Next Article in Journal
A Longitudinal Analysis of the Creation of Environmental Identity and Attitudes towards Energy Sustainability Using the Framework of Identity Theory and Big Data Analysis
Next Article in Special Issue
Decentralized V2G/G2V Scheduling of EV Charging Stations by Considering the Conversion Efficiency of Bidirectional Chargers
Previous Article in Journal
Economic Analysis of Special Rate for Renewable Energy Based on the Design of an Optimized Model for Distributed Energy Resource Capacities in Buildings
Previous Article in Special Issue
Development of a Static Equivalent Model for Korean Power Systems Using Power Transfer Distribution Factor-Based k-Means++ Algorithm
 
 

Order Article Reprints

Journal: Energies, 2021
Volume: 14
Number: 646

Article: Technical Loss Calculation in Distribution Grids Using Equivalent Minimum Order Networks and an Iterative Power Factor Correction Procedure
Authors: by Carlos Eduardo Moreira Rodrigues, Maria Emilia de Lima Tostes, Ubiratan Holanda Bezerra, Thiago Mota Soares, Edson Ortiz de Matos, Lázaro Serra Soares Filho, Elaine Cristina dos Santos Silva, Michel Ferreira Rendeiro and Carlos Jeferson da Silva Moura
Link: https://www.mdpi.com/1996-1073/14/3/646

MDPI provides article reprints in high quality with convenient shipping to destinations worldwide. The articles are printed in on premium paper with high-resolution figures. Our covers are customized to your article and designed to be complimentary to the journal. These reprints are ideal additions to your portfolio. Copy details: 135g/m2 paper, 2x stitched, full colour and glossy finish, orderable in quantities from 10 to 1000.

If you have any questions, or special requests, please write to our support team; we are happy to provide you with the information you need.

Reprint Options

If you need more than 400 copies, please contact us by e-mail (articlereprints@mdpi.com) and we will prepare an individual offer for you.

Order Cost and Details

Contact Person

Invoice Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop