Preuner, P.; Scolobig, A.; Linnerooth Bayer, J.; Ottowitz, D.; Hoyer, S.; Jochum, B.
A Participatory Process to Develop a Landslide Warning System: Paradoxes of Responsibility Sharing in a Case Study in Upper Austria. Resources 2017, 6, 54.
https://doi.org/10.3390/resources6040054
AMA Style
Preuner P, Scolobig A, Linnerooth Bayer J, Ottowitz D, Hoyer S, Jochum B.
A Participatory Process to Develop a Landslide Warning System: Paradoxes of Responsibility Sharing in a Case Study in Upper Austria. Resources. 2017; 6(4):54.
https://doi.org/10.3390/resources6040054
Chicago/Turabian Style
Preuner, Philipp, Anna Scolobig, JoAnne Linnerooth Bayer, David Ottowitz, Stefan Hoyer, and Birgit Jochum.
2017. "A Participatory Process to Develop a Landslide Warning System: Paradoxes of Responsibility Sharing in a Case Study in Upper Austria" Resources 6, no. 4: 54.
https://doi.org/10.3390/resources6040054
APA Style
Preuner, P., Scolobig, A., Linnerooth Bayer, J., Ottowitz, D., Hoyer, S., & Jochum, B.
(2017). A Participatory Process to Develop a Landslide Warning System: Paradoxes of Responsibility Sharing in a Case Study in Upper Austria. Resources, 6(4), 54.
https://doi.org/10.3390/resources6040054