Next Article in Journal
Effects of Future Climate Change and Adaptation Measures on Summer Comfort of Modern Homes across the Regions of the UK
Next Article in Special Issue
Energy Sustainability of a Cluster of Buildings with the Application of Smart Grids and the Decentralization of Renewable Energy Sources
Previous Article in Journal
Pyrolysis-Based Municipal Solid Waste Management in Poland—SWOT Analysis
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

A Comparative Assessment of Conventional and Artificial Neural Networks Methods for Electricity Outage Forecasting

by
Adeniyi Kehinde Onaolapo
1,*,
Rudiren Pillay Carpanen
1,
David George Dorrell
2 and
Evans Eshiemogie Ojo
3
1
Discipline of Electrical, Electronic and Computer Engineering, University of Kwazulu-Natal, Durban 4041, South Africa
2
School of Electrical and Information Engineering, University of the Witwatersrand, Johannesburg 4041, South Africa
3
Department of Electrical Power Engineering, Durban University of Technology, Durban 4000, South Africa
*
Author to whom correspondence should be addressed.
Energies 2022, 15(2), 511; https://doi.org/10.3390/en15020511
Submission received: 8 October 2021 / Revised: 30 October 2021 / Accepted: 1 November 2021 / Published: 12 January 2022
(This article belongs to the Special Issue Smart Grid Control and Optimization)

Abstract

:
The reliability of the power supply depends on the reliability of the structure of the grid. Grid networks are exposed to varying weather events, which makes them prone to faults. There is a growing concern that climate change will lead to increasing numbers and severity of weather events, which will adversely affect grid reliability and electricity supply. Predictive models of electricity reliability have been used which utilize computational intelligence techniques. These techniques have not been adequately explored in forecasting problems related to electricity outages due to weather factors. A model for predicting electricity outages caused by weather events is presented in this study. This uses the back-propagation algorithm as related to the concept of artificial neural networks (ANNs). The performance of the ANN model is evaluated using real-life data sets from Pietermaritzburg, South Africa, and compared with some conventional models. These are the exponential smoothing (ES) and multiple linear regression (MLR) models. The results obtained from the ANN model are found to be satisfactory when compared to those obtained from MLR and ES. The results demonstrate that artificial neural networks are robust and can be used to predict electricity outages with regards to faults caused by severe weather conditions.

1. Introduction

Reliable electrical power is very important. Plans for economic development in developing countries are incomplete without including planned reliable electricity supply. This is virtually indispensable in modern society and requires dependable generation, transmission and distribution stages. For grid systems, there is an interrelation between weather events and outage events; an increase in weather events leads to an increase in the rate of grid fault occurrence. This makes the supply less reliable with higher maintenance costs. To solve this problem, electricity outage predictive models that are dependent on weather events are important for reliable and efficient electricity supply [1]. In this study, there is a comparative evaluation of the performance of artificial neural networks (ANN), multiple linear regression (MLR), and the exponential smoothing (ES) models.
The authors in [2] successfully modeled failure rates in overhead distribution lines using prediction models. They used Bayesian network and Poisson regression techniques and analyzed them using a Monte Carlo method. Rodriguez and Vargas [3] estimated the restoration time-range to solve the problem of load restoration using a fuzzy-heuristic technique. The proposed technique was tested in a real network consisting of 290 nodes. Zhou et al. [4] proposed a method to reduce large cascades of outages using the Markov chain to model historical data. The lines responsible for large cascades were found using the asymptotic characteristic of the Markov model. Kankanala et al. [5] estimated weather-induced outages in power systems using an ADABOOST algorithm. They evaluated the performance of the model using real-life weather and historical data of four cities in Kansas.
The authors in [6] investigated a less-researched weakness of a power system through which the system can be attacked, thereby causing damage and outage. The proposed model was capable of identifying the weakness of the system and quantifying the impact of the attacks. Eskandarpour and Khodaei [7] developed a model based on the characteristics of the data used to predict power outage using the support vector machine (SVM) method. The features of the data considered were the seriousness of, and the distance from, the extreme event, together with component deterioration. Eskandarpour and Khodaei [8] proposed a method for predicting the component outage of a power grid in expectation of a looming hurricane. The method used was logistic regression, and the performance was validated using a case study. Jaech et al. [9] introduced a method for predicting the duration of an outage using field records. They trained neural networks as models and validated the performance using natural language processing. They were able to establish good correlations between environmental properties used and outage causes. In [10], the use of predictive models that can improve the reliability and availability of electricity supply on a long-term basis was reported. A display system for predictive maintenance purposes was developed. This determined the date for servicing different components of the plant to avoid failure during operation.
The effects of vegetation on the reliability of the distribution system were analyzed in [11]. The researchers used parameters obtained from historical vegetation growth to develop models. It was observed that, to achieve improvement in system reliability, a predictive model is required to calculate the failure rate. In [12], the authors assessed the predictive reliability of a distribution network in the USA. They developed a model with five-year historical fault data and proved, through the results, the prospects and benefits of predictive models. An ANN and logistic regression (LR) were used in [13] to develop a prediction model in the medical field. The ANN performed more favorably than LR, confirming the efficiency of ANN models.
There are many components of distribution and transmission grids which are exposed to unfavorable weather events and susceptible to faults, reviewed in [1]. It was reiterated that, as weather events increase and become more severe due to climate change, electricity supply and grid reliability will be affected. A review was given in [14] on the different factors which are responsible for failures in distribution systems. The factors were categorized into: intrinsic factors (age of equipment, equipment manufacturing defects, conductor sizes, etc.); external factors (ice, lightning, wind, birds/animals, trees, etc.); and human error factors (vandalism, work crew accidents, vehicle accidents, etc.). It was inferred that external factors are predominant in causing faults in distribution systems. Yuan et al. [15] developed a prediction outage model for typhoons using historical data and random forest techniques. They were able to estimate the number of damaged poles and customer outages during a storm. Alpay et al. [16] developed a prediction model directly from weather forecasts for understanding the hourly dynamics of outages caused by thunderstorms using event-wise outage prediction models (OPMs). The validation work showed that the model is capable of reporting temporary and storm-wide outage characteristics. Pasqualini et al. [17] presented a technique for overcoming a lack of data and distribution models in data-poor environments using winter conditions and hurricane-force winds to forecast outage. Nateghi et al. [18] identified the main features responsible for forecasting the duration of outages caused by hurricanes. They were able to forecast the post-storm restoration times. In [19], Cerrai et al. presented outage predictions for ice and snow related storms using Bayesian regression tree and random forest models. The techniques were able to predict both lower impact events and extreme events. They followed on from this [20] and used the regression tree technique. This utilized weather and soil spatial distribution, together with historical power outage and vegetation data, to predict the spatial distribution and number of outages in a power distribution network. Dokic et al. [21] described how a weather-related outage was modeled and assessed in real-time in a transmission network. Wanik et al. [22] demonstrated an improvement in outage prediction using land cover and utility-specific infrastructure data. The authors in [23] proposed a method based on the multi-interval parameter estimation to determine outage in a Korea Electric Power Corporation network. The algorithm proved appropriate for power system analysis of low frequency oscillation and efficient in term of reliability and accuracy. An analysis of the resilience of the grid to extreme weather events was conducted by Jufri et al. Grid vulnerability, grid exposure, and weather event intensity were used as determinants to evaluate the resilience of the grid. This analysis can be used as a tool to plan, prioritize and manage improvement strategies of grid resilience [24]. Kang and Lee presented the demand response based prediction of load curtailment using historical data and k-nearest neighbor (k-NN) ensemble method to alleviate the problem of scarcity of data and the uniqueness of customer characteristics. The proposed method was compared with support vector regression and a multi-layer perceptron and gave superior results [23]. GIS spatial methods were used to analyze hurricane-induced power outages in Tallahassee, USA, by Ghorbanzadeh et al. to understand the difference in the impacts of Hurricane Michael and Hurricane Hermine previously experienced by the city. The study results were able to identify high-risk areas. This will be useful for engineers and planners who can focus on those areas for safety intervention efforts, and accessibility and power restorations [25]. Lo Frano et al. investigated the creep phenomena and impact of ageing by subjecting an old reactor pressure vessel to blackout, and analyzed its thermo-mechanical consequences using MARC and MELCOR codes. The results demonstrated a good agreement between the theoretical and experimental results. Such a predictive model will help in the application of operational management programs [26]. Watson et al. presented a weather ensemble impact outage model that is able to predict the potential impacts of thunderstorms, such as the location of storm impacts and the total damage by an event using weather variables, WRF (Weather Research and Forecasting Model) simulation and NOAA (National Oceanic and Atmospheric Administration) analysis data sets. This model found applications in preparing for thunderstorms by decision makers [27]. Yang et al. used learning curves and evaluation metrics to develop a model to quantify the uncertainty in outage prediction. The overestimation and underestimation biases in low-severity and high-severity events were addressed using the proposed method [28]. In [29], we developed a model using the ANNs method, and historical and meteorological data for outage prediction; but wind speed, which is a significant factor responsible for high percentage of outages was missing in the data. The model developed was also predicated on fault data instead of outage data.
In summary, a review of previous studies shows that substantial work has been carried out on weather-related outage prediction. This has produced a sound platform, but there is still much work that can be done to create a predictive model with accuracy and efficacy that is satisfactory.
The conventional approach, as used by electric utilities, makes the assumption of co-linearity, and is low in accuracy. Computational intelligence methods are currently used to develop robust models to address system failure problems. These methods are robust, economical, efficient and flexible, and can provide solutions to vague, complex, nonlinear and dynamic real-life problems [30]. They are replacing conventional methods.
For a new weather-event outage prediction method, there must be an improvement on current models. Most existing electricity outage models do not take climate change into consideration; hence, there is a need for new models which will handle this factor. The model should reconcile the dynamic and complex inter-relationship between climatic and technological factors of system failure. This is essential to establish a legacy that is secure and reliable for the future, both at the local and global levels. The extent of the effectiveness of the methods used in this study can be highlighted by comparison to other studies. A comprehensive literature review was carried out to assess the work done in those studies, and Table 1 illustrates the effectiveness of the work done here.
In this study, the main contributions are as follows:
i
Assessment of the dynamic and complex inter-relationship between climatic and technological factors of system failure. The application of ANNs to forecast power outages of a South African power system. The study findings are significant in the South African context, as they show that AI methods can be applied to outage forecasting and weather conditions do impact the performance of the distribution power system in South Africa;
ii
Development of a useful model for power utilities which will assist maintenance crews. Development of a model for power outage forecasting using meteorological data and artificial neural networks. This model uses the novel approach of expressing the outage events per season as the target output;
iii
Adoption of extensive statistical measures in evaluating the developed outage models. To increase the credibility of the results, real life data are used. The proposed method demonstrated an improved performance, reduced computation time and an ease of implementation as compared to other baseline methods; and
iv
Development of a model that will improve decision making by utilities. This can mean that they pre-position materials and crews, and proactively inform consumers of possibilities of outage. Conventionally, restoration plans of utilities are based on management discretion and experience, and not expert outage prediction models.
This study uses feed-forward ANNs for predicting electrical system failure problems. The performance of the developed ANN model is compared with conventional MLR and ES models. The ANN model is further compared with recent optimization techniques.

2. Materials and Methods

This study uses three methods: the ES; MLR; and ANN. This forecasted weather was related to electricity system failure. This section contains a brief discussion of the methods.

2.1. Exponential Smoothing

Exponential smoothing is a prediction method in the moving average category, which predicts dependent factors by using weighted averages of past data. The weights of previous data sets are subjected to exponential decay, while new data sets are subjected to comparatively bigger weights. The prediction of the dependent parameters from the weighted sum of observed variables is illustrated using [32]:
Y t + 1 = α X t + ( 1 α ) Y t and ( 0 < α < 1 )
where X t = target value at time t, Y t = predicted value at time t, ( 1 α ) = damping factor and α = smoothing value.
This model operates on the basic notion of a regular and stable time series trend, which persists and has its historical trend continue into the future [33]. The values of damping factor ( 1 α ) or smoothing value ( α ) determine the accuracy of the ES prediction. The value of ( α ) is determined using trial and error.

2.2. Multiple Linear Regression

Multiple linear regression is formed from the interconnection between a response parameter and two or more explanatory parameters, by assigning a linear equation to the observed data. MLR is given by [34]:
Y = β 0 + β 1 X 1 + β 2 X 2 + . . . + β k X k + E
where the coefficients of regression are β 0 , β 1 , β 2 , β k ; E is model deviation or error notation; Y is the dependent parameter; and X 1 , X 2 ,..., X k are independent variables.
The deviation notation of an MLR model is used to estimate its performance. This is the deviation between the target and the forecasted values. The performances of MLR models are usually analyzed using statistical calculations such as coefficient of determination ( R 2 ) and the correlation coefficient (r).

2.3. Artificial Neural Networks

ANNs are computationally intelligent methods inspired by the operation of the neural networks in a biological brain [35]. They are effective data-driven modelling tools which have found wide application with dynamic, non-linear and complex systems. They are made up of different numbers of perceptron which receive, process and transmit signals by the action of weight and bias adjustments. Feed-forward multi-layer perceptron ANNs are widely used in engineering applications. ANNs have interesting properties, such as real-time adaptability, multidirectional implementation and robustness, irrespective of incomplete or damaged data, asynchronous processing possibility, ability to learn, well-grounded mathematical foundation, automatic generalization, and high level of parallelism. The main disadvantage of an ANN is that there is no rule-of-thumb for selecting the appropriate configuration [35]. The typical structure of a feed-forward ANN is shown in Figure 1. ANN models learn from their input data sets iteratively by modifying their connecting weights using their error values. They allocate weights to their input data and modify the weights using training algorithms and transfer functions. The sigmoid transfer function s [36] can be illustrated using
F = 1 1 + e s
s = ( a 1 w 1 + a 2 w 2 + . . . ) + B
where F = output of each node, s=output of sigmoid transfer function, a 1 = input value, B = bias and w = weight,
ANNs work iteratively by reducing the overall error E between the target X and the prediction Y. The error is given by [37]:
E = 1 N i = 1 N ( X i Y i ) 2
where N represents the total number of actual data, and X i and Y i represent the target and the predicted values respectively.
In this study, feed-forward ANNs are created using the ANNs toolbox in the MATLAB environment.

3. Description of the Study Area

The case study here is the city of Pietermaritzburg (PMB). The city is the headquarters of the Msunduzi local municipality, the Umgungundlovu district municipality and the KwaZulu-Natal (KZN) province, South Africa. The city was founded in 1838 and is about 70 km from South Africa’s tropical East coast and is 676 m above sea level. It often experiences extreme weather. The city population in 2011 was 223,448, and it is growing. The city is the second-largest population in the province with tourism and energy resources [38]. Thus, it is a major South African urban area.
There are three operating units (OUs) in the KZN province; they are PMB, Newcastle (NWC) and Empangeni (EMP) zones. Due to the outage problems associated with the PMB zone (Figure 2), and its extreme weather conditions, this network is chosen as representative and suitable for use as a case study. The climatic variables that affect power outage were taken into consideration while applying ANN models. These variables were discussed in [1]. In this work, the variables considered are outage date OD, cloud amount CLD (%), minimum temperature TMN (°C), maximum temperature TMX (°C), number of frost days FRSD (days/month), number of wet days WETD (days/month), potential evapotranspiration PET (mm/month), precipitation PRE (mm/month), vapor pressure VAPD (hPa or mbar), and wind speed WS (m/s). The data sets spanned the period between January 2014 and July 2017 (forty-three months). They were acquired from the South African Weather Service (SAWS) and the electricity public utility Eskom Holdings SOC Ltd., Durban, KZN, South Africa.
The statistical features and historical trends of the acquired data for the case study are shown in Table 2 and Figure 3, Figure 4, Figure 5, Figure 6, Figure 7 and Figure 8, respectively. Figure 3 shows occasional heavy precipitation, which is often accompanied by strong wind, lightning, flooding and landslides (responsible for causing faults). Figure 4 shows record high temperatures, which impacts distribution and transmission networks by reducing the maximum power rating of equipment and increasing energy losses. Figure 5 shows the numbers of wet days per month. These are very low for several months during the study period. A prolonged drought can result in the drying out of the ground, reducing the thermal conductivity of the soil, and causing the rating of underground cables to reduce. Figure 6 shows high maximum wind speed for different months. High wind can cause faults by damaging overhead lines, blowing debris against overhead lines, collapsing trees against overhead lines, and uprooting utility poles in extreme high winds [39].
Figure 7 shows the fluctuation of the outage events in different months in the city between January 2014 and July 2017. The outage events vary from year to year, but in general, over 50% of the outages have been attributed to weather events. From Table 3 and Figure 8, it can be observed that 35% of the outages occurred during winter, 27% during autumn, 21% during spring, and 17% during summer within the period covered (note that 2017 did not cover winter in full or cover spring at all).

4. Model Development

The potential explanatory variables were subjected to a screening process to investigate the predictive model for variables with a good description of the system. This is to enhance good generalization from a robust learning process. To implement the ES model, the smoothing factor was varied in steps of 0.1 between 0.1 and 0.9. The best smoothing factor that had the least error estimates was 0.8. In this study, two models were developed for both MLR and ANN. All the historical variables listed under the description of study area were used for Model 1 of both the MLR and ANN methods to determine the weather-related electricity system failure (SF). Model 1, in both cases, is governed mathematically by the expression
S F = f ( OD , CLD , FRSD , PRE , PET , TMN , TMX , VAPD , WETD , WS )
Pearson correlation analysis was used in Model 2 (for both MLR and ANN) to screen the variables to those presumed to be directly related or more appropriate. Table 4 presents the results of the correlation analysis. The cut-off mark was chosen by accepting the correlation coefficient in the range 0.5 | x | 1 and discarding the correlation coefficient in the range 0.5 < x < 0.5 . The results yield high correlation (0.5 or −0.5) for cloud amount, precipitation, minimum temperature, maximum temperature, vapor pressure, number of wet days and wind speed. The remaining variables with correlation coefficients in the range 0.5 < x < 0.5 were discarded.
For Model 2, both the MLR and ANN models are governed by the expression:
S F = f ( CLD , PRE , TMN , TMX , VAPD , WETD , WS )
For training and testing purposes, the data sets were split in the ratio 70% to 30%; hence, 159 data sets were used for training, and 68 data sets for testing. For the ANN models, feed-forward ANNs with supervised learning methods were used in this study. Target outputs specified in Table 5 were used for the system failure. The two ANN models were implemented in the ANN toolbox in MATLAB, while the MLR and ES models were implemented using Microsoft Excel. The two ANN models were subjected to the expressions in (6) and (7) respectively; as were the two MLR models. The model performances and the performance of the ES models can be compared. For ANN Models 1 and 2, the configurations used were 10-60-1 (10, 60 and 1 neurons in the input, hidden and output layers) and 7-60-1 (7, 60 and 1 neurons in the input, hidden and output layers), respectively. Linear and sigmoid transfer functions combined with a back propagation algorithm (BPA) were used for the ANN models. The ability of an ANN to approximate functions is expressed through transfer functions. The common types of transfer functions are piece-wise linear, sigmoid, unit step (threshold), and Gaussian. The type of transfer function used is determined by the application requirements. Transfer functions for the binary and bipolar sigmoid can be expressed, respectively, as [40]:
F = 1 1 + e σ x
F = 1 e σ x 1 + e σ x
where x = sum of weighted inputs and σ = steepness parameter.

5. Model Evaluation

In this study, the performance of the predictive models was evaluated using six statistical measures. The measures are R 2 , RMSE, MAPE, MAD, MSE and MAE. R 2 measures the degree of variance between the predicted and target values. RMSE is a measure of the error variance of the prediction model. MAPE calculates the absolute differences between the predicted and target values. MAD measures the variability of a dataset by defining the deviation between each data point and its mean. MSE (or MSD) is a measure of the average of the squares of the deviations—that is, the average squared error between the predicted values and the target value. MAE measures the errors between paired observations denoting the same phenomenon [41].
The closer that RMSE, MAPE, MAD, MSE and MAE are to zero, the better the model. For R 2 , the closer it is to 1, the better the model; this can be obtained from
R 2 = i = 1 N Y i Y ¯ X i X ¯ i = 1 N Y i Y ¯ 2 i = 1 N X i X ¯ 2 2
The following equations are for the other statistical measures [32,42,43,44].
The error variance of the prediction model can be calculated using
RMSE = i = 1 N Y i X i 2 N
The absolute differences between the predicted and target values are
MAPE = 100 N i = 1 N | Y i X i | Y i
while the deviation between each data point and its mean is obtained from
MAD = 1 N i = 1 N | X i X |
and the average of the squares of the deviation is
MSE = 1 N i = 1 N Y i Y ¯ 2
The errors between paired observations can be obtained from
MAE = 1 N i = 1 N | Y i X i |
where, in these equations, N = number of occurrences in the set; and X i , Y i , X ¯ and Y ¯ = target, predicted and their respective mean values.

6. Results and Discussion

Table 6 presents the performance of the predictive models. The results of ANN Models 1 and 2 were satisfactory for both training and testing operations, but the performance of ANN Model 1 is better than all the other models. The performances of the models were compared and the R 2 of ANN Model 1 for training and testing are the highest; they are 0.9982 and 0.9999, respectively. ANN Model 1 also recorded the lowest values for other measures during both training and testing, such as RMSE (0.3156 and 0.0035), MAPE (0.0009% and 0.0001%), MAD (0.0293 and 0.0017), MSE (0.0996 and 0.00001), and MAE (0.0293 and 0.0017). Ranking the models in order of performance based on their statistical measures: ANN Model 1 > ANN Model 2 > ES Model > MLR Model 1 > MLR Model 2). The results indicate that all or most of the considered variables were significant, directly or indirectly, in determining weather-related electricity system failures for PMB.
A careful analysis of the results shows that the accuracy of the prediction of the power system outages depends on the ten variables considered in ANN Model 1 and MLR Model 1. A reduction in the number of input variables in ANN Model 2 and MLR Model 2 reduced the accuracy of the forecasted values for the models. Therefore, the ten variables make up the best subset of the model that is sufficient to represent the weather related electricity system failure of the city, as opposed to the scaled down number of variables of seven.
For both the training and testing of the five models, Figure 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15, Figure 16, Figure 17 and Figure 18 show how the data points deviated from the line of equality.
The performance of the ES method is presented in Table 6, and in Figure 9 and Figure 10. This was implemented by incrementing the damping factor by 0.1 between 0.1 and 0.9. It was observed that the damping factor with the highest error estimate was 0.1, while the damping factor with the least error estimate was 0.8. Therefore, the best damping factor (with least error estimate) was taken as 0.8. From Figure 9 and Figure 10, which show the system failure plots of target vs. predicted value for the ES Model training and testing, it can be observed that the deviations of the data points from the line of equality are high. The percentage overfit suffered by the ES model is between 5.5 and 39.9%, thereby showing unsatisfactory performance.
Figure 11, Figure 12, Figure 13 and Figure 14 show the system failure plots of target vs. predicted values for MLR Models 1 and 2 training and testing. It can be seen that the deviation of the data points from the line of equality is high, in a similar manner to the ES model. The percentage overfit of Models 1 and 2 varies between 4.7 and 43.8%, again showing unsatisfactory performance.
Figure 15, Figure 16, Figure 17 and Figure 18 show minimal deviations confirming the satisfactory performance of the ANN models and their efficiency when compared to conventional models. The figures show the system failure plots of target vs. predicted value for ANN Models 1 and 2 training and testing. This time, the deviation of the data points from the line of equality are very small. The percentage overfit suffered by ANN models 1 and 2 is generally below 1%. This illustrates that the performance is very satisfactory.
The number of input neurons of ANN model 1 was 10 by virtue of the number of input variables. Different configurations consisting of different numbers of hidden layers with different numbers of neurons were trained and the configuration, with one hidden layer containing sixty neurons giving the best results. The methods used in this study further illustrate that ANNs are robust and applicable to weather related power system failure, and that they are able to account for complex relationships between power system failure and climatic parameters. It can be inferred that ANN-based models have potential in terms of managing weather-related power system failure prediction effectively.

7. Comparison with Some Optimization Techniques

The results of the comparison of the proposed method with some optimization techniques are presented in Table 7. The data used for ANN Model 1 training were implemented using a differential search (DS), differential evolutionary algorithm (DE), genetic algorithm (GA) and ant colony optimization (ACO) methods. The results were evaluated using the RMSE statistical measure. Although the RMSE values for all the methods are very close, the ANN Model 1 method excelled by its ease of implementation, its superior computation time, and having the least computation complexity with respect to the other compared optimization methods.

8. Conclusions

The performance of ANN-based and conventional predictive methods (MLR and ES) was compared for weather related electricity system failure. Statistical measures serve as the basis for the model performance using real-life data sets from PMB, South Africa. Two models were generated for both ANN and MLR. In both cases, ten potential explanatory variables were used for Model 1, while seven potential explanatory variables were used for Model 2 after careful screening using correlation analysis. An analysis showed that ANN Model 1 was better than the other models in terms of performance. The order of performance of the models is ANN Model 1 > ANN Model 2 > ES Model > MLR Model 1 > MLR Model 2. The results are further confirmation of the appropriateness and robustness of ANNs in predicting weather related electricity system failure. The complex relationship between weather events and electricity system failure is demonstrated in this study. Future research could investigate the use of larger data sets, investigate similar ANN models when forecasting outages for multiple power systems, use metaheuristic optimization methods, and compare the accuracy of the developed ANN model 1 against other artificial intelligent methods.

Author Contributions

Conceptualization: A.K.O.; methodology: A.K.O.; software: A.K.O.; validation: R.P.C., D.G.D. and E.E.O.; formal analysis: R.P.C., D.G.D. and E.E.O.; investigation, R.P.C., D.G.D. and E.E.O.; writing—original draft preparation—review: A.K.O., R.P.C., D.G.D. and E.E.O.; editing: R.P.C., D.G.D. and E.E.O.; funding acquisition: D.G.D. All authors have read and agreed to the submitted version of the manuscript.

Funding

This research was funded partly by the UK Newton Fund Scheme under Grant IAPP161758, and partly by the CSIR through the DSI Smart Networks Initiative under Grant K9DSEIF.11214.05400.054RC.UNI.

Data Availability Statement

The availability of these data involves some restrictions. Data were obtained from Eskom Holdings SOC Ltd and South African Weather Service (SAWS). They are available from the authors with the permission of Eskom Holdings SOC Ltd and South African Weather Service (SAWS).

Acknowledgments

The authors wish to acknowledge the Eskom Holdings SOC Ltd and South African Weather Service (SAWS) for the real-life data used for this study and the Eskom Smart Grid Centre, University of KwaZulu-Natal, South Africa, for research facilities.

Conflicts of Interest

The authors declare no conflict of interest.

Abbreviations

The following abbreviations are used in this manuscript:
ANNsArtificial neural networks
CLDCloud (%)
EMPEmpangeni
ESExponential smoothing
FRSDNumber of frost days (days/month)
KZNKwaZulu Natal
KZNOUKwaZulu Natal operating unit
MADMean absolute deviation
MAEMean absolute error
MAPEMean absolute percent error
MLRMultiple linear regression
MSDMean squared deviation
MSEMean squared error
NWCNewcastle
ODOutage date
PETPotential evapotranspiration (mm/month)
PMBPietermaritzburg
PREPrecipitation (mm/month)
R 2 Coefficient of determination
RMSERoot mean-square error
SAWSSouth African Weather Service
SFSystem failure
TMNMinimum temperature (°C)
TMXMaximum temperature (°C)
VAPDVapor pressure (hPa or mb)
WETDNumber of wet days (days/month)
WSWind speed (m/s)

References

  1. Ward, D.M. The effect of weather on grid systems and the reliability of electricity supply. Clim. Chang. 2013, 121, 103–113. [Google Scholar] [CrossRef]
  2. Zhou, Y.; Pahwa, A.; Yang, S.S. Modeling weather-related failures of overhead distribution lines. IEEE Trans. Power Syst. 2006, 21, 1683–1690. [Google Scholar] [CrossRef]
  3. Rodriguez, J.R.A.; Vargas, A. Fuzzy-heuristic methodology to estimate the load restoration time in MV networks. IEEE Trans. Power Syst. 2005, 20, 1095–1102. [Google Scholar] [CrossRef]
  4. Zhou, K.; Dobson, I.; Wang, Z.; Roitershtein, A.; Ghosh, A.P.A. Markovian influence graph formed from utility line outage data to mitigate large cascades. IEEE Trans. Power Syst. 2020, 35, 3224–3235. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  5. Kankanala, P.; Das, S.; Pahwa, A. AdaBoost +: An Ensemble Learning Approach for Estimating Weather-Related Outages in Distribution Systems. IEEE Trans. Power Syst. 2014, 29, 359–367. [Google Scholar] [CrossRef] [Green Version]
  6. Che, L.; Liu, X.; Li, Z.; Wen, Y. False data injection attacks induced sequential outages in power systems. IEEE Trans. Power Syst. 2018, 34, 1513–1523. [Google Scholar] [CrossRef]
  7. Eskandarpour, R.; Khodaei, A. Leveraging accuracy-uncertainty tradeoff in SVM to achieve highly accurate outage predictions. IEEE Trans. Power Syst. 2017, 33, 1139–1141. [Google Scholar] [CrossRef]
  8. Eskandarpour, R.; Khodaei, A. Machine learning based power grid outage prediction in response to extreme events. IEEE Trans. Power Syst. 2016, 32, 3315–3316. [Google Scholar] [CrossRef]
  9. Jaech, A.; Zhang, B.; Ostendorf, M.; Kirschen, D.S. Real-time prediction of the duration of distribution system outages. IEEE Trans. Power Syst. 2018, 34, 773–781. [Google Scholar] [CrossRef] [Green Version]
  10. Ridolfo, C.F. Predictive Maintenance Display System. U.S. Patent 6735549 B2, 11 May 2004. [Google Scholar]
  11. Radmer, D.T.; Kuntz, P.A.; Christie, R.D.; Venkata, S.S.; Fletcher, R.H. Predicting vegetation-related failure rates for overhead distribution feeders. IEEE Trans. Power Deliv. 2013, 17, 103–113. [Google Scholar]
  12. Aguero, J.R.; Spare, J.; Phillips, E.; O’Meally, C.; Wang, J.; Brown, R.E. Distribution system reliability improvement using predictive models. In Proceedings of the IEEE Power & Energy Society General Meeting, Calgary, AB, Canada, 26–30 July 2009; pp. 1–7. [Google Scholar]
  13. Rau, H.H.; Hsu, C.Y.; Lin, Y.A.; Atique, S.; Fuad, A.; Wei, L.M.; Hsu, M.H. Development of a web-based liver cancer prediction model for type II diabetes patients by using an artificial neural network. Comput. Methods Programs Biomed. 2016, 125, 58–65. [Google Scholar] [CrossRef]
  14. Pahwa, A. Effect of environmental factors on failure rate of overhead distribution feeders. In Proceedings of the IEEE Power Engineering Society General Meeting, Denver, CO, USA, 6–10 June 2004; pp. 691–692. [Google Scholar]
  15. Yuan, S.; Quiring, S.M.; Zhu, L.; Huang, Y.; Wang, J. Development of a typhoon power outage model in Guangdong, China. J. Abbr. 2020, 117, 105711. [Google Scholar] [CrossRef]
  16. Alpay, B.A.; Wanik, D.; Watson, P.; Cerrai, D.; Liang, G.; Anagnostou, E. Dynamic modeling of power outages caused by thunderstorms. Forecasting 2020, 2, 151–162. [Google Scholar] [CrossRef]
  17. Pasqualini, D.; Kaufeld, K.A.; Dorn, M.F. Electric Power Outage Forecasting: Model; Los Alamos National Lab. (LANL): Los Alamos, NM, USA, 2018; Volume 34, pp. 773–781.
  18. Nateghi, R.; Guikema, S.D.; Quiring, S.M. Forecasting hurricane induced power outage durations. Nat. Hazards 2014, 74, 1795–1811. [Google Scholar] [CrossRef]
  19. Cerrai, D.; Koukoula, M.; Watson, P.; Anagnostou, E.N. Outage prediction models for snow and ice storms. Sustain. Energy Grids Netw. 2020, 21, 100294. [Google Scholar] [CrossRef]
  20. Cerrai, D.; Wanik, D.W.; Bhuiyan, M.A.E.; Zhang, X.; Yang, J.; Frediani, M.E.B.; Anagnostou, E.N. Predicting storm outages through new representations of weather and vegetation. IEEE Access 2019, 7, 29639–29654. [Google Scholar] [CrossRef]
  21. Dokic, T.; Pavlovski, M. Spatially aware ensemble-based learning to predict weather-related outages in transmission. In Proceedings of the Hawaii International Conference on System Sciences—HICSS, Maui, HI, USA, 8–11 January 2019. [Google Scholar]
  22. Wanik, D.; Anagnostou, E.; Hartman, B.; Frediani, M.; Astitha, M. Storm outage modeling for an electric distribution network in northeastern USA. Nat. Hazards 2015, 79, 1359–1384. [Google Scholar] [CrossRef]
  23. Shim, K.S.; Ahn, S.J.; Yun, S.Y.; Choi, J.H. Analysis of Low Frequency Oscillation Using the Multi-Interval Parameter Estimation Method on a Rolling Blackout in the KEPCO System. Energies 2017, 10, 484. [Google Scholar] [CrossRef]
  24. Jufri, F.H.; Kim, J.S.; Jung, J. Analysis of determinants of the impact and the grid capability to evaluate and improve grid resilience from extreme weather event. Energies 2017, 10, 1779. [Google Scholar] [CrossRef] [Green Version]
  25. Ghorbanzadeh, M.; Koloushani, M.; Ulak, M.B.; Ozguven, E.E.; Jouneghani, R.A. Statistical and spatial analysis of hurricane-induced roadway closures and power outages. Energies 2020, 13, 1098. [Google Scholar] [CrossRef] [Green Version]
  26. Lo Frano, R.; Cancemi, S.A.; Darnowski, P.; Ciolini, R.; Paci, S. Preliminary Analysis of an Aged RPV Subjected to Station Blackout. Energies 2021, 14, 4394. [Google Scholar] [CrossRef]
  27. Watson, P.L.; Koukoula, M.; Anagnostou, E. Influence of the characteristics of weather information in a thunderstorm-related power outage prediction system. Forecasting 2021, 3, 541–560. [Google Scholar] [CrossRef]
  28. Yang, F.; Wanik, D.W.; Cerrai, D.; Bhuiyan, M.A.E.; Anagnostou, E.N. Quantifying uncertainty in machine learning-based power outage prediction model training: A tool for sustainable storm restoration. Sustainability 2020, 12, 1525. [Google Scholar] [CrossRef] [Green Version]
  29. Onaolapo, A.K.; Pillay Carpanen, R.; Dorrell, D.G.; Ojo, E.E. A Comparative Evaluation of Conventional and Computational Intelligence Techniques for Forecasting Electricity Outage. In Proceedings of the Southern African Universities Power Engineering Conference/Robotics and Mechatronics/Pattern Recognition Association of South Africa (SAUPEC/RobMech/PRASA), Potchefstroom, South Africa, 27–29 January 2021; pp. 1–6. [Google Scholar]
  30. Onaolapo, A.K.; Pillay Carpanen, R.; Dorrell, D.G.; Ojo, E.E. Transmission Line Fault Classification and Location Using Multi-Layer Perceptron Artificial Neural Network. In Proceedings of the 46th Annual Conference of the IEEE Industrial Electronics Society, Singapore, 18–21 October 2020; pp. 5182–5187. [Google Scholar]
  31. Kang, J.; Lee, S. Data-driven prediction of load curtailment in incentive-based demand response system. Energies 2018, 11, 2905. [Google Scholar] [CrossRef] [Green Version]
  32. Oyebode, O.; Ighravwe, D.E. Urban water demand forecasting: A comparative evaluation of conventional and soft computing techniques. Resources 2019, 8, 156. [Google Scholar] [CrossRef] [Green Version]
  33. Hyndman, R.; Koehler, A.B.; Ord, J.K.; Snyder, R.D. Forecasting with Exponential Smoothing: The State Space Approach; Springer Science & Business Media: New York, NY, USA, 2008. [Google Scholar]
  34. Wu, L.; You, S.; Dong, J.; Liu, Y.; Bilke, T. Multiple Linear Regression Based Disturbance Magnitude Estimations for Bulk Power Systems. In Proceedings of the IEEE Power & Energy Society General Meeting (PESGM), Portland, OR, USA, 5–10 August 2018; pp. 1–5. [Google Scholar]
  35. Onaolapo, A.K.; Akindeji, K.T.; Adetiba, E. Simulation Experiments for Faults Location in Smart Distribution Networks using IEEE 13 Node Test Feeder and Artificial Neural Network. J. Phys. Conf. Ser. 2019, 1378, 032021. [Google Scholar] [CrossRef]
  36. Mafi, S.; Amirinia, G. Forecasting hurricane wave height in Gulf of Mexico using soft computing methods. Ocean. Eng. 2017, 146, 352–362. [Google Scholar] [CrossRef]
  37. Jarndal, A.; Hamdan, S. Forecasting of Peak Electricity Demand Using ANNGA and ANN-PSO Approaches. In Proceedings of the International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO), Sharjah, United Arab Emirates, 4–6 April 2017; pp. 1–5. [Google Scholar]
  38. Hlahla, S.; Hill, T.R. Responses to Climate Variability in Urban Poor Communities in Pietermaritzburg, KwaZulu-Natal, South Africa. SAGE Open 2017, 8, 2158244018800914. [Google Scholar] [CrossRef] [Green Version]
  39. Aven, T. Interpretations of alternative uncertainty representations in a reliability and risk analysis context. Reliab. Eng. Syst. Saf. 2011, 96, 353–360. [Google Scholar] [CrossRef]
  40. Panicker, M.; Babu, C. Efficient FPGA Implementation of Sigmoid and Bipolar Sigmoid Activation Functions for Multilayer Perceptrons. IOSR J. Eng. 2012, 22, 1352–1356. [Google Scholar] [CrossRef]
  41. Hyndman, R.J.; Koehler, A.B. Another look at measures of forecast accuracy. Int. J. Forecast. 2006, 22, 679–688. [Google Scholar] [CrossRef] [Green Version]
  42. Chai, T.; Draxler, R.R. Root mean square error (RMSE) or mean absolute error (MAE)?—Arguments against avoiding RMSE in the literature. Geosci. Model Dev. 2014, 7, 1247–1250. [Google Scholar] [CrossRef] [Green Version]
  43. Nitis, M.; Jun, H. Confidence intervals and point estimators for a normal mean under purely sequential strategies involving Gini’s mean difference and mean absolute deviation. Seq. Anal. 2017, 36, 210–239. [Google Scholar]
  44. Lee, D.; Park, C.S. On the Generalized Mean Square Error and its Applications. J. Korean Inst. Ind. Eng. 2018, 44, 102–113. [Google Scholar] [CrossRef]
Figure 1. A typical structure of an ANN with three layers.
Figure 1. A typical structure of an ANN with three layers.
Energies 15 00511 g001
Figure 2. Overview of line fault in KZN zones between 2010 and 2017. [Source: Eskom].
Figure 2. Overview of line fault in KZN zones between 2010 and 2017. [Source: Eskom].
Energies 15 00511 g002
Figure 3. Historical trend of PRE, PET and CLD.
Figure 3. Historical trend of PRE, PET and CLD.
Energies 15 00511 g003
Figure 4. Historical trend of TMN and TMX.
Figure 4. Historical trend of TMN and TMX.
Energies 15 00511 g004
Figure 5. Historical trend of WAPD and WETD.
Figure 5. Historical trend of WAPD and WETD.
Energies 15 00511 g005
Figure 6. Historical trend of FRSD and WS.
Figure 6. Historical trend of FRSD and WS.
Energies 15 00511 g006
Figure 7. Historical trend of faults per month.
Figure 7. Historical trend of faults per month.
Energies 15 00511 g007
Figure 8. Historical trend of outages per season.
Figure 8. Historical trend of outages per season.
Energies 15 00511 g008
Figure 9. System failure plot of target vs. predicted value for ES Model training.
Figure 9. System failure plot of target vs. predicted value for ES Model training.
Energies 15 00511 g009
Figure 10. System failure plot of target vs. predicted value for ES Model testing.
Figure 10. System failure plot of target vs. predicted value for ES Model testing.
Energies 15 00511 g010
Figure 11. System failure plot of target vs. predicted value for MLR Model 1 training.
Figure 11. System failure plot of target vs. predicted value for MLR Model 1 training.
Energies 15 00511 g011
Figure 12. System failure plot of target vs. predicted value for MLR Model 1 testing.
Figure 12. System failure plot of target vs. predicted value for MLR Model 1 testing.
Energies 15 00511 g012
Figure 13. System failure plot of target vs. predicted value for MLR Model 2 training.
Figure 13. System failure plot of target vs. predicted value for MLR Model 2 training.
Energies 15 00511 g013
Figure 14. System failure plot of target vs. predicted value for MLR Model 2 testing.
Figure 14. System failure plot of target vs. predicted value for MLR Model 2 testing.
Energies 15 00511 g014
Figure 15. System failure plot of target vs. predicted value for ANN Model 1 training.
Figure 15. System failure plot of target vs. predicted value for ANN Model 1 training.
Energies 15 00511 g015
Figure 16. System failure plot of target vs. predicted value for ANN Model 1 testing.
Figure 16. System failure plot of target vs. predicted value for ANN Model 1 testing.
Energies 15 00511 g016
Figure 17. System failure plot of target vs. predicted value for ANN Model 2 training.
Figure 17. System failure plot of target vs. predicted value for ANN Model 2 training.
Energies 15 00511 g017
Figure 18. System failure plot of target vs. predicted value for ANN Model 2 testing.
Figure 18. System failure plot of target vs. predicted value for ANN Model 2 testing.
Energies 15 00511 g018
Table 1. Comparison of studies.
Table 1. Comparison of studies.
StudyPrediction
Model
Historical
Data
Meteorological
Data
Simulated
Data
Low
Computation Time
Ease of
Implemen-Tation
[4]🗸🗸----
[5]🗸🗸🗸---
[6]🗸-🗸---
[8]🗸--🗸--
[9]🗸🗸🗸---
[15]🗸-🗸---
[16]🗸🗸🗸---
[17]🗸🗸🗸---
[19]🗸🗸🗸---
[20]🗸-🗸---
[21]🗸🗸🗸---
[22]🗸-🗸---
[23]🗸🗸----
[24]🗸🗸🗸---
[31]🗸🗸----
[25]🗸🗸----
[26]🗸🗸----
[27]🗸🗸🗸🗸--
[28]🗸🗸🗸---
This study🗸🗸🗸-🗸🗸
Table 2. Statistics of data used in the research.
Table 2. Statistics of data used in the research.
Statistical ParameterPREPETCLDTMNTMXVAPDWETDFRSDWS
Mean61.5189.2545.749.9723.7713.419.571.842.96
Maximum146.80136.9082.1016.6027.8020.3018.808.273.45
Minimum12.8057.8016.503.6020.008.302.740.002.08
Standard Deviation44.2223.4317.434.172.213.985.732.640.30
Variance 1.96 × 10 3 549.0303.717.404.8815.8532.846.960.09
Kurtosis coefficient1.521.731.981.671.961.731.402.743.15
Skewness coefficient0.380.150.240.05−0.120.280.181.11−0.63
Table 3. Percentage analysis of outages per season.
Table 3. Percentage analysis of outages per season.
Season2014201520162017Total
Summer (%)734317
Autumn (%)10341027
Winter (%)81411235
Spring (%)876021
Table 4. Pearson correlation analysis result.
Table 4. Pearson correlation analysis result.
S/nVariablesCorrelation Coefficients
1OD−0.05051
2CLD0.549712
3FRSD−0.26586
4PET0.471735
5PRE0.57765
6TMN0.597951
7TMX0.520818
8VAPD0.638733
9WETD0.534573
10WS−0.57327
Table 5. System failure target outputs.
Table 5. System failure target outputs.
S/nYearTime of the YearSeasonOutage Events
120141 January–28 FebruarySummer16.0
220141 March–31 MayAutumn22.0
320141 June–31 AugustWinter19.0
420141 September–30 NovemberSpring18.0
52014/20151 December–28 FebruarySummer7.0
62014/20151 March–31 MayAutumn8.0
72014/20151 June–31 AugustWinter31.0
82014/20151 September–30 NovemberSpring17.0
92015/20161 December–28 FebruarySummer8.0
102015/20161 March–31 MayAutumn8.0
112015/20161 June–31 AugustWinter26.0
122015/20161 September–30 NovemberSpring13.0
132016/20171 December–28 FebruarySummer7.0
142016/20171 March–31 MayAutumn22.0
152016/20171 June–31 JulyWinter5.0
Table 6. Performance of the developed predictive models.
Table 6. Performance of the developed predictive models.
TrainTestTrainTestTrainTestTrainTestTrainTestTrainTest
Technique R 2 R 2 RMSERMSEMAPEMAPEMADMADMSEMSEMAEMAE
ES0.770.473.823.830.040.091.182.2914.6314.671.182.67
MLR Model 10.510.565.223.130.140.124.093.1327.249.804.093.66
MLR Model 20.460.555.513.140.150.124.433.0830.319.894.433.60
ANN Model 10.990.990.320.010.010.010.030.010.090.010.030.01
ANN Model 20.950.991.610.870.010.010.130.152.600.760.130.15
Table 7. Comparison with some optimization techniques.
Table 7. Comparison with some optimization techniques.
MethodComputation Time (s)RMSE
ACO52.320.3222
GA54.350.3417
DE51.290.3365
DS45.060.3323
ANN model 125.140.3156
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Onaolapo, A.K.; Carpanen, R.P.; Dorrell, D.G.; Ojo, E.E. A Comparative Assessment of Conventional and Artificial Neural Networks Methods for Electricity Outage Forecasting. Energies 2022, 15, 511. https://doi.org/10.3390/en15020511

AMA Style

Onaolapo AK, Carpanen RP, Dorrell DG, Ojo EE. A Comparative Assessment of Conventional and Artificial Neural Networks Methods for Electricity Outage Forecasting. Energies. 2022; 15(2):511. https://doi.org/10.3390/en15020511

Chicago/Turabian Style

Onaolapo, Adeniyi Kehinde, Rudiren Pillay Carpanen, David George Dorrell, and Evans Eshiemogie Ojo. 2022. "A Comparative Assessment of Conventional and Artificial Neural Networks Methods for Electricity Outage Forecasting" Energies 15, no. 2: 511. https://doi.org/10.3390/en15020511

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop