The Evolution and Effect Evaluation of Photovoltaic Industry Policy in China
Abstract
:1. Introduction
2. Design Theory of Evaluation System
3. Research Methodology
3.1. Sorting and Quantifying China’s Photovoltaic Industry Policy
3.1.1. Policy Measure
3.1.2. Policy Type
3.1.3. Policy Strength
3.1.4. Policy Issuing Department
3.2. Data Resource
4. Results
4.1. Evolution of Policy Measures
4.2. Evolution of Policy Types
4.3. Evolution of Policy Strength
4.3.1. Evolution of National-Level Policy Strength
4.3.2. Evolution of Regional Policy Strength
4.4. Evolution of Policy Issuing Departments
4.5. Evaluation of the Effect of Polices
5. Conclusions and Policy Implications
5.1. Conclusions
5.2. Policy Implications
Acknowledgments
Author Contributions
Conflicts of Interest
Appendix A
Value | Strength Description of ‘Guidance Measures’ |
Government incentive | |
5 | Formulate issue-specific preferential policies for the development of the solar PV industry. |
4 | Take coercive measures such as market share policy to develop the PV industry. |
3 | Take the PV industry as a new economic growth point, and have corresponding incentive measures. |
2 | Encourage the development of the solar PV industry. |
1 | Mention the development of solar power or the PV industry. |
Green development | |
5 | Implement the ‘Renewable Energy Law’ conscientiously and formulate relevant supporting policies and regulations; Photovoltaic enterprises and projects should comply with laws and regulations such as environmental conservation, energy-saving management; Photovoltaic manufacturing and power generation projects implement the environmental impact assessment system. |
4 | Take green development as a national sustainable development strategy in the photovoltaic industry-related policies; encourage taking the use of solar energy into energy-development, energy-saving and emission-reduction planning. |
3 | Promote green development in policy, pay attention to the environmental benefits of solar energy utilization, and encourage (through policy) projects to acquire the relevant green testing certification during construction. |
2 | Pay attention to environmental problems in the construction process of photovoltaic manufacturing and power generation projects. |
1 | Mention green development in policy. |
Value | Strength description of ‘supporting measures’ |
Financial support | |
5 | Satisfy two or more of the following financial value items: 2, 3, 4. |
4 | The policy stipulates that financial institutions provide low interest loans and preferential loans to PV equipment manufacturers, PV power stations or PV power generation projects. |
3 | Government or social capital provides guaranteed loans to the PV industry. |
2 | For PV enterprises, PV power plants or PV projects broaden financing channels and develop innovative financial services such as stocks, bonds, funds and private investments. |
1 | Mention support for development of the PV industry using financial measures. |
Fiscal support | |
5 | Satisfy two or more of the following fiscal value items: 2, 3, 4. |
4 | The policy stipulates that the government provides tax allowance and exemption and financial subsidies for PV equipment manufacturers, PV power stations or PV power generation projects. |
3 | The Ministry of Finance provides discounted loans for renewable resources projects. |
2 | Establish special funds for renewable energy or the PV industry, encourage local governments to make supporting financial subsidies policy on the basis of national subsidies. |
1 | Mention support for the development of the PV industry using fiscal or tax policies. |
Technical support | |
5 | Satisfy two or more of the following technical value items: 2, 3, 4. |
4 | Support PV enterprises to carry out technological innovation and build research and development platforms of PV power generation technology; research the key PV technology; encourage cooperative research and production. |
3 | The research and development of PV technology is included in the special projects of technological development. |
2 | Selectively introduce technologies of the PV industry; digestion, absorption and recreation of foreign advanced technologies; promote technical exchanges; encourage enterprises to strengthen international research and development cooperation. |
1 | Mention the research and development of the photovoltaic technology. |
Personnel training | |
5 | Satisfy two or more of the following personnel value items: 2, 3, 4. |
4 | Train professional technology and management personnel by colleges and research institutes; support universities, research institutions and enterprises to establish an international talent introduction and training mechanism. |
3 | Integrate renewable energy knowledge and technology into education, set up related courses in higher or polytechnic schools. |
2 | Explore the establishment of a personnel training system, standardize the training of photovoltaic practitioners. |
1 | Mention photovoltaic related personnel training. |
Grid support | |
5 | Satisfy two or more of the following grid value items: 2, 3, 4. |
4 | Acquire the full grid-connected power of renewable energy generation projects within the coverage of power grid enterprises. |
3 | Set up the subregional benchmark feed-in tariff at PV power stations and establish a subsidy standard for photovoltaic power generation, and a subsidy for PV price, to assure the difference between the average cost of conventional energy and the value added in the sale price is shared by the whole society. |
2 | Formulate a supporting power grid construction plan, coordinate and promote the construction and transformation of supporting grid; Strengthen the grid access and grid connected service of photovoltaic power generation projects. |
1 | Mention solving the photovoltaic power grid problems. |
Information support | |
5 | Satisfy two or more of the following information value items: 2, 3, 4. |
4 | Evaluation of solar energy resources and pre-feasibility study of photovoltaic power plant projects |
3 | The survey and publishing of solar energy information resources. |
2 | Photovoltaic medium- and long-term development planning. |
1 | Develop renewable energy industry development guidance catalogue. |
Project support | |
5 | Satisfy two or more of the following project value items: 2, 3, 4. |
4 | Put forward the construction plan and organize the implementation of a photovoltaic demonstration project. |
3 | Implement quota subsidy policy of unit electricity for photovoltaic power generation projects in the demonstration area. |
2 | Encourage the provinces (district, city) to use financial funds to support the construction of photovoltaic demonstration projects. |
1 | Mention the construction of photovoltaic demonstration projects. |
Value | Strength description of ‘specification measures’ |
Operation specification | |
5 | Satisfy two or more of the following operation value items: 2, 3, 4. |
4 | Inspect and evaluate work of important processes such as the construction operation, equipment operation and parallel operation of photovoltaic power generation projects. |
3 | Record the generating capacity, operational aspect and price of photovoltaic power generation projects. |
2 | Macro guidance for the operation of photovoltaic power generation project. |
1 | Mention the establishment of operation specifications for photovoltaic power generation projects. |
Technical specification | |
5 | Satisfy two or more of the following technical value items: 2, 3, 4. |
4 | Photovoltaic power plant projects need to comply with the technical standard of grid access of photovoltaic power stations; Photovoltaic devices and products must be evaluated by the national inspection and certification institution. |
3 | The construction of photovoltaic standards system and the improvement of the industry standards system. |
2 | The related technical standards of the PV industry. |
1 | Mention the establishment of relevant technical standards for PV equipment or PV power stations. |
Product specification | |
5 | Satisfy two or more of the following product value items: 2, 3, 4. |
4 | The access conditions for the PV product market and the specification of the PV manufacturing industry. |
3 | Information disclosure of the PV products market, and limits on the capacity of PV manufacturing projects. |
2 | Quality specifications, and improve product quality. |
1 | Mention the specification of PV product quality and the PV product manufacturing market. |
Value | Strength description of ‘supervision measures’ |
Quality supervision | |
5 | Satisfy two or more of the following quality value items: 2, 3, 4. |
4 | Set up relevant departments and committees for solar PV products to carry out product quality supervision and inspections of businesses. |
3 | Regularly organize relevant departments to carry out technological quality inspection of PV market products, and focus on examining key technological functions and product quality of PV products. |
2 | Establish an excellent quality supervision system and an effective quality supervision mechanism, strengthen the quality supervision and management of PV project construction. |
1 | Mention the quality supervision of PV market products. |
Operation supervision | |
5 | Satisfy two or more of the following operation value items: 2, 3, 4. |
4 | Establish a renewable energy project information system, and monitor the construction and operation of PV power plant projects in various regions; establish an industrial monitoring and evaluation system. |
3 | Supervise and research the consumptive situation of the grid access, abandoned power, and electricity subsidy settlements. |
2 | Implement information sharing of PV power generation project management and supervision, and strengthen the operation supervision of PV power generation. |
1 | Mention the operation supervision of PV power generation. |
Appendix B
Num | Time | Policy Name | Policy Measure | Policy Department | Policy Type |
---|---|---|---|---|---|
1 | 1994.09.19 | Notice on Issuing the Science and technology development planning of power industry | Guidance measures-GI Supporting measures-TS | MOPI | Measures |
2 | 1995.01.05 | Notice on Issuing the outline for the development of new energy and renewable energy | Guidance measures-GI Supporting measures-IS, FIS, FS, TS | NDRC, SSTC, SETC | Measures |
3 | 1995.12.28 | Electric Power Law of the People’s Republic of China | Guidance measures-GI | NPC | Laws |
4 | 1997.05.27 | Interim Provisions on the management of new energy infrastructure projects | Guidance measures-GI Supporting measures-IS, TS | SPC | Measures |
5 | 1999.01.12 | Notice on further supporting relevant issues on renewable energy development | Guidance measures-GI Supporting measures-FS, FIS, GS | NDRC, MOST | Notices |
6 | 2001.10.10 | Notice on issuing the ‘10th Five-Year Plan’ for the development of new energy and renewable energy industries | Guidance measures-GI Supporting measures-IS, FIS, TS Specification measures-PSP, TSP | SETC | Measures |
7 | 2005.02.28 | Renewable Energy Law of the People’s Republic of China | Guidance measures-GI, GD Supporting measures-IS, TS, PT, GS, FIS, FS Supervision measures-OSU | NPC | Laws |
8 | 2005.03.16 | Notice on organizing the implementation of industrialization projects for the renewable energy and new energy high-tech industry | Supporting measures-TS | NDRC | Notices |
9 | 2005.05.01 | Interim Measures for the administration of Grid Power Price | Supporting measures-GS | NDRC | Measures |
10 | 2005.11.10 | Regulations on the administration of energy efficiency in civil buildings | Guidance measures-GI Supporting measures-TS | MOC | Opinions and Rules |
11 | 2005.11.29 | Circular of the National Development and Reform Commission on Printing and Distributing Catalog for the Guidance of the Industrial Development of Renewable Energy | Supporting measures-IS | NDRC | Notices |
12 | 2005.12.26 | Notice on Issuing the Outline for the long-term Development of science and technology (2006–2020) | Guidance measures-GI | SC | Opinions and Rules |
13 | 2006.01.04 | Notice of the National Development and Reform Commission on Issuing the Trial Measures for the Management of Prices and Allocation of Costs for Electricity Generated from Renewable Energy | Guidance measures-GI Supporting measures-GS | NDRC | Measures |
14 | 2006.01.05 | Notice of the National Development and Reform Commission on Issuing Administrative Provisions on Renewable Energy Power Generation | Supporting measures-GS | NDRC | Opinions and Rules |
15 | 2006.05.11 | Notice on submitting the Application and Demonstration of Renewable Energy in Buildings | Supporting measures-IS | MOF, MOC | Notices |
16 | 2006.05.30 | Notice on Issuing the Interim Measures for the Administration of Special Funds for the Development of Renewable Energy | Guidance measures-GI Supporting measures-FIS | MOF | Measures |
17 | 2006.06.26 | Notice on further doing well the feasibility study report for the Application and Demonstration projects of Renewable Energy in Buildings | Supporting measures-IS | MOC | Notices |
18 | 2006.08.25 | Implementation Opinions on Accelerating the application of renewable energy in buildings | Guidance measures-GI,GD Supporting measures-TS,PS,FIS Specification measures-TSP Supervision measures-OSU | MOC, MOF | Measures |
19 | 2006.09.04 | Interim Measures for the administration of special funds for the applications of renewable energy in buildings | Guidance measures-GI Supporting measures-FIS | MOF, MOC | Measures |
20 | 2007.01.11 | Notice of the National Development and Reform Commission on Issuance of the Interim Measures for Allocation of Income from Surcharges on Renewable Energy Power Prices | Guidance measures-GI Supporting measures-FIS | NDRC | Measures |
21 | 2007.02.13 | Notice on strengthening the administration of the Application and Demonstration of Renewable Energy in Buildings | Supervision measures-OSU | MOF, MOC | Notices |
22 | 2007.04.06 | Notice on organizing the implementation of major industrialization projects for high purity silicon material and high-tech industry | Supporting measures-TS | NDRC | Notices |
23 | 2007.04.28 | Notice on Issuing the ‘11th Five-Year plan’ for the development of high technology industry | Guidance measures-GI Supporting measures-FS, FIS, PT Specification measures-TSP | NDRC | Measures |
24 | 2007.05.23 | Notice on Issuing a comprehensive work plan for energy-conservation and emission-reduction | Guidance measures-GI | SC | Notices |
25 | 2007.06.09 | Notice on Issuing the “11th Five-Year Plan” for the rural economic and social development | Guidance measures-GI | NDRC | Measures |
26 | 2007.07.25 | Regulatory Measures for Grid Enterprises’ Full Purchase of Renewable Energy Electricity | Supporting measures-GS Supervision measures-OSU | SERC | Measures |
27 | 2007.08.31 | Notice on Issuing the medium and long term development plan for renewable energy | Guidance measures-GI,GD Supporting measures-IS, GS, PS, FIS, TS | NDRC | Measures |
28 | 2007.10.28 | Economizing Energy Law of the People’s Republic of China (2007 Amendment) | Guidance measures-GI | NPC | Laws |
29 | 2007.10.31 | Notice on the issuing the Guiding Catalogue for foreign investment(2007 Amendment) | Guidance measures-GI Supporting measures-FS | GAC | Notices |
30 | 2008.03.03 | Notice on issuing the ‘11th Five-Year Plan’ for the development of renewable energy | Guidance measures-GI,GD Supporting measures-IS, GS, TS, FIS Specification measures-TSP Supervision measures-QS | NDRC | Measures |
31 | 2008.06.02 | Notice on organizing the declaring of application demonstration projects of renewable energy in buildings in 2008 | Supporting measures-PS | MOF, MOHURD | Notices |
32 | 2008.06.10 | Notice on inspecting the Grid Enterprises’ Full Acquisition of Renewable Energy Electricity and the implementation of renewable energy tariff policies | Supervision measures-OSU | SERC | Notices |
33 | 2008.07.15 | Notice on Issuing the work arrangements for energy-conservation and emission-reduction in 2008 | Guidance measures-GI | SC | Notices |
34 | 2008.08.01 | Regulations on energy conservation for civil buildings | Guidance measures-GI | SC | Regulations and Orders |
35 | 2008.11.11 | Notice on renewable energy price subsidies and quota trading schemes from October 2007 to June 2008 | Guidance measures-GI Supporting measures-FIS, GS | NDRC, SERC | Notices |
36 | 2009.03.23 | Implementation Opinions on accelerating the applications of solar photovoltaic in buildings | Guidance measures-GI Supporting measures-PS, FIS Specification measures-TSP | MOF, MOHURD | Measures |
37 | 2009.03.23 | Interim Measures on the administration of financial subsidies for the application of solar photovoltaic in buildings | Guidance measures-GI Supporting measures-FIS,GS | MOF | Measures |
38 | 2009.03.31 | Notice on the authorization of the national quality supervision and Inspection Center for solar photovoltaic products | Supervision measures-QS | CNCA | Notices |
39 | 2009.07.16 | Interim Measures on the administration of government subsidies of golden sun demonstration project | Supporting measures-FIS, GS Specification measures-OS Supervision measures-OSU | MOF, MOST, NEA | Measures |
40 | 2009.07.19 | Notice on issuing the work arrangements for energy-conservation and emission-reduction in 2009 | Guidance measures-GI Supporting measures-TS | SC | Notices |
41 | 2009.07.22 | Notice on the publication of the catalogue of technologies and products for import (2009) | Supporting measures-TS, FIS | NDRC, MOF, MOFCOM | Notices |
42 | 2009.09.26 | Notice on retraining excess capacity in some industries and repeated construction and guiding the healthy development of the industry | Guidance measures-GD Specification measures-PSP | SC | Opinions and Rules |
43 | 2009.12.07 | Notice on the establishment of standard propulsion group for photovoltaic power generation and industrialization | Specification measures-TSP | SAC | Notices |
44 | 2009.12.11 | Notice on the establishment of national solar photovoltaic products quality supervision and inspection center | Supervision measures-QS | AQSIQ, CNCA | Notices |
45 | 2009.12.26 | Renewable Energy Law of the People’s Republic of China (2009 Amendment) | Guidance measures-GI, GD Supporting measures-IS, TS, PT, GS, FIS, FS Supervision measures-OSU | NPC | Laws |
46 | 2009.12.31 | Notice on Issuing the catalogue of preferential enterprise income tax for environmental protection and energy conservation and water saving projects (for Trial Implementation) | Supporting measures-FIS | MOF, NDRC, SAT | Notices |
47 | 2010.04.12 | Notice on organizing the declaring of application demonstration projects of solar photovoltaic in buildings in 2010 | Supporting measures-PS | MOF, MOHURD | Notices |
48 | 2010.05.07 | Opinions on encouraging and guiding the healthy development of private investment | Guidance measures-GI Supporting measures-FS | SC | Opinions and Rules |
49 | 2010.08.20 | Notice on renewable energy price subsidies and quotas trading scheme from July to December in 2009 | Guidance measures-GI Supporting measures-FIS, GS | NDRC, SERC | Notices |
50 | 2010.09.03 | Notice on organizing the training courses for new energy and renewable energy technologies | Supporting measures-PT | MOHURD | Notices |
51 | 2010.09.21 | Notice on strengthening the construction management of the golden sun demonstration project and solar photovoltaic building demonstration project | Guidance measures-GI Supporting measures-PS, FIS, GS Specification measures-TSP Supervision measures-OSU | MOF, MOST, MOHURD, NEA | Notices |
52 | 2010.10.10 | Decision on accelerating the cultivation and development of strategic emerging industries | Guidance measures-GI Supporting measures-GS | SC | Opinions and Rules |
53 | 2010.12.28 | Notice on the authorization of the national photovoltaic products quality supervision and Inspection Center in Chengdu | Supervision measures-QS | CNCA | Notices |
54 | 2011.01.27 | Notice on organizing the implementation of integrated demonstration of solar photovoltaic building applications | Guidance measures-GI Supporting measures-FIS Specification measures-TSP Supervision measures-OSU | MOF, MOHURD | Notices |
55 | 2011.07.24 | Notice on improving the feed-in tariff policy of solar photovoltaic power generation | Supporting measures-GS | NDRC | Notices |
56 | 2011.08.12 | Notice on strengthening the follow-up work management of solar photovoltaic building application demonstration | Supervision measures-OSU | MOF, MOHURD | Notices |
57 | 2011.11.29 | Notice of the General Office of the Ministry of Finance and the General Office of the Ministry of Housing and Urban-Rural Development on Organizing the Work of demonstrations for Application of Renewable Energy in Buildings in 2012 | Supporting measures-PS | MOF, MOHURD | Notices |
58 | 2012.01.01 | Notice of the Ministry of Finance, the National Development and Reform Commission and the National Energy Administration on Issuing the Interim Measures for the Administration of the Collection and Use of the Renewable Energy Development Fund | Guidance measures-GI Supporting measures-FIS | MOF, NDRC, NEA | Measures |
59 | 2012.02.13 | Notice on organizing the implementation of demonstration projects of the state organs’ rooftop photovoltaic power generation | Supporting measures-PS | GOASC | Notices |
60 | 2012.03.14 | Notice of the Ministry of Finance, National Development and Reform Commission, and National Energy Administration on Issuing the Interim Administrative Measures for Tariff Premium Subsidy Funds for Renewable Energy | Guidance measures-GI Supporting measures-FIS, GS | MOF, NDRC, NEA | Measures |
61 | 2012.03.27 | Notice on Issuing the “12th Five-Year Plan” special plan for the development of solar power generation technology | Guidance measures-GI Supporting measures-IS, TS, PT, FIS, FS, PS Specification measures-TSP | MOST | Measures |
62 | 2012.07.07 | Notice on Issuing the “12th Five-Year Plan” for the development of solar power generation | Guidance measures-GD Supporting measures-PS, TS, IS, GS Specification measures-OS, TSP, PSP Supervision measures-OSU | NEA | Measures |
63 | 2012.07.09 | Notice on Issuing the ‘12th Five-Year Plan” for the development of national strategic emerging industry | Supporting measures-IS, TS, PS | SC | Opinions and Rules |
64 | 2012.09.14 | Notice on declaring distributed photovoltaic power generation demonstration area | Guidance measures-GI Supporting measures-FIS, GS, PS, TS | NEA | Notices |
65 | 2012.11.20 | Notice on Issuing the scheme of quality supervision system for renewable energy power generation projects | Supervision measures-QS | NEA | Notices |
66 | 2012.11.26 | Notice on renewable energy price subsidies and quota trading schemes form October 2010 to April 2011 | Guidance measures-GI Supporting measures-FIS, GS | NDRC, SERC | Notices |
67 | 2012.12.12 | Notice on the pre allocation of additional subsidies for renewable energy prices in 2012 | Guidance measures-GI Supporting measures-FIS | MOF | Notices |
68 | 2013.03.29 | Notice on the Ministry of Finance on Allocating Additional Subsidies for Renewable Energy Electricity Prices | Guidance measures-GI Supporting measures-FIS | MOF | Notices |
69 | 2013.07.04 | Opinions on promoting the healthy development of photovoltaic industry | Guidance measures-GI Supporting measures-GS, FIS, FS, TS, PT Specification measures-TSP Supervision measures-OSU | SC | Opinions and Rules |
70 | 2013.07.22 | Notice on developing the supervision research for the consumption situation of wind power and solar photovoltaic power | Supervision measures-OSU | NEA | Notices |
71 | 2013.07.24 | Notice on the issues of implementing the subsidy policy according to the amount of electricity in the distributed photovoltaic power generation | Guidance measures-GI Supporting measures-FIS | MOF | Notices |
72 | 2013.08.22 | Opinions on supporting the financial Services in distributed Photovoltaic Generation | Guidance measures-GI Supporting measures-FS | NEA, CDB | Measures |
73 | 2013.08.26 | Notice on promoting the healthy development of PV industry by using price leverage | Guidance measures-GI Supporting measures-GS, FIS, GS Specification measures-OS | NDRC | Notices |
74 | 2013.08.29 | Interim Measures for the administration of photovoltaic power station projects | Guidance measures-GI Supporting measures-IS, GS, FIS Specification measures-TSP Supervision measures-QS,OSU | NEA | Measures |
75 | 2013.09.10 | Notice of the Ministry of Finance on Adjusting the Standards for the Collection of Surcharges on Renewable Energy Power Prices | Guidance measures-GI Supporting measures-FIS | MOF | Notices |
76 | 2013.09.23 | Notice of the Ministry of Finance and the State Administration of Taxation on the Value-added Tax Policy for Photovoltaic Power Generation | Guidance measures-GI Supporting measures-FIS | MOF, SAT | Notices |
77 | 2013.10.11 | Interim Measures for the administration of the norms announcement of the photovoltaic manufacturing industry | Guidance measures-GD Specification measures-TSP, PSP | MIIT | Measures |
78 | 2013.11.18 | Interim Measures for the administration of distributed generation projects | Guidance measures-GI Supporting measures-GS, FIS Specification measures-TSP Supervision measures-OSU | NEA | Measures |
79 | 2013.11.19 | Notice on the issues of the exemption of government funds for the spontaneous use of distributed photovoltaic power generation | Guidance measures-GI Supporting measures-FIS | MOF | Notices |
80 | 2013.11.26 | Notice of the National Energy Administration on Issuing the Interim Measures for the Administration of Distributed Power Generation | Supporting measures-GS Supervision measures-OSU | NEA | Measures |
81 | 2014.01.17 | Notice on Issuing the additional construction scale of photovoltaic power generation in 2014 | Supporting measures-TS, GS Supervision measures-OSU | NEA | Notices |
82 | 2014.02.08 | Implementation opinions on strengthening the work of product testing and certification | Specification measures-TSP Supervision measures-QS | CNCA, NEA | Measures |
83 | 2014.02.19 | Notice on organizing the recommendation of key projects in the photovoltaic industry in 2014 | Guidance measures-GI Supporting measures-FS, TS, PS | MIIT, CDB | Notices |
84 | 2014.03.10 | Notice on Issuing the work plan for strengthening the information monitoring of photovoltaic industry | Specification measures-OS Supervision measures-OSU | NEA | Notices |
85 | 2014.04.21 | Report on the work of energy conservation and emission reduction | Guidance measures-GI Supporting measures-GS | SC | Notices |
86 | 2014.05.04 | Notice on the authorization of the national quality supervision and Inspection Center for solar photovoltaic products in Guangdong | Supervision measures-QS | CNCA | Notices |
87 | 2014.05.20 | Notice on strengthening the information statistics and submission of photovoltaic power generation projects | Supervision measures-OSU | NEA | Notices |
88 | 2014.06.07 | Notice on Issuing the energy development strategy action plan from 2014 to 2020 | Guidance measures-GI Supporting measures-IS, GS | SC | Notices |
89 | 2014.07.01 | Notice on Issuing grid scheduling agreement model text of wind and photovoltaic power station | Specification measures-OS | NEA, SAIC | Notices |
90 | 2014.09.02 | Notice of the National Energy Administration on Further Implementing Relevant Policies on Distributed Photovoltaic Power Generation | Guidance measures-GI,GD Supporting measures-IS, FIS, FS, GS, PS Specification measures-TSP Supervision measures-OSU | NEA | Notices |
91 | 2014.09.10 | Notice on the establishment of the national solar photovoltaic products quality supervision and Inspection Center in Guangdong | Supervision measures-QS | AQSIQ, CNCA | Notices |
92 | 2014.10.09 | Notice on Further Strengthening the Construction and Operation Management for Photovoltaic Power Stations | Guidance measures-GI,GD Supporting measures-PS, GS, FS Specification measures-TSP Supervision measures-OSU | NEA | Notices |
93 | 2014.10.11 | Notice on the implementation of the work plan for the photovoltaic poverty alleviation projects | Guidance measures-GI Supporting measures-FIS | NEA, SC | Notices |
94 | 2014.10.15 | Notice on increasing the construction scale of power generation in Xinjiang autonomous region and Xinjiang production and Construction Corps in 2014 | Supporting measures-GS | NEA | Notices |
95 | 2014.10.28 | Notice on regulating the order of investment and development of photovoltaic power station | Guidance measures-GD Supporting measures-IS Specification measures-OS Supervision measures-OSU | NEA | Notices |
96 | 2014.11.21 | Notice on promoting the construction of distributed PV application demonstration area | Guidance measures-GI Supporting measures-FS, GS, PS, IS Specification measures-TSP,OS Supervision measures-OSU | NEA | Notices |
97 | 2014.12.16 | Notice on do a good job of connecting the network of Photovoltaic power generation projects in 2014 | Supporting measures-GS Supervision measures-OSU | NEA | Notices |
98 | 2014.12.16 | Notice on doing well the preparation work of ‘13th Five-Year Plan’ for the solar energy development | Guidance measures-GD Supporting measures-PS, IS | NEA | Notices |
99 | 2014.12.30 | Opinions of the Ministry of Industry and Information Technology on Further Optimizing the Market Environment for the Merger and Restructuring of Photovoltaic Enterprises | Guidance measures-GI Supporting measures-TS, FIS, FS Specification measures-PSP | MIIT | Measures |
100 | 2015.01.09 | Notice on the establishment of photovoltaic product testing and certification technical committee | Specification measures-TSP | CNCA,NEA | Notices |
101 | 2015.03.15 | Opinions on further deepening the reform of electric power system | Supporting measures-GS Specification measures-TSP | SC | Opinions and Rules |
102 | 2015.03.16 | Notice on Issuing the 2015 implementation plan for the construction of photovoltaic power generation | Guidance measures-GI Supporting measures-FIS, GS Supervision measures-OSU | NEA | Notices |
103 | 2015.03.20 | Guiding opinions on improving the operation of electric power and promoting the development of clean energy | Supporting measures-GS Supervision measures-OSU | NDRC, NEA | Measures |
104 | 2015.03.31 | Notice on carrying out the declaration of the norms of the photovoltaic manufacturing industry | Specification measures-PSP | MIIT | Notices |
105 | 2015.04.02 | Notice on Issuing the Interim Measures for the Administration of Special Funds for the Development of Renewable Energy | Guidance measures-GI Supporting measures-FIS | MOF | Measures |
106 | 2015.04.07 | Notice on carrying out the quality inspection for the national photovoltaic power generation project | Specification measures-TSP, OS | NEA | Notices |
107 | 2015.04.13 | Guiding opinions on further improving the “13th Five-Year” planning work for the development of renewable energy | Supporting measures-IS | NEA | Measures |
108 | 2015.04.20 | Notice on Issuing the standardization creation specification of safety production of photovoltaic enterprises | Specification measures-OS | NEA, SAWS | Notices |
109 | 2015.06.01 | Opinions on promoting the application of advanced photovoltaic technology products and industrial upgrading | Guidance measures-GI Supporting measures-FIS, TS Specification measures-PSP, TSP Supervision measures-QS, OSU | NEA,MIIT,CNCA | Measures |
110 | 2015.09.06 | Notice on the establishment of the International Electro-technical Commission’s mutual recognition system for renewable energy equipment certification | Specification measures-TSP | CNCA | Notices |
111 | 2015.09.08 | Notice on Issuing the statutes of photovoltaic products inspection and certification technical committee | Specification measures-TSP | CNCA | Notices |
112 | 2015.09.24 | Notice on increasing the construction scale of photovoltaic power stations in some areas in 2015 | Supporting measures-GS | NEA | Notices |
113 | 2015.09.28 | Notice on implementing the information management of renewable energy power generation projects | Supervision measures-OSU | NEA | Notices |
114 | 2015.10.28 | Notice on carrying out the nearest consumptive pilot for renewable energy | Supervision measures-OSU | NDRC | Notices |
115 | 2015.11.27 | Notice on issues of the use of forest land in the construction of photovoltaic power stations | Guidance measures-GD | SFA | Notices |
116 | 2015.12.02 | Notice on issuing the control index of land use for photovoltaic power station project | Specification measures-OS | MOLR | Notices |
117 | 2015.12.22 | Notice on improving the benchmark price policy of onshore wind and photovoltaic power generation | Supporting measures-GS Specification measures-OS | NDRC | Notices |
118 | 2016.01.01 | Notice of the Ministry of Finance and the National Development and Reform Commission on Issues concerning Raising the Collection Rate of the Renewable Energy Development Fund | Guidance measures-GI Supporting measures-FIS | MOF, NDRC | Notices |
119 | 2016.01.11 | Notice on doing well the connection between PV power generation project and national renewable energy information management platform | Supervision measures-OSU | NEA | Notices |
120 | 2016.02.05 | Notice on doing well the consumptive work for the renewable energy in northeast, north and northwest Regions | Supervision measures-OSU | NEA | Notices |
121 | 2016.02.29 | Guiding opinions on establishing the guiding system for the development and utilization of renewable energy | Supporting measures-IS Supervision measures-OSU | NEA | Measures |
122 | 2016.03.23 | Opinions on implementing the poverty alleviation work of photovoltaic power generation | Guidance measures-GI Supporting measures-FS, FIS, GS Specification measures-TSP Supervision measures-OSU | NDRC, SC, NEA | Measures |
123 | 2016.03.24 | Notice of the National Development and Reform Commission on Issuing the Measures for the Administration of the Guaranteed Buyout of Electricity Generated by Renewable Energy Resources | Supporting measures-GS Supervision measures-OSU | NDRC | Measures |
124 | 2016.04.14 | Notice on Issuing the statistical report forms of renewable energy utilization | Supervision measures-OSU | NEA | Notices |
125 | 2016.05.27 | Notice on doing well the full acquisition management of wind power and photovoltaic power generation | Supporting measures-GS Specification measures-OS | NDRC, NEA | Notices |
126 | 2016.06.03 | Notice on Issuing the construction implementation plan of photovoltaic power generation in 2016 | Guidance measures-GI Supporting measures-FIS Specification measures-TSP Supervision measures-OSU | NEA | Notices |
127 | 2016.07.14 | Trial measures on the preferential generation for the renewable energy peak unit | Supervision measures-OSU | NDRC, NEA | Measures |
128 | 2016.07.25 | Notice of the Ministry of Finance and the State Administration of Taxation on Continuing the Implementation of the Value-added Tax Policy for Photovoltaic Power Generation | Guidance measures-GI Supporting measures-FIS | MOF,SAT | Notices |
129 | 2016.10.17 | Notice on issuing the first batch of photovoltaic poverty alleviation projects | Guidance measures-GI, GD Supporting measures-FS, GS Supervision measures-OSU | NEA, SC | Notices |
130 | 2016.10.27 | Notice on Issuing the 13th Five-Year work plan for controlling greenhouse gas emissions | Guidance measures-GI | SC | Notices |
131 | 2016.11.29 | Notice on issuing the “13th Five-Year Plan” for the development of national strategic emerging industry | Guidance measures-GI Supporting measures-IS | SC | Opinions and Rules |
132 | 2016.12.08 | Notice on issuing the “13th Five-Year Plan” for the solar development | Guidance measures-GD Supporting measures-PS, TS, PT, GS Specification measures-OS, TSP Supervision measures-QS, OSU | NEA | Opinions and Rules |
133 | 2016.12.10 | Notice on issuing the “13th Five-Year Plan” for the development of renewable energy | Guidance measures-GD Supporting measures-IS, PS, TS, GS Specification measures-TSP Supervision measures-OSU | NDRC | Opinions and Rules |
134 | 2016.12.26 | Notice on adjusting the benchmark price of onshore wind and photovoltaic power generation | Guidance measures-GI Supporting measures-FIS, GS Specification measures-OS | NDRC | Notices |
Beijing | |||||
135 | 2009.12.27 | Guidance of accelerate the development and utilization of solar energy to promote industrial development | Guidance measures-GI, GDSupporting measures-FS, TS, PS Specification measures-TSP Supervision measures-OSU | DRC | Measures |
136 | 2011.01.31 | Notice on continue to declare solar photovoltaic building integration demonstration project application | Guidance measures-FIS Supporting measures-PS Specification measures-TSP | CC | Notices |
137 | 2012.01.31 | Notice on 2012 Beijing solar photovoltaic building demonstration | Supporting measures-FIS, PS Specification measures-TSP | CC | Notices |
138 | 2012.11.12 | Notice on continue to declare solar photovoltaic building integration demonstration project application | Supporting measures-FIS, PSSpecification measures-TSP | CC | Notices |
139 | 2014.7.25 | Notice on Issuing the Interim Measures for management of distributed photovoltaic power generation project in Beijing | Supporting measures-PS | DRC | Notices |
140 | 2015.8.18 | Notice on the issuance of Beijing distributed PV incentive fund management approach | Supporting measures-GS | DRC | Notices |
Tianjin province | |||||
141 | 2011.02.12 | Notice on price subsidies for renewable energy projects and additional funds advance | Supporting measures-GS | PB | Notices |
142 | 2015.10.22 | Notice on Further Regulating the Construction and Management of Photovoltaic Power Generation Projects | Supporting measures-GS Specification measures-OS Supervision measures-OSU | DRC | Notices |
Hebei province | |||||
143 | 2010.10.22 | Guiding opinions on promoting the development of photovoltaic industry | Guidance measures-GI, GDSupporting measures-FIS, FS, TS, GS, IS, PT Specification measures-TSP | PG | Measures |
144 | 2011.08.24 | Notice on Laiyuan Xintian Wind Energy Ltd solar power tariff | Supporting measures-GS | PB | Notices |
145 | 2015.05.22 | Notice on the construction of photovoltaic power generation project | Supporting measures-GS | DRC | Notices |
146 | 2015.07.07 | Notice on price policy in our province distributed photovoltaic application key demonstration village project | Supporting measures-GS | PB | Notices |
147 | 2015.08.12 | The guidance on further regulating the photovoltaic power generation project management | Guidance measures-GI Supporting measures-FIS, GS Specification measures-OS Supervision measures-OSU | DRC | Measures |
148 | 2015.11.12 | Notice on Issuing the action plan for the construction of renewable energy demonstration zone in Hebei, Zhangjiakou (2015–2017 years) | Supporting measures-IS, FIS, FS, PT | PG | Notices |
149 | 2015.12.18 | Notice on strengthening the construction of solar photovoltaic application work | Guidance measures-GI, GD Supporting measures-FIS Specification measures-TSP Supervision measures-OSU | CC | Notices |
150 | 2016.04.29 | Notice on poverty alleviation and development on the implementation of PV poverty alleviation program 2016 | Supporting measures-PS | DRC | Notices |
151 | 2016.10.14 | Notice on the issuance of Hebei Province renewable energy development “13th Five-Year Plan” | Supporting measures-IS, PS, TS, GS Supervision measures-OSU Specification measures-TSP Guidance measures-GD, GI | DRC | Notices |
152 | 2016.10.19 | Notice on issuing the first batch of ordinary grid photovoltaic power generation project plan in 2016 | Supporting measures-GS | DRC | Notices |
153 | 2016.12.29 | Notice on the third batch of ordinary grid photovoltaic power generation project plan | Supporting measures-GS | DRC | Notices |
Shanxi province | |||||
154 | 2010.10.27 | Notice on approving the establishment of a notice of photovoltaic materials and Devices Engineering Technology Research Center | Supporting measures-TS | Provincial Department of science and technology | Notices |
155 | 2014.02.08 | The implementation opinions on promoting the healthy development of the PV industry | Supporting measures-FIS, FS, GS, PS Specification measures-TSP, PSP | PG | Measures |
156 | 2016.04.18 | Notice on issuing related to photovoltaic poverty alleviation project in 2016 | Supporting measures-PS | PG | Notices |
157 | 2016.06.17 | Guiding opinions on concerning photovoltaic poverty alleviation work | Guidance measures-GI Supporting measures-PS, FIS, FS Specification measures-TSP Supervision measures-OSU | PG | Measures |
158 | 2016.08.25 | Notice on issuing indicators of photovoltaic power generation projects | Supporting measures-GS | DRC | Notices |
Nei Monggol | |||||
159 | 2013.12.31 | Notice on the issuance of the Inner Mongolia Autonomous Region 2020 2013—solar power development plan | Supporting measures-IS, GSSupervision measures-OSU | DRC | Notices |
160 | 2014.08.06 | The opinions on promoting the development of photovoltaic industry | Supporting measures-TS, PSSpecification measures-PSP | PG | Measures |
161 | 2015.03.13 | Guidance on the establishment of renewable energy protection of the acquisition of long-term mechanism | Guidance measures-GI Supporting measures-GS | PG | Measures |
162 | 2016.01.20 | Notice issued on the implementation of district 2015 Annual Supplement of photovoltaic power generation index construction scheme and relevant problems in construction projects | Specification measures-OS Supervision measures-OSU | DRC | Notices |
163 | 2016.07.14 | Notice on Further Strengthening the management of photovoltaic power generation projects in our region | Specification measures-OS | DRC | Notices |
164 | 2016.07.28 | Notice on the issuance of the Inner Mongolia Autonomous Region ordinary photovoltaic power plant project notice Competitive Allocation Trial Measures | Specification measures-OS, TSP | DRC | Notices |
165 | 2016.09.13 | Guidance on the implementation of the poverty relief work of photovoltaic power generation | Guidance measures-GI Supporting measures-FS, GS, PS Specification measures-TSP Supervision measures-QS | PG | Measures |
Liaoning province | |||||
166 | 2011.11.06 | Notice on the implementation of solar photovoltaic subsidies | Supporting measures-GS | DRC | Notices |
167 | 2016.02.22 | Notice on implementation policy of tariff and tariff subsidy for distributed photovoltaic power generation projects | Supporting measures-GS | PB | Notices |
Jilin province | |||||
168 | 2012.06.13 | Notice on printing and distributing the measures for quality acceptance of renewable energy construction application projects in Jilin province | Specification measures-OS | CC | Notices |
Heilongjiang province | |||||
169 | 2008.01.18 | Heilongjiang Province, rural development and utilization of renewable energy regulations | Guidance measures-GD Supporting measures-FIS, FS, TS, PT Specification measures-PSP, TSP | PG | Opinions and Rules |
170 | 2015.04.17 | Regulations on the development and utilization of renewable energy in rural areas of Heilongjiang (2015 Amendment) | Guidance measures-GD Supporting measures-FIS, FS, TS, PT Specification measures-PSP, TSP | PG | Opinions and Rules |
171 | 2016.06.21 | Notices on the issuance of 2016 photovoltaic power plant project in Heilongjiang Province ordinary competitive allocation scheme | Specification measures-OS | DRC | Notices |
Shanghai province | |||||
172 | 2010.11.18 | Notice on the allocation of renewable energy and new energy support funds for the city in 2010 | Supporting measures-FIS | DRC | Notices |
173 | 2013.11.22 | Notice on promoting the healthy development of the PV industry on the implementation plan | Supporting measures-FS; TS; PT Specification measures-TSP | PG | Notices |
174 | 2014.04.04 | Notice on carrying out the declaration of scale application construction scale of distributed photovoltaic power generation in 2014 | Supporting measures-GS | DRC | Notices |
175 | 2014.07.01 | Notice on issued 2014 annual distributed PV annual new construction scale | Supporting measures-GS | DRC | Notices |
176 | 2014.10.27 | Notice on printing and distributing the regulations for the management of photovoltaic power generation projects in Shanghai | Specification measures-OS Supervision measures-OSU | DRC | Notices |
177 | 2015.07.06 | Notice on issued 2015 annual implementation plan of the construction of photovoltaic power generation | Supporting measures-GS | DRC | Notices |
178 | 2016.11.02 | Notice on Issuing the measures for supporting the special funds for the development of renewable energy and new energy in Shanghai (2016 Revision) | Supporting measures-FIS, GS | DRC | Notices |
Jiangsu procvince | |||||
179 | 2009.06.19 | Notice on Forwarding the provincial development and Reform Commission of Jiangsu province photovoltaic power generation propulsion views | Guidance measures-GI Supporting measures-FIS; FS; PT; PS; TS; Specification measures-TSP | DRC | Notices |
180 | 2009.10.26 | Notice on strengthening the construction of solar photovoltaic demonstration project management. | Specification measures-TSP Supervision measures-QS | CC | Notices |
181 | 2012.06.08 | Notice informed the Provincial Energy Bureau on photovoltaic power generation to continue to support the policy advice | Guidance measures-GI Supporting measures-GS; FS; TS | DRC | Notices |
182 | 2014.08.06 | Jiangsu Provincial Price Bureau on 2014 to determine the second number of grid connected photovoltaic power generation project tariff notice | Supporting measures-GS | PB | Notices |
183 | 2014.10.20 | Jiangsu Provincial Price Bureau on 2014 to determine the third number of grid connected photovoltaic power generation project tariff notice | Supporting measuresGS | PB | Notices |
184 | 2014.10.25 | The opinions on promoting the healthy development of distributed PV | Guidance measures-GI Supervision measures-OSU Specification measures-OS | DRC | Notices |
185 | 2015.06.05 | Notice on Pizhou Hu Wei photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
186 | 2015.07.31 | Notice on Jiangsu Longchang photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
187 | 2015.10.09 | Price Bureau of Jiangsu province to determine the Funing LIREN and other photovoltaic power generation projects on the electricity price notice | Supporting measures-GS | PB | Notices |
188 | 2015.11.25 | Notice of Jiangsu Provincial Price Bureau on determining the tariff of photovoltaic power generation projects | Supporting measures-GS | PB | Notices |
189 | 2015.12.28 | Notice on Jiangsu Haidong photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
190 | 2016.01.19 | Notice on Jiangsu coastal GCL photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
191 | 2016.02.17 | Notice on the determination of Baoying blessing the new photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
192 | 2016.10.13 | Notice of Jiangsu Provincial Price Bureau on the determination of Guofeng new energy photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
193 | 2016.11.28 | Notice of Jiangsu Provincial Price Bureau on Danyang Corning photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
194 | 2016.12.13 | Notice of Jiangsu Provincial Price Bureau on Danyang Corning photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
Zhejiang province | |||||
195 | 2012.05.30 | Regulations for promoting the development and utilization of renewable energy in Zhejiang | Guidance measures-GI, GD Supporting measures-FIS, FS, GS, IS | PG | Opinions and Rules |
196 | 2013.09.26 | Implementation opinions on further accelerating the application of photovoltaic industry to promote the healthy development of the industry | Supporting measures-GS; FIS, FS, TS, Specification measures-TSP | PG | Measures |
197 | 2015.04.27 | Notice on Issuing the management measures of special funds for renewable energy development in Zhejiang | Supporting measures-FIS | PEA | Notices |
198 | 2016.01.19 | Notice on the further strengthening of the construction of renewable energy integration application work | Supporting measures-PS | CC | Notices |
199 | 2016.07.13 | Notice on the issuance of notice of both civil construction installation of solar photovoltaic system design guidelines | Specification measures-TSP | CC, PEA | Notices |
200 | 2016.09.02 | Opinion on promoting the implementation of the views of Zhejiang Province million households roof photovoltaic project construction | Guidance measures-GD Specification measures-TSP Supporting measures-GS, FS Supervision measures-QS | PG | Measures |
Anhui province | |||||
201 | 2011.08.10 | Notice on strengthening the implementation and management of the national solar photovoltaic building application demonstration project | Guidance measures-GD Supervision measures-QS, OSU | CC | Notices |
202 | 2012.01.06 | Notice on the implementation of the 2012 solar photovoltaic building application demonstration | PS | CC/FB | Notices |
203 | 2015.06.17 | Guiding opinions on the implementation of photovoltaic poverty alleviation | Guidance measures-GI; Supporting measures-PS; FIS; FS | PG | Measures |
Fujian province | |||||
204 | 2008.12.20 | Opinions on the joint implementation of LED and solar photovoltaic industry training base construction work | Supporting measures-PT | FB | Measures |
205 | 2016.01.06 | Noticeon 2015 photovoltaic power plant project construction management work | Specification measures-OS | DRC | Notices |
206 | 2016.11.14 | Notice on 2016 photovoltaic power plant project construction supervision work | Specification measures-OS | DRC | Notices |
207 | 2016.12.09 | Notice on 2014–2015 years of photovoltaic construction and implementation plan of the project construction management | Specification measures-OS | DRC | Notices |
Jiangxi province | |||||
208 | 2012.03.29 | Notice on holding a senior seminar on practice and development of solar photovoltaic industry | Supporting measures-PT | PG | Notice |
209 | 2013 | Notice on Printing and Distributing Implementation Plan of “10,000 Roofs Photovoltaic Generation Project of Jiangxi Province (Trial)” | Supporting measures-PS Specification measures-TSP Supervision measures-QS | NRC | Notice |
210 | 2013.06.27 | Notice on the work of demonstration project of 10,000 roofs photovoltaic power generation | Supporting measures-GS Supervision measures-OSU | PEA | Notice |
211 | 2013.11.26 | Notice on Speeding up Promotion of 10,000 Roofs Photovoltaic Power Generation Demonstration Projects | Supervision measures-OSU | PEA | Notice |
212 | 2014.04.23 | Notice on Printing and Distributing the Work Plan for Accelerating the Application of Photovoltaic Power Generation in the Province | Guidance measures-GI Supporting measures-PS, GS, FS | PG | Notice |
213 | 2015.08.07 | Notice on further improving the work of photovoltaic power generation applications | Supporting measures-GS Specification measures-TSP | PG | Notice |
Shandong Province | |||||
214 | 2009.09.14 | Notice on the development of solar energy industry in Shandong province (2009–2011) | Guidance measures-GD Supporting measures-FIS, FS, TS, PS Specification measures-PSP | NRC | Notice |
215 | 2010.07.01 | Notice on support to accelerate the development of the views of the photovoltaic power generation | Supporting measures-GS, FIS, FS | PG | Notice |
216 | 2011.07.14 | Notice on further improvement of the pricing policy of photovoltaic power generation | Supporting measures-GS | PB | Notice |
217 | 2013.10.24 | Notice on Promoting the Healthy Development of Renewable Energy, Energy-saving and Environmental-friendly Power Generation Project by Price Policy | Supporting measures-GS | PB | Notice |
218 | 2014.09.29 | Opinion on Implementing Guo Fa (2013) No. 24 Document to Promote the Healthy Development of Photovoltaic Industry | Guidance measures-GI Supporting measures-FIS, FS, TS, GS Specification measures-TSP | PG | Opinion |
219 | 2015.03.09 | Notice on Further Strengthening the Construction and Operation of Photovoltaic Power Generation | Guidance measures-GI Supporting measures-GS Supervision measures-OSU | NRC/PEA | Notice |
220 | 2015.08.25 | Notice on Issuing Special Funds Investment Plan for Regional Strategic Promotion of Distributed Photovoltaic Power Generation Project | Supporting measures-FIS | NRC/FB | Notice |
221 | 2015.10.22 | Notice on Carrying out the Construction of Shandong Province Solar Energy Application Demonstration City (County) | Supporting measures-PS | NRC | Notice |
222 | 2015.11.06 | Notice on matters related to construction of photovoltaic power station in 2015 | Supporting measures-GS | NRC | Notice |
223 | 2016.06.23 | Notice of accelerating the promotion of photovoltaic work in the province | Supporting measures-PS, FIS, FS, GS | NRC | Notice |
Henan province | |||||
224 | 2008.05.05 | Notice on the grant of subsidy funds for the project of renewable energy construction application | Supporting measures-FIS | FB | Notice |
225 | 2010.10.09 | “Notice on Strengthening the Construction Management of Golden Sun Demonstration Project and Solar PV Building Application Demonstration Project” | Supporting measures-FIS, PS | NRC | Notice |
Hunan province | |||||
226 | 2009.11.12 | Opinion on accelerating the application of photovoltaic power generation and lighting | Guidance measures-GD Supporting measures-PS, FIS, FS, TS, PT Specification measures-TSP | PG | Opinion |
227 | 2016.01.21 | Notice on Further Strengthening the Application and Management of Renewable Energy Buildings | Guidance measures-GD Supporting measures-FIS | CC | Notice |
Hubei province | |||||
228 | 2010.07.30 | Rural renewable energy regulations | Guidance measures-GI | PG | Regulations |
229 | 2013.10.21 | Notice on Organizing Relevant Enterprises to Declare the Normative Bulletin of the Photovoltaic Manufacturing Industry | Specification measures-PSP | NRC | Notice |
230 | 2014.05.08 | Notice on Carrying out Demonstration Work of Demonstration of Application of Renewable Energy Building and Solar PV Building | Supervision measures-OSU | CC/FB | Notice |
Guangdong province | |||||
231 | 2014.03.05 | The opinions of the general office of the people’s Government of Guangdong Province on promoting the healthy development of the PV industry | Guidance measures-GI Supporting measures-FIS, FS, GS, PT, TS, IS Specification measures-PSP | PG | Measures |
232 | 2014.03.26 | Notice of the Guangdong provincial development and Reform Commission issued in 2014 on the annual new construction scale photovoltaic power generation | Supporting measures-GS | DRC | Notices |
233 | 2014.08.20 | On the issuance of Guangdong province solar photovoltaic development plan (2014–2020) Notice | Guidance measures-GI, GD Supporting measures-FIS, FS, GS, IS Supervisionmeasures-OSU | DRC | Notices |
234 | 2015.01.12 | Notice of the Guangdong provincial development and Reform Commission on doing a good job in preparation of solar energy development planning “in 13th Five-Year” | Supporting measures-IS | DRC | Notices |
235 | 2015.06.02 | Notice of the Guangdong provincial development and Reform Commission issued on 2015 in Guangdong Province, the construction of photovoltaic power generation project | Supporting measures-GS Supervision measures-OSU | DRC | Notices |
Guangxi province | |||||
236 | 2016.01.22 | Notice of the the Guangxi Zhuang Autonomous Region development and Reform Commission on the improvement of the area of photovoltaic power plant project construction management work | Supervision measures-OSU | DRC | Notices |
Sichuan province | |||||
237 | 2016.01.28 | Sichuan provincial development and Reform Commission forwards the national development and Reform Commission on the improvement of onshore wind power photovoltaic power generation benchmark price policy notice notice | Supporting measures-GS | DRC | Notices |
Guizhou province | |||||
238 | 2010.10.10 | Notice on the organization declared the 2010 provincial renewable energy construction application demonstration city and rural areas of the County demonstration special fund project | Supporting measures-FIS | CC/FB | Notices |
239 | 2011.06.15 | Notice on the organization to declare the provincial city of application of renewable energy in rural areas and Building Demonstration County demonstration special fund project | Supporting measures-FIS | CC/FB | Notices |
Yunnan province | |||||
240 | 2011.04.01 | The measures for the implementation of the access system of renewable energy power generation project in Yunnan Province | Supporting measures-GS | DRC | Measures |
241 | 2012.01.08 | Notice on Application of special fund project for renewable energy development in 2012 | Supporting measures-FIS | FB | Notices |
242 | 2014.01.13 | Notice on Application of special fund project for renewable energy development in 2014 | Supporting measures-FIS | FB | Notices |
243 | 2014.04.01 | Notice of Yunnan Provincial People’s Government on printing and distributing the implementation plan of promoting the healthy development of photovoltaic industry in Yunnan | Guidance measures-GI, GD Supporting measures-GS, FIS, FS Specification measures-TSP, PSP | PG | Notices |
Shaanxi province | |||||
244 | 2009.09.02 | Notice of the Ministry of finance of Shaanxi province and the Ministry of housing and urban rural development on Issuing the guidelines for the application of provincial solar photovoltaic building application demonstration projects | Supporting measures-FIS | FB/CC | Notices |
245 | 2009.10.14 | Notice of Shaanxi provincial Ministry of industry and information technology on declaring the special project of solar photovoltaic and semiconductor lighting industry development in Shaanxi Province in 2009 | Supporting measures-FIS | DRC | Notices |
246 | 2010.05.05 | Notice of the Shaanxi provincial development and Reform Commission on photovoltaic power plant in our province provide information about franchise rights for the project | Supporting measures-IS | DRC | Notices |
247 | 2011.05.13 | Notice of the Shaanxi provincial development and Reform Commission to submit relevant materials about the “12th Five-Year” solar power generation project | Guidance measures-GI | DRC | Notices |
248 | 2011.07.11 | Notice on the issuance of the 2011 provincial solar photovoltaic and photothermal building demonstration project reporting guidelines. | Supporting measures-FIS | CC/FB | Notices |
249 | 2012.05.02 | Notice of Shaanxi Provincial Department of housing and urban rural construction on 2012 issued by the provincial solar photovoltaic and photothermal building demonstration project reporting guidelines. | Supporting measures-FIS | CC | Notices |
250 | 2012.06.15 | Notice of Shaanxi provincial development and Reform Commission on the 2012 development plan of grid connected photovoltaic power generation project organization | Supporting measures-IS | DRC | Notices |
251 | 2012.06.25 | Notice on accelerating the construction of solar photovoltaic applications work. | Guidance measures-GI, GD Specification measures-TSP | CC | Notices |
252 | 2013.07.18 | To vigorously promote the development of the solar power industry to speed up the notice | Guidance measures-GI Supporting measures-FIS, FS | DRC | Notices |
253 | 2013.09.24 | Notice of Shaanxi provincial development and Reform Commission on speeding up the construction of photovoltaic power generation projects | Supporting measures-GS Supervision measures-OSU | DRC | Notices |
254 | 2014.12.04 | The People’s Government of Shaanxi Province on promoting the implementation of the views of distributed photovoltaic power generation demonstration | Guidance measures-GD Supporting measures-PS, GS, FIS, FS | PG | Measures |
255 | 2015.01.16 | Notice on the 2014 annual provincial renewable energy demonstration project management and acceptance related matters | Supervision measures-QS, OSU | CC | Notices |
Gansu province | |||||
256 | 2012.06.15 | Gansu provincial development and Reform Commission on Dongfang Electric (Jiuquan) approved the solar power generation Co. Ltd. in Suzhou District Dong Dong Tan 9 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
257 | 2012.06.19 | Approved by the Gansu provincial development and Reform Commission on the approval of the Gansu Long Chang photovoltaic power company limited Jinchuan district 15 MW photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
258 | 2012.07.20 | Gansu provincial development and Reform Commission on the zkenergy (Jiuquan) Amperex Technology Limited approved the 9 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
259 | 2012.07.20 | Approved by the Gansu provincial development and Reform Commission on the approval of Dong Dong Tan Huadian new energy Jiuquan Suzhou 9 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
260 | 2012.07.30 | Approved by the Gansu provincial development and Reform Commission on the approval of Huadian new Energy Developments Ltd Jiayuguan 9 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
261 | 2012.08.22 | Approved by the Gansu provincial development and Reform Commission on the approval of Xigou mine of Gansu Shenzhou photovoltaic power company limited Jiayuguan 9 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
262 | 2012.08.22 | Approved provincial development and Reform Commission on hydropower and new energy development limited liability company ganzhouborough approved 50 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
263 | 2012.09.29 | Approved by the Gansu provincial development and Reform Commission on China Hydropower Construction Group New Energy Development Co. Ltd. Liangzhou district approved 50 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
264 | 2012.10.24 | Approved by the Gansu provincial development and Reform Commission on the approval of CHINT photovoltaic power generation Co. Ltd. Aksay Aksay county 10 MW grid connected photovoltaic power generation project | Guidance measures-GD Supporting measures-GS | DRC | Notice |
265 | 2012.10.30 | Gansu provincial development and Reform Commission approved the approval of the 9 MW grid connected photovoltaic power generation project in Wuwei Liangzhou District of the Yellow River Gansu hydropower Co., Ltd. | Guidance measures-GD Supporting measures-GS | DRC | Notice |
266 | 2013.04.17 | Notice of the Ministry of housing and urban rural development of Gansu on strengthening the management of national renewable energy construction application demonstration project | Supervision measures-QS, OSU | CC | Notices |
267 | 2013.06.24 | Regarding the development of renewable energy construction application of special information disclosure work notice | Supervision measures-OSU | CC | Notices |
268 | 2013.12.31 | Gansu province to implement the implementation of the State Council on promoting the healthy development of photovoltaic industry several opinions implementation plan | Supporting measures-GS, TS, FIS, FS, PT | PG | Notices |
269 | 2014.03.10 | Notice of Gansu provincial industry and Information Committee on organizing and recommending key projects of photovoltaic industry in 2014 | Supporting measures-FS | DRC | Notices |
Qinghai province | |||||
270 | 2008.04.08 | Guidance on using solar building | Supporting measures-FIS, TS, PS | CC | Measures |
271 | 2010.01.25 | Notice of 2008 7 month run public renewable energy independent power system maintenance cost subsidies | Supporting measures-FIS | DRC | Notices |
272 | 2010.04.08 | Notice of the Qinghai provincial development and Reform Commission agreed to carry out Chinese Water Conservancy Investment Corporation Golmud 10 MW photovoltaic power grid work | Supporting measures-GS | DRC | Notices |
273 | 2010.04.08 | Notice of Qinghai provincial development and Reform Commission on the development of Golmud 10 MW grid connected photovoltaic power station of Limited by Share Ltd | Supporting measures-GS | DRC | Notices |
274 | 2010.04.25 | Qinghai provincial development and Reform Commission on the approval of notice to carry out SDIC Golmud photovoltaic power generation Co. Ltd. Golmud two 30 MW grid connected photovoltaic power plant work | Supporting measures-GS | DRC | Notices |
275 | 2010.05.06 | Qinghai provincial development and Reform Commission on the approval of China Guangdong Nuclear Power Solar Energy Development Company Limited (Dachaidan) Notice tin Tieshan two 30 MW photovoltaic power grid work | Supporting measures-GS | DRC | Notices |
276 | 2011.08.04 | Notice of the Qinghai provincial development and Reform Commission on the relevant issues concerning the first half of the province in 2009 renewable energy price subsidies under the | Supporting measures-FIS | DRC | Notices |
277 | 2011.10.10 | Notice of the Qinghai provincial development and Reform Commission on the province from January to September 2010 renewable energy price subsidies related matters | Supporting measures-FIS | DRC | Notices |
278 | 2011.12.30 | Notice of Qinghai provincial development and Reform Commission on the province in 2011 the completion of photovoltaic power tariff | Supporting measures-GS | DRC | Notices |
279 | 2012.07.05 | Approved on Golmud Huadian Solar Power Co. Ltd. Golmud two 20 MW grid connected photovoltaic power generation project environmental impact report | Guidance measures-GD | DRC | Notice |
280 | 2014.04.01 | The opinions of the general office of the People’s Government of Qinghai Province on promoting the healthy development of photovoltaic industry in Qinghai | Supporting measures-TS, FIS, FS, GS | PG | Measures |
281 | 2015.02.03 | Qinghai provincial development and Reform Commission on notice of the distributed photovoltaic power generation | Supporting measures-GS Supervision measures-OSU | DRC | Notices |
282 | 2015.06.29 | Notify the office of Qinghai Provincial People’s government poverty alleviation Bureau and other departments of Qinghai Province on 2015 PV poor pilot scheme | Supporting measures-FIS, GS | PG | Notices |
283 | 2016.09.18 | Notice of the Qinghai provincial development and Reform Commission on the issuance of Qinghai Province in 2016 the first batch of ordinary scale photovoltaic power plant project bidding scheme index | Supervision measures-OSU | DRC | Notices |
Ningxia province | |||||
284 | 2010.04.20 | Approved by the the Ningxia Hui Autonomous Region Bureau on my area of Ningxia sun Hill four solar photovoltaic power station temporary tariff | Supporting measures-GS | PB | Notice |
285 | 2010.08.02 | On the issuance of the Ningxia Hui Autonomous Region planning and architectural applications of renewable energy development (2010–2020) Notice | Guidance measures-GI, GD Supporting measures-FIS, FS, IS, PT Specification measures-TSP Supervision measures-QS, OSU | PG | Notices |
286 | 2014.08.22 | Notice of the the Ningxia Hui Autonomous Region Bureau of Yongning County of Tiexi Hui Min Ning town primary school 90 kW distributed photovoltaic power generation projects electricity price | Supporting measures-GS | PB | Notices |
287 | 2015.11.25 | The Ningxia Hui Autonomous Region Bureau of price notice on renewable energy power generation projects of Ningxia Yanchi wind farm (Chen Jiliang) capital Gan 49.5 MW wind power project | Supporting measures-GS | PB | Notices |
288 | 2015.12.30 | Notice of the the Ningxia Hui Autonomous Region Bureau of Wuzhong City Baita wind power limited Wind 1 wind farms two phase expansion project and other renewable energy power generation projects electricity price | Supporting measures-GS | PB | Notices |
289 | 2015.12.31 | The Ningxia Hui Autonomous Region Bureau of Wuzhong Longyuan Wind Power Co. Ltd (3 Yanchi pond, Su Bu Jing, Hua Ma Chi) Notice of wind and other renewable energy power generation projects electricity price | Supporting measures-GS | PB | Notices |
290 | 2016.01.05 | Notice of the general office of the People’s Government of the Ningxia Hui Autonomous Region on Issuing the guiding opinions on the allocation of resources for photovoltaic power station projects and for the record and construction management of photovoltaic power station projects | Specification measures-TSP | PB | Notices |
291 | 2016.01.08 | Notice of the the Ningxia Hui Autonomous Region Bureau of Beijing Helan ponds photovoltaic demonstration project and Guoxin Yanchi photovoltaic and livestock processing integration projects tariff | Supporting measures-GS | PB | Notices |
292 | 2016.02.03 | The Ningxia Hui Autonomous Region Price Bureau, autonomous region Price Bureau on Ningxia Bao Bao central two phase photovoltaic power station and other renewable energy generation projects on the electricity price notice | Supporting measures-GS | PB | Notices |
293 | 2016.03.24 | The Ningxia Hui Autonomous Region Price Bureau on division three Pingluo 50 MWp photovoltaic power plant and other renewable energy power generation projects tariff notification | Supporting measures-GS | PB | Notices |
294 | 2016.06.07 | Notice of the the Ningxia Hui Autonomous Region People’s Government Office forwarded the autonomous region development and Reform Commission and other departments on the opinions to further standardize the construction management of photovoltaic power station | Specification measures-OS | DRC | Notices |
Xinjiang province | |||||
295 | 2011.12.01 | Regarding the development of new electronic materials, notify the basic survey of solar photovoltaic industry | Supporting measures-IS | DRC | Notices |
296 | 2012.03.16 | On the issuance of the Xinjiang Uygur Autonomous Region solar energy photovoltaic industry development plan (2011–2015) Notice | Supporting measures-IS, GS, FIS, PT | PG | Notices |
297 | 2013.08.16 | Notice on accelerating Xinjiang without electricity power supply engineering and photovoltaic independent power supply project EIA related matters | Guidance measures-GD | DRC | Notices |
298 | 2014.03.03 | Notice of the Xinjiang autonomous region development and Reform Commission and the Ministry of Finance on printing and distributing the administrative measures for the independent power supply project of photovoltaic power construction in Xinjiang without electricity area | Supervision measuresOSU | DRC | Notices |
Hainan province | |||||
299 | 2008.09.25 | Opinions on promoting the large-scale utilization of solar energy in Hainan | Guidance measures-GI, GD Supporting measures-FIS, FS, TS Specification measures-TSP | DRC | Measures |
300 | 2012.12.29 | Notice of Hainan Provincial Price Bureau of Haikou national hi tech Development Zone, photovoltaic power generation demonstration project tariff, etc. | Supporting measures-GS | PB | Notices |
301 | 2013.07.26 | Notice of Hainan Provincial Price Bureau on cross-strait new energy cooperation Hainan Aerospace 50 MW photovoltaic power generation demonstration of golden sun demonstration project, electricity price | Supporting measures-GS | PB | Notices |
302 | 2013.12.24 | Hainan Province Price Bureau of Hainan City Economic Development Zone, Jinsheng building materials mall concentrated photovoltaic power generation projects such as tariff notification | Supporting measures-GS | PB | Notices |
303 | 2013.12.27 | Notice of Hainan Provincial Price Bureau on Ledong Xiangshui 20 MW photovoltaic power plant electricity price | Supporting measures-GS | PB | Notices |
304 | 2014.09.26 | Hainan Provincial Price Bureau on the approval of the sea star (Yangpu) aquatic food Co., Ltd. rooftop photovoltaic power generation project tariff notice | Supporting measures-GS | PB | Notices |
Chongqing province | |||||
305 | 2009.05.13 | Notice on the declaration of solar photovoltaic building demonstration project | Supporting measures-FIS | CC | Notices |
306 | 2009.07.13 | Notice on recollecting the demonstration project of renewable energy construction in our city | Supporting measures-FIS | CC | Notices |
307 | 2009.07.27 | organization notice to declare the construction of renewable energy demonstration city | Guidance measures-GD Supporting measures-FIS | CC | Notices |
References
- International Energy Agency Photovoltaic Power Systems Programme. Annual Report 2016. Available online: http://www.iea-pvps.org/fileadmin/dam/public/report/statistics/IEA-PVPS_-_A_Snapshot_of_Global_PV_-_1992–2016__1_.pdf (accessed on 1 June 2017).
- BP. BP Statistical Review of World Energy 2017 Underpinning Data. Available online: http://www.bp.com/statisticalreview (accessed on 1 June 2017).
- Liu, D.; Shiroyama, H. Development of photovoltaic power generation in China: A transition perspective. Renew. Sustain. Energy Rev. 2013, 25, 782–792. [Google Scholar] [CrossRef]
- Zhi, Q.; Sun, H.; Li, Y.; Xu, Y.; Su, J. China’s solar photovoltaic policy: An analysis based on policy instruments. Appl. Energy 2014, 129, 308–319. [Google Scholar] [CrossRef]
- Tour, A.D.L.; Glachant, M.; Ménière, Y. Innovation and international technology transfer: The case of the Chinese photovoltaic industry. Energy Policy 2011, 39, 761–770. [Google Scholar] [CrossRef] [Green Version]
- Sun, H.; Qiang, Z.; Wang, Y.; Yao, Q.; Su, J. China’s solar photovoltaic industry development: The status quo, problems and approaches. Appl. Energy 2014, 118, 221–230. [Google Scholar] [CrossRef]
- Li, S.; Wang, J.; Liu, Q.; Li, L.; Hua, Y.; Liu, W. Analysis of Status of Photovoltaic and Wind Power Abandoned in China. J. Power Energy Eng. 2017, 5, 91–100. [Google Scholar] [CrossRef]
- Grau, T.; Huo, M.; Neuhoff, K. Survey of photovoltaic industry and policy in Germany and China. Energy Policy 2012, 51, 20–37. [Google Scholar] [CrossRef]
- Huo, M.L.; Zhang, D.W. Lessons from photovoltaic policies in China for future development. Energy Policy 2012, 51, 38–45. [Google Scholar] [CrossRef]
- Zhang, S.; He, Y. Analysis on the development and policy of solar PV power in China. Renew. Sustain. Energy Rev. 2013, 21, 393–401. [Google Scholar] [CrossRef]
- Zou, H.; Du, H.; Ren, J.; Sovacool, B.K.; Zhang, Y.; Mao, G. Market dynamics, innovation, and transition in China’s solar photovoltaic (PV) industry: A critical review. Renew. Sustain. Energy Rev. 2017, 69, 197–206. [Google Scholar] [CrossRef]
- Kayser, D. Solar photovoltaic projects in China: High investment risks and the need for institutional response. Appl. Energy 2016, 174, 144–152. [Google Scholar] [CrossRef]
- Dusonchet, L.; Telaretti, E. Economic analysis of different supporting policies for the production of electrical energy by solar photovoltaics in western European Union countries. Energy Policy 2010, 38, 3297–3308. [Google Scholar] [CrossRef]
- Sarasa-Maestro, C.J.; Dufo-López, R.; Bernal-Agustín, J.L. Photovoltaic remuneration policies in the European Union. Energy Policy 2013, 55, 317–328. [Google Scholar] [CrossRef]
- Shrimali, G.; Jenner, S. The impact of state policy on deployment and cost of solar photovoltaic technology in the US: A sector-specific empirical analysis. Renew. Energy 2013, 60, 679–690. [Google Scholar] [CrossRef]
- Sarzynski, A.; Larrieu, J.; Shrimali, G. The impact of state financial incentives on market deployment of solar technology. Energy Policy 2012, 46, 550–557. [Google Scholar] [CrossRef]
- Kwan, C.L. Influence of local environmental, social, economic and political variables on the spatial distribution of residential solar PV arrays across the United States. Energy Policy 2012, 47, 332–344. [Google Scholar] [CrossRef]
- Zhang, S.; Zhao, X.; Andrews-Speed, P.; He, Y. The development trajectories of wind power and solar PV power in China: A comparison and policy recommendations. Renew. Sustain. Energy Rev. 2013, 26, 322–331. [Google Scholar] [CrossRef]
- Zhang, M.; Zhou, D.; Zhou, P. A real option model for renewable energy policy evaluation with application to solar PV power generation in China. Renew. Sustain. Energy Rev. 2014, 40, 944–955. [Google Scholar] [CrossRef]
- Zhao, X.; Zeng, Y.; Zhao, D. Distributed solar photovoltaics in China: Policies and economic performance. Energy 2015, 88, 572–583. [Google Scholar] [CrossRef]
- Yuan, C.; Liu, S.; Yang, Y.; Chen, D.; Fang, Z.; Shui, L. An analysis on investment policy effect of China’s photovoltaic industry based on feedback model. Appl. Energy 2014, 135, 423–428. [Google Scholar] [CrossRef]
- Guo, X.; Guo, X.; Lund, H. China’s photovoltaic power development under policy incentives: A system dynamics analysis. Energy 2015, 93, 589–598. [Google Scholar] [CrossRef]
- Li, L.; Chi, T.; Zhang, M.; Wang, S. Multi-Layered Capital Subsidy Policy for the PV Industry in China Considering Regional Differences. Sustainability 2016, 8, 45. [Google Scholar] [CrossRef]
- Rothwell, R.; Zegveld, W. Industrial Innovation and Public Policy: Preparing for the 1980s and the 1990s; F. Pinter: London, UK, 1981. [Google Scholar]
- Gabriele, A. S&T Policies and Technical Progress in China’s Industry. Rev. Int. Political Econ. 2002, 9, 333–373. [Google Scholar]
- Su, Y.S.; Lin, C.J.; Li, C.Y. An assessment of innovation policy in Taiwan’s electric vehicle industry. Int. J. Technol. Manag. 2016, 72, 210–229. [Google Scholar] [CrossRef]
- Breslin, S. Foreign direct investment in the People’s Republic of China: Preferences, policies and performance. Policy Soc. 2006, 25, 9–38. [Google Scholar] [CrossRef]
- Huang, C. Organization, programme and structure: An analysis of the Chinese innovation policy framework. R&D Manag. 2010, 34, 367–387. [Google Scholar]
- Peng, J.S.; Sun, W.X.; Zhong, W.G. The evolution of Chinese technological and innovational policies and the empirical research on the performance (1978–2006). Sci. Res. Manag. 2008, 29, 134–150. [Google Scholar]
- Wang, X.Z.; Peng, Z.G.; Gao, W.; Ji, S.B. The policy evolution and effect evaluation of wind power industry in China. Stud. Sci. Sci. 2016, 34, 1817–1829. [Google Scholar]
- Schneider, A.; Ingram, H. Systematically Pinching Ideas: A Comparative Approach to Policy Design. J. Public Policy 1988, 8, 61–80. [Google Scholar] [CrossRef]
- Peters, B.G. Policy Instruments and Public Management: Bridging the Gaps. J. Public Adm. Res. Theory 2000, 10, 35–47. [Google Scholar] [CrossRef]
- The Law Information Database of Peking University. Available online: http://www.pkulaw.cn/ (accessed on 15 June 2017).
- Menz, F.C.; Vachon, S. The effectiveness of different policy regimes for promoting wind power: Experiences from the states. Energy Policy 2006, 34, 1786–1796. [Google Scholar] [CrossRef]
- Delmas, M.A.; Montes-Sancho, M.J. US state policies for renewable energy: Context and effectiveness. Soc. Sci. Electron. Publ. 2011, 39, 2273–2288. [Google Scholar]
Notices | Measures | Opinions and Rules | Regulations and Orders | Laws | Sum |
---|---|---|---|---|---|
228 (149) | 59 (20) | 15 (4) | 1 | 4 | 307 |
Apartment | Number of Issued Policies | Apartment | Number of Issued Policies |
---|---|---|---|
National-level policy department | |||
1994MOPI | 1 | 2009SAC | 1 |
1995NDRC | 34 | 2009AQSIQ | 2 |
1995SSTC | 1 | 2009NEA | 43 |
1995SETC | 2 | 2009MOFCOM | 1 |
1995NPC | 4 | 2009SAT | 3 |
1999MOST | 4 | 2012GOASC | 1 |
2005SC | 16 | 2013CDB | 2 |
2005MOC | 6 | 2013MIIT | 5 |
2006MOF | 27 | 2014SAIC | 1 |
2007SERC | 5 | 2014APDOSC | 2 |
2007GAC | 1 | 2015SAWS | 1 |
2008MOHURD | 7 | 2015SFA | 1 |
2009CNCA | 10 | 2015MOLR | 1 |
Regional policy department | |||
PDRC | 127 | PG | 48 |
CC | 25 | FB | 63 |
PB | 54 | PEA | 8 |
Variable | Coefficient | Variable | Coefficient |
---|---|---|---|
GI | 4.583 (1.316) | IS | 0.809 (1.883) |
GD | 1.679 (1.699) | PS | −0.004 (2.027) |
FS | −0.914 (2.511) | OS | 5.561 (1.554) |
FIS | 1.146 (3.364) | TSP | 4.680 (0.859) |
TS | - | PSP | −1.875 (1.554) |
PT | 1.243 (2.566) | QS | 3.977 (1.043) |
GS | 4.419 (3.112) | OSU | 4.308 (0.889) |
Variable | Coefficient | Variable | Coefficient |
---|---|---|---|
Notices | 3.307 (0.635) | Regulations and Orders | −0.472 (1.455) |
Measures | 0.245 (0.669) | Laws | −0.650 (0.738) |
Opinions and Rules | 1.381 (0.688) | R2 | 0.938 |
Variable | Coefficient | Variable | Coefficient |
---|---|---|---|
GI | 1.972 (0.348) | IS | −1.848 (1.281) |
GD | −0.497 (0.615) | PS | 0.233 (0.344) |
FS | 0.47 (0.694) | OS | 0.746 (0.854) |
FIS | 2.620 (1.300) | TSP | 2.888 (0.459) |
TS | 1.187 (1.093) | PSP | −0.1060 (0.958) |
PT | −0.844 (0.485) | QS | 1.179 (0.879) |
GS | 0.324 (1.092) | OSU | 1.864 (0.446) |
Variable | Coefficient | Variable | Coefficient |
---|---|---|---|
SC | 2.993 (1.321) | NEA | 3.420 (1.408) |
NDRC | 0.435 (1.288) | OD | 1.478 (1.182) |
R2 | 0.933 |
© 2017 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Long, R.; Cui, W.; Li, Q. The Evolution and Effect Evaluation of Photovoltaic Industry Policy in China. Sustainability 2017, 9, 2147. https://doi.org/10.3390/su9122147
Long R, Cui W, Li Q. The Evolution and Effect Evaluation of Photovoltaic Industry Policy in China. Sustainability. 2017; 9(12):2147. https://doi.org/10.3390/su9122147
Chicago/Turabian StyleLong, Ruyin, Wenhua Cui, and Qianwen Li. 2017. "The Evolution and Effect Evaluation of Photovoltaic Industry Policy in China" Sustainability 9, no. 12: 2147. https://doi.org/10.3390/su9122147