CO 2 contains 1 g of carbon.

3. The Three Hybrid Model Scenario Results

Scenario (1) Hybrid Energy System with Battery; Scenario (2) Hybrid Energy System with Diesel Generator; Scenario (3) Hybrid Energy System with Both Battery and Diesel Generator
1. Hybrid energy system with battery

3.1. System Architecture of the Hybrid Energy System with Battery

In Figure 7 the model scenario shows the Hybrid Energy System when Battery is used which consists of the electric load at 6.56 kWh/day and the peak at 2.75 kW. It has a 1 kWh lead acid (LA) battery for storage with a size of 11 strings, a flat plate PV of 4.25 kW is used, a System Converter of 4.38 kW was added and the cycle charging (CC) dispatch strategy used was as it tends to be optimal in systems with little or no renewable power.
The PV production is 7669 kWh/year, the consumption summary is 2394 kWh/year for AC Primary load and zero for the DC primary load. The excess electricity is valued at 4902 kWh/year and with an unmet electric load of 1.14 kWh/year. It also has a capacity shortage of 2.37 kWh/year. The levelized cost of Energy is $0.870 (kWh) and the total net present cost (NPC) is $26,916.03.
2. Hybrid Energy System with Diesel Generator

3.2. System Architecture of the Hybrid Energy System with Diesel Generator

The model scenario in Figure 8a below has an electric load of 6.56 kWh/day and 2.75 kW during peak hours. The PV array size is 0.00912 kW, the Diesel Generator Set of 500 kW is used with a system converter of 0.00651 kW and the dispatch strategy is set at cycle charging.
The Levelized Cost of Energy is $0.780 (kWh) and the total net present costs (NPC) is $24,166.58.

3.3. System Architecture of the Hybrid Energy System with Both Battery and Diesel Generator

In Figure 9 the model scenario shows the Hybrid Energy System when both Battery and Diesel Generators are used, which consists of the electric load of 6.56 kWh/day and the peak of 2.37 kW, a converter and solar PV. HOMER optimized the model scenario and produced a series of lower cost options of the overall costs associated with system. The results are presented below in Table 3. Below. The flat plate PV of 3.52 kW was determined as the optimum size to meet the demand load for the Gwakwani village with the diesel generator and the battery storage using the dispatch strategy of Load Following (LF). However, this scenario does not satisfy the objective optimal system requirement as mentioned earlier in literature of energy demand satisfaction, system cost and pollution in a sustainable manner. The system has a battery storage unit of 1 kWh Lead Acid Battery with a size of 18 strings and the Diesel Generator is at fixed capacity of 500 kW with a System Converter of 2.66 kW, CO2 emissions of 295 kg/year, and a total net present cost of $140,970.60/year.

3.4. System Operation

Within HOMER software, there are sets of rules used to control generator and storage bank operation whenever there is insufficient renewable energy to supply the load. This is activated through a dispatch strategy technique of which there are two options: these are the Cycle Charging Strategy (CC) and Load Following Strategy (LF). The CC Strategy operates where the generator serves the primary load and operated in full output power, surplus electrical production goes towards the lower priority objectives in order of decreasing priority such as severing the deferrable load and charging the storage bank. In HOMER, the CC dispatches the controllable power sources (which are generators and storage banks for this design) each time step of the simulation in a two-step process. First, it selects the optimal combination of power sources to serve the primary load and the thermal load at the least total cost, while satisfying the operating reserve requirement. Secondly, HOMER maximizes the output of the generator in that optimal combination to its rated capacity, or as close as possible without producing excess electricity. While the operation within the LF Strategy produces only enough power to meet the primary load when a generator is in operation. The lower-priority objectives, such as storage bank and serving the deferrable load, are left to the renewable power sources [12,16,17].

4. Results

4.1. PV System with Battery for Energy Storage

Four different sizes of system have been applied and the result has been analyzed for every size. These sizes are 1 kW, 0.8 kW, 0.6 kW and 0.4 kW. The total amount of energy production during the year of each system size is shown in Figure 10 below. The demand load for the Gwakwani village is 6563 W/h/day (see Table 1). The PV is designed based on the demand load and the daily solar irradiation in Figure 1. The use of PV size 0.6 kW meets the demand load, as well as the other PV sizes 0.8 kW and 1 kW. However, the increase in PV sizes consequently leads to an increase in its economic costs.
The cost difference between these scenarios mainly comes from the number and the O&M of the batteries in each scenario. For example, in the first scenario the 1 kW PV size activates the battery string at 18 cell while the 0.4 kW PV activates the battery string at 19 cell. In addition, due to the small size of the PV system in 0.4 kW and 0.6 kW, the battery will take more time to fully charge, which will lead to more operation and maintenance (O&M) cost. Degradation is the main issue of the battery and has a direct relation to the period of operation. The operation and maintenance cost were $2327, $2327, $2327, and $2456 for the 1 kW, 0.8 kW, 0.6 kW, and 0.4 kW respectively.
The O&M cost of the PV system also has an inverse relationship with the PV system size even though the operation costs per year (4388 h/year) for all sizes is the same. This possibility is because small sizes require more on-off connection to battery since it takes more time to fill the charge of battery. This interpretation shows the difference between lifetime throughput of the battery in each scenario since the large size has longer lifetime (11,234 kWh) compared with 11,666 kWh in 0.4 kW size. The rest of the calculations, such as the unmet demand, energy price and total system cost per size, are presented in Table 4.
The results reveal that changing the PV size does not strongly affect the main function of the system since the unmet demand remains the same during the other three sizes. The unmet demand is equal only for one day demand during the year. With regard to the system component part, a decrease in the system size led to an increase in cost and a corresponding increase in the system’s battery size—which is required to meet any shortages due to the reduced PV size. Based on the calculation above, first size (1 kW) can be considered to be economically efficient to meet the demand in the village even though more surplus energy will be wasted due to the small size of battery. Alternatively, the next step would be to increase the size of battery but increasing the battery size will further increase the system costs as well.
Another option to combat this conundrum would be to introduce other household appliances to maximize the surplus energy for demand-side response by adding television and radio sets, etc. The highest energy price costs come from the energy storage cost. For example, in 1 kW, the levelized cost of energy produced via PV system is 0.134 $/kWh whereas the storage wear cost is 0.419 $/kWh. The rest comes from the annualized cost of other components.

4.2. PV System with Diesel Generators and without Battery

In this scenario the battery storage is replaced by diesel generator to meet the demand during the PV shortage times. The same PV system sizes are used as with the first scenario. These were tested, and two main points are observed even before the operation stage: the increase in CO2 emissions due to the fossil fuel usage and the amount of renewable energy wasted is higher than the last scenario—because of the lack of energy storage equipment. It is important to note that the Gwakwani residents usually travel long distances of approximately 5 miles to buy fuel which leads to an increase in the fuel price above the normal rates. As of 2017, the fuel price in South Africa is fixed at around 1 $/L. Therefore, the price could be considered 1.75 $/L to cover the transportation cost.
In Figure 11 above, when 1 kW of PV system plus diesel generator is applied, the energy production is more than double other PV sizes due to the highest share of the PV system in the total production. Regardless of the PV sizes, 1 kW, 0.8 kW, 0.6 kW and 0.4 kW produced nearly the same amount of energy and most energy coming from diesel generator as shown in Figure 12 below.
The total power generated by the PV arrays when the diesel generator is added increases, and this uses the solar irradiance as retrieved for the case location of Gwakwani Village. The solar irradiance fluctuates throughout the year with the highest months from January to March, September to December, while it dips at its lowest months from 12 March to 10 September (see Figure 1).
The wasted energy is higher in 1 kW PV size compared with other scenarios due to the absence of energy storage equipment during the period of high PV productivity and low demand.
However, in other scenarios the surplus energy comes from a mismatch between the diesel generator production and demand since the diesel generator is operating at full capacity at any time of operation regardless of the required energy demand. The surplus energy is estimated to be 15,734 kWh, 4922 kWh, 4922 kWh, and 4922 kWh for 1, 0.8, 0.6, and 0.4 kW system sizes respectively; which is wasted without proper storage units. In terms of demand satisfaction, all scenarios can meet the total demand without any deficiency due to the sustainable and efficient source of energy (diesel generator). The cost details of the total system under different PV sizes are presented in Figure 13 and Figure 14.
There is a clear share of the 1 kW PV in the total capital cost of the system since the size is relatively high compared to other tested sizes and the PV. The PV system (1 kW) is responsible for nearly 60% of the total production. However, in other scenarios, most costs come from the diesel generator as in Figure 14 and the resources cost represents the highest part of the cost in both sizes since the fuel price is quite high. Other sizes will be same as in Figure 14. The effect of diesel operation on the environment can be considered as one of main disadvantage of this scenario, especially if the system extended to include more villages. More cost can be added to the system due to the emissions and based on the social carbon cost (SCC) of South Africa. The carbon dioxide (CO2) is 6.9 ton/year for first year in contrast with 9.1 ton/year in other scenarios. The difference in emissions can be linked to the operation hours of diesel generator in each scenario. For 1 kW scenario, diesel generators were running for 2219 h/year whereas the running hours was estimated to be 2920 h/year. Finally, the average price of energy per kWh was 3.34 $/kWh in first scenario in contrast 3.4 $/kWh in other scenarios. To sum up, first scenario can be considered as a best optimum scenario based on the system cost, pollution levels and energy price. The first scenario has less surplus energy than scenario two, but slightly more surplus than scenario three. Scenario three has more CO2 emissions than the first scenario and it also has a higher net present cost (see Table 5 below).

5. Discussion

HOMER Pro as used for this study analysis is distinctively different from HOMER Grid. It enables start-up designs for regions such as Gwakwani lacking in any form of variable data for analysis and connectivity and access to grid. The simulation results give an overview into the viability of a HRES with the potential for further expansion in a HOMER Grid, if the demand arises [10,23,29]. A simulation of the energy demand load requirement is necessary before the optimal planning design of the HRES and the configuration of the system is also dependent on the output power for generation and the load on the system [4,38]. It is important to consider the reliability status of the entire system, and while the reliability is considered to be relatively higher in a HRES (which is often a combination of both renewable and non-renewable resources), there is noticeably a considerable amount of savings on the total annualized costs associated with the system [18].
In HOMER, the distribution of the energy system is regulated by the dispatch strategy and controller systems, where the economic dispatch controllers CC and LF and are pre-set at default in HOMER and this enables the system design to match the load without any considerations for future adjustments. Due to this operational strategy (which is active only in the moment), the LF dispatch strategy of the diesel generators enables it to produce just enough power to serve the load, without producing any surplus energy [28]. While in the CC dispatch strategy, the generators produce as much power as required, without producing excess electricity and then further charges generators with the surplus power [23]. This allows the engine to operate storage and power sources to serve the load in a systematic way through a dispatch strategy, with the deferrable load of higher priority to battery charging. The dispatch strategies used in the three scenarios are:
  • Scenario (1) PV-Battery: Cycle Charging (CC)
  • Scenario (2) PV-Diesel Generator: Cycle Charging (CC)
  • Scenario (3) PV-Diesel Generator plus Battery: Load Following (LF)

Comparison between PV-Battery Scenario and PV-Diesel Generator Scenario

The comparison will include only 1 kW PV system since this was observed as the optimal mode of operation in each scenario. Based on the result above, the operation of photovoltaic with the battery has many advantages in contrast with its operation with diesel generator. There is a clear difference in system costs and energy price per kWh between different scenarios, regardless of its economic advantages. The operation of the photovoltaics with battery has no emissions—and this can be an added feature benefit in environmental factors. The comparison summary between these scenarios is given in Table 5.

6. Conclusions and Future Work

Renewable energy-based off-grid rural electrification programs are one of the most effective ways to increase access to energy in remote areas of developing countries. In this paper, three scenarios of off-grid system have been investigated and compared to provide sustainable energy for a small village in South Africa. These scenarios are (1) PV-battery system, (2) PV-diesel generator and (3) PV—both diesel generator and battery system. Based on this research analysis both battery and diesel generator systems achieved the same objective function of backing up the PV system at periods of supply shortages. The four different PV sizes used in each model scenario indicated different optimal sizes and this was used as the rallying point for optimization. The optimal size selection satisfied the criteria conditions of: overall system cost, pollution emissions and demand satisfaction. As it is presented in the result section in scenario (1) the PV-Battery model—1 kW PV size was the optimal option between all sizes. The total cost of this size is the cheapest between all sizes which was approximately $26,916.03 compared with $27,053.39, $27,311.95, and $27,484.29 for 0.8 kW, 0.6 kW and 0.4 kW. This leads to the cheapest energy price per kWh between all sizes. Other advantages can be noticed in 1 kW size related to the demand satisfaction and battery degradation.
In scenario (2) the PV-Diesel Generator model, same size (1 kW) was the optimum in contrast with other scenarios. The power share of the PV system in 1 kW size is nearly 60% of the total energy produced whereas the share is nearly zero in other scenarios. In terms of the pollution, 6 tCO2/year is released by 1 kW scenario compared with 9.6 tCO2 in other scenarios. The only problem with this scenario is the wasted energy will be higher than other scenarios.
In scenario (3) the PV-Diesel Generator and Battery model, adequately satisfies demand with a surplus energy of 3508 (kWh/year) and energy price per 4.55 ($/kWh), the emissions rates however are 295 (kg/year) and the system net present costs at $140,970.60 ($/year).
The three model system scenarios can be used for electrification and match the energy demand at some considerable cost. The optimal solution however, ensures a more reliable cost-beneficial system as seen in scenario (1). The costs of adopting scenario (3) is not economically viable for a small village setting such as Gwakwani at $140,970.60 NPC, however the surplus energy per year of 3.508 (kWh/year) indicates the potential for cost minimization through the application of economics of scale, which is a more viable option. This would be more beneficial if the Gwakwani village had access and connection to a grid system to supply surplus energy at a fixed cost, to earn income and invariable reduce CO2 emission. Thereby offsetting the initial capital investment costs of $157,253 in the scenario (3) model. Also, the combination of the PV-wind system is economically beneficial for remote areas with less than a daily load of 75 kWh/day and a load point of 50 km or more away from grid [18]. This situation is characteristic to the Gwakwani village with a daily load point of 6.56 kWh/day. With the source of sustenance of the Gwakwani village is farming and agriculture; biomass and wind are available renewable energy resources which can be further considered in a more detailed simulation analysis using biomass and wind turbine; based on the results, this can be added, swapped, or supplemented with the PV in a techno-economic assessment. Alternatively, this can be applied as a standalone system and compared. A simple tariff builder system can also be installed to evaluate costs per kWh of each family unit (in a demand-side response) to give allowance for any future increase.
Lastly, while the optimal sizes aim to satisfy three main conditions of system cost, pollution emissions and demand satisfaction, distinctive disparities exist between the model scenarios. The first and second scenario can sufficiently meet the demand without any a considerable interruption. The reliability of the system is significantly reduced in a HRES with an uneven power sharing control dynamic in the DC/AC Bus connection, which can occur when the system malfunctions in the DC/AC converter, since the main challenge of power sharing is to achieve a desired load distribution when the system is connected to a DC-bus configuration and the AC power is lost (due to malfunctioning) [4]. The size under PV-Battery scenario (1) does not release any harmful emissions compared with nearly 6 tCO2/year in PV-Diesel scenario. There is a huge different in cost between these scenarios. The cost in PV-Battery represents 26% of the cost in PV-Diesel Generator scenario. In addition to all the mentioned differences that clearly support the PV-Battery scenario, there is a global trend towards enhancing renewable energy penetration and this approach requires a high capacity to store energy in several ways, including batteries, flywheels, and hydrogen. This will inevitably lead to a reduction in the storage technique prices. In contrast, the emission penalty is increasing, and most industrialized countries are trying to move away from conventional fuels to preserve the environment and build a strong and sustainable economy. Future research studies will include more appliances to accommodate the wasted energy, and different energy storage techniques can be tested and compared with batteries. A controller system dynamic model using either a MATLAB simulation or a combined dispatch algorithm which modulates start time, finish time and allows for an out-of-the-box controller algorithm which enables a flexible design to recalibrate itself in periods of higher energy demand, solar irradiation fluctuations and other unforeseen climatic challenges, storage and high emissions is proposed to actively choose between the LF and CC strategies at every step of the process.

Author Contributions

Conceptualization and Methodology, M.M. and A.R.; Software, M.M.; Validation, M.M., A.R.; Formal Analysis & Investigation, A.R. and R.M.; Resources, Data Curation, Writing-Original Draft Preparation, M.M. and A.R.; Writing-Review & Editing & Visualization, M.M., A.R. and R.M.; Supervision, R.M.; Project Administration & Funding Acquisition, M.M. & A.R.

Funding

This research received no external funding.

Acknowledgments

We would like to extend our gratitude to the NREL HOMER Pro Software management team, USA for the continued support and software update management and access and also, De Montfort University, Leicester for the opportunity to conduct this research study.

Conflicts of Interest

The authors declare no conflict of interest.

Nomenclature

CO2Carbon dioxide
CCCycle Charging
HRESHybrid Renewable Energy Systems
KMKilometer
kWhKilowatt Hours
kWKilowatt
LFLoad Following
LCOELevelized Costs of Energy
PVPhotovoltaic

References

  1. Kolhe, M.; Ranaweera, K.M.I.U.; Gunawardana, S.A.G.B. Techno-economic sizing of off-grid hybrid renewable energy system for rural electrification in Sri Lanka. J. Sustain. Energy Technol. Assess. 2015, 11, 53–64. [Google Scholar] [CrossRef]
  2. Qolipour, M.; Mostafaeipour, A.; Tousi, M.O. Techno-economic Feasibility of a Photovoltaic-Wind power plant construction for electric and hydrogen production: A Case Study. Renew. Sustain. Energy Rev. 2017, 78, 113–123. [Google Scholar] [CrossRef]
  3. Hope, G.; Gilding, P.; Alvarez, J. Quantifying the Implicit Climate Subsidy Received by Leading Fossil Fuel Companies; Working Paper No. 2; Cambridge Judge Business School: Cambridge, UK, 2015. [Google Scholar]
  4. Eltamaly, A.M.; Addoweesh, K.E.; Bawah, U.; Mohamed, A.M. New Software for Hybrid Renewable Energy Assessment for Ten Locations in Saudi Arabia. J. Renew. Sustain. Energy 2013, 5, 033126. [Google Scholar] [CrossRef]
  5. Rahil, A.; Gammon, R.; Brown, N. Techno-economic assessment of dispatchable hydrogen production by multiple electrolysers in Libya. J. Energy Storage 2018, 16, 46–60. [Google Scholar] [CrossRef]
  6. Hossain, M.; Mekhilef, S.; Olatomiwa, L. Performance Evaluation of a Stand-Alone PV-Wind-Diesel-Battery Hybrid System Feasible for a Large Resort Center in South China Sea, Malaysia. Sustain. Cities Soc. 2017, 28, 358–366. [Google Scholar] [CrossRef]
  7. Iaquaniell, G.; Montanari, W.; Salladini, A. Standalone CSP-DG system for electrification of remote areas and desalinated water supply. J. Sol. Energy 2017, 157, 1056–1063. [Google Scholar] [CrossRef]
  8. Koutroulis, E.; Kololotsa, D.; Potirakis, A.; Kalaitzakis, K. Methodology for optimal sizing of stand-alone photovoltaic/wind-generator systems using genetic algorithms. J. Sol. Energy 2006, 80, 1072–1088. [Google Scholar] [CrossRef]
  9. Kaur, T.; Segal, R. Designing Rural Electrification Solutions Considering Hybrid Energy Systems for Papua New Guinea. J. Energy 2017, 110, 1–7. [Google Scholar] [CrossRef]
  10. Zahboune, H.; Zouggar, S.; Krajacic, G.; Varbanov, P.S.; Elhafyani, M.; Ziani, E. Optimal hybrid renewable energy design in autonomous system using Modified Electric System Cascade Analysis and Homer software. Energy Convers. Manag. 2016, 126, 909–922. [Google Scholar] [CrossRef]
  11. Chang, K.-U.; Lin, G. Optimal Design of Hybrid Renewable Energy Systems using Simulation Optimization. Simul. Model. Pract. Theory 2015, 52, 40–51. [Google Scholar] [CrossRef]
  12. Jose, L.; Bernal-Agustin, L.J.; Dufo-Lopez, R. Design and control strategies of PV-Diesel systems using genetic algorithms. J. Sol. Energy 2005, 79, 33–46. [Google Scholar]
  13. Dufo-López, R.; Bernal-Agustín, J.L. Multi-objective design of PV–wind–diesel–hydrogen–battery systems. Renew. Energy 2008, 33, 2559–2572. [Google Scholar] [CrossRef]
  14. Krishan, O.; Sathans. Design and Techno-Economic Analysis of a HRES in a Rural Village. Procedia Comput. Sci. 2018, 125, 321–328. [Google Scholar] [CrossRef]
  15. Kim, H.; Jung, Y.T. Independent solar photovoltaic with Energy Storage Systems (ESS) for rural electrification in Myanmar. J. Renew. Sustain. Energy Rev. 2017, 82 Pt 1, 1187–1194. [Google Scholar] [CrossRef]
  16. Sureshkumar, U.; Manoharan, P.; Ramalakshmi, A. Economic cost analysis of hybrid renewable energy system using HOMER. In Proceedings of the 2012 International Conference on Advances in Engineering, Science and Management (ICAESM), Tamil Nadu, India, 30–31 March 2012; pp. 94–99. [Google Scholar]
  17. Amutha, W.M.; Rajini, V. Cost benefit and technical analysis of rural electrification alternatives in southern India using HOMER. J. Renew. Sustain. Energy Rev. 2016, 62, 236–246. [Google Scholar] [CrossRef]
  18. Goel, S.; Sharma, R. Performance evaluation of standalone, grid connected and hybrid renewable energy systems for rural application: A comparative review. J. Renew. Sustain. Energy Rev. 2017, 78, 1378–1389. [Google Scholar] [CrossRef]
  19. Ghaib, K.; Ben-Fares, F.-Z. A design methodology of stand-alone photovoltaic power systems for rural electrification. Energy Convers. Manag. 2017, 148, 1127–1141. [Google Scholar] [CrossRef]
  20. Chade, D.; Miklis, T.; Dvorak, D. Feasibility Study of Wind-to-Hydrogen System for Artic Remote Locations—Grimsey Island Case Study. Renew. Energy 2015, 76, 204–211. [Google Scholar] [CrossRef]
  21. Hosseinalizadeh, R.; Shakouri, G.H.; Amalnick, S.M.; Taghipour, P. Economic sizing of a hybrid (PV-WT-FC) renewable energy system (HRES) for stand-alone usages by an optimization-simulation model: Case study of Iran. Renew. Sustain. Energy Rev. 2016, 54, 139–150. [Google Scholar] [CrossRef]
  22. Rahil, A.; Gammon, R. Dispatchable Hydrogen Production at the Forecourt for Electricity Demand Shaping. Sustainability 2017, 9, 1785. [Google Scholar] [CrossRef]
  23. Singh, A.; Baredar, P.; Gupta, B. Computational simulation & optimization of a solar, fuel cell and biomass hybrid energy system using HOMER pro software. J. Procedia Eng. 2015, 127, 743–750. [Google Scholar]
  24. Schenbel, C.; Zipperle, T.; Tzscheutschler, P. Modeling of industrial-scale hybrid renewable energy systems (HRES)—The profitability of decentralized supply for industry. Renew. Energy 2017, 108, 52–63. [Google Scholar] [CrossRef]
  25. Sawle, Y.; Gupta, S.C.; Bohre, K.A. Review of hybrid renewable energy systems with comparative analysis of off-grid hybrid systems. J. Renew. Sustain. Energy Rev. 2017, 81 Pt 2, 2217–2235. [Google Scholar] [CrossRef]
  26. Shezan, S.K.A.; Das, N.; Mahmudul, H. Techno-Economic Analysis of a Smart-grid hybrid renewable energy system for Brisbane of Australia. Energy Procedia 2017, 110, 340–345. [Google Scholar] [CrossRef]
  27. Shafiullah, G.M. Hybrid Renewable Energy Integration (HREI) System for Subtropical Climate in Central Queensland, Australia. Renew. Energy 2016, 96, 1034–1053. [Google Scholar] [CrossRef]
  28. Yang, Y.; Bremner, S.; Menictas, C.; Kay, M. Battery Energy Storage System Size Determination in Renewable Energy Systems: A Review. Renew. Sustain. Energy 2018, 91, 109–125. [Google Scholar] [CrossRef]
  29. Rahil, A.; Gammon, R.; Brown, N. Dispatchable hydrogen production at the forecourt for electricity grid balancing. AIP Conf. Proc. 2017, 1814, 020011. [Google Scholar]
  30. Voice of Africa News Forum Remote South Africa Village Gets Electricity for First Time—In 2014. Available online: https://www.voanews.com/a/remote-south-africa-village-gets-electricity-for-first-time----in-2014/1887672.html (accessed on 15 December 2017).
  31. Adaramola, M.S.; Paul, S.S.; Oyewola, O.M. Assessment of Decentralized Hybrid PV Solar-Diesel Power System for Applications in Northern Part of Nigeria. Energy Sustain. Dev. 2014, 19, 72–82. [Google Scholar] [CrossRef]
  32. Makukule, N.A.; Sigauke, C.; Lesaoana, M. Daily electricity demand forecasting in South Africa. Afr. J. Bus. Manag. 2012, 6, 3246–3252. [Google Scholar] [CrossRef]
  33. Holloway, J.P.; Mokilane, P.; Makhany, S.; Magadla, T.; Koen, R. Forecasts for Electricity Demand in South Africa 2014–2050 Using the CSIR Sectoral Regression Model; Project Report Eskom; Council for Scientific and Industrial Research (CSIR): Pretoria, South Africa, 2016. [Google Scholar]
  34. University of Johannesburg Gwakwani, the Forgotten People. Community Engagement Project. Available online: https://gwakwanielectrifyingaforgottenvillageinlimpopowordpress.files,wordpress.com/2016/05/gwakwani-project-presentation.pdf (accessed on 15 December 2017).
  35. Belfkira, R.; Zhang, L.; Barakat, G. Optimal sizing study of hybrid wind/PV/diesel power generation unit. J. Sol. Energy 2011, 85, 100–110. [Google Scholar] [CrossRef]
  36. Dufo-Lopez, R.; Bernal-Agustin, J.L.; Yusta-Loyo, J.M.; Dominguez-Navarro, J.A.; Ramirez-Rosado, I.J.; Lujano, J.; Aso, I. Multi-objective optimization minimizing cost and life cycle emissions of stand-alone PV-wind-diesel systems with batteries storage. J. Appl. Energy 2011, 88, 4033–4041. [Google Scholar] [CrossRef]
  37. Yilmaz, S.; Dincer, F. Optimal Design of Hybrid PV-Diesel-Battery Systems for Isolated Lands: A Case Study for Kilis, Turkey. Renew. Sustain. Energy Rev. 2017, 77, 344–352. [Google Scholar] [CrossRef]
  38. Mavroyeoryos, K.; Engonopoulos, I.; Tyralis, H.; Dimitriadis, P.; Koutsoyiannis, D. Simulation of Electricity Demand in A Remote Island for Optimal Planning of the Hybrid Renewable Energy System. Energy Procedia 2017, 125, 435–442. [Google Scholar] [CrossRef]
  39. Lao, C.; Chungpaibulpatana, S. Techno-economic analysis of hybrid system for rural electrification in Cambodia. Energy Procedia 2017, 138, 524–529. [Google Scholar] [CrossRef]
  40. Mamaghani, H.A.; Escandon, A.A.S.; Najafi, B.; Shirazi, A.; Rinaldi, F. Techno-economic feasibility of photovoltaic, wind, diesel and hybrid electrification systems for off-grid rural electrification in Colombia. J. Renew. Energy 2016, 97, 292–305. [Google Scholar] [CrossRef]
  41. Shezan, S.K.A.; Julai, S.; Kibria, M.A.; Ullah, K.R.; Saidur, R.; Chong, W.T.; Akikur, R.K. Performance Analysis of an Off-grid Wind-PV-Diesel-Battery Hybrid Energy System feasible for Remote Areas. J. Clean. Prod. 2016, 125, 121–132. [Google Scholar] [CrossRef]
  42. Sawle, Y.; Gupta, S.C.; Bohre, A.K. Review of Hybrid Renewable Energy Systems with Comparative Analysis of Off-Grid Hybrid System. Renew. Sustain. Energy Rev. 2018, 81, 2217–2235. [Google Scholar] [CrossRef]
  43. Olatomiwa, L.; Mekhilef, S.; Huda, A.S.N.; Ohunakin, S.O. Economic evaluation of hybrid energy systems for rural electrification in six geo-political zones of Nigeria. J. Renew. Energy 2015, 83, 435–446. [Google Scholar] [CrossRef]
Figure 1. Yearly solar irradiance pattern for Gwakwani area.
Figure 1. Yearly solar irradiance pattern for Gwakwani area.
Environments 05 00057 g001
Figure 2. Housing and agriculture activities in Gwakwani village. (a) Cross section of Gwakwani village; (b) Cross section of agricultural farm.
Figure 2. Housing and agriculture activities in Gwakwani village. (a) Cross section of Gwakwani village; (b) Cross section of agricultural farm.
Environments 05 00057 g002
Figure 3. Hourly demand for Gwakwani based on the aforementioned devices.
Figure 3. Hourly demand for Gwakwani based on the aforementioned devices.
Environments 05 00057 g003
Figure 4. Block diagram of autonomous hybrid PV/battery storage system.
Figure 4. Block diagram of autonomous hybrid PV/battery storage system.
Environments 05 00057 g004
Figure 5. Block diagram of autonomous hybrid PV/diesel generator system.
Figure 5. Block diagram of autonomous hybrid PV/diesel generator system.
Environments 05 00057 g005
Figure 6. Block diagram of autonomous hybrid PV/diesel generator system/battery storage.
Figure 6. Block diagram of autonomous hybrid PV/diesel generator system/battery storage.
Environments 05 00057 g006
Figure 7. (a) Hybrid energy system with battery; (b) Cost summary.
Figure 7. (a) Hybrid energy system with battery; (b) Cost summary.
Environments 05 00057 g007aEnvironments 05 00057 g007b
Figure 8. (a) Hybrid energy system with diesel generator; (b) Cost summary.
Figure 8. (a) Hybrid energy system with diesel generator; (b) Cost summary.
Environments 05 00057 g008
Figure 9. Hybrid energy system with diesel generator and battery.
Figure 9. Hybrid energy system with diesel generator and battery.
Environments 05 00057 g009
Figure 10. Energy production of different sizes of PV systems.
Figure 10. Energy production of different sizes of PV systems.
Environments 05 00057 g010
Figure 11. The sharing cost of each component of the system.
Figure 11. The sharing cost of each component of the system.
Environments 05 00057 g011
Figure 12. Energy production share of diesel generator and PV in each scenario.
Figure 12. Energy production share of diesel generator and PV in each scenario.
Environments 05 00057 g012
Figure 13. Cost summary of the system (1 kW PV).
Figure 13. Cost summary of the system (1 kW PV).
Environments 05 00057 g013
Figure 14. Cost summary of the system (0.8 kW PV).
Figure 14. Cost summary of the system (0.8 kW PV).
Environments 05 00057 g014
Table 1. Electricity consumption devices and its energy consumption.
Table 1. Electricity consumption devices and its energy consumption.
DeviceLoad Point in VillageRating (W)Load (W)Operation Time (h)Load Duration (h)Energy Demand (Wh/day)
Lighting [5,6,9]172034017:00–21:0051700
Mobile Phone [23]17254257:00–10:0031275
Water pumping [34]159811967:00–10:0033588
Total35643196110116563
Table 2. Component parts and characteristics.
Table 2. Component parts and characteristics.
ComponentsSpecificationDescription
PV arraySize1, 0.8, 0.6, 0.4 kW
Capital Cost$300
Replacement Cost$200
O&M Costs$200
Lifetime5 years
Diesel generatorSizeAuto size to Load (500 kW)
Capital Cost$1500
Replacement Cost$200
O&M Costs$200
Lifetime15 years
Fuel Cost1.75 $/L
BatteryTypeLead acid
Nominal Voltage12 V
Nominal Capacity1 kWh
Maximum Capacity83.4 Ah
Round Trip Efficiency80%
Capital Cost$300
Replacement Cost$300
O&M Costs$10 year
Converter Size1 kW
Capital cost$300
O&M cost$60/year
Replacement Cost$300
Efficiency95%
Lifetime16 years
Project Lifetime25 years
Carbon Emission Factor0.957 tCO2/MWh in 2010
Interest Rate5%
Fuel Heating Value45 MJ/kg
Table 3. Cost Summary.
Table 3. Cost Summary.
Annualized CostsCapitalOperatingReplacementSalvageResourceTotal
Generic 1 kWh Lead Acid$417.71$180.00$369.02$50.03$0$916.70
Generic 500 kW Fixed Capacity Genset$11,603$15.00$0$2766$112.50$8965
Generic Flat Plate PV$81.71$704.19$0$2.17$0$783.73
System Converter$61.66$159.42$24.71$6.46$0$239.33
System$12,164$1059$393.73$2824$112.50$10,905
Net Present CostsCapitalOperatingReplacementSalvageResourceTotal
Generic 1 kWh Lead Acid$5400$2327$4771$646.81$0$11,851
Generic 500 kW Fixed Capacity Genset$150,000$193.91$0$35,754$1454$115,894
Generic Flat Plate PV$1056$9103$0$28.12$0$10,132
System Converter$797.12$2061$319.41$83.54$0$3094
System$157,253$13,685$5090$36,512$1454$140,971
Table 4. Summary of the system under different sizes of photovoltaics.
Table 4. Summary of the system under different sizes of photovoltaics.
PV System Size1 kW0.8 kW0.6 kW0.4 kW
unmet demand (kWh/year)1.141.141.141.22
energy price ($/kWh)0.8700.8740.8820.888
total net present cost ($/year)26,916.0327,053.3927,311.9527,484.29
Table 5. Comparison between the operation of the three scenario hybrid energy systems—PV with Battery, PV with diesel generator and PV with both diesel generator and battery.
Table 5. Comparison between the operation of the three scenario hybrid energy systems—PV with Battery, PV with diesel generator and PV with both diesel generator and battery.
CaptionPhotovoltaic with BatteryPhotovoltaic with Diesel Generator without BatteryPhotovoltaic with Both Diesel Generator and Battery
unmet demand (kWh/year)1.1400
energy price ($/kWh)0.8703.344.55
total net present cost ($/year)26,916.03$103,496.20$140,970.60
surplus energy (kWh/year)490215,7353508
CO2 emissions (kg/year)06928295

Share and Cite

MDPI and ACS Style

Madziga, M.; Rahil, A.; Mansoor, R. Comparison between Three Off-Grid Hybrid Systems (Solar Photovoltaic, Diesel Generator and Battery Storage System) for Electrification for Gwakwani Village, South Africa. Environments 2018, 5, 57. https://doi.org/10.3390/environments5050057

AMA Style

Madziga M, Rahil A, Mansoor R. Comparison between Three Off-Grid Hybrid Systems (Solar Photovoltaic, Diesel Generator and Battery Storage System) for Electrification for Gwakwani Village, South Africa. Environments. 2018; 5(5):57. https://doi.org/10.3390/environments5050057

Chicago/Turabian Style

Madziga, Miriam, Abdulla Rahil, and Riyadh Mansoor. 2018. "Comparison between Three Off-Grid Hybrid Systems (Solar Photovoltaic, Diesel Generator and Battery Storage System) for Electrification for Gwakwani Village, South Africa" Environments 5, no. 5: 57. https://doi.org/10.3390/environments5050057

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.