Erratum: Merisalu et al. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82
- In page 5: A “)” must be added after “(Figure 4”, and should have read: “(Figure 4)”.
- In page 7: The sentences “Schematic description of staircase and continuous risk functions indicated by red circles and black solid line together with an interval for uncertainty indicated by dashed lines. “P” and “C” indicate probability and consequence, respectively. (a) The risk curve; (b) the risk curve after retrieval of more information resulting in less uncertainty; and (c) “the risk curve after implementation of risk-reducing measures resulting in reduced total risk.” in the main text should be deleted. The paragraph should have read: “As illustrated by Figure 6a, the risk function includes both high-probability ...”.
- In Page 16: “Data Availability Statement: None of these three parts are relevant for this study.” should be changed to “Data Availability Statement: Not relevant for this study.”
Reference
- Merisalu, J.; Sundell, J.; Rosén, L. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82. [Google Scholar] [CrossRef]
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2021 by the author. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Geosciences Editorial Office. Erratum: Merisalu et al. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82. Geosciences 2021, 11, 221. https://doi.org/10.3390/geosciences11050221
Geosciences Editorial Office. Erratum: Merisalu et al. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82. Geosciences. 2021; 11(5):221. https://doi.org/10.3390/geosciences11050221
Chicago/Turabian StyleGeosciences Editorial Office. 2021. "Erratum: Merisalu et al. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82" Geosciences 11, no. 5: 221. https://doi.org/10.3390/geosciences11050221
APA StyleGeosciences Editorial Office. (2021). Erratum: Merisalu et al. A Framework for Risk-Based Cost–Benefit Analysis for Decision Support on Hydrogeological Risks in Underground Construction. Geosciences 2021, 11, 82. Geosciences, 11(5), 221. https://doi.org/10.3390/geosciences11050221