Next Article in Journal
Perceptions of Resettled Refugee Congolese Women: Maintaining Cultural Traditions during Resettlement
Next Article in Special Issue
Spatial and Temporal Evolution of Land Use and the Response of Habitat Quality in Wusu, China
Previous Article in Journal
Health Literacy of People with Substitutive Private Health Insurance in Germany and Their Assessment of the Health System Performance According to Health Literacy Levels: Results from a Survey
Previous Article in Special Issue
Influence Mechanism of Polycentric Spatial Structure on Urban Land Use Efficiency: A Moderated Mediation Model
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam

1
Department of Resource and Environment, Shijiazhuang University, Shijiazhuang 050035, China
2
College of Geography and Environment, Shandong Normal University, Jinan 250358, China
3
Coastal Studies Inst, Louisiana State University, Baton Rouge, LA 70803, USA
4
Dongying Institute, Shandong Normal University, Dongying 257092, China
*
Authors to whom correspondence should be addressed.
Int. J. Environ. Res. Public Health 2022, 19(24), 16712; https://doi.org/10.3390/ijerph192416712
Submission received: 7 November 2022 / Revised: 6 December 2022 / Accepted: 7 December 2022 / Published: 13 December 2022
(This article belongs to the Special Issue Land Use Change and Its Effects on Regional Sustainable Development)

Abstract

:
The global demand for sand and gravel is at 50 billion tons per year, far exceeding global resource capacities. It reached 7.6 billion tons in 2021 in the Yangtze River Basin (YRB), China. However, production is severely limited in the YRB. Therefore, the incongruity between the supply and demand of river sand is prominent. Wise management of decreasing sand resources in the YRB has become critical since the Three Gorges Dam became operational in 2003. This study synthesized spatial and temporal changes in sand mining activities and quantities along the Yangtze River and its major tributaries from 2004 to 2020. Results from the study show that the mining amount during the period reached 76.2 million tons annually. At the same time, riverine suspended sediment discharge (SSD) downstream of the Three Gorges Dam decreased largely. SSD reduction leads to riverbed erosion, further limiting the riverine sand and gravel sources for mining. Thus, alternative sand and gravel resources, as well as optimizing supply/demand balance, are necessary for sustainable development. There is an urgent need to assess the relationship between river sand resources and exploitation in the YRB for creating a sand and gravel data management system in order to cope with the increasing incongruity between their supply and demand.

1. Introduction

Over the last 20 years, the global demand for sand and gravel has tripled. This demand has been projected to double by 2060, driven by the construction and expansion of urban infrastructure [1,2]. While many coastal areas in the world have been losing land, sand and gravel sources have become crucial for protecting and/or creating land in the cities and towns near the coast. For example, 517 million tons (MT) of sand and gravel have been used in land reclamation over the past two decades in Singapore; most of which was imported [3,4]. Therefore, sand and gravel reserves face multiple challenges worldwide.
As high-quality resources, river sand and gravel are highly beneficial to humans. On the other hand, sand mining activities often have profound negative impacts on the ecological environment of rivers [5]. These negative impacts [6,7,8] include changing the river channel morphology and affecting the stability of the river regime, leading to an increase in flood frequency and intensity and exacerbation in drought occurrences [9,10,11,12]. For example, the Manimala River suffers from groundwater level recession and water resource shortages due to river sand mining in southwestern India [13]. Moreover, massive sand mining in rivers could accelerate beach erosion in their deltaic areas [14,15,16]. Illegal sand mining activities are typically random and ignore environmental impacts, causing more harm to the physical and ecological functioning of river systems. Unfortunately, these activities continue worldwide, especially in Malaysia, India, Cambodia, and South Africa [17,18,19].
In China, sand and gravel demand was approximately 18 billion tons in 2021 (https://www.cssglw.com/; accessed on 3 March 2022). The Yangtze River Basin (YRB) is a crucial source and consumption area for high-quality sand. Sand mining along the YRB began in the late 1970s, and illegal sand mining was rampant owing to “profiteering.” Mining along the Yangtze River (YR) mainstream was banned during the early 21st century, and illegal sand mining vessels moved to Poyang Lake, which is connected with the YR. Studies have reported that these sand mining activities have caused the water level of Poyang Lake to drop in the dry season [20], the subaqueous topography to change [21], and the fish and bird habitats to deteriorate [22]. Hence, China has recently established strict regulations for sand mining management and regulation in the YRB. Moreover, the government authorities have increased the inspection and supervision of sensitive waters, including unannounced inspections of key river sections [23].
However, as China has been rapidly developing, the demand for sand and gravel exceeds the supply. The demand-supply discrepancy makes it impossible to prohibit sand mining (including illegal sand mining). Therefore, scientifically and rationally exploiting and managing river sand resources is critical. This study focuses on spatial and temporal changes in sand mining activities in the YRB, aiming to (1) estimate the amount of historical sand mining, (2) analyze characteristics of spatial and temporal mining changes, and (3) propose recommendations and countermeasures for sand mining in the YRB, which can be applicable to other alluvial rivers in the world.

2. Study Area and Methods

The Yangtze River originates in the Qinghai-Tibet Plateau in west China and flows 6300 km eastward before entering the East China Sea (Figure 1) [24]. The YRB serves approximately 40% of China’s population and economy. The Yangtze Delta generates almost 25% of China’s total economic production, although it encompasses below 4% of the country’s land area (https://www.thepaper.cn/; accessed on 4 January 2021). This enormous economic burden requires large amounts of sand and gravel.
During the 1980s, the demand for river sand was low and priced at RMB 2–3 per ton. However, it increased to RMB 15 per ton in 2010. Additionally, the demand for sand and gravel increased to 7.6 billion tons within the YRB during 2021 (https://www.cssglw.com/; accessed on 3 March 2022). In response, the price of river sand rose to RMB 142 per ton in 2021 (http://www.zgss.org.cn/; accessed on 1 March 2022).
Sand mining data were obtained from the Yangtze River Sediment Bulletin (2004–2020; http://www.cjw.gov.cn/; accessed on 30 July 2021) and Jiangxi Provincial Water Resources Department (2004–2016; http://slt.jiangxi.gov.cn/; accessed on 16 June 2016). Other sand mining data collected for the main tributaries and lakes are listed in Table 1. Illegal mining data were derived from previous studies and cases of judicial punishment (Table 2).
Table 3 exhibits the average annual runoff and sediment discharge data from Zhutuo, Cuntan, Yichang, Shashi, Hankou, and Datong, along YR.
The average annual runoff and sediment discharge data for Poyang Lake is shown in Table 4.
Estimation of the total sand mining for the YRB can be as given below:
S t o t a l = S 1 + S 2 + S 3 + S 4
where Stotal is the total amount of sand mined within the YRB from 2004 to 2020, S1 is the sand mined in the YR mainstream (Figure 2), and S2 is the amount of sand mined in Poyang Lake during the same period, including estimated sand mined both illegally and legally during 2004–2010 [25] and sand mining planning amount in Poyang Lake during 2011 and 2020, S3 is the amount of sand mining planned in Dongting Lake and the other tributaries during 2012–2020 (Table 5), and S4 is the extra illegal mining data reported by judicial bodies for the period of 2013–2020 (Table 2).

3. Results

3.1. Sand Mining along the YR Mainstem

From 2004–2020, 756.3 MT of sand was mined from the mainstream YR, averaging 44.5 MT per year (standard deviation is 23.5 MT). There was large interannual fluctuation (Figure 2), with a peak in 2018 (102 MT) but a sharp decline in 2020 (21.1MT). Overall, mining in the YR mainstem increased largely in 2008, i.e., more than double the annual amount in the previous years.
Before 2010, sand mining planning was spatially concentrated in the Jiangsu and Hubei Provinces (the middle reach of the YR) (Figure 3). After 2015, mining expanded to Chongqing City (the upper reach of the YR) and Shanghai City (the lower reach of the YR. Currently, sand mining planning is mainly concentrated in Chongqing, Hubei, Jiangxi, Anhui, Jiangsu, and Shanghai. The mined sand is transported to other areas through the “golden waterway” of the YR.

3.2. Sand Mining in Poyang Lake

From 2004-2020, 539.6 MT of sand were mined from Poyang Lake at an annual average of 31.7 MT (Figure 4). Overall, there was a downward trend with pronounced fluctuations (Figure 5). For example, the maximum mined amount was 49.9 MT in 2007. Mining was then prohibited in 2008 (Figure 5) and resumed in 2009. However, only 4.8 MT were mined in 2018.

3.3. Sand Mining from Tributary Rivers and Reservoirs

Over the past 10 years, sand mining from the major tributary rivers and reservoirs of the YR totaled 837.8 MT (Table 5). These include, among others, Han, Jialing, Wu, Fu, Qu, Qing, Han, Xiang, Zi, Yuan, Li River, and Dongting Lake. This mining quantity within a much shorter period of time was higher than that mined from the YR mainstem as well as from Poyang Lake.

3.4. Characteristics of Sand Uses

Based on the utilization, sand mining in this review can be divided into three categories: (1) engineering sand mining (used for land formation), (2) construction and operational sand mining (used for building), and (3) river and waterway dredging sand (purpose is to dredge river channel; can be used for land formation and building) (http://slt.hubei.gov.cn/; accessed on 2 December 2019).
The largest amount of sand (584.0 MT) was obtained through engineered sand mining (Table 6). This accounts for 77.22% of the total amount (Table 6). The maximum amount mined was 79.0 MT in 2013 (Figure 6). However, the minimum amount was 3.7 MT in 2020, which is substantially lower than the annual amounts from 2004–2020 (34.4 MT; Figure 6).
The amount from construction and operational sand mining was 28.5 MT, accounting for 3.77% of the total (Table 6). The largest amount mined was during 2015 (8.5 MT), while the annual average was 1.7 MT (Figure 6).
The amount of river and waterway dredged sand was 143.8 MT, accounting for 19.01% of the total (Table 6). The maximum amount (89.0 MT) was mined in 2018, while the annual average was 8.5 MT (Figure 6).

4. Discussion

4.1. Estimation of the Actual Sand Mining Amount in the YR

Quantifying the sand mining amount from Poyang Lake is crucial for accurately estimating the total sand mined from the YR. Because illegal sand mining along the YR mainstream was prohibited in the early 21st century, mining activities vessels have moved to Poyang Lake, resulting in excessive illegal mining in the lake over an extended period. Jiang et al. [25] found that the amount of sand mining in Poyang Lake was approximately 2154 MT from 2001–2010, which is 7–8 times the approved amount. According to the ship-port affairs department statistics, Chen [26] stated that the actual amount of sand mining in Poyang Lake was approximately 230–290 MT during 2005–2007, which is 4–5 times the planned amount. Therefore, in this study, we referenced the above studies, and the total amount of sand mining was estimated at 3470 MT in the YRB during 2004–2020, yielding an average annual amount of 204.1 MT.

4.2. Discrepancy between Supply and Demand of Sand Resources in the YR

Development of the YR Economic Belt resulted in reserve land resources driving the demand for sand and gravel. The reclamation project expanded from reinforcing embankments, filling ponds and foundations, and farmland improvement to coastal protection, island reclamation, and even national defense construction. For example, dredged sand from the Huangpu River was used to reclaim Fuxing Island in Shanghai. Therefore, sand and gravel resources in the YRB have been in short supply.
Additionally, studies show that the middle and lower reaches of YR, including delta regions, will likely continue to erode in the future [27]. However, the sand discharge in the YRB continuously decreased (Figure 7). Sediment discharge has been limited, particularly since the Three Gorges Dam (TGD) became operational in 2003 [28,29]. During 2004–2018, the TGD trapped 77% of riverine sediment inflow, largely reducing sediment load downstream [30]. For example, the sediment discharge fluctuated from 64 MT in 2004 to 46.8 MT in 2020, with an annual value of 31.3 MT at Yichang Station (Figure 7), far below the annual sediment discharge of 501.0 MT during 1950–2000. Hankou and Datong stations, located in the middle and lower reaches of the YR, demonstrated similar decreases (Figure 7). Therefore, there is a prominent incongruity between the sand and gravel supply and the demand in the YRB.

4.3. Coping Strategies and Enlightenment

Based on the comprehensive review of sand mining in the Yangtze River Basin, we propose the following strategies that address the discrepancy between sand and gravel supply and demand. These include
  • Gain more insight into the YR channel evolution and adjust sand mining areas scientifically and dynamically.
The YR has experienced inconsistent channel scouring and deposition over time. Therefore, more studies on the river channel dynamics need to be conducted to identify spatiotemporal erosion-deposition equilibrium. The recoverable area should be dynamically adjusted according to runoff and sediment discharge characteristics. For example, the river section from Yichang to Chenglingji is currently in a state of erosion. Therefore, sand mining should be prohibited along this reach.
2.
Reduce demand for natural sand.
Reducing demand for natural sand can be achieved through two approaches. First, mining amount and demand are often not equal on a yearly basis. Therefore, a modeling approach to optimize supply/demand balancing can be used, such as the model developed by Zhai et al. [31]. For instance, if the quantity of sand mining this year exceeds the demand, mining can be adjusted accordingly next year.
Second, research should focus on the use of recycled and alternative materials, such as “green concrete” with lower carbon emissions, ultra-high-performance, fly ash, lightweight, and geopolymer concretes, as well as recycled construction materials [32,33,34,35,36,37]. Alternatively, manufactured sand can replace natural sand. Manufactured sand with a particle size below 4.75 mm is formed by removing soil from rocks, pebbles, and mine tailings and crushing them to size.
3.
Strengthen the geological survey of sand and gravel resources in the YR and its tributaries and establish a sand and gravel data management system.
Geological surveys should include location and reserve information [38]. These surveys can play an essential role in sand mining planning, alleviating discrepancies between supply and demand, tracing sand mining sources, and reducing the negative environmental and social impacts.
4.
Establish scientific standards for sustainable sand mining.
Application of the quality management method from the plan-do-check-act cycle can aid sand and gravel mining management. Thus, the total amount of sand mining, recoverable area and period, and mining elevation can be planned and monitored. First, the on-site supervision should be strengthened following the plan implementation. Topography, actual sediment supply, and flow velocity variation should then be evaluated to gradually establish technical standards and institutionalize the best practices for sustainable sand mining.
Additionally, natural sand consumption must be reduced during construction [39,40]. Relevant departments can review and verify technical standards for construction projects to avoid an engineering “overdesign” [41,42]. We should reduce the construction of non-essential infrastructure and expand the use of green infrastructures, such as permeable pavements [43,44,45,46].
The middle and lower reaches of the YR are typical alluvial rivers with good-quality river sand, being an important sand resource in China. The recent decadal rapid development of the economy and building industry in the country has led to urbanization along the river. Conflicts between supply and demand have become and will remain challenging. Scientific assessment of the sand and gravel resources and planning reasonable sand mining behavior are prerequisites for maintaining the sustainable development of the YR sand. Establishing a scientific management system and strengthening management and control of sand mining processes are important in the sustainable development of sand resources. Additionally, research on renewable and alternative materials is important in solving the incongruity between the supply and demand of sand in China’s Yangtze River Basin. Furthermore, the assessment and review conducted in this study can also serve as a reference for the mining and management of river sand for other rivers in the world, especially those where illegal sand mining is widespread, such as the Indus, Narmada, Nile, and Congo Rivers.

5. Conclusions

Currently, the global demand for sand and gravel is approximately 50 billion tons per year. With this gigantic demand, sand and gravel resources in countries worldwide are facing multiple challenges. Taking the YRB as an example, this study analyzed spatial and temporal changes in sand mining activities. The main conclusions are as follows.
  • After 2015, sand mining areas in the YR expanded to their upper and lower reaches (Chongqing City and Shanghai City, respectively). Currently, sand mining is mainly distributed in the reaches of Chongqing, Hubei, Jiangxi, Anhui, Jiangsu, and Shanghai.
  • There were 756.3 MT and 539.6 MT of sand mined in the YR mainstream and Poyang Lake during 2004–2020, respectively. The demand for sand and gravel increased to 7.6 billion tons within the YRB during 2021. There is a prominent incongruity between the sand and gravel supply and the demand in the YRB.
  • Based on the current state of sand mining in the YR, reducing natural sand consumption for city construction is necessary. Optimizing supply/demand balance and replacing natural sand with recycled (including recycled construction materials) and alternative materials are essential. Furthermore, the recoverable area should be dynamically adjusted according to the YR evolution. Moreover, a geological survey of sand and gravel resources should be strengthened, and a sand and gravel data management system established.

Author Contributions

Methodology, Y.M.; software, Y.C.; formal analysis, Y.M; writing—review and editing, Y.J.X.; data curation, S.Z; writing—original draft preparation, Y.M and S.Z.; writing—review and editing, S.Z. and Z.L. funding acquisition, S.Z. and Y.M. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Natural Science Foundation of Shandong Province, grant number ZR2020QD083 and the Postdoctoral Science Foundation funded project, grant number 2018M642693.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Torres, A.; Simoni, M.U.; Keiding, J.K.; Müller, D.B.; zu Ermgassen, S.O.; Liu, J.; Jaeger, J.A.; Winter, M.; Lambin, E.F. Sustainability of the global sand system in the Anthropocene. One Earth 2021, 4, 639–650. [Google Scholar] [CrossRef]
  2. United Nations Environment Programme (UNEP). Sand and Sustainability: 10 Strategic Recommendations to Avert a Crisis; GRID-Geneva: Geneva, Switzerland, 2022. [Google Scholar]
  3. United Nations Environment Programme (UNEP). Sand and Sustainability: Finding New Solutions for Environmental Governance of Global Sand Resources: Synthesis for Policy-Makers; GRID-Geneva: Geneva, Switzerland, 2019. [Google Scholar]
  4. Global Witness. Shifting Sand: How Singapore’s Demand for Cambodian Sand Threatens Ecosystems and Undermines Good Governance; Global Witness: London, UK, 2010. [Google Scholar]
  5. Xiao, Y.; Li, W.; Yang, S. Gravel excavation and geomorphic evolution of the mining affected river in the upstream reach of the Yangtze River, China. Int. J. Sediment Res. 2022, 37, 272–286. [Google Scholar] [CrossRef]
  6. Koehnken, L.; Rintoul, M. Impacts of Sand Mining on Ecosystem Structure, Process and Biodiversity in Rivers; World Wide Fund for Nature, Greater Mekong: Grang, Switzerland, 2018. [Google Scholar]
  7. Koehnken, L.; Rintoul, M.S.; Goichot, M.; Tickner, D.; Loftus, A.-C.; Acreman, M.C. Impacts of riverine sand mining on freshwater ecosystems: A review of the scientific evidence and guidance for future research. River Res. Appl. 2020, 36, 362–370. [Google Scholar] [CrossRef] [Green Version]
  8. Hackney, C.R.; Darby, S.E.; Parsons, D.R.; Leyland, J.; Best, J.L.; Aalto, R.; Nicholas, A.P.; Houseago, R.C. River bank instability from unsustainable sand mining in the lower Mekong River. Nat. Sustain. 2020, 3, 217–225. [Google Scholar] [CrossRef]
  9. Zawiejska, J.; Wyzga, B.; Pawlik, A.R. Variation of bed material along mountain river modified by gravel extraction and channelization, the Czarny Dunajec, Polish Carpathians. Geomorphology 2015, 231, 353e366. [Google Scholar] [CrossRef]
  10. Barman, B.; Kumar, B.; Sarma, A.K. Turbulent flow structures and geomorphic characteristics of a mining affected alluvial channel. Earth Surf. Process. Landf. 2018, 43, 1811–1824. [Google Scholar] [CrossRef]
  11. Kondolf, G.M. PROFILE: Hungry Water: Effects of Dams and Gravel Mining on River Channels. Environ. Manag. 1997, 21, 533–551. [Google Scholar] [CrossRef]
  12. John, E. The impacts of sand mining in Kallada river (Pathanapuram Taluk), Kerala. J. Basic Appl. Biol. 2009, 3, 108–113. [Google Scholar]
  13. Sreebha, S.; Padmalal, D. Environmental Impact Assessment of Sand Mining from the Small Catchment Rivers in the Southwestern Coast of India: A Case Study. Environ. Manag. 2011, 47, 130–140. [Google Scholar] [CrossRef]
  14. Thornton, P.K.; Jones, P.G.; Owiyo, T.; Kruska, R.L.; Herrero, M.T.; Kristjanson, P.M.; Omolo, A. Mapping Climate Vulnerability and Poverty in Africa; International Livestock Research Institute (ILRI): Nairobi, Kenya, 2006. [Google Scholar]
  15. Pye, K.; Neal, A. Coastal dune erosion at Formby Point, north Merseyside, England: Causes and Mechanisms. Mar. Geol. 1994, 119, 39–56. [Google Scholar] [CrossRef]
  16. Yuill, B.T.; Gaweesh, A.; Allison, M.A.; Meselhe, E.A. Morphodynamic evolution of a lower Mississippi River channel bar after sand mining. Earth Surf. Process. Landf. 2015, 41, 526–542. [Google Scholar] [CrossRef]
  17. Sengani, F.; Zvarivadza, T. The impact of sand mining on the fluvial environment: Case study of Nzhelele River in Limpopo Province, South Africa. In Symposium on Environmental Issues and Waste Management in Energy and Mineral Production; Springer: Cham, Switzerland, 2018; pp. 67–80. [Google Scholar] [CrossRef]
  18. Gavriletea, M.D. Environmental Impacts of Sand Exploitation. Analysis of Sand Market. Sustainability 2017, 9, 1118. [Google Scholar] [CrossRef] [Green Version]
  19. India, Ministry of Environment, Forest and Climate Change. Sustainable Sand Mining Management Guidelines 2016; Ministry of Environment, Forest and Climate Change: New Delhi, India, 2016. [Google Scholar]
  20. Lai, X.; Shankman, D.; Huber, C.; Yesou, H.; Huang, Q.; Jiang, J. Sand mining and increasing Poyang Lake’s discharge ability: A reassessment of causes for lake decline in China. J. Hydrol. 2014, 519, 1698–1706. [Google Scholar] [CrossRef]
  21. Zheng, S.; Cheng, H.; Tang, M.; Xu, W.; Liu, E.; Gao, S.; Best, J.; Jiang, Y.; Zhou, Q. Sand mining impact on Poyang Lake: A case study based on high-resolution bathymetry and sub-bottom data. J. Oceanol. Limnol. 2022, 40, 1404–1416. [Google Scholar] [CrossRef]
  22. Mei, X.; Dai, Z.; Du, J.; Chen, J. Linkage between three gorges dam impacts and the dramatic recessions in China’s largest freshwater lake, Poyang Lake. Sci. Rep. 2015, 5, 18197. [Google Scholar] [CrossRef] [Green Version]
  23. Yangtze River Water Conservancy Commission. Systematic Governance, Promoting High-Quality Development of Sand Mining Management in Yangtze River; People’s Yangtze River News: Wuhan, China, 2022. [Google Scholar]
  24. Chen, Z.; Yu, L.; Gupta, A. The Yangtze River: An introduction. Geomorphology 2001, 41, 73–75. [Google Scholar] [CrossRef]
  25. Jiang, F.; Qi, S.; Liao, F.; Zhang, X.; Wang, D.; Zhu, J.; Xiong, M. Hydrological and sediment effects from sand mining in Poyang Lake during 2001–2010. Acta Geogr. Sin. 2015, 70, 837–845. [Google Scholar]
  26. Chen, Q. Effect of unified managing sand-excavating on Poyang Lake in Jiujiang city. Jiangxi Hydrol. Sci. Technol. 2010, 36, 147–148. [Google Scholar]
  27. Lu, J.; Liu, C.J.; Guan, J.Z.; Liu, L.; Liu, H.F. Sand and Gravel Mining in the Upstream of the Yangtze River and Its Effects on the Three Gorges Reservoir. In World Environmental and Water Resources Congress; ASCE: Austin, TX, USA, 2015; pp. 1821–1830. [Google Scholar] [CrossRef]
  28. Wang, Y.; Wang, D.; Lewis, Q.W.; Wu, J.; Huang, F. A framework to assess the cumulative impacts of dams on hydrological regime: A case study of the Yangtze River. Hydrol. Process. 2017, 31, 3045–3055. [Google Scholar] [CrossRef]
  29. Marwan, A.H.; Church, M.; Yan, O.S. Spatial and temporal variation of inreach suspended sediment dynamics along the mainstem of Changjiang (Yangtze River), China. Water Resour. Res. 2012, 46, W11551. [Google Scholar]
  30. Li, S.; Xu, Y.J.; Ni, M. Changes in sediment, nutrients and major ions in the world largest reservoir: Effects of damming and reservoir operation. J. Clean. Prod. 2021, 318, 128601. [Google Scholar] [CrossRef]
  31. Zhai, W.; Ding, J.; An, X.; Wang, Z. An optimization model of sand and gravel mining quantity considering healthy ecosystem in Yangtze River, China. J. Clean. Prod. 2020, 242, 118385. [Google Scholar] [CrossRef]
  32. Liew, K.; Sojobi, A.; Zhang, L. Green concrete: Prospects and challenges. Constr. Build. Mater. 2017, 156, 1063–1095. [Google Scholar] [CrossRef]
  33. Shafigh, P.; Bin Mahmud, H.; Bin Jumaat, M.Z.; Ahmmad, R.; Bahri, S. Structural lightweight aggregate concrete using two types of waste from the palm oil industry as aggregate. J. Clean. Prod. 2014, 80, 187–196. [Google Scholar] [CrossRef]
  34. Siddique, R.; Singh, G.; Belarbi, R.; Ait-Mokhtar, K. Kunal Comparative investigation on the influence of spent foundry sand as partial replacement of fine aggregates on the properties of two grades of concrete. Constr. Build. Mater. 2015, 83, 216–222. [Google Scholar] [CrossRef]
  35. Singh, P.; Singla, R.K. Utilization of waste ceramic tiles as coarse aggregate in concrete. J. Multidiscip. Eng. Sci. Technol. 2015, 2, 3294–3300. [Google Scholar]
  36. Lin, K.L. Feasibility study of using brick made from municipal solid waste incinerator fly ash slag. J. Hazard. Mater. 2006, 137, 1810–1816. [Google Scholar] [CrossRef]
  37. Meddah, A.; Beddar, M.; Bali, A. Use of shredded rubber tire aggregates for roller compacted concrete pavement. J. Clean. Prod. 2014, 72, 187–192. [Google Scholar] [CrossRef]
  38. Bhoopathy, V.; Subramanian, S.S. The way forward to sustain environmental quality through sustainable sand mining and the use of manufactured sand as an alternative to natural sand. Environ. Sci. Pollut. Res. 2022, 29, 30793–30801. [Google Scholar] [CrossRef]
  39. O’Callaghan, C.; Boyle, M.; Kitchin, R. Post-politics, crisis, and Ireland’s ‘ghost estates’. Polit. Geogr. 2014, 42, 121–133. [Google Scholar] [CrossRef]
  40. Peduzzi, P. Sand, Rarer Than One Thinks. Global Environmental Alert Service (GEAS); United Nations Environment Programme: Nairobi, Kenya, 2014. [Google Scholar]
  41. Orr, J.; Drewniok, M.P.; Walker, I.; Ibell, T.; Copping, A.; Emmitt, S. Minimising energy in construction: Practitioners’ views on material efficiency. Resour. Conserv. Recycl. 2019, 140, 125–136. [Google Scholar] [CrossRef]
  42. Albrechts, L.; Balducci, A. Practicing Strategic Planning: In Search of Critical Features to Explain the Strategic Character of Plans. disP- Plan. Rev. 2013, 49, 16–27. [Google Scholar] [CrossRef]
  43. Yuan, X.; Tang, Y.; Li, Y.; Wang, Q.; Zuo, J.; Song, Z. Environmental and economic impacts assessment of concrete pavement brick and permeable brick production process—A case study in China. J. Clean. Prod. 2018, 171, 198–208. [Google Scholar] [CrossRef]
  44. Admute, A.M.; Gandhi, A.V.; Adsul, S.S.; Agarkar, A.A.; Bhor, G.S.; Kolte, G.P. Permeable pavements: New technique for construction of road pavements in India. Int. Res. J. Eng. Technol. 2017, 4, 1810–1814. [Google Scholar]
  45. Disfani, M.M.; Mohammadinia, A.; Narsilio, G.A.; Aye, L. Performance evaluation of semi-flexible permeable pavements under cyclic loads. Int. J. Pavement Eng. 2020, 21, 336–346. [Google Scholar] [CrossRef]
  46. Wang, T.; Xiao, F.; Zhu, X.; Huang, B.; Wang, J.; Amirkhanian, S. Energy consumption and environmental impact of rubberized asphalt pavement. J. Clean. Prod. 2018, 180, 139–158. [Google Scholar] [CrossRef]
Figure 1. The Yangtze River, its major tributaries, and drainage basin.
Figure 1. The Yangtze River, its major tributaries, and drainage basin.
Ijerph 19 16712 g001
Figure 2. Sand mining planning data for the mainstream YR during 2004–2020.
Figure 2. Sand mining planning data for the mainstream YR during 2004–2020.
Ijerph 19 16712 g002
Figure 3. Sand mining within the YRB from 2004–2020: (A) Hubei Province; (B) Jiangsu Province; (C) Chongqing City; (D) Shanghai City; (E) Anhui Province; (F) Jiangxi Province.
Figure 3. Sand mining within the YRB from 2004–2020: (A) Hubei Province; (B) Jiangsu Province; (C) Chongqing City; (D) Shanghai City; (E) Anhui Province; (F) Jiangxi Province.
Ijerph 19 16712 g003
Figure 4. Maps show the location of Poyang Lake. (a) Poyang Lake from remote sensing image. (b,c) Sawtooth sandbar in the Poyang Lake formed by sand mining in 2017. (b1,c1) Sand mining equipment in operation on 27 February 2017. (d) Photo of a sand dredger in Poyang Lake.
Figure 4. Maps show the location of Poyang Lake. (a) Poyang Lake from remote sensing image. (b,c) Sawtooth sandbar in the Poyang Lake formed by sand mining in 2017. (b1,c1) Sand mining equipment in operation on 27 February 2017. (d) Photo of a sand dredger in Poyang Lake.
Ijerph 19 16712 g004
Figure 5. Annual sand mining quantity from Poyang Lake during 2004–2020.
Figure 5. Annual sand mining quantity from Poyang Lake during 2004–2020.
Ijerph 19 16712 g005
Figure 6. Sand mining by type during 2004–2020.
Figure 6. Sand mining by type during 2004–2020.
Ijerph 19 16712 g006
Figure 7. Sediment discharged data from hydrological stations in the mainstream YR from 2004–2020.
Figure 7. Sediment discharged data from hydrological stations in the mainstream YR from 2004–2020.
Ijerph 19 16712 g007
Table 1. The planned data source of sand mining in the tributaries of the Yangtze River (YR).
Table 1. The planned data source of sand mining in the tributaries of the Yangtze River (YR).
The Main TributariesData Source
Tuo RiverSand Mining Planning Report of Neijiang Section of the Tuo River (2018–2022)
Jialing, Wu, Fu, Qu, Qing River, and other rivers in ChongqingSand Mining Planning of Important River Channels in Chongqing (2016–2020)
Han and Dongjing RiverSand Mining Planning for the Middle and Lower Reaches of the Han and Dongjing River (2018–2023)
Xiang, Zi, Yuan, Li River, and Dongting LakeSand Mining Planning in the Mainstream of Xiang, Zi, Yuan, Li River, and Dongting Lake in Hunan Province (2012–2016)
Sand Mining Planning in the Mainstream of Xiang, Zi, Yuan, Li River, and Dongting Lake in Hunan Province (2019–2022)
Gan, Fu, Rao, Xin, and Xiu RiverSand Mining Planning in the Middle and Lower Mainstream of Gan, Fu, Rao, Xin, Xiu River, and Poyang Lake in Jiangxi Province (2019–2023)
Sand Mining Planning of Poyang Lake in Jiangxi Province (2019–2023)
Table 2. Illegal sand mining in YR.
Table 2. Illegal sand mining in YR.
No.TimeLocationSand Mining Amount/×103 TonsData Source
12001–2010Poyang Lake2154 × 103Literature [25]
22005–2007Poyang Lake230~290 × 103Literature [26]
32013Waters of Hannan section, Hubei province30 https://news.sina.com.cn/; accessed on 18 April 2013
42015Waters of Fuchi Town, Xisai mountain, and Qichun County, Hubei province881.5https://hb.ifeng.com/; accessed on 4 June 2019
52015–2017Waters of Zhangjiagang section, Jiangsu province1000https://cssglw.com/; accessed on 23 December 2019
62016Waters of Jiangjin section, Chongqing city170https://www.sohu.com/; accessed on 1 December 2017
72016–2017Dongting Lake41 × 103https://www.thepaper.cn/; accessed on 19 August 2018
82016–2018Waters of Taicang section, Jiangsu province11 × 103https://cssglw.com/; accessed on 1 December 2019
92017Waters of Zhenjiang section, Jiangsu province600https://www.thepaper.cn/; accessed on 8 August 2018
102017Waters in the forbidden mining area 6https://www.sohu.com/; accessed on 14 April 2014
112015–2018Waters of Zhangjiagang section, Jiangsu province12 × 103https://www.toutiao.com/; accessed on 13 April 2020
122017–2020Waters of the Sichuan province section 46.1https://www.sohu.com/; accessed on 11 March 2020
132018Waters of Yichang section, Hubei province14https://view.inews.qq.com/; accessed on 10 August 2018
142018–2019Waters of Jing River, Hunan province, and Chongqing city, etc.15 × 103https://legal.people.com.cn/legal.people.com.cn/; accessed on 31 July 2019
152018–2019Nantong section, Jiangsu province57.2http://rgfy.cpcrugao.cn/; accessed on 27 April 2020
162018–2019Dongting Lake100https://hnrb.voc.com.cn/; accessed on 15 September 2020
172019Poyang Lake50https://www.163.com/; accessed on 7 June 2019
182019Waters in the forbidden mining area 19 × 103http://www.gov.cn/; accessed on 16 November 2019
192019Waters of Maanshan, Wuhu and Chizhou City, Anhui province and waters of Huangshi City, Hubei province 237http://www.gov.cn/; accessed on 23 October 2019
202019Waters of Tongling section, Anhui province5.6https://k.sina.com.cn/; accessed on 26 May 2020
212019National nature reserve for freshwater dolphins in Tongling, Anhui province (no mining zone)180https://ah.ifeng.com/; accessed on 15 June 2020
222019Waters of Zhenjiang section, Jiangsu province and Maanshan section, Anhui province.51http://szb.wxrb.com/; accessed on 9 July 2020
232020Waters of Jiangsu and Anhui province sections.1.0 × 103http://egal.people.com.cn/; accessed on 6 July 2020
242020Waters of Anhui province 2.5https://www.chinacourt.org/; accessed on 8 June 2021
252020The waters at the junction of Rugao and Jingjiang City, Jiangsu province.66.6https://k.sina.com.cn/; accessed on 23 July 2021
Table 3. Average runoff and sediment discharge in YR.
Table 3. Average runoff and sediment discharge in YR.
YearHydrological StationZhutuoCuntanYichangShashiHankouDatong
2004–2020annual runoff /billion m3261.4336.7395.5390.6690.3875.4
2004–2020annual sediment dicharge/MT111.1136.931.347.192.7129.8
Table 4. Average runoff and sediment discharge in Poyang Lake.
Table 4. Average runoff and sediment discharge in Poyang Lake.
YearTributaryGan RiverFu RiverXin RiverRao
River
Xiu RiverHukou
Waterway
Hydrological StationWai zhouLijiaduMeigangHushanWanjiabuHukou
2004–2020annual runoff/billion m368.812.118.36.93.6151.6
2004–2020annual sediment discharge/MT2.41.11.11.10.210.0
Table 5. Planned data of sand mining in the tributaries of the YR.
Table 5. Planned data of sand mining in the tributaries of the YR.
Main TributariesTimeAnnual Planned Sand Mining Amount/MTTotal Sand Mining/MT
Tuo River2018–20200.92.7
Jialing, Wu, Fu, Qu, Qing River, and other rivers in Chongqing2016–20206.532.5
Han and Dongjing River2018–20207.021
Xiang, Zi, Yuan, Li River, and Dongting Lake2012–2016120600
2019–202059.5119
Gan, Fu, Rao, Xin, and Xiu River2019–202031.362.6
Total planned sand mining amount 837.8
Table 6. Total sand mining data of different user types in the mainstream of the YR.
Table 6. Total sand mining data of different user types in the mainstream of the YR.
Type of Sand MiningEngineering Sand MiningConstruction and Operational Sand MiningRiver and Waterway Dredging Sand
Sand mining amount /MT584.028.5143.8
proportion77.22%3.77%19.01%
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Ma, Y.; Chai, Y.; Xu, Y.J.; Li, Z.; Zheng, S. Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam. Int. J. Environ. Res. Public Health 2022, 19, 16712. https://doi.org/10.3390/ijerph192416712

AMA Style

Ma Y, Chai Y, Xu YJ, Li Z, Zheng S. Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam. International Journal of Environmental Research and Public Health. 2022; 19(24):16712. https://doi.org/10.3390/ijerph192416712

Chicago/Turabian Style

Ma, Yugai, Yingying Chai, Y. Jun Xu, Zijun Li, and Shuwei Zheng. 2022. "Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam" International Journal of Environmental Research and Public Health 19, no. 24: 16712. https://doi.org/10.3390/ijerph192416712

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop