Next Article in Journal
The Bright and Dark Sides of Energy Efficiency Obligation Scheme: The Case of Latvia
Next Article in Special Issue
Assessment of Ground Regeneration around Borehole Heat Exchangers between Heating Seasons in Cold Climates: A Case Study in Bialystok (NE, Poland)
Previous Article in Journal
Multi-Objective Optimization of Autonomous Microgrids with Reliability Consideration
Previous Article in Special Issue
Determination of the Selected Wells Operational Power with Borehole Heat Exchangers Operating in Real Conditions, Based on Experimental Tests
 
 
Article

Article Versions Notes

Energies 2021, 14(15), 4465; https://doi.org/10.3390/en14154465
Action Date Notes Link
article xml file uploaded 23 July 2021 15:56 CEST Original file -
article xml uploaded. 23 July 2021 15:56 CEST Update https://www.mdpi.com/1996-1073/14/15/4465/xml
article pdf uploaded. 23 July 2021 15:56 CEST Version of Record https://www.mdpi.com/1996-1073/14/15/4465/pdf
article html file updated 23 July 2021 15:57 CEST Original file -
article html file updated 27 July 2022 06:16 CEST Update https://www.mdpi.com/1996-1073/14/15/4465/html
Back to TopTop