Next Article in Journal
Sustainable Water Supply Systems Management for Energy Efficiency: A Case Study
Next Article in Special Issue
Optimisation of the Two-Tier Distribution System in Omni-Channel Environment
Previous Article in Journal
Decoupling Analysis of CO2 Emissions in the Industrial Sector from Economic Growth in China
Previous Article in Special Issue
Shaping the Safety Culture of High Reliability Organizations through Digital Transformation
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport

by
Elzbieta Broniewicz
* and
Karolina Ogrodnik
Faculty of Civil Engineering and Environmental Sciences, Bialystok University of Technology, Wiejska St. 45A, 15-351 Bialystok, Poland
*
Author to whom correspondence should be addressed.
Energies 2021, 14(16), 5100; https://doi.org/10.3390/en14165100
Submission received: 1 July 2021 / Revised: 5 August 2021 / Accepted: 11 August 2021 / Published: 19 August 2021
(This article belongs to the Special Issue Planning and Management of Sustainable Transport)

Abstract

:
The article pertains to the utilization of the application potential of MCDM/MCDA (Multi-Criteria Decision Making/Multi-Criteria Decision Analysis) methods in decision-making problems in the field of transport in light of sustainable development. The article consists of a theoretical and an empirical part. As part of the literature studies, a review was carried out on the latest applications of MCDM/MCDA methods for decision-making problems in the field of transport. In the empirical part, a multi-criteria analysis of the placement selection for a strip of expressway located in north-eastern Poland was carried out. For this purpose, a hybrid approach was used, consisting of three selected MCDM/MCDA methods: DEMATEL, REMBRANDT, and VIKOR. The ranking was compared with the results achieved in the EIA report of the investment and the results were obtained by using a different set of MCDM/MCDA methods that were proposed in the first part of the research, i.e., AHP, Fuzzy AHP, TOPSIS, and PROMETHEE. The performed multi-criteria analyses allowed for an eventual multi-dimensional evaluation of the most popular MCDM/MCDA methods currently applied in the field of transport.

1. Introduction

Transport is an important branch of the economy and science, in which the decisions made are often multi-criteria in character. The choice of the investment location, route for road infrastructure, and public transport development scenario are just some of the decision-making problems in the field of transport [1] that require considering multiple environmental, economic, and social factors according to the idea of sustainable transport. The concept of sustainable transport appeared almost parallel with the definition of sustainable development in the Report of the World Commission on Environment and Development: Our Common Future [2]. In the early 1990s, Daly [3] and Pearce [4] defined sustainable transport as transport with non-declining capital, in which the capital includes human capital, monetary capital, and natural capital. Multi-criteria decision-making support in the area of sustainable transport is significant due to the multitude of aspects that should be considered.
Multi-criteria decision-making support in the area of sustainable transport is significant due to the multitude of aspects that should be considered.
There is, after all, a clear relationship between the level of development of transport systems and the area’s economic development. Transport performs many functions in the economy: it is an essential instrument for the exchange of goods and services, it determines the distribution of investments, and it is also an important factor in the location of settlements. Transport also affects the development of other branches of the economy and is an essential factor in GDP growth. Sustainable development requires considering environmental issues in economic decisions. As a component of the economy significantly influencing the environment, transport requires paying particular attention to environmental issues. The social function of transport is also worth emphasizing. Efficient transport satisfies society’s communication needs and shapes the spatial availability of the necessary functions [5].
Among the main features of transport infrastructure, one should include: a long period of its implementation and operation; high capital demands with a long return-on-investment period; immobility; and the possibility for various external influences to exist (especially in the context of the natural environment) [5]. Due to the functions of transport in the modern world and its features, the decision-making process in this field is an important and responsible task that often requires multi-criteria analyses.
The main goal of this work is to perform a comparative analysis of the results obtained while applying various MCDM/MCDA methods to a selected decision-making problem in the field of transport. The specific objectives of the study pertain to:
  • updating the review of the current applications of the MCDM/MCDA methods to the selected decision-making problems in the field of transport, along with indication of the latest trends;
  • carrying out a multi-criteria analysis of design variants using a hybrid approach that includes the DEMATEL, REMBRANDT, and VIKOR methods;
  • carrying out a comparative analysis of the results obtained with previous tests, which used a combination of the AHP, Fuzzy AHP, TOPSIS, and PROMETHEE methods; and
  • an assessment of the methods applied in both studies in the context of their advantages, disadvantages, and limitations in solving contemporary problems in the field of transport.
The research questions the authors try to answer are as follows: (1) whether the assessment of road construction investment options differs with the use of several multi-criteria methods and (2) which of the MDCA methods are most helpful in assessing this type of decision problem.
Therefore, this paper is devoted to the study of the applicability potential of selected MCDM/MCDA methods in the field of transport. In the beginning, a review of the literature on the latest applications of the selected methods in various decision-making processes was performed. Then, computational examples were developed through a case study on routing an expressway section in north-eastern Poland. Finally, based on multi-criteria and comparative analyses, the selected methods that have been used most commonly in the field of transport were assessed in detail. They were used to select the variant of the expressway section in north-eastern Poland and compare the result of the analysis with the choice made in the analyzed environmental impact report.
In the available literature on the subject, you can find many items devoted to the analysis of the application potential of MCDM/MCDA methods in various areas of life and science (see, e.g., [6,7,8,9]). However, this work focuses only on decision-making problems in the field of transport: the most popular research topics have been identified and, on the basis of several dozen previous scientific papers, the most popular methods from the MCDM/MCDA family have been identified. In addition, a proprietary hybrid approach was proposed, supporting multi-criteria decision support in environmental impact assessments of transport investments.

2. Literature Review Materials and Methods

We considered a total of 52 scientific articles [10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59] in which MCDM/MCDA methods were applied to decision-making problems in the field of transport in 2020 and 2021 worldwide (Previous publications from 2000–2019 were analyzed in the first part of the paper: Broniewicz, E., Ogrodnik, K., 2020. Multi-criteria analysis of transport infrastructure projects, Transportation Research Part D: Transport and Environment 83, 102351, https://doi.org/10.1016/j.trd.2020.102351, accessed on 15 May 2021). Articles indexed in Scopus and Web of Science were considered, with the leading search criteria being the following keywords: MCDM, MCDA, and transport. Appendix A presents the types of MCDM/MCDA methods used, the research problem, and the temporal and territorial delimitation of the research. As in the previous study [1], six areas of activity related to transport infrastructure were identified: quality and safety of public transport, scenarios for the development of public transport systems, choice of investment location, road, air, rail and sea transport, and electric vehicles, among other areas of activity. It can be observed that between 2020 and 2021, AHP, TOPSIS, PROMETHEE, Fuzzy AHP, and DEA are still the most popular methods of multi-criteria decision making. There are also multiple new, hitherto unobserved multi-criteria decision-making methods such as CODAS, COMET, CRITIC, EDAS, MARCOS, PIPRECIA, and MEW PROMETHEE II, among others (see Appendix A).
Data on multi-criteria decision-making methods were summarized to obtain a database from 2000 to 2021 (Appendix B). Figure 1 shows the methods that have been used in at least two studies over the past 20 years.
Based on the data in Figure 1, it can be observed that—in the last 20 years—the most frequently used MCDM/MCDA methods in the field of transport were the AHP, TOPSIS, and PROMETHEE methods. It should be emphasized that these exact methods were used in previous studies [1]. In the second part, a decision was made to use the selected methods included in the following items of the carried out review. The hybrid approach proposed in this article is the result of the literature review. In the case study, alternative methods were used to those from the first part of the study [1], which were also at the forefront of the MCDM/MCDA method ranking. A hybrid approach was again used including the following methods:
  • DEMATEL; the method placed fifth in the ranking. This method makes it possible to perform dependency analyses at the level of decision factors, making it possible to conduct a multi-criteria analysis in a new dimension.
  • VIKOR; the method was placed, along with other methods, in the seventh position, selected as an alternative to the TOPSIS method from the first research part.
  • REMBRANDT; although this method was placed in a distant nineth place, it is one of the few methods enabling the weighting of decision factors. It was selected as an alternative to the AHP and Fuzzy AHP methods from the first part of the study.

3. Research Methods

Figure 2 shows the hybrid approach proposed in the article and the scope of multi-criteria and comparative analyses.

3.1. DEMATEL Method (Decision-Making Trial and Evaluation Laboratory)

The DEMATEL method was developed in the second half of the 1970s in Switzerland. Generally, it allows for the analysis of cause-and-effect relationships at the level of decision factors. The algorithm of the classic DEMATEL method is relatively simple, as is the case with the AHP method, and is based on comparing factors in pairs using a point scale. The basic assumptions of the method’s algorithm are characterized below [60] (pp. 64–65) [61] (pp. 125–129) [62] (pp. 67–68) [7] (pp. 63–65). The first step in the DEMATEL method is to develop a matrix of direct relations. This matrix is created using a point scale. The classical scale (by Fontel and Gabus, the authors of the method) consists of the following five levels: 0 meaning no direct influence; 1 meaning low impact; 2 meaning medium impact; 3 meaning high impact; and 4 meaning very high impact. There are also other scales. An increased interest in fuzzy scales is observed (see, e.g., [63]). The assessment of the direct interrelationships between the elements is made in pairs (by a single decision-maker or a group of decision-makers). The effect of these comparisons is the so-called matrix of direct relations M. A matrix of direct relations is a square matrix in which the elements on the main diagonal are equal to 0.
In contrast, the other matrix elements show direct relations between the factors within a given pair. The next step in the DEMATEL method is the normalization of elements in the developed matrix of direct relations. The normalization procedure in the DEMATEL method consists of dividing the elements in the matrix of direct relations by the highest value of its row or column sums, thus creating a normalized matrix of direct relations M’. Then, the following formula creates a matrix of integral relations:
N = M′(I − M′)−1
where N is the matrix of total relations, M′ is the normalized matrix of direct relations, and I is the unit matrix (the dimension that relates to the dimension of the direct relation matrix).
The elements of the n matrix represent both direct and indirect relations between decision factors. The final stage in the DEMATEL method is the calculation of two key indicators, the so-called significance index and relation index. Based on their values, the final cause-and-effect diagram is created, illustrating both the activity of the decision factors and their nature in the created cause–effect chain. The factors with positive values of the relation index are causal, i.e., they have the most significant impact on the remaining elements in the data set under consideration. Conversely, factors with negative values of the dependency index affect the created cause–effect chain.
It is worth adding that the DEMATEL and AHP methods have common features including similar initial matrices, namely the matrix of comparisons and matrix of direct relations. Both matrices are square with the constant form of a diagonal (in the AHP comparison matrix, it is 1; in the DEMATEL matrix, the values on the main diagonal are 0). Both methods also utilize point scales [61]. Examples of approaches to linking the classic Saaty scale with the Fontel and Gabus scale (both classic and its modification) are presented in Table 1.
Despite the possibility of transforming the initial comparison matrix within the AHP method onto the matrix of direct relations within the DEMATEL method, it should be noted that the procedure of comparing elements in the classic DEMATEL variant concerns the mutual relationships between factors, not the estimation of their importance. Therefore, a multi-criteria analysis using the classic DEMATEL method should be performed regardless of the pairwise comparison procedure present in the AHP method. As part of this article, a cause-and-effect chain of decision-making factors has been developed. It should be emphasized that this is the only multi-criteria analysis developed as part of the research, not related to the level of variants. The REMBRANDT method, an alternative to the AHP method, was used to estimate the weight of decision factors.

3.2. REMBRANDT Method

The REMBRANDT method (Ratio Estimation in Magnitudes or deciBells to Rate Alternatives which are Non-DominaTed) was developed in the Netherlands to respond to the selected solutions used in the AHP method that have been subject to criticism. Among the debatable elements of the algorithm of the AHP method, the authors Forman [66] and Moghtadernejad et al. [67] indicated, among others, that the independence of the examined elements, the measurable subjectivity within pairwise comparisons, or the difficulty in accounting for uncertainties related to judgments. Although the REMBRANDT method, similarly to the AHP method, enables the weighting of decision factors, there are significant technical differences between the methods [68,69,70]:
  • in the REMBRANDT method, a logarithmic scale is used instead of a Saaty scale;
  • a logarithmic method of least squares is used to derive scale vectors; and
  • the geometric mean aggregation is used for the generalized evaluation of variants.
A comparison of the scales used in the AHP and REMBRANDT methods and the grades definition is presented in Table 2.
The first step in the REMBRANDT method is the comparing of pairs of elements at a given decision stage using a numerical scale. The grades are then converted into values on a geometric scale. The conversion is done according to the following formula [69]:
rij = exp(γδij)
where γ is the ln 2 and δij is the figure from the scale.
In the second stage, a geometric mean for each row is calculated and then normalized to give the weight vector [68,69,71].
It should be emphasized that in this study, to be able to conduct a full-scale comparative analysis, the ratings from the initial comparison matrix in the AHP method were transformed into ratings that are in accordance with the REMBRANDT scale.

3.3. VIKOR Method

The VIKOR method (Serb. VIsekrzterijumska Optimizacija i Kompromisno Resenje) was developed in the 1990s and then disseminated thanks to the work of Opricovic and Tzeng [72], in which a comparative analysis of the VIKOR and TOPSIS methods (the latter being characterized by similar assumptions) was performed [70]. Similar to TOPSIS, the VIKOR method enables assessing decision alternatives based on their position to defined reference points [62]. The VIKOR method algorithm assumes the following calculation steps [70,72,73,74]. In the first stage, the best and worst grades are determined against the given criteria; these are so-called ideal and anti-ideal points. Then, for individual decision variants, the sum of the weighted, normalized distances from the ideal solution (metric S) and the maximum distance of the weighted, normalized assessment (metric R) are calculated. The lower the value of these metrics, the better. In the next step, the value of the comprehensive indicator is determined (metric Q) according to the following formula [72,73]:
Q i = v   S i S + S S + + ( 1 v )   R i R + R R +
where v is the weight of the strategy of “the majority of criteria”, Si is the S metric (the sum of the weighted, normalized distances of the i-variant from the ideal solution), and Ri is the R metric, the maximum weighted, normalized rating distance.
Three ranking lists constitute the results of the above calculations: variant evaluations in light of S, R, and Q metrics. The lower the values of these metrics, the higher the position in the rankings is awarded to a given variant. The final stage consists of comparing the rankings obtained in terms of an acceptable advantage and acceptable decision stability. Importantly, rankings in the VIKOR method can be carried out with different values of criteria weights, which enables the analysis of the impact of the weights of these criteria on the proposed compromise solution.

4. Case Study

This article once again takes advantage of the data from the report on the environmental impact of a project comprising the construction of an expressway and the construction of a national road in north-eastern Poland. The data was made available by the General Directorate for National Roads and Motorways, Bialystok Branch [75]. Detailed information on the decision-making factors and variants can be found in this article [1].
The planned project involves the construction of an expressway on the Choroszcz-Ploski section and a national road on the section between the towns of Kudrycze and Grabówka, together with the construction of the necessary technical infrastructure. The planned investment is essential for the economic development of this region of Poland. Additionally, it will contribute to improving the quality and safety of road traffic. This road belongs to the international transport corridor network. Six location variants were adopted for the analysis, including two variants of the expressway and three variants of the national road connected to it. The road route variants differ in the location and number of engineering structures [75]. The characteristics of the analyzed variants are presented in Table 3.

4.1. Decomposing a Decision-Making Problem

As part of this multi-criteria analysis, six different variants of the road route and 13 decision-making factors reflecting the impact of this investment on the environment and society at large were considered. The criteria for the evaluation of variants are each time individually selected depending on the nature and subject of the analysis. The decision criteria in this case study were adopted from the environmental impact report [75]. The hierarchical structure of the decision problem under consideration is shown in Figure 3.

4.2. Numerical Example

The results of the basic calculations performed using each of the selected methods are presented below: DEMATEL and then REMBRANDT, used to estimate the factor weights, which were later used with the VIKOR method.
The first stage concerned the analysis of dependencies at the level of decision factors. First, the decision criteria were compared in pairs using the classic DEMATEL scale, obtaining the matrix of direct relations M (Table 4). Then, the grades were normalized (Table 5) and the matrix of total N relations was determined (Table 6), which allowed for the ranking of factors under consideration in the form of a cause-and-effect chain (Table 7 and Figure 4).
It should be emphasized that the classic DEMATEL method enables the analysis of dependencies (direct and indirect) between decision factors. This should not be identified directly with the weights of these factors. Therefore, a multi-criteria analysis using DEMATEL helps rank the factors in terms of their mutual relations to identify those that have the most significant impact on the others. In the case of the analyzed data set, the causal factors, i.e., the ones that have the most significant impact on the others, are: factors related to the location of NATURA 2000 areas pertaining to the planned investment (C1, C2, and C5), as well as linear factors, i.e., length sections with a high degree of pollution risk (C9) and the length of the intersection of the complex of soils 2 and 2z (C11). Conversely, the following factors were classified as the resultant of the impact of the above-mentioned criteria: the number of herpetofauna locations in the test buffer (C8); the impact on snail habitats (C6); the impact on the habitats of insects (C7); the number of vascular plant species destroyed (C3); the number of fungi (lichens) species destroyed (C4); and the number of buildings exposed to excessive noise (C13). Two factors remained neutral (C10 and C12), which may indicate their different nature. The classic DEMATEL method facilitates ordering at the level of decision factors and their analysis regarding their mutual interactions. Therefore, it can be an instrument supporting the selection of factors at the stage of the decomposition of the decision-making problem.
Alternatively, the REMBRANDT method was used to estimate the weights of the criteria. It should be noted that the matrix of comparisons in the REMBRANDT method Based on the primary comparison matrix of the AHP method (Table 8), which was used in the first part of the study [1], it was developed (Table 9). Then, according to Formula 2, the matrix elements were transformed into values on the geometric scale. The decision factor weights were estimated using the geometric mean and additive normalization (Table 10).
The final stage focuses on developing a ranking of the considered decision variants in light of the defined criteria. For this purpose, the VIKOR method was used. In addition to the weights calculated by the REMBRANDT method, sets of weights estimated by the AHP and Fuzzy AHP methods were also used, finally obtaining three rankings (Table 11 and Table 12).

4.3. Comparative Analysis

Figure 5 presents individual decision factors’ weights estimated using the following methods: AHP, Fuzzy AHP [1], and REMBRANDT. It should be emphasized that the starting point for the calculations was the AHP comparison matrix evaluations, which were then transformed according to the algorithm of the other two methods.
Comparing the sets of weights estimated with the AHP, Fuzzy AHP, and REMBRANDT methods, it can be noticed that there are specific differences; however, the order of the factors in terms of their importance has not changed. It should be added, though, that the differences between the weights obtained with the AHP method and the weights estimated with the Fuzzy AHP method are much lower than the differences between the sets of AHP and REMBRANDT scales. Therefore, it can be concluded that the modifications proposed in the REMBRANDT method (mainly the form of the scale and the logarithmic method of least squares that is used to estimate the weight vector) have a greater overall impact on the final vector of the weights than the case with a transformation of a classic Saaty scale into a fuzzy triangular scale has (see also [68]).
The assessment of the impact that a change in the value of factor weights has on the final ranking of decision variants serves as yet another important element of the comparative analysis. Table 13 presents the final rankings of alternatives developed using the three MCDM/MCDA methods: TOPSIS, PROMETHEE, and VIKOR. Additionally, the ranking of variants developed as part of the environmental impact report for the investment in question was given as a reference point. A detailed description of the obtained rankings in terms of content is presented in [1].
A change in the weighting of decision factors did not affect the final ranking of the variants. For both the TOPSIS and PROMETHEE methods, even after changing the set of weights, the final order did not change. Similar observations apply to the multi-criteria analysis performed using the VIKOR method. It should be emphasized that the final rankings of the decision variants presented in Table 13 are almost identical. However, in the case of receiving different rankings, it is recommended to use, for example, the rank similarity coefficient in decision-making problems (see [76]).
Significantly, the obtained rankings of the decision alternatives differ in regards to the first position. In the case of the method used in the report and the PROMETHEE method, which represents the family of methods based on the height difference, W3 arrived in the first place. However, among the methods based on reference points, identical rankings were obtained, with W2 in the first place. In the case of the rankings obtained using the TOPSIS method, the differences between the first and second place were negligible (e.g., with the use of weights calculated by using the classic AHP and the final index of W2 = 0.777 and W3 = 0.772). In contrast, in the rankings prepared using the VIKOR method, the difference between the first two places was higher and W2 met both the condition of “acceptable advantage” and “acceptable stability”.
It should be emphasized that the comparative analysis of the distance methods VIKOR and TOPSIS (especially in the context of the algorithms used) was the subject of previous research; see, e.g., [72,77].

5. Discussion and Conclusions

The performed multi-criteria analyses allowed to verify the choice of the course of the selected investment made as part of the report [75] and which made it possible to evaluate the usefulness of the selected MCDM/MCDA methods in the field of transport. Based on the performed calculations as well as the comparative analyses of the obtained results and their interpretations, Table 14 presents the evaluation of the MCDM/MCDA methods applied, their advantages/opportunities, and disadvantages/limitations, including the fields of application in the transport domain. It should be noted that, due to the growing popularity of MCDM/MCDA methods, they have already been studied in terms of their advantages and disadvantages (see, e.g., [8,78,79,80,81]). However, in the framework of this paper, the observations formulated by the authors concern the application of these methods in decision-making problems in the area of transport. Of course, despite such a narrower approach, selected comments on the usefulness of the selected methods can be considered universal.
Based on the literature studies and the conducted analyses, the following conclusions can be drawn:
  • Multi-criteria decision support in the field of transport is invariably based mainly on the methods from the AHP, PROMETHEE, and TOPSIS family. This is primarily due to their universal nature, transparent and proven algorithms, and the available software to facilitate the performance of multi-dimensional analyses. However, each year, new methods not yet observed in the field of transport emerge, such as CODAS, COMET, CRITIC, EDAS, MARCOS, PIPRECIA, or MEW.
  • In any multi-criteria analysis, the weighting of decision-making factors serves as a crucial stage, especially in investments in the field of transport, which are usually characterized by large dimensions and thus a large scale of potential impacts. Therefore, it seems appropriate to use methods that enable pairwise comparisons of factors as part of the expert research stage (AHP, Fuzzy AHP, or REMBRANDT).
  • The DEMATEL method can serve as a support tool at the stage of selecting and analyzing decision factors. To increase objectivity, the analysis of dependencies can be successfully performed as part of expert interviews.
  • When ranking decision alternatives, the number of multi-criteria methods available is significant. Concerning decision-making problems in the field of transport, especially in a situation where the considered alternatives are similar, it is recommended to use at least two methods.
Due to the dynamic development of MCDM/MCDA methods, the development of multi-criteria analyses in the field of transport with the use of other methods, especially the “youngest” methods which have so far been characterized by single implementations of the study, should be indicated among the future directions of development. Furthermore, it would be interesting to compare their usefulness with classic methods well known in theory and practice that dominate the developed application overview.

Author Contributions

Conceptualization, K.O. and E.B.; methodology, K.O.; writing, E.B. and K.O. Both authors have read and agreed to the published version of the manuscript.

Funding

The study was carried out as part of study number WZ/WB-IIL/6/2019 and WZ/WB-IIŚ/1/2020 at the Bialystok University of Technology and was financed by a subvention provided by the Minister of Science and Higher Education.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

Appendix A

Table A1. Compilation of the literature review on multi-criteria methods applied in transport-related projects in 2020–2021.
Table A1. Compilation of the literature review on multi-criteria methods applied in transport-related projects in 2020–2021.
Author (Year of Publication)LocationMCDM/MCDA Methods UsedThe Main Subject of the Research
Safety and Quality of Public Transport
Vavrek and Bečica (2020) [6]Czech RepublicCV-TOPISISEvaluation of transport companies
Blagojević et al. (2020) [7]Bosnia and HerzegovinaFuzzy PIPRECIA and Entropy methodSafety evaluation of railway traffic
Damidavičius et al. (2020) [8]LithuaniaCOPRAS, TOPSIS, ARAS, and EDASAssessment of urban transport systems and their potential in terms of sustainable mobility
Zehmed and Jawab (2020) [9]Fez, MoroccoFuzzy SERVPERF and DEA Quality of urban bus transport service
Kumar and Anbanandam (2020) [10]IndiaFuzzy Best–Worst method (FBWM)Assessment of social sustainability indicators in the freight transport industry
Kumar and Anbanandam (2020A) [11]IndiaIntuitionistic fuzzy AHP (IF-AHP) and IF-VICORAssessment of environmental sustainability indicators in the freight transport industry
Pamucar et al. (2020) [12]Istanbul (Turkey)Fuzzy Full Consistency Method-Dombi–Bonferroni (fuzzy FUCOM-D’Bonferroni)Assessment of transport demand management measures
Kumar et al. (2020B) [13]IndiaAHP, DEA, VICOR, and MPIAssessment of the performance of public road transportation systems
Blagojević et al. (2021) [14]Bosnia and HerzegovinaFuzzy FUCOM, fuzzy PIPRECIA, and fuzzy MARCOSEvaluation of safety degree at railway crossings
Karim and Jawab (2020) [15]MoroccoDEA and fuzzy SERVPERFAssessment of the quality of urban bus transport
Scenarios for the Development of Public Transport Systems
Kizielewicz and Dobryakova (2020) [16]PolandCOMET (Characteristic Objects METhod)The assessment of model electric scooters in cities
D’Orso et al. (2020) [17]SpainAHPThe optimal allocation of economic resources for identifying the actions in the transport sector
Ogrodnik (2020) [18]PolandPROMETHEESustainable solutions for public transport and infrastructure
Hamurcu and Eren (2020) [19]Kırıkkale, TurkeyTOPSISPrioritizing alternative public transportation projects
Kim et al. (2020) [20]KoreaFAHPStrategies for efficient use of Trans-Siberian Railway for multimodal transport
Görçün (2021) [21]Istanbul, TurkeyCRITIC (CRiteria Importance Through Intercriteria Correlation) and EDAS (Evaluation based on Distance from Average Solution)Evaluation of the selection of urban rail vehicles
Choice of Investment Location
Palczewski and Sałabun (2019) [22]PolandPROMETHEE IILocation of the airport
Akin and Kara (2020) [23]Istanbul, TurkeyAdditive value (AV) modelLocation of intercity bus terminal
Ortega et al. (2020) [24]Ecuador, CuencaFuzzy AHPLocation of park-and-ride facility
Broniewicz and Ogrodnik (2020) [1]PolandAHP, Fuzzy AHP, TOPSIS, and PROMETHEELocation of the expressway section
Tadic et al. (2020) [25]Western Balkans regionAHP and CODASDry port terminal location selection
Aljohani and Thompson (2020) [26]Inner Melbourne, AustraliaTOPSISLocation of freight consolidation facility
Sukmanee et al. (2020) [27]ThailandAnalytic Network Process (ANP) and Design Structure Matrix (DSM)Location of dry port
Zagorskas and Turskis (2020) [28]Kaunas, LithuaniaMEW, EDAS, ARAS, and SWARALocation of new pedestrian bridges
Aksoy and Gursoy (2020) [29]TurkeyAHP and ELECTRELocations of logistic villages
Muravev et al. (2020) [30]ChinaDEMATEL–MAIRCALocation optimization of international logistics centers
Ayub and Balogun (2021) [31]Bandar Seri Iskandar MalaysiaAHPOptimal bus-stop locations
Road, Air, Railway, and Sea Transport
Li et al. (2020) [32]ChinaBest–Worst method (BWM)Customers’ preferences for the main attributes that define the transport service
Shishegaran et al. (2020) [33]Tehran, IranTOPSISSustainability evaluation of scenarios transport network condition
Stokic et al. (2020) [34]Belgrade, SerbiaHybrid DANP–TOPSISSelection of the most suitable vehicle
Stoilova et al. (2020) [35]Trans-European Transport Network (TEN-T)SIMUSEvaluation of railway network performance
Tolga and Durak (2020) [36]Istanbul, TurkeyFuzzy COPRASEvaluation of innovation projects in the air cargo sector
Lameira et al. (2020) [37]the AmazonAHP, DEMATEL, and ELECTREEvaluation and selection of the best river train in the Amazon region
Electric Vehicles
Shekhovtsov et al. (2020) [38]PolandVICOR and TOPSIS Evaluation of electric bicycles
Kaya et al. (2020) [39]IstanbulVIKOR and PROMETHEELocation of electric vehicle charging stations
Wilken et al. (2020) [40]GermanyPROMETHEEComparison of electric vehicles with internal combustion engine vehicles
Cheng and Wei (2020) [41]Beijing, ChinaAHP and DEALocation selection of bike-sharing parking points
Other
Solecka et al. (2020) [42]Krakow, PolandCompensation-Conjunctive method (CC)Adaptation of interchanges to the needs of people with reduced mobility
Dang and Yeo (2020) [43]VietnamFuzzy TOPSISSynchronization in developing transport infrastructures, such as between transport systems and dry port networks
Zapolskytė et al. (2020) [44]Vilnius, LithuaniaAHP, COPRAS, TOPSIS, and SAW Assessment of the level of development of infrastructure and transport services
Zagorskas and Turskis (2020) [45]Vilnius, LithuaniaAdditive Ratio ASsessment with Fuzzy (ARAS-F)Ranking the priorities for development and the renewal of bicycle pathway segments
Galinska (2019) [46]PolandPromethee IISelection of logistics operator
Pamucar et al. (2020) [47]RomaniaBWM and MARCOSPrioritizing the alternatives of the hydrogen bus development
Liachovičius et al. (2020) [48]LithuaniaSAW, COPRAS, TOPSIS, EDAS, and PROMETHEEBusiness valuation of road freight transport companies
Ur Rehman and Ali (2021) [49]China Pakistan Economic Corridor (CPEC)Fuzzy-TOPSISIdentification of China’s most optimal route for crude oil import
Kaska and Tolga (2021) [50]TurkeyTOPSISSelection of software for a maritime organization
Koohathongsumrit and Meethom (2021) [51]ThailandAHP, DEA, and TOPSISRoute selection in multimodal supply chains
Aghamohagheghi et al. (2001) [52]IranInterval-valued pythagorean fuzzy set (IVPFS)Assessment of sustainable transport projects
Ðalić et al. (2021) [53]Bosnia and HerzegovinaModel based on the integration of fuzzy PIPRECIA, FUCOM, and MARCOSSet of business strategies of the transport company
Risk Analysis
Cunha et al. (2021) [54]Brazilian airportsMCDA-CAnalysis of risks related to airport runway maintenance
Erdoğan and Kaya (2020) [55]Istanbul, TurkeyFuzzy rule-based system FRBS and particle swarm optimization PSOEvaluation of risks and failures of public transport systems
Bakioglu and Atahan (2021) [56]TurkeyAHP, PF-TOPSIS, and PF-VIKORRisk prioritization in self-driving vehicles

Appendix B

Table A2. Summary of the methods’ application in selected areas associated with transport infrastructure in 2000–2021.
Table A2. Summary of the methods’ application in selected areas associated with transport infrastructure in 2000–2021.
MethodSafety snd Quality of Public TransportScenarios for the Development of the Public Transport SystemChoice of Investment LocationRoad, Air, Rail, and Sea TransportElectric VehiclesOtherTotal
AHP76561631
ANOVA1000001
ANP0110024
ARAS-F1020014
AV0010001
BWM0002013
CC0000011
CFA0010001
CODAS0010001
COMET0100001
COPRAS2000024
COPRAS-G0100001
COSIMA0001001
CRITIC0100001
CV-TOPSIS1000001
DANP0002002
De Borda0001001
DEA3000126
Delphi2010014
DEMATEL1212129
DSM0010001
EDAS1010013
ELECTRE III/IV0312006
Entropy2000002
FARE1000001
FSWARA0001001
Fuzzy AHP32220211
Fuzzy ANP0010001
Fuzzy BWM1001002
Fuzzy COPRAS0001001
Fuzzy Delphi0010001
Fuzzy DEMATEL0000011
fuzzy FUCOM-D’Bonferroni1000012
Fuzzy GRA1100002
Fuzzy MARCOS1000001
Fuzzy MULTIMOORA0001001
Fuzzy particle swarm Optimisation PSO0000011
Fuzzy PIPRECIA2000013
Fuzzy SERVPERF2000002
Fuzzy TOPSIS1100136
Fuzzy VIKOR1110014
GAHP1001002
GRA1000001
Hybrid DANP-TOPSIS0001001
Interval AHP1100002
IVPFS0000011
MABAC0001001
MACBETH0010001
MARCOS0000022
MAUT0100001
MCDA-C0000011
MEW0010001
Modified rough AHP0001001
Modified VIKOR0001001
MPI1000001
MULTIMOORA0000011
PROMETHEE11213210
Promethee II0010012
REMBRANDT0001023
ROC0100001
SAW0001034
SMARTER0000011
Stochastic TOPSIS1000001
SWARA-G0110002
TOPSIS23341619
VIKOR2001205
WASPAS0010001

References

  1. Broniewicz, E.; Ogrodnik, K. Multi-criteria analysis of transport infrastructure projects. Transp. Res. Part D Transp. Environ. 2020, 83, 102351. [Google Scholar] [CrossRef]
  2. Brundtland Commission. Our Common Future, Report of the World Commission on Environment and Development; Brundtland Commission: Rio de Janeiro, Brazil, 1987. [Google Scholar]
  3. Daly, H.E. Allocation, Distribution, and Scale: Towards an Economics that is Efficient, Just, and Sustainable. Ecol. Econ. 1992, 6, 185–193. [Google Scholar] [CrossRef]
  4. Pearce, D.W.; Atkinson, G.D. Capital theory and the measurement of sustainable development: An indicator of “weak” sustainability. Ecol. Econ. 1993, 8, 103–108. [Google Scholar] [CrossRef]
  5. Urbanyi-Popiołek, I. Podstawy Organizacji i ekonomiki transportu–wybrane zagadnienia. In Ekonomiczne I Organizacyjne Aspekty Transportu, Urbanyi-Popiołek, I., Ed.; Wydawnictwo Uczelniane Wyższej Szkoły Gospodarki w Bydgoszczy: Bydgoszcz, Poland, 2013; pp. 9–27. (In Polish) [Google Scholar]
  6. Zavadskas, E.K.; Turskis, Z.; Kildienė, S. State of art surveys of overviews on MCDM/MADM methods. Technol. Econ. Dev. Econ. 2014, 20, 165–179. [Google Scholar] [CrossRef] [Green Version]
  7. Ogrodnik, K. The use of the DEMATEL method to analyze cause and effect relationships between sustainable development indicators. Ekonomia i Środowisko 2018, 4, 60–72. [Google Scholar]
  8. Kumar, A.; Sah, B.; Singh, A.R.; Deng, Y.; He, X.; Kumar, P.; Bansal, R. A review of multi criteria decision making (MCDM) towards sustainable renewable energy development. Renew. Sustain. Energy Rev. 2017, 69, 596–609. [Google Scholar] [CrossRef]
  9. Stojčić, M.; Zavadskas, E.K.; Pamučar, D.; Stević, Ž.; Mardani, A. Application of MCDM Methods in Sustainability Engineering: A Literature Review 2008–2018. Symmetry 2019, 11, 350. [Google Scholar] [CrossRef] [Green Version]
  10. Vavrek, R.; Bečica, J. Capital City as a Factor of Multi-Criteria Decision Analysis—Application on Transport Companies in the Czech Republic. Mathematics 2020, 8, 1765. [Google Scholar] [CrossRef]
  11. Blagojević, A.; Stević, Ž.; Marinković, D.; Kasalica, S.; Rajilić, S. A Novel Entropy-Fuzzy PIPRECIA-DEA Model for Safety Evaluation of Railway Traffic. Symmetry 2020, 12, 1479. [Google Scholar] [CrossRef]
  12. Damidavičius, J.; Burinskienė, M.; Antuchevičienė, J. Assessing Sustainable Mobility Measures Applying Multicriteria Decision Making Methods. Sustainability 2020, 12, 6067. [Google Scholar] [CrossRef]
  13. Zehmed, K.; Jawab, F. A Combined Approach Based on Fuzzy SERVPERF and DEA for Measuring and Benchmarking the Quality of Urban Bus Transport Service at the Route Level. Ind. Eng. Manag. Syst. 2020, 19, 442–459. [Google Scholar] [CrossRef]
  14. Kumar, A.; Anbanandam, R. An MCDM framework for assessment of social sustainability indicators of the freight transport industry under uncertainty. A multi-company perspective. J. Enterp. Inf. Manag. 2020, 33, 1023–1058. [Google Scholar] [CrossRef]
  15. Kumar, A.; Anbanandam, R. Environmentally responsible freight transport service providers’ assessment under data-driven information uncertainty. J. Enterp. Inf. Manag. 2020, 34, 506–542. [Google Scholar] [CrossRef]
  16. Pamucar, D.; Deveci, M.; Canıtez, F.; Bozanic, D. A fuzzy Full Consistency Method-Dombi-Bonferroni model for prioritizing transportation demand management measures. Appl. Soft Comput. 2020, 87, 105952. [Google Scholar] [CrossRef]
  17. Kumar, A.; Singh, G.; Vaidya, O.S. A Comparative Evaluation of Public Road Transportation Systems in India Using Multicriteria Decision-Making Techniques. J. Adv. Transp. 2020, 2020, 1–16. [Google Scholar] [CrossRef]
  18. Blagojević, A.; Kasalica, S.; Stević, Ž.; Tričković, G.; Pavelkić, V. Evaluation of Safety Degree at Railway Crossings in Order to Achieve Sustainable Traffic Management: A Novel Integrated Fuzzy MCDM Model. Sustainability 2021, 13, 832. [Google Scholar] [CrossRef]
  19. Kizielewicz, B.; Dobryakova, L. How to choose the optimal single-track vehicle to move in the city? Electric scooters study case. Procedia Comput. Sci. 2020, 176, 2243–2253. [Google Scholar] [CrossRef]
  20. D’Orso, G.; Migliore, M.; Peri, G.; Rizzo, G. Using AHP methodology for prioritizing the actions in the transport sector in the frame of SECAPs. In Proceedings of the 2020 IEEE International Conference on Environment and Electrical Engineering and 2020 IEEE Industrial and Commercial Power Systems Europe 2020, Madrid, Spain, 9–12 June 2020. [Google Scholar]
  21. Ogrodnik, K. Multi-criteria analysis of smart cities in Poland. Geogr. Pol. 2020, 93, 163–181. [Google Scholar] [CrossRef]
  22. Hamurcu, M.; Eren, T. Strategic Planning Based on Sustainability for Urban Transportation: An Application to Decision-Making. Sustainability 2020, 12, 3589. [Google Scholar] [CrossRef]
  23. Kim, G.-S.; Lee, S.-W.; Seo, Y.-J.; Kim, A.-R. Multimodal transportation via TSR for effective Northern logistics: Perspectives of Korean logistics companies. Marit. Bus. Rev. 2020, 5, 295–312. [Google Scholar] [CrossRef]
  24. Görçün, Ö.F. Evaluation of the selection of proper metro and tram vehicle for urban transportation by using a novel integrated MCDM approach. Sci. Prog. 2021, 104. [Google Scholar] [CrossRef] [PubMed]
  25. Palczewski, K.; Sałabun, W. Influence of various normalization methods in PROMETHEE II: An empirical study on the selection of the airport location. Procedia Comput. Sci. 2019, 159, 2051–2060. [Google Scholar] [CrossRef]
  26. Akin, D.; Kara, D. Multicriteria analysis of planned intercity bus terminals in the metropolitan city of Istanbul, Turkey. Transp. Res. Part A Policy Pr. 2020, 132, 465–489. [Google Scholar] [CrossRef]
  27. Ortega, J.; Tóth, J.; Moslem, S.; Péter, T.; Duleba, S. An Integrated Approach of Analytic Hierarchy Process and Triangular Fuzzy Sets for Analyzing the Park-and-Ride Facility Location Problem. Symmetry 2020, 12, 1225. [Google Scholar] [CrossRef]
  28. Tadić, S.; Krstić, M.; Roso, V.; Brnjac, N. Dry Port Terminal Location Selection by Applying the Hybrid Grey MCDM Model. Sustainability 2020, 12, 6983. [Google Scholar] [CrossRef]
  29. Aljohani, K.; Thompson, R.G. A multi-criteria spatial evaluation framework to optimise the siting of freight consolidation facilities in inner-city areas. Transp. Res. Part A Policy Pr. 2020, 138, 51–69. [Google Scholar] [CrossRef]
  30. Sukmanee, J.; Kesvarakul, R.; Janthong, N. Network Modeling with ANP to Determine the Appropriate Area for the Development of Dry Port in Thailand. Adv. Sci. Technol. Eng. Syst. J. 2020, 5, 676–683. [Google Scholar] [CrossRef]
  31. Zagorskas, J.; Turskis, Z. Setting priority list for construction works of bicycle path segments based on eckenrode rating and aras-f decision support method integrated in gis. Transport 2020, 35, 179–192. [Google Scholar] [CrossRef]
  32. Aksoy, B.; Gursoy, M. Evaluation of location selection process of logistics villages using Analytic Hierarchy Process and ELECTRE methods: A case study for Turkey. Sigma J. Eng. Nat. Sci.Sigma Muhendis. Bil. Derg. 2020, 38, 1897–1910. [Google Scholar]
  33. Muravev, D.; Hu, H.; Zhou, H.; Pamucar, D. Location Optimization of CR Express International Logistics Centers. Symmetry 2020, 12, 143. [Google Scholar] [CrossRef] [Green Version]
  34. Ayub, U.B.; Balogun, A.-L.B. Spatial Analysis for Sustainable Campus Transportation: A Case Study of UTP. Lect. Notes Civil Eng. 2021, 132, 870–882. [Google Scholar]
  35. Li, Q.; Rezaei, J.; Tavasszy, L.; Wiegmans, B.; Guo, J.; Tang, Y.; Peng, Q. Customers’ preferences for freight service attributes of China Railway Express. Transp. Res. Part A Policy Pract. 2020, 142, 225–236. [Google Scholar] [CrossRef]
  36. Shishegaran, A.; Shishegaran, A.; Mazzulla, G.; Forciniti, C. A Novel Approach for a Sustainability Evaluation of Developing System Interchange: The Case Study of the Sheikhfazolah-Yadegar Interchange, Tehran, Iran. Int. J. Environ. Res. Public Health 2020, 17, 435. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  37. Stokic, M.; Vujanovic, D.; Sekulic, D. A New Comprehensive Approach for Efficient Road Vehicle Procurement Using Hybrid DANP-TOPSIS Method. Sustainability 2020, 12, 4044. [Google Scholar] [CrossRef]
  38. Stoilova, S.; Munier, N.; Kendra, M.; Skrúcaný, T. Multi-Criteria Evaluation of Railway Network Performance in Countries of the TEN-T Orient–East Med Corridor. Sustainability 2020, 12, 1482. [Google Scholar] [CrossRef] [Green Version]
  39. Tolga, A.C.; Durak, G. Valuating innovation projects in air cargo sector with fuzzy COPRAS, In Intelligent and Fuzzy Techniques in Big Data Analytics and Decision Making. INFUS 2019. Advances in Intelligent Systems and Computing 1029; Kahraman, C., Cebi, S., Cevik Onar, S., Oztaysi, B., Tolga, A., Sari, I., Eds.; Springer: Berlin/Heidelberg, Germany, 2020; pp. 702–710. [Google Scholar]
  40. Lameira, P.I.D.; Filgueiras, T.C.G.M.; Botter, R.C.; Saavedra, R.D.S. An Approach using Multicriteria Decision Methods to Barges Configuration for Pushed Convoys in the Amazon. Int. J. Inf. Technol. Decis. Mak. 2020, 19, 317–341. [Google Scholar] [CrossRef]
  41. Shekhovtsov, A.; Kozlov, V.; Nosov, V.; Sałabun, W. Efficiency of Methods for Determining the Relevance of Criteria in Sustainable Transport Problems: A Comparative Case Study. Sustainability 2020, 12, 7915. [Google Scholar] [CrossRef]
  42. Kaya, Ö.; Tortum, A.; Alemdar, K.D.; Çodur, M.Y. Site selection for EVCS in Istanbul by GIS and multi-criteria decision-making. Transp. Res. Part D Transp. Environ. 2020, 80, 102271. [Google Scholar] [CrossRef]
  43. Wilken, D.; Oswald, M.; Draheim, P.; Pade, C.; Brand, U.; Vogt, T. Multi-dimensional assessment of passenger cars: Comparison of electric vehicles with internal combustion engine vehicles. Procedia CIRP 2020, 90, 291–296. [Google Scholar] [CrossRef]
  44. Cheng, M.; Wei, W. An AHP-DEA Approach of the Bike-Sharing Spots Selection Problem in the Free-Floating Bike-Sharing System. Discret. Dyn. Nat. Soc. 2020, 2020, 1–15. [Google Scholar] [CrossRef]
  45. Solecka, K.; Hoy, K.N.; Deryło, A. Assessment of transport interchanges for the needs of people with reduced mobility. Travel Behav. Soc. 2020, 21, 48–56. [Google Scholar] [CrossRef]
  46. Dang, V.L.; Yeo, G.T. Finding the optimal order of priority for dry port construction: Case study in the North of Vietnam. Int. J. Shipp. Transp. Logist. 2020, 12, 597. [Google Scholar] [CrossRef]
  47. Zapolskytė, S.; Vabuolytė, V.; Burinskienė, M.; Antuchevičienė, J. Assessment of Sustainable Mobility by MCDM Methods in the Science and Technology Parks of Vilnius, Lithuania. Sustainability 2020, 12, 9947. [Google Scholar] [CrossRef]
  48. Zagorskas, J.; Turskis, Z. Location Preferences of New Pedestrian Bridges Based on Multi-Criteria Decision-Making and GIS-Based Estimation. Balt. J. Road Bridg. Eng. 2020, 15, 158–181. [Google Scholar] [CrossRef]
  49. Galińska, B. MCDM as the Tool of Intelligent Decision Making in Transport. Case Study Analysis. In Smart and Green Solutions for Transport Systems. TSTP 2019. Advances in Intelligent Systems and Computing 1091 AISC 2020; Sierpiński, G., Ed.; Springer: Berlin/Heidelberg, Germany, 2020; pp. 67–79. [Google Scholar]
  50. Pamucar, D.; Iordache, M.; Deveci, M.; Schitea, D.; Iordache, I. A new hybrid fuzzy multi-criteria decision methodology model for prioritizing the alternatives of the hydrogen bus development: A case study from Romania. Int. J. Hydrog. Energy 2020, 46, 29616–29637. [Google Scholar] [CrossRef]
  51. Liachovičius, E.; Skrickij, V.; Podviezko, A. MCDM Evaluation of Asset-Based Road Freight Transport Companies Using Key Drivers That Influence the Enterprise Value. Sustainability 2020, 12, 7259. [Google Scholar] [CrossRef]
  52. Rehman, O.U.; Ali, Y. Optimality study of China’s crude oil imports through China Pakistan economic corridor using fuzzy TOPSIS and Cost-Benefit analysis. Transp. Res. Part E Logist. Transp. Rev. 2021, 148, 102246. [Google Scholar] [CrossRef]
  53. Kaska, M.; Tolga, A.C. Blockchain Software Selection for a Maritime Organization with MCDM Method. In Intelligent and Fuzzy Techniques: Smart and Innovative Solutions. INFUS 2020. Advances in Intelligent Systems and Computing; Kahraman, C., Cevik Onar, S., Oztaysi, B., Sari, I., Cebi, S., Tolga, A., Eds.; Springer: Berlin/Heidelberg, Germany, 2021; Volume 1197. [Google Scholar]
  54. Koohathongsumrit, N.; Meethom, W. Route selection in multimodal transportation networks: A hybrid multiple criteria decision-making approach. J. Ind. Prod. Eng. 2021, 38, 171–185. [Google Scholar] [CrossRef]
  55. Aghamohagheghi, M.; Hashemi, S.M.; Tavakkoli-Moghaddam, R. An advanced decision support framework to assess sustainable transport projects using a new uncertainty modelling tool: Interval-valued Pythagorean trapezoidal fuzzy numbers. Iran. J. Fuzzy Syst. 2021, 18, 53–73. [Google Scholar]
  56. Ðalić, I.; . Stević, Z.; Ateljević, J.; Turskis, Z.; Zavadskas, E.K.; Mardani, A. A novel integrated MCDM-SWOT-TOWS model for the strategic decision analysis in transportation company. Mech. Eng. 2021, 32, 1–22. [Google Scholar]
  57. Cunha, D.A.; Andrade, M.; Prado, L.A.; Santana, L.O.; da Silv, M.P.G. RISK assessment in airport maintenance runway condition using MCDA-C. J. Air Transp. Manag. 2021, 90, 101948. [Google Scholar] [CrossRef]
  58. Erdoğan, M.; Kaya, I. A systematic approach to evaluate risks and failures of public transport systems with a real case study for bus rapid system in Istanbul. Sustain. Cities Soc. 2020, 53, 101951. [Google Scholar] [CrossRef]
  59. Bakioglu, G.; Atahan, A.O. AHP integrated TOPSIS and VIKOR methods with Pythagorean fuzzy sets to prioritize risks in self-driving vehicles. Appl. Soft Comput. 2021, 99, 106948. [Google Scholar] [CrossRef]
  60. Tamura, H.; Akazawa, K. Structural modeling and systems analysis of uneasy factors for realizing safe, secure and reliable society. J. Telecommun. Inf. Technol. 2005, 3, 64–72. [Google Scholar]
  61. Dytczak, M. Selected Methods for Multi-Criteria Decision Analysis in Civil Engineering; Oficyna Wydawnicza Politechniki Opolskiej: Opole, Poland, 2010. (In Polish) [Google Scholar]
  62. Michnik, J. Wielokryterialne Metody Wspomagania Decyzji W Procesie Innowacji; Wydawnictwo Uniwersytetu Ekonomicznego w Katowicach: Katowice, Poland, 2013. (In Polish) [Google Scholar]
  63. Si, S.-L.; You, X.-Y.; Liu, H.-C.; Zhang, P. DEMATEL Technique: A Systematic Review of the State-of-the-Art Literature on Methodologies and Applications. Math. Probl. Eng. 2018, 2018, 1–33. [Google Scholar] [CrossRef] [Green Version]
  64. Saaty, T.L. Decision making with the analytic hierarchy process. Int. J. Serv. Sci. 2008, 1, 83. [Google Scholar] [CrossRef] [Green Version]
  65. Ayhan, M.B. A Fuzzy Ahp Approach For Supplier Selection Problem: A Case Study In A Gearmotor Company. Int. J. Manag. Value Supply Chains 2013, 4, 11–23. [Google Scholar] [CrossRef]
  66. Forman, E.H. Facts and fictions about the analytic hierarchy process. Math. Comput. Model. 1993, 17, 19–26. [Google Scholar] [CrossRef]
  67. Moghtadernejad, S.; Chouinard, L.E.; Mirza, M.S. Multi-criteria decision-making methods for preliminary design of sustainable facades. J. Build. Eng. 2018, 19, 181–190. [Google Scholar] [CrossRef]
  68. Olson, D.L.; Fliedner, G.; Currie, K. Comparison of the REMBRANDT system with analytic hierarchy process. Eur. J. Oper. Res. 1995, 82, 522–539. [Google Scholar] [CrossRef]
  69. Górecka, D. Comparison of chosen methods for determining the weights of criteria for evaluating decision variants. In Zastosowania Badań Operacyjnych. Zarządzanie Projektami. Decyzje Finansowe, Logistyka; Konarzewska-Gubała, I., Ed.; Wydawnictwo Uniwersytetu Ekonomicznego we Wrocławiu: Wroclaw, Poland, 2011. (In Polish) [Google Scholar]
  70. Trzaskalik, T. Multicriteria decision support. Review of methods and applications. Sci. Pap. Silesian Univ. Technol Organ. Manag. Ser. 2014, 74, 239–263. [Google Scholar]
  71. Dachowski, R.; Gałek, K. Risk of Emergency Situations of Underground Objects in the Perspective of Multi-Criteria Decision Making. Arch. Civ. Eng. 2019, 65, 149–162. [Google Scholar] [CrossRef]
  72. Opricovic, S.; Tzeng, G.-H. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. Eur. J. Oper. Res. 2004, 156, 445–455. [Google Scholar] [CrossRef]
  73. Kobryń, A. Wielokryterialne Wspomaganie Decyzji w Gospodarowaniu Przestrzenią; Difin: Warszawa, Poland, 2014. (In Polish) [Google Scholar]
  74. Pośpiech, E.; Mastalerz-Kodzis, A. Multi-criteria method choice to investment decision making. Zesz. Naukowe Politech. Śląskiej 2015, 86, 379–388. [Google Scholar]
  75. Environmental Impact Assessment Report: Construction of the S19 Road on the Section Choroszcz-Ploski along with the Construction of the Section of National Road No. 65 Kudrycze-Kuriany-Grabówka as well as the Construction, Extension and Reconstruction of Roads of Other Categories and the Necessary Technical Infrastructure; General Directorate for National Roads and Motorways, Department in Bialystok: Bialystok, Poland, 2018. (In Polish)
  76. Sałabun, W.; Urbaniak, K. A New Coefficient of Rankings Similarity in Decision-Making Problems. In Computational Science–ICCS 2020; Krzhizhanovskaya, V., Ed.; Springer: Berlin/Heidelberg, Germany, 2020; Volume 12138. [Google Scholar]
  77. Shekhovtsov, A.; Sałabun, W. A comparative case study of the VIKOR and TOPSIS rankings similarity. Procedia Comput. Sci. 2020, 176, 3730–3740. [Google Scholar] [CrossRef]
  78. Velasquez, M.; Hester, P.T. An Analysis of Multi-Criteria Decision Making Methods. Int. J. Op. Res. 2013, 10, 56–66. [Google Scholar]
  79. Mandic, K.; Bobar, V.; Delibašić, B. Modeling Interactions Among Criteria in MCDM Methods: A Review. In Proceedings of the International Conference on Decision Support System Technology, Belgrade, Serbia, 27–29 May 2015; pp. 98–109. [Google Scholar]
  80. Alsalem, M.; Zaidan, A.A.; Zaidan, B.B.; Hashim, M.; Albahri, O.S.; Hadi, A.; Mohammed, K.I. Systematic Review of an Automated Multiclass Detection and Classification System for Acute Leukaemia in Terms of Evaluation and Benchmarking, Open Challenges, Issues and Methodological Aspects. J. Med Syst. 2018, 42, 204. [Google Scholar] [CrossRef]
  81. Siksnelyte-Butkiene, I.; Zavadskas, E.K.; Streimikiene, D. Multi-Criteria Decision-Making (MCDM) for the Assessment of Renewable Energy Technologies in a Household: A Review. Energies 2020, 13, 1164. [Google Scholar] [CrossRef] [Green Version]
  82. Ghorbanzadeh, O.; Moslem, S.; Blaschke, T.; Duleba, S. Sustainable Urban Transport Planning Considering Different Stakeholder Groups by an Interval-AHP Decision Support Model. Sustainability 2018, 11, 9. [Google Scholar] [CrossRef] [Green Version]
  83. Nosal, K.; Solecka, K. Application of AHP Method for Multi-criteria Evaluation of Variants of the Integration of Urban Public Transport. Transp. Res. Procedia 2014, 3, 269–278. [Google Scholar] [CrossRef] [Green Version]
  84. Kiciński, M.; Solecka, K. Application of MCDA/MCDM methods for an integrated urban public transportation system–case study, city of Cracow. Arch. Transp. 2018, 46, 71–84. [Google Scholar] [CrossRef]
  85. Zavadskas, E.K.; Turskis, Z.; Bagočius, V. Multi-criteria selection of a deep-water port in the Eastern Baltic Sea. Appl. Soft Comput. 2015, 26, 180–192. [Google Scholar] [CrossRef]
  86. Nanda, S.; Singh, S. Evaluation of Factors Responsible for Road Accidents in India by Fuzzy AHP. In Networking Communication and Data Knowledge Engineering. Lecture Notes on Data Engineering and Communications Technologies 3; Perez, G., Mishra, K., Tiwari, S., Trivedi, M., Eds.; Springer: Singapore, 2018. [Google Scholar]
  87. Jimenez-Delgado, G.; Balmaceda-Castro, N.; Hernández-Palma, H.; de la Hoz-Franco, E.; García-Guiliany, J.; Martinez-Ventura, J. An Integrated Approach of Multiple Correspondences Analysis (MCA) and Fuzzy AHP Method for Occupational Health and Safety Performance Evaluation in the Land Cargo Transportation. In Digital Human Modeling and Applications in Health, Safety, Ergonomics and Risk Management. Human Body and Motion. HCII 2019. LectureNotes in Computer Science 11581; Duffy, V., Ed.; Springer: Berlin/Heidelberg, Germany, 2019. [Google Scholar]
  88. Barfod, M.B.; Jensen, A.V.; Leleur, S. Examination of Decision Support Systems for Composite CBA and MCDA Assessments of Transport Infrastructure Projects. In New State of MCDM in the 21st Century, Lecture Notes in Economics and Mathematical Systems; Shi, Y., Wang, S., Kou, G., Wallenius, J., Eds.; Springer: Berlin/Heidelberg, Germany, 2011; Volume 648, pp. 167–176. [Google Scholar]
  89. Cadena, B.P.C.; Magro, J.M.V. Setting the weights of sustainability criteria for the appraisal of transport projects. Transport 2015, 30, 298–306. [Google Scholar] [CrossRef] [Green Version]
  90. Liu, H.C.; You, X.Y.; Xue, Y.X.; Luan, X. Exploring critical factors influencing the diffusion of electric vehicles in China: A multi-stakeholder perspective. Res. Transp. Econ. 2017, 66, 46–58. [Google Scholar] [CrossRef]
  91. Komchornrit, K. The Selection of Dry Port Location by a Hybrid CFA-MACBETH-PROMETHEE Method: A Case Study of Southern Thailand. Asian J. Shipp. Logist. 2017, 33, 141–153. [Google Scholar] [CrossRef]
  92. Hsu, C.-C.; Liou, J.J.; Lo, H.-W.; Wang, Y.-C. Using a hybrid method for evaluating and improving the service quality of public bike-sharing systems. J. Clean. Prod. 2018, 202, 1131–1144. [Google Scholar] [CrossRef]
  93. Lambas, M.E.L.; Giuffrida, N.; Ignaccolo, M.; Inturri, G. Comparison between Bus Rapid Transit and Light-Rail Transit Systems: A Multi-Criteria Decision Analysis Approach. WIT Trans. Built Environ. 2017, 176, 143–154. [Google Scholar] [CrossRef] [Green Version]
  94. Deveci, M.; Canıtez, F.; Gökaşar, I. WASPAS and TOPSIS based interval type-2 fuzzy MCDM method for a selection of a car sharing station. Sustain. Cities Soc. 2018, 41, 777–791. [Google Scholar] [CrossRef]
Figure 1. The most popular MCDM/MCDA methods used in the field of transport between 2000 and 2021. Source: author’s work.
Figure 1. The most popular MCDM/MCDA methods used in the field of transport between 2000 and 2021. Source: author’s work.
Energies 14 05100 g001
Figure 2. The basis for the proposed hybrid approach. Source: author’s work.
Figure 2. The basis for the proposed hybrid approach. Source: author’s work.
Energies 14 05100 g002
Figure 3. Hierarchical structure tree. Source: author’s work based on [75].
Figure 3. Hierarchical structure tree. Source: author’s work based on [75].
Energies 14 05100 g003
Figure 4. Cause-and-effect diagram. Source: author’s work.
Figure 4. Cause-and-effect diagram. Source: author’s work.
Energies 14 05100 g004
Figure 5. Decision factor weights calculated using the AHP, Fuzzy AHP, and REMBRANDT methods. Source: author’s work.
Figure 5. Decision factor weights calculated using the AHP, Fuzzy AHP, and REMBRANDT methods. Source: author’s work.
Energies 14 05100 g005
Table 1. An example of how to combine the scales used in the family of AHP and DEMATEL methods.
Table 1. An example of how to combine the scales used in the family of AHP and DEMATEL methods.
Classic Saaty ScaleFuzzy Triangular ScaleClassic Fontela and Gabus ScaleModification Fontela and Gabus Scale
11, 1, 100
21, 2, 311
32, 3, 42
43, 4, 523
54, 5, 64
65, 6, 735
76, 7, 86
87, 8, 947
99, 9, 98
Source: author’s work based on [61,64,65].
Table 2. The classic Saaty scale and the scale used in the REMBRANDT method.
Table 2. The classic Saaty scale and the scale used in the REMBRANDT method.
DefinitionClassic Saaty ScaleREMBRANDT Scale
Equal importance10
Weak or slight21
Moderate importance32
Moderate plus43
Strong importance54
Strong plus65
Very strong76
Very, very strong87
Extremely strong98
If activity i has one of the above non-zero numbers assigned to it when compared with activity j, then j has the reciprocal value when compared with i1/9, 1/8, 1/7, 1/6, 1/5, 1/4, 1/3, 1/2−8, −7, −6, −5, −4, −3, −2, −1
Source: [64] (p. 86), [68] (p. 524), and [69] (p. 339).
Table 3. Variants’ characteristics.
Table 3. Variants’ characteristics.
NumberNameVariant of the Expressway RouteVariant of the National Road RouteLength (km)Number of Engineering Objects
V1Variant 11153 856.3780
V2Variant 21253 651.3982
V3Variant 31353 517.1977
V4Variant 42252 249.9778
V5Variant 52153 230.5779
V6Variant 62352 891.3976
Source: author’s work based on [75].
Table 4. The matrix of direct relations for decision factors M (DEMATEL method).
Table 4. The matrix of direct relations for decision factors M (DEMATEL method).
MC1C2C3C4C5C6C7C8C9C10C11C12C13
C10.0004.0004.0004.0004.0004.0004.0004.0000.0000.0000.0000.0000.000
C23.0000.0003.0003.0003.0003.0003.0003.0000.0000.0000.0000.0000.000
C30.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C40.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C50.0000.0004.0004.0000.0004.0004.0004.0000.0000.0000.0000.0000.000
C60.0000.0000.0000.0000.0000.0000.0003.0000.0000.0000.0000.0000.000
C70.0000.0000.0000.0000.0000.0000.0003.0000.0000.0000.0000.0000.000
C80.0000.0000.0000.0000.0002.0002.0000.0000.0000.0000.0000.0000.000
C90.0000.0004.0004.0000.0004.0004.0004.0000.0000.0000.0000.0004.000
C100.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C110.0000.0003.0003.0000.0003.0003.0003.0000.0000.0000.0000.0000.000
C120.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C130.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Source: author’s work.
Table 5. Normalized matrix of direct relations M (DEMATEL method).
Table 5. Normalized matrix of direct relations M (DEMATEL method).
M’C1C2C3C4C5C6C7C8C9C10C11C12C13
C10.0000.1430.1430.1430.1430.1430.1430.1430.0000.0000.0000.0000.000
C20.1070.0000.1070.1070.1070.1070.1070.1070.0000.0000.0000.0000.000
C30.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C40.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C50.0000.0000.1430.1430.0000.1430.1430.1430.0000.0000.0000.0000.000
C60.0000.0000.0000.0000.0000.0000.0000.1070.0000.0000.0000.0000.000
C70.0000.0000.0000.0000.0000.0000.0000.1070.0000.0000.0000.0000.000
C80.0000.0000.0000.0000.0000.0710.0710.0000.0000.0000.0000.0000.000
C90.0000.0000.1430.1430.0000.1430.1430.1430.0000.0000.0000.0000.143
C100.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C110.0000.0000.1070.1070.0000.1070.1070.1070.0000.0000.0000.0000.000
C120.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C130.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Source: author’s work.
Table 6. Matrix of total relations (direct and indirect) N with row and column sums (DEMATEL method).
Table 6. Matrix of total relations (direct and indirect) N with row and column sums (DEMATEL method).
nC1C2C3C4C5C6C7C8C9C10C11C12C13Score L
C10.0160.1450.1840.1840.1610.2000.2000.2260.0000.0000.0000.0000.0001.314
C20.1090.0160.1420.1420.1240.1550.1550.1750.0000.0000.0000.0000.0001.017
C30.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C40.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C50.0000.0000.1430.1430.0000.1550.1550.1760.0000.0000.0000.0000.0000.773
C60.0000.0000.0000.0000.0000.0080.0080.1090.0000.0000.0000.0000.0000.124
C70.0000.0000.0000.0000.0000.0080.0080.1090.0000.0000.0000.0000.0000.124
C80.0000.0000.0000.0000.0000.0730.0730.0160.0000.0000.0000.0000.0000.161
C90.0000.0000.1430.1430.0000.1550.1550.1760.0000.0000.0000.0000.1430.916
C100.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C110.0000.0000.1070.1070.0000.1170.1170.1320.0000.0000.0000.0000.0000.580
C120.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
C130.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Score C0.1240.1610.7190.7190.2850.8700.8701.1190.0000.0000.0000.0000.143
Source: author’s work.
Table 7. The value of the position indicator and relation indicator (DEMATEL method).
Table 7. The value of the position indicator and relation indicator (DEMATEL method).
Score LScore CProminenceRelation
C11.3140.1241.4391.190
C21.0170.1611.1780.857
C30.0000.7190.719−0.719
C40.0000.7190.719−0.719
C50.7730.2851.0580.488
C60.1240.8700.994−0.746
C70.1240.8700.994−0.746
C80.1611.1191.280−0.959
C90.9160.0000.9160.916
C100.0000.0000.0000.000
C110.5800.0000.5800.580
C120.0000.0000.0000.000
C130.0000.1430.143−0.143
Source: author’s work.
Table 8. Matrix of comparisons, criteria weights, and consistency assessment estimated using the classical AHP method.
Table 8. Matrix of comparisons, criteria weights, and consistency assessment estimated using the classical AHP method.
C1C2C3C4C5C6C7C8C9C10C11C12C13Weight
C11.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C21.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C30.3330.3331.0001.0000.3330.3330.3330.3333.0001.0003.0000.3330.3330.039
C40.3330.3331.0001.0000.3330.3330.3330.3333.0001.0003.0000.3330.3330.039
C51.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C61.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C71.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C81.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C90.2000.2000.3330.3330.2000.2000.2000.2001.0000.3331.0000.2000.2000.019
C100.3330.3331.0001.0000.3330.3330.3330.3333.0001.0003.0000.3330.3330.039
C110.2000.2000.3330.3330.2000.2000.2000.2001.0000.3331.0000.2000.2000.019
C121.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
C131.0001.0003.0003.0001.0001.0001.0001.0005.0003.0005.0001.0001.0000.106
Consistency check
λmax = 13.009 and CR = 0.005
Source: [1].
Table 9. Decision factor comparison matrix (REMBRANDT method).
Table 9. Decision factor comparison matrix (REMBRANDT method).
C1C2C3C4C5C6C7C8C9C10C11C12C13
C10.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C20.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C3−2.000−2.0000.0000.000−2.000−2.000−2.000−2.0002.0000.0002.000−2.000−2.000
C4−2.000−2.0000.0000.000−2.000−2.000−2.000−2.0002.0000.0002.000−2.000−2.000
C50.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C60.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C70.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C80.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C9−4.000−4.000−2.000−2.000−4.000−4.000−4.000−4.0000.000−2.0000.000−4.000−4.000
C10−2.000−2.0000.0000.000−2.000−2.000−2.000−2.0002.0000.0002.000−2.000−2.000
C11−4.000−4.000−2.000−2.000−4.000−4.000−4.000−4.0000.000−2.0000.000−4.000−4.000
C120.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
C130.0000.0002.0002.0000.0000.0000.0000.0004.0002.0004.0000.0000.000
Source: author’s work.
Table 10. Transformed comparison matrix of decision factors: the geometric mean of the rows and weights of decision factors (REMBRANDT method).
Table 10. Transformed comparison matrix of decision factors: the geometric mean of the rows and weights of decision factors (REMBRANDT method).
C1C2C3C4C5C6C7C8C9C10C11C12C13Avg.Weight
C11.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C21.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C30.5000.5001.0001.0000.5000.5000.5000.5002.0001.0002.0000.5000.5000.7260.050
C40.5000.5001.0001.0000.5000.5000.5000.5002.0001.0002.0000.5000.5000.7260.050
C51.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C61.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C71.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C81.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C90.2500.2500.5000.5000.2500.2500.2500.2501.0000.5001.0000.2500.2500.3630.025
C100.5000.5001.0001.0000.5000.5000.5000.5002.0001.0002.0000.5000.5000.7260.050
C110.2500.2500.5000.5000.2500.2500.2500.2501.0000.5001.0000.2500.2500.3630.025
C121.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
C131.0001.0002.0002.0001.0001.0001.0001.0004.0002.0004.0001.0001.0001.4520.100
Source: author’s work.
Table 11. Initial data (VIKOR method).
Table 11. Initial data (VIKOR method).
C1C2C3C4C5C6C7C8C9C10C11C12C13
W186.124259039.1411643.1231285077
W242.695311044.8510622.9221226897
W342.693711041.8411602.9231180687
W448.615739162.966652.933143531426
W592.130457157.257683.134151851726
W648.615579159.957642.934141411426
Characterdest.dest.dest.dest.dest.dest.dest.dest.dest.dest.dest.dest.dest.
Weights (AHP)0.1060.1060.0390.0390.1060.1060.1060.1060.0190.0390.0190.1060.106
Weights (FAHP)0.1050.1050.0410.0410.1050.1050.1050.1050.0190.0410.0190.1050.105
Weights (REMBRANDT)0.1000.1000.0500.0500.1000.1000.1000.1000.0250.0500.0250.1000.100
Source: [1,75].
Table 12. The values of S, R, and Q metrics together with a ranking and verification of conditions.
Table 12. The values of S, R, and Q metrics together with a ranking and verification of conditions.
MethodsVariantsC1C2C3C4C5C6C7C8C9C10C11C12C13SRQRanking
VIKOR method, AHP weightsW10.0930.0750.0200.0000.0000.0000.1060.0530.0190.0030.0060.0000.0000.3750.1060.6623
W20.0000.0010.0390.0000.0250.0530.0850.0270.0000.0000.0030.0210.0000.2530.0850.0651
W20.0000.0000.0390.0000.0120.0000.1060.0000.0000.0030.0000.0110.0000.1710.1060.5002
W40.0130.0320.0200.0390.1060.1060.0000.0660.0000.0360.0140.0740.1060.6120.1060.8505
W50.1060.1060.0000.0390.0810.0530.0210.1060.0190.0390.0190.1060.1060.8010.1061.0006
W60.0130.0310.0200.0390.0930.0530.0210.0530.0000.0390.0130.0740.1060.5550.1060.8054
Condition 1. Acceptable advantage, yes; Condition 2. Acceptable stability, yes
VIKOR method, Fuzzy AHP weightsW10.0920.0740.0210.0000.0000.0000.1050.0530.0190.0030.0060.0000.0000.3730.1050.6603
W20.0000.0010.0410.0000.0250.0530.0840.0260.0000.0000.0030.0210.0000.2530.0840.0651
W20.0000.0000.0410.0000.0120.0000.1050.0000.0000.0030.0000.0110.0000.1720.1050.5002
W40.0130.0320.0210.0410.1050.1050.0000.0660.0000.0380.0140.0740.1050.6120.1050.8515
W50.1050.1050.0000.0410.0800.0530.0210.1050.0190.0410.0190.1050.1050.7980.1051.0006
W60.0130.0310.0210.0410.0920.0530.0210.0530.0000.0410.0130.0740.1050.5560.1050.8064
Condition 1. Acceptable advantage, yes; Condition 2. Acceptable stability, yes
VIKOR method, REMBRANDT weightsW10.0880.0710.0250.0000.0000.0000.1000.0500.0250.0040.0080.0000.0000.3700.1000.6573
W20.0000.0010.0500.0000.0240.0500.0800.0250.0000.0000.0030.0200.0000.2530.0800.0631
W20.0000.0000.0500.0000.0110.0000.1000.0000.0000.0040.0000.0100.0000.1760.1000.5002
W40.0120.0300.0250.0500.1000.1000.0000.0630.0000.0460.0190.0700.1000.6140.1000.8545
W50.1000.1000.0000.0500.0760.0500.0200.1000.0250.0500.0250.1000.1000.7960.1001.0006
W60.0120.0290.0250.0500.0870.0500.0200.0500.0000.0500.0170.0700.1000.5610.1000.8114
Condition 1. Acceptable advantage, yes; Condition 2. Acceptable stability, yes
Source: author’s work.
Table 13. Ranking of decision variants: summary list.
Table 13. Ranking of decision variants: summary list.
Method UsedVariant Ranking (from Best to Worst)
Report methodW3 > W2 > W1 > W6 > W4 > W5
TOPSIS (AHP weights)W2 > W3 > W1 > W6 > W4 > W5
TOPSIS (FAHP weights)W2 > W3 > W1 > W6 > W4 > W5
TOPSIS (REMBRANDT weights)W2 > W3 > W1 > W6 > W4 > W5
PROMETHEE (AHP weights)W3 > W2 > W1 > W6 > W4 > W5
PROMETHEE (FAHP weights)W3 > W2 > W1 > W6 > W4 > W5
PROMETHEE (REMBRANDT weights)W3 > W2 > W1 > W6 > W4 > W5
VIKOR (AHP weights)W2 > W3 > W1 > W6 > W4 > W5
VIKOR (FAHP weights)W2 > W3 > W1 > W6 > W4 > W5
VIKOR (REMBRANDT weights)W2 > W3 > W1 > W6 > W4 > W5
Source: author’s work.
Table 14. Assessment of the most popular MCDM/MCDA methods used so far in the field of transport with their SWOT analysis and examples of applications.
Table 14. Assessment of the most popular MCDM/MCDA methods used so far in the field of transport with their SWOT analysis and examples of applications.
MethodStrengths/OpportunitiesWeaknesses
Limitations
Examples of Problems Present in the Field of Transport
AHP
relatively easy calculation algorithm
possibility of performing calculations in a regular spreadsheet
possibility of assessing the consistency of comparisons in pairs
possibility of pairwise comparisons by a group of experts (especially important when choosing the location variants for large-scale investments)
possibility of estimating both the weighting of decision factors and the possibility of constructing rankings of the variants under consideration
possibility of including the pair comparison procedure in the form of a questionnaire
possibility of integration with other methods
a considerable amount of software (often available and free) supporting the calculations with the chosen method
a significant number of examples of the method’s application in the field of transport
recommendation of the method by the authorities responsible for maintaining and developing road infrastructure (in Poland, by the General Directorate for National Roads and Motorways)
possible problems with maintaining the consistency of pairwise comparisons when more elements are taken into consideration
assessment of the preferences displayed by users of transport systems (see, e.g., [82])
assessment and selection of the transport system/systems development scenario (see, e.g., [83,84]
selecting an investment location (see e.g., [85])
Fuzzy AHP
possibility of taking uncertain information into account
the possibility of comparing the elements in pairs
possibility of integration with other methods
development of software supporting complex multi-criteria analyses and also on fuzzy sets
more time-consuming (as compared to the classic AHP method)
more complex algorithm (as compared to the classic AHP method)
analysis of safety factors (see, e.g., [86,87])
REMBRANDT
possibility of pairwise comparisons by a group of experts (especially important when choosing the location variants of large-scale investments)
possibility of decision factors and the possibility of constructing rankings of the variants under consideration
possibility of performing calculations in a regular spreadsheet
more complex algorithm (as compared to the classic AHP method)
no computer software
possibility of taking into account three decision levels
evaluation of transport infrastructure projects (see, e.g., [88,89])
DEMATEL
possibility of analysis at the level of decision factors in terms of mutual dependencies
relatively simple algorithm (compared to, e.g., the ANP method)
development of the method towards weighing factors
possibility of group assessments, estimating the weighting
ability to visualize the results in the form of a cause-and-effect diagram
high subjectivism at the stage of dependency assessment
a classic version of the method does not assume the weighting of factors
development factor analysis (see, e.g., [90])
PROMETHEE
possibility of taking into account both quantitative and qualitative criteria
possibility of taking into account the size of the variant differences in light of subsequent decision criteria
possibility of integration with other methods
ability to perform an analysis in the Visual PROMETHEE program, which enables calculations and offers various visualization functions of the obtained results (available in the academic or business version)
systematically created and publicly available PROMETHEE Bibliographical Database
need to weigh decision factors using other methods
need to select the preference function, the selection of the preference, and equivalence thresholds
selection of an investment location (see, e.g., [91])
VIKOR
possibility of performing calculations in a regular spreadsheet
is based on quantitative data
identification of patterns and anti-patterns
possibility of integration with other methods
possibility of defining a compromise solution, taking into account many conflicting criteria
need to weigh decision factors using other methods
assessment of the quality of public transport systems (see, e.g., [92])
TOPSIS
possibility of performing calculations in a regular spreadsheet
is based on quantitative data
identification of patterns and anti-patterns
possibility of integration with other methods
need to weigh decision factors using other methods
analysis of selected transport systems (see, e.g., [93])
choice of investment location (see, e.g., [94])
Source: author’s work.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Broniewicz, E.; Ogrodnik, K. A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport. Energies 2021, 14, 5100. https://doi.org/10.3390/en14165100

AMA Style

Broniewicz E, Ogrodnik K. A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport. Energies. 2021; 14(16):5100. https://doi.org/10.3390/en14165100

Chicago/Turabian Style

Broniewicz, Elzbieta, and Karolina Ogrodnik. 2021. "A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport" Energies 14, no. 16: 5100. https://doi.org/10.3390/en14165100

APA Style

Broniewicz, E., & Ogrodnik, K. (2021). A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport. Energies, 14(16), 5100. https://doi.org/10.3390/en14165100

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop