A Space Reduction Heuristic for Thermal Unit Commitment Considering Ramp Constraints and Large-Scale Generation Systems

by
Layon Mescolin de Oliveira
1,
Ivo Chaves da Silva Junior
1 and
Ramon Abritta
2,*
1
Laboratory of Power Systems, Department of Electrical Energy, Federal University of Juiz de Fora, José Lourenço Kelmer St., São Pedro, Juiz de Fora 36036-900, Brazil
2
Department of Geoscience and Petroleum, Norwegian University of Science and Technology, PTS Paviljong, 540, Valgrinda, S.P. Andersens veg 15, 7031 Trondheim, Norway
*
Author to whom correspondence should be addressed.
Energies 2023, 16(14), 5370; https://doi.org/10.3390/en16145370
Submission received: 25 May 2023 / Revised: 28 June 2023 / Accepted: 1 July 2023 / Published: 14 July 2023
(This article belongs to the Section J: Thermal Management)

Abstract

:
This paper expands the research around a recently proposed method to reduce the search space region for thermal unit commitment problems. The importance of such techniques comes from the combinatorial explosion regarding the variables of the problem when there are a large quantity of generating units in the system. The proposed heuristic approach utilizes sensitivity indices to gather information about the system and fix many of the binary decision variables over the planning horizon. This work further explores the method by demonstrating its effectiveness in large-scale systems subjected to ramp constraints. Despite the significantly increased complexity, the results of this paper indicate that the method can achieve high quality solutions notably faster than other approaches from the literature.

1. Introduction

The short-term Unit Commitment (UC) problem is among the most relevant problems in the electrical energy sector, as it targets the planning and operation of generating units, varying from a few hours to a day [1]. In general, UC can be described according to two main stages: the operation decisions regarding the generating units, and the economic dispatch [2]. The former aims to determine which generating units must operate and supply power during each hour of the planning horizon, while the latter has the goal of minimizing operational costs by optimally indicating how much power each operating unit should generate [3,4] in order to attend to the power and reserve demands. UC problems can relate to different planning horizons and time discretizations. This paper addresses applications regarding a short-term 24 h planning window with hourly discretizations. When all generating units are thermoelectric, UC is referred to as Thermal Unit Commitment (TUC). Solving the TUC problem is a complex task due to the large number of binary variables [5] which represent the operation decisions concerning each thermoelectric unit. Furthermore, the problem under investigation is subjected to time-coupling constraints that further increase its complexity. The UC problem can be represented in different manners, as shown in the review presented by Montero et al. [6].
The combinatorial explosion regarding the decision-making process implies a significant mathematical challenge to operational planning. Each unit added to an existing system greatly increases the number of operational possibilities. Large-scale systems, e.g., 40 to 100 units, have large solving difficulty due to the number of variables [7].
Considering ramp constraints brings the solution closer to real operation conditions by including the thermoelectric characteristics of the generators [8]. However, this makes the problem more challenging to solve [9]. Montero et al. [6] indicated that researchers occasionally neglect ramp constraints.
The TUC problem has been addressed by several techniques designed for combinatorial formulations. It is well known that an exhaustive search would be infeasible due to computational burden issues [10]. Among the early methods to solve TUC, Branch and Bound [11] and Dynamic Programming [12] should be highlighted. However, these approaches tend to take a long time to retrieve the solution, and can exclude the global optimum early in the solving process [13]. Priority lists are based on heuristic information regarding the characteristics of the generating units. They are widely utilized due to their simple implementation [14,15]. Metaheuristics are able to provide good results faster than other methods. However, they have the disadvantage of a large number of tuning parameters, and are prone to local stagnation. In addition, their good performance usually depends on a feasible initial solution [16,17,18].
In previous research [19], we presented a method of reducing the search space of the TUC problem. The proposed constructive heuristic based on sensitivity indices exploits system information to reduce the number of decision variables. This work extends our previous study, and makes two new main contributions to the TUC literature:
  • An adaptation of the method from [19] is presented to significantly reduce the search space for the addressed TUC problem considering ramp constraints. Despite the space reduction, the methodology preserves high quality solutions and enables feasibility for cases in which the non-reduced problem does not converge within the established time limit. Montero et al. [6] showed that 50% of the reviewed publications neglected ramp constraints. This a fact increases the value of the results provided in this paper towards advancing the state of the art.
  • Based on [6], it has been verified that 48% of the reported papers address systems with more than 50 generating units. In this paper, systems with 60, 80, and 100 units are within the scope of the study. Thus, the value of the proposed method is shown for large systems, which are usually neglected in the specialized literature.
It should be emphasized that the method proposed in [19] has proven able to greatly reduce the search space for small-scale TUC problems. The results from [19] motivated the study presented herein concerning larger systems subjected to ramp constraints.
Beyond this introduction, Section 2 provides the TUC problem formulation for this study, Section 3 summarizes the proposed approach according to previous research, Section 4 explores case studies by expanding the application to ramp-constrained andsignificantly larger systems compared to the previous research, and Section 5 concludes the work and mentions future studies.

2. Thermal Unit Commitment Problem

Different approaches exist to formulate the TUC problem [20,21,22]. In this work, the problem is provided by a mixed-integer quadratic programming formulation, as in [23]. A variety of constraints are considered, aiming at obtaining solutions that better mimic real operation, including minimum and maximum up time, cold and hot startup, and ramp limitations.
The objective function seeks to minimize the operational costs (C). These expenses are provided by the fuel consumption costs plus the startup costs, as in Equation (1). This goal is broadly utilized in TUC studies. However, adaptations including other goals and cost factors can be carried out according to the needs of the implementation. As a further remark, Equation (1) models the startup cost of a generating unit according to the period during which the unit has been inactive [24]. This factor changes the temperature conditions of the unit, thereby impacting the startup expenditure:
minimize C = t = 1 T i = 1 NG a i u i t + b i Pg i t + c i Pg i t 2 + s i t cold · s i cost cold + s i t hot · s i cost hot
where T is the quantity of discretizations in the planning horizon; NG is the amount of generating units; a i , b i , and c i are the fuel cost coefficients; u i t are the binary ON/OFF states of the units; Pg i t is the power output; s i t cold and s i t hot indicate cold and hot startups, respectively; and s i cost cold and s i cost hot are the costs for cold and hot startups, respectively.
As mentioned before, many characteristics constrain the TUC solving process. As in any electrical power system, power balance is mandatory. In other words, the power supply has to meet the demand, as represented by Equation (2):
i = 1 NG Pg i t = L t , t T
where L t is the power demand MW at time t.
Power dispatch problems usually include the requirement of a spinning reserve attendance, as in Equation (3). This reserve serves as a readily available power generation. It can help the overall system in case of unexpected events [25], such as a power demand value that surpasses what has been forecast:
i = 1 NG u i t Pg ¯ i L t + sr t , t T
where sr t is the predetermined spinning reserve MW .
The operational characteristics of the units impose several constraints on the problem. The individual power generation of the units is bounded, as indicated by Equation (4). Upon startup/shutdown, a unit must remain on/off according to its minimum up/down time, as shown by Equations (5) and (6):
u i t Pg ̲ i Pg i t u i t Pg ¯ i , t T , i NG
w = t MUT i + 1 t x i w u i t , t T , i NG
w = t MDT i + 1 t y i w 1 u i t , t T , i NG
where Pg ¯ i and Pg ̲ i are the maximum and minimum generation of unit i, respectively, and MUT i and MDT i represent the minimum up and down times, respectively. In other words, they relate to the least amount of time the unit must remain online/offline until it can go inactive/active again. In addition, x i t and y i t are binary variables indicating start-up and shut-down occurrences, respectively, while w is an auxiliary index responsible for representing the relevant periods.
In this formulation, the startup and shutdown occurrences require the auxiliary variables x and y. The former indicates the startup of a unit, whereas the latter represents its shutdown. Equation (7) establishes the temporal relation between the on/off variables and the startup/shutdown indications. Equation (8) prevents a unit from simultaneously starting and stopping:
u i t u i t 1 = x i t y i t , t T , i NG
x i t + y i t 1 , t T , i NG
Equation (9) determines whether a startup is cold or hot. Equation (10) indicates if the startup cost should be taken as cold or hot, ensuring that the objective function is adequately quantified:
s i t cold + s i t hot = x i t , t T , i NG
u i t w = t t csu i MDT i 1 t 1 u i w = s i t cold , t T , i NG
where t csu i is the number of hours (after MDT ) in which unit i has a hot start if activated again.
Finally, the following description regards the ramp constraints. These restrictions impose limitations on how much the power output of a unit can increase or decrease once it is in operation. If a unit is not operating and is about to be activated, it is not subjected to the ramp constraint. In other words, it can be set to any power value within its operational range. This is an important aspect that must be captured by the constraints. Equations (11) and (12) describe the up and down ramping limitations, respectively. The parameters U i up and U i down denote how much the generation of unit i can increase or decrease, respectively, if the unit was active in the previous period. Conversely, if the unit was off, ϵ ensures that the unit can be turned on and set to any power value in its generation range. It should be highlighted that ϵ must be greater than or equal to the maximum power output among all units. In cases in which a unit goes from an OFF to an ON state, Equation (4) is responsible for bounding the generation from above.
Pg i t Pg i t 1 u i t 1 · U i up + 1 u i t 1 · ϵ , t T , i NG
Pg i t 1 Pg i t u i t · U i down + 1 u i t · ϵ , t T , i NG

3. Summary of Previous Work

In [19], we proposed a constructive heuristic method to reduce the search space in TUC problems. The method applies a workflow to generate several hybrid priority lists (HPLs). These HPLs are combinations of pre-established lists obtained via consolidated metrics, such as the full load average production cost [26], the production marginal cost [27], and the Lagrange sensitivity [28]. Each HPL can be used to determine the operation decisions of a TUC problem, followed by economic dispatch optimization. However, the method in [19] consists of grouping all HPLs to obtain the so-called Relevance Matrix (RM).
In essence, each HPL is a matrix of zeros and ones that indicates the status of the units over the planing horizon. The RM comes from the sum of all HPLs, granting activation percentages regarding the units at each period. For instance, if at a certain hour a unit was given as active in 800 out of 1000 HPLs, the method states that this unit had a relevance of 80% to operate at this hour. Readers who wish to understand the method in greater detail are invited to read the third section of [19], which is openly available. This work does not present the method in its entirety, as it has not been modified. As mentioned before, the main contribution of the present paper comes from demonstrating the feasibility and effectiveness of our previous method in larger-scale systems including ramp constraints. Apart from not considering ramp limitations, the largest system in [19] had 40 units. The present paper, on the other hand, applies the method for systems with up to 100 units.
The method considers three relevance levels for RM: high α , in which units were ON at a certain hour in all HPLs; low β , in which units were ON at a certain hour in 10% or less of the HPLs; and none γ , in which units were always OFF at a certain hour. The 10% criterion for low relevance classification was decided empirically. After several trials, this value showed a good balance between the number of the number of fixed variables (which impacts the computational burden) and quality of solutions.
Considering the aforementioned relevance levels, the method fixes several of the ON/OFF decision variables; in other words, RM indicates their operation. Therefore, these variables are no longer for the optimization to quantify. The procedure to fix part of the variables follows Equation (13). If the relevance of a unit at a given time does not relate to the procedure, its decision comes from the optimization of Equations (1)–(12).
u i t = 1 , α 0 , β and γ
Table 1 exemplifies the utilization of RM. In this table, the α , β , and γ occurrences are colored as (), (), and (), respectively. This color scheme is utilized in the other tables as well. In Table 1, 18 out of the 24 ON/OFF decision variables are decided by RM. The reduced optimization problem has 2 6 ON/OFF combinations to explore, whereas the original problem needed to search 2 24 combinations. This example illustrates the extent to which our method can reduce the solution region. Despite being merely a demonstration, this example highlights that the previous work [19] reports reductions in the number of ON/OFF decision variables of around 80%.

4. Results and Discussions

The ten-unit system from [24] was used as an initial test for the proposed method. This system uses a planning horizon of 24 h. Table 2 provides the technical data on the system. The power demands are found in [24]. The spinning reserve is taken as 10% of the load, as in [29]. A total of 1000 HPLs were created, according to the procedure from [19]. Figure 1 shows the boxplot regarding the solutions for each one of the HPLs separately. The lowest cost found is equal to USD 564,795. The median of all solutions is equal to USD 569,327. The literature reports an optimal cost of USD 563,937. It can be observed that the process of generating HPLs was able to achieve solutions that are close to the optimal.
The approach proposed in this paper aims to reduce the search space while keeping good quality solutions and alleviating the computational burden. Considering that the HPLs reduce the search space by deciding the ON/OFF variables, Figure 1 provides an idea of the quality of solutions after fixing the binary decisions. However, the true potential of the method is yet to be shown. Combined with RM, an academic license of the commercial solver Mosek [30] is utilized to demonstrate the computational benefits that can be obtained through this approach.
As shown in the example of Table 1, the proposed RM does not decide all ON/OFF decisions. Therefore, Mosek is responsible for optimizing the remaining binary variables, in addition to solving the economic dispatch of the generating units. As described below, five cases are considered regarding the search space reduction. Table 3 presents the reduction magnitude of each case for the ten-unit system in Table 2. Table 3 was obtained according to the procedure summarized in Section 3. In other words, 1000 HPLs were created to define the relevance levels.
  • No reduction; Mosek solves the full problem.
  • RM fixes decisions only for α occurrences.
  • RM fixes decisions only for γ occurrences.
  • RM fixes decisions only for β occurrences (which include γ ).
  • RM fixes decisions for α , β , and γ occurrences.
Considering the meaning of cases 2 and 3, Table 3 shows that 104 occurrences always participate in the power demand attendance. In opposition, 54 occurrences never take part. For clarification, an occurrence refers to a certain unit operating at a certain hour. After reducing the search space, Mosek solves the remaining problem. An optimality gap of up to 0.5% was allowed. This gap is provided by the percentage difference between the objective function evaluation of a feasible solution and the evaluation of the relaxed problem regarding the binary variables [30]. Thus, as long as the gap is greater than 0.5%, Mosek’s Branch and Bound keeps exploring the nodes in the search for an acceptable feasible solution. Table 4 presents the optimal cost, number of explored branches (NB), and solving time (ST) for the five cases.
Table 4 shows that the optimizer required around 72 s to find the global solution when the proposed method was not applied (null gap, case 1). For all reduction cases and gap possibilities, ST is reduced significantly compared to case 1. It is worth highlighting that all simulations utilized the same hardware. Therefore, the reductions to ST are all due the proposed method. Regarding the cases with a gap of 0%, Table 4 indicates that the global solution was achieved even in case 5, which is the one with the most significantly reduced search region. This is an important observation, as it shows that for this system the proposed approach is able to fix binary variables in such a way that the global optimum was not compromised.
As a highlight, Figure 1 shows that none of the 1000 HPLs was individually capable of providing the optimal cost of USD 563,937.68 after optimization of the economic dispatch. However, as shown in Table 4, combining the HPLs to create RM could achieve global optimality.
For non-null gap values, it can be observed that tightening the search space can affect the obtained solution concerning the global optimum. However, this is related to both the space reduction and the gap itself. For the the cases with a gap of 0.05%, it can be noted that the best solution was not achieved by the case with the most significant reduction. It is worth emphasizing that the final solution for non-null gap binary optimization via branch-and-bound algorithms always depends on how the binary search is performed. The most important result to be highlighted here is that the proposed approach is capable of greatly decreasing the computational burden while keeping high quality solutions. Apart from the results presented for the ten-unit system, the following subsections explore studies for systems with up to 100 units planned over 24 h. Such systems are obtained by replicating the data from Table 2, as in [24].

4.1. Large-Scale Systems without Ramp Constraints

As a thermoelectric system becomes larger, the number of combinations for the binary ON/OFF decisions grows exponentially. For 100 units operating over 24 h, there are 2400 variables, for a total of 2 2400 ON/OFF combinations. This combinatorial explosion tends to make classical optimization approaches not viable. Therefore, heuristics can play an important role in reducing the number of combinations to be evaluated.
In order to validate the method brought in this paper, RM was put to the test in systems with 20, 40, 60, 80, and 100 units. These systems were obtained by duplicating the data from Table 2. Figure 2 shows the cost dispersion for these systems. Table 5 provides the median and minimum costs. Analogously to analysis of the the ten-unit system, these results were obtained prior to applying RM.
For each of the five systems, the RM was obtained in order for the Mosek optimization to take place. The same gap possibilities from Table 4 were utilized. Certain simulations were quite long due to the size of the system. Computations that reached 3 h without convergence were interrupted. The following tables tag these cases with a “*”. The results are summarized in Table 6.
As seen in Table 6, several small gap cases were interrupted due to reaching the 3 h limit. Only the twenty-unit system converged (for certain cases) with a null gap. In this system, case 5 increased the cost by 0.087% compared to case 2. However, the solving time decreased by 99.57%. Similar trends can be observed for the other gap possibilities and for the other systems. With a gap of 0.05%, only the twenty-unit and forty-unit systems converged. The latter was only solved within a viable time in case 5. The process took almost 1 h. This exemplifies how the computational effort increases as the system becomes larger. For a gap of 0.25%, cases 1 and 3 did not converge for systems with forty or more units. As a reminder, case 1 applied no reduction, whereas case 3 had a small impact as it only fixed occurrences where the units were switched off in all HPLs (see Table 3). With the more relaxed gap of 0.5%, all cases converged. It is interesting to note that case 2 often presents a reasonable solving time despite the system being larger than in case 5. For instance, in cases 2 and 5 for the 100-unit system with a gap of 0.5%, it was expected that the solution of case 2 would have better quality than case 5, as its search space reduction was less intense. It can be seen that the solving time of case 2 is significantly larger than that of case 5. However, around 5 min is an acceptable time when it comes to daily planning. This indicates that the best way of utilizing such an heuristic depends on how the user balances the solving time versus the solution quality.

4.2. Large-Scale Systems with Ramp Constraints

To verify the applicability of the proposed method to systems subjected to ramp constraints, the same cases of the previous subsection, i.e., based on [24], were simulated, including Equations (11) and (12). The parameters U i up and U i down for each unit were both taken as equal to 20% of the maximum power output of the unit [31]. Ramp constraints model the behavior where the power generation of a unit cannot reach its maximum capacity in an one hour interval. Adding new constraints to an optimization problem tends to make it computationally heavier. Therefore, heuristics that aim to reduce the search region become even more valuable. Table 7 summarizes the results for this part of the research.
Compared to the simulations without ramping constraints (Table 4 and Table 6), the following simulations did not converge within the established time limit: gap 0, twenty units, case 2; gap 0.25%, twenty units, cases 1 and 3; gap 0.05%, forty units, case 5; gap 0.25%, forty, sixty, and eighty units, case 2. These are consequences of the additional layer of complexity added by the ramp constraints. In general, similar conclusions to the previous subsection can be drawn regarding the tradeoffs between the solving time and optimality gap. Overall, the most important indication is that again the proposed approach is shown to greatly reduce the computational burden, although the quality of the solutions is hardly affected.

4.3. Comparisons to Other Publications

To validate the proposed approach, this subsection presents comparisons to the TUC literature regarding the optimal cost and processing time. For all executions of the proposed heuristic, the simulation duration is based on a Core i5 1.19 Ghz, 8 GB de RAM computer. Table 8 and Table 9 provide comparisons without and with the ramp constraints, respectively. In these tables, the lowest cost for each system is presented in bold. The values of C for the proposed approach were retrieved from Table 4, Table 6 and Table 7. They were chosen according to what we believe represents a good balance between cost and solving time. Thus, these cost values are not necessarily the smallest ones among all executed simulations.
For the simulations without ramp constraints (Table 8), the proposed RM method was the fastest to achieve the global optimum for the ten-unit system compared to the papers that reported simulation duration. For the twenty-, forty-, and sixty-unit systems, the cost values from RM were only slightly higher than the best ones in the analyzed literature. However, the simulation lengths were significantly shorter. For the 80- and 100-unit systems, the gains in computational burden were relevant, despite not being as prominent as in the other systems. As a remark regarding the two larger systems, it can be seen in Table 6 that the proposed approach was able to find costs of 4,496,674 and 5,609,350 in 0.9 and 1.6 s, respectively. On the one hand, these values are around 0.35% greater than the lowest costs reported in the literature. On the other hand, the processing times decreased by more than 99%. This indicates how powerful the proposed RM method can be in reaching good quality solutions for the TUC problem in incredibly short time periods.
When the ramp constraints are included (Table 9), RM outperformed the other papers both in terms of cost and time concerning the ten- and eighty-unit systems. For all other systems, the proposed method converged with slightly higher cost, though in a shorter period of time. Analogously to the studies without ramp constraints, Table 7 reveals that RM can find solutions for the 80- and 100-unit systems faster than the values presented in Table 9. The method does this without imposing a significant increment to the cost values.
It is worth noting that in Table 8 and Table 9 the proposed approach provides values from different reduction cases and optimality gaps. In other words, the proposed heuristic should be tested for different cases and gaps before being applied to real problems. Depending on the system and constraints in place, a different case may be the most promising one.

5. Conclusions

This paper further explores a search region reduction method proposed by the authors for the thermal unit commitment problem. As a sequence to the previous research, the method was applied to larger systems with up to 100 generating units. Furthermore, ramp constraints were included as an additional layer of complexity. The proposed approach has been shown to greatly reduce the computational burden with a minor overall impact on the obtained cost. For certain cases, the method was able to outperform the investigated alternatives from the literature in terms of the final cost as well.
The implementation of the proposed method is relatively simple. In addition, although Mosek was used to solve the economic dispatch and operation decisions that were not fixed by RM, many other optimization techniques could be applied. It should be emphasized that the method can also be used to generate initial solutions for other optimization techniques.
The findings of this paper demonstrate that the proposed method has the potential to be a solid contribution to the solving processes of large thermal systems. In the investigations carried out in this work, RM reduced the computational burden by up to 99.2% in certain cases compared to the convergence time required when the method was not utilized. Adding network constraints to the formulation is the main factor in expanding the scope of future research.

Author Contributions

Conceptualization, I.C.d.S.J. and L.M.d.O.; methodology, I.C.d.S.J. and L.M.d.O.; software, L.M.d.O. and R.A.; validation, L.M.d.O.; formal analysis, I.C.d.S.J., L.M.d.O. and R.A.; investigation, L.M.d.O.; resources, I.C.d.S.J. and L.M.d.O.; data curation, L.M.d.O.; writing—original draft preparation, L.M.d.O.; writing—review and editing, I.C.d.S.J., L.M.d.O. and R.A.; visualization, L.M.d.O. and R.A.; supervision, I.C.d.S.J.; project administration, I.C.d.S.J.; funding acquisition, I.C.d.S.J. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by FAPEMIG, grant number PPM-00184-17.

Data Availability Statement

Not applicable.

Acknowledgments

The authors thank FAPEMIG and the Electrical Engineering Post-Graduation Program of the Federal University of Juiz de Fora for supporting this research.

Conflicts of Interest

The authors declare no conflict of interest. The funders had no role in the design of the study, in the collection, analysis, or interpretation of data, in the writing of the manuscript, or in the decision to publish the results.

Abbreviations

The following abbreviations are used in this manuscript:
TUCThermal Unit Commitment
RMRelevance Matrix
HPLHybrid Priority List
NBNumber of explored Branches
STSolving Time

References

  1. Tovar-Ramírez, C.; Fuerte-Esquivel, C.; Mares, A.M.; Sánchez-Garduño, J. A generalized short-term unit commitment approach for analyzing electric power and natural gas integrated systems. Electr. Power Syst. Res. 2019, 172, 63–76. [Google Scholar] [CrossRef]
  2. Saravanan, B.; Das, S.; Sikri, S.; Kothari, D. A solution to the unit commitment problem—A review. Front. Energy 2013, 7, 223–236. [Google Scholar] [CrossRef]
  3. Knueven, B.; Ostrowski, J.; Watson, J.P. On mixed-integer programming formulations for the unit commitment problem. INFORMS J. Comput. 2020, 32, 857–876. [Google Scholar] [CrossRef]
  4. Alam, M.S.; Kumari, M.S. Unit commitment of thermal units in integration with wind and solar energy considering ancillary service management using priority list (IC) based genetic algorithm. In Proceedings of the 2016 International Conference on Innovation and Challenges in Cyber Security (ICICCS-INBUSH), Greater Noida, India, 3–5 February 2016; pp. 277–282. [Google Scholar] [CrossRef]
  5. Wood, A.J.; Wollenberg, B.F.; Sheblé, G.B. Power Generation, Operation, and Control; John Wiley & Sons: Hoboken, NJ, USA, 2013. [Google Scholar]
  6. Montero, L.; Bello, A.; Reneses, J. A review on the unit commitment problem: Approaches, techniques, and resolution methods. Energies 2022, 15, 1296. [Google Scholar] [CrossRef]
  7. Correa-Posada, C.M.; Morales-Espana, G.; Duenas, P.; Sánchez-Martín, P. Dynamic ramping model including intraperiod ramp-rate changes in unit commitment. IEEE Trans. Sustain. Energy 2016, 8, 43–50. [Google Scholar] [CrossRef] [Green Version]
  8. Wang, C.; Shahidehpour, S. Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect. IEEE Trans. Power Syst. 1994, 9, 1539–1545. [Google Scholar] [CrossRef]
  9. Deka, D.; Datta, D. Optimization of unit commitment problem with ramp-rate constraint and wrap-around scheduling. Electr. Power Syst. Res. 2019, 177, 105948. [Google Scholar] [CrossRef]
  10. Finardi, E.C.; Silva, E.L.d.; Sagastizábal, C. Solving the unit commitment problem of hydropower plants via Lagrangian relaxation and sequential quadratic programming. Comput. Appl. Math. 2005, 24, 317–342. [Google Scholar] [CrossRef] [Green Version]
  11. Ostrowski, J.; Anjos, M.F.; Vannelli, A. Modified orbital branching for structured symmetry with an application to unit commitment. Math. Program. 2015, 150, 99–129. [Google Scholar] [CrossRef] [Green Version]
  12. Singhal, P.K.; Sharma, R.N. Dynamic programming approach for large scale unit commitment problem. In Proceedings of the 2011 International Conference on Communication Systems and Network Technologies, Katra, India, 3–5 June 2011; pp. 714–717. [Google Scholar] [CrossRef]
  13. Diniz, A. Uma Estratégia de Decomposição por Relaxação Lagrangeana para a Otimização da Programação diária da Operação de Sistemas Hidrotérmicos com Modelagem Detalhada da rede Elétrica–aplicação ao Sistema Brasileiro. Ph.D. Thesis, COPPE/UFRJ, Rio de Janeiro, Brazil, 2007. [Google Scholar]
  14. Elsayed, A.M.; Maklad, A.M.; Farrag, S.M. A new priority list unit commitment method for large-scale power systems. In Proceedings of the 2017 Nineteenth International Middle East Power Systems Conference (MEPCON), Cairo, Egypt, 19–21 December 2017; pp. 359–367. [Google Scholar] [CrossRef]
  15. Shahbazitabar, M.; Abdi, H. A novel priority-based stochastic unit commitment considering renewable energy sources and parking lot cooperation. Energy 2018, 161, 308–324. [Google Scholar] [CrossRef]
  16. Reddy, K.S.; Panwar, L.K.; Panigrahi, B.; Kumar, R. A new binary variant of sine–cosine algorithm: Development and application to solve profit-based unit commitment problem. Arab. J. Sci. Eng. 2018, 43, 4041–4056. [Google Scholar] [CrossRef]
  17. Reddy K, S.; Panwar, L.; Panigrahi, B.; Kumar, R. Binary whale optimization algorithm: A new metaheuristic approach for profit-based unit commitment problems in competitive electricity markets. Eng. Optim. 2019, 51, 369–389. [Google Scholar] [CrossRef]
  18. Barati, M.; Farsangi, M.M. Solving unit commitment problem by a binary shuffled frog leaping algorithm. IET Gener. Transm. Distrib. 2014, 8, 1050–1060. [Google Scholar] [CrossRef]
  19. De Oliveira, L.M.; da Silva Junior, I.C.; Abritta, R. Search Space Reduction for the Thermal Unit Commitment Problem through a Relevance Matrix. Energies 2022, 15, 7153. [Google Scholar] [CrossRef]
  20. Tuffaha, M.; Gravdahl, J.T. Mixed-integer formulation of unit commitment problem for power systems: Focus on start-up cost. In Proceedings of the IECON 2013—39th Annual Conference of the IEEE Industrial Electronics Society, Vienna, Austria, 10–13 November 2013; pp. 8160–8165. [Google Scholar] [CrossRef]
  21. Tumuluru, V.K.; Huang, Z.; Tsang, D.H. Unit commitment problem: A new formulation and solution method. Int. J. Electr. Power Energy Syst. 2014, 57, 222–231. [Google Scholar] [CrossRef]
  22. Tejada-Arango, D.A.; Lumbreras, S.; Sánchez-Martín, P.; Ramos, A. Which unit-commitment formulation is best? A comparison framework. IEEE Trans. Power Syst. 2019, 35, 2926–2936. [Google Scholar] [CrossRef]
  23. Viana, A.; Pedroso, J.P. A new MILP-based approach for unit commitment in power production planning. Int. J. Electr. Power Energy Syst. 2013, 44, 997–1005. [Google Scholar] [CrossRef] [Green Version]
  24. Kazarlis, S.A.; Bakirtzis, A.; Petridis, V. A genetic algorithm solution to the unit commitment problem. IEEE Trans. Power Syst. 1996, 11, 83–92. [Google Scholar] [CrossRef]
  25. Abujarad, S.Y.; Mustafa, M.W.; Jamian, J.J. Recent approaches of unit commitment in the presence of intermittent renewable energy resources: A review. Renew. Sustain. Energy Rev. 2017, 70, 215–223. [Google Scholar] [CrossRef]
  26. Muralidharan, S.; Kumar, V.M.; Baalavignesh, A. Thermal unit commitment using flac guided modified dynamic programming approach. In Proceedings of the 2011 International Conference on Recent advancements in Electrical, Electronics and Control Engineering, Sivakasi, India, 15–17 December 2011; pp. 339–345. [Google Scholar] [CrossRef]
  27. Pang, C.; Chen, H. Optimal short-term thermal unit commitment. IEEE Trans. Power Appar. Syst. 1976, 95, 1336–1346. [Google Scholar] [CrossRef]
  28. Silva Junior, I.C.d.; Carneiro Junior, S.; Oliveira, E.J.d.; Pereira, J.L.R.; Garcia, P.A.N.; Marcato, A.L. Determinação da operação de unidades térmicas para o estudo de Unit Commitment através de uma análise de sensibilidade. Sba Controle Automaç Ao Soc. Bras. De Autom. 2006, 17, 300–311. [Google Scholar] [CrossRef]
  29. Han, W.; Wang, H.h.; Zhang, X.s.; Chen, L. A unit commitment model with implicit reserve constraint based on an improved artificial fish swarm algorithm. Math. Probl. Eng. 2013, 2013, 912825. [Google Scholar] [CrossRef] [Green Version]
  30. ApS, M. Mosek Documentation: Optimizers. 2019. Available online: https://docs.mosek.com/latest/capi/cont-optimizers.html (accessed on 13 May 2023).
  31. Simopoulos, D.N.; Kavatza, S.D.; Vournas, C.D. Unit commitment by an enhanced simulated annealing algorithm. IEEE Trans. Power Syst. 2006, 21, 68–76. [Google Scholar] [CrossRef]
  32. Wang, B.; Li, Y.; Watada, J. Re-scheduling the unit commitment problem in fuzzy environment. In Proceedings of the 2011 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE 2011), Taipei, Taiwan, 27–30 June 2011; pp. 1090–1095. [Google Scholar] [CrossRef]
  33. Yuan, X.; Ji, B.; Zhang, S.; Tian, H.; Hou, Y. A new approach for unit commitment problem via binary gravitational search algorithm. Appl. Soft Comput. 2014, 22, 249–260. [Google Scholar] [CrossRef]
  34. Zheng, H.; Jian, J.; Yang, L.; Quan, R. A deterministic method for the unit commitment problem in power systems. Comput. Oper. Res. 2016, 66, 241–247. [Google Scholar] [CrossRef]
  35. Qin, H.; Wei, H. A quantum-inspired approximate dynamic programming algorithm for unit commitment problems considering wind power. In Proceedings of the 2017 IEEE International Conference on Smart Grid and Smart Cities (ICSGSC), Singapore, 23–26 July 2017; pp. 94–98. [Google Scholar] [CrossRef]
  36. Tsalavoutis, V.A.; Vrionis, C.G.; Tolis, A.I. Optimizing a unit commitment problem using an evolutionary algorithm and a plurality of priority lists. Oper. Res. 2021, 21, 1–54. [Google Scholar] [CrossRef]
  37. Khunkitti, S.; R. Watson, N.; Chatthaworn, R.; Premrudeepreechacharn, S.; Siritaratiwat, A. An improved DA-PSO optimization approach for unit commitment problem. Energies 2019, 12, 2335. [Google Scholar] [CrossRef] [Green Version]
  38. Bhadoria, A.; Marwaha, S.; Kamboj, V.K. An optimum forceful generation scheduling and unit commitment of thermal power system using sine cosine algorithm. Neural Comput. Appl. 2020, 32, 2785–2814. [Google Scholar] [CrossRef]
  39. Bhadoria, A.; Marwaha, S. Moth flame optimizer-based solution approach for unit commitment and generation scheduling problem of electric power system. J. Comput. Des. Eng. 2020, 7, 668–683. [Google Scholar] [CrossRef]
  40. Zhao, S.; Yang, Z.; Zhu, X.; Wang, Y. A Novel Binary Social Learning Particle Swarm Optimizer for Power System Unit Commitment. In Proceedings of the 2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2), Wuhan, China, 30 October–1 November 2020; pp. 1361–1365. [Google Scholar] [CrossRef]
  41. Elsayed, A.M.; Maklad, A.M.; Farrag, S.M. Three-Stage Priority List Unit Commitment for Large-Scale Power Systems Considering Ramp Rate Constraints. IEEE Can. J. Electr. Comput. Eng. 2021, 44, 329–342. [Google Scholar] [CrossRef]
  42. Sayed, A.; Ebeed, M.; Ali, Z.M.; Abdel-Rahman, A.B.; Ahmed, M.; Abdel Aleem, S.H.; El-Shahat, A.; Rihan, M. A hybrid optimization algorithm for solving of the unit commitment problem considering uncertainty of the load demand. Energies 2021, 14, 8014. [Google Scholar] [CrossRef]
  43. Kigsirisin, S.; Miyauchi, H. Short-term operational scheduling of unit commitment using binary alternative moth-flame optimization. IEEE Access 2021, 9, 12267–12281. [Google Scholar] [CrossRef]
  44. Singhal, P.K.; Naresh, R.; Sharma, V. A modified binary artificial bee colony algorithm for ramp rate constrained unit commitment problem. Int. Trans. Electr. Energy Syst. 2015, 25, 3472–3491. [Google Scholar] [CrossRef]
  45. Zhu, X.; Zhao, S.; Yang, Z.; Zhang, N.; Xu, X. A parallel meta-heuristic method for solving large scale unit commitment considering the integration of new energy sectors. Energy 2022, 238, 121829. [Google Scholar] [CrossRef]
  46. Damousis, I.G.; Bakirtzis, A.G.; Dokopoulos, P.S. A solution to the unit-commitment problem using integer-coded genetic algorithm. IEEE Trans. Power Syst. 2004, 19, 1165–1172. [Google Scholar] [CrossRef]
  47. Kumar, V.; Naresh, R. Monarch butterfly optimization-based computational methodology for unit commitment problem. Electr. Power Compon. Syst. 2021, 48, 2181–2194. [Google Scholar] [CrossRef]
  48. Zhu, Y.; Gao, H. Improved binary artificial fish swarm algorithm and fast constraint processing for large scale unit commitment. IEEE Access 2020, 8, 152081–152092. [Google Scholar] [CrossRef]
Figure 1. Cost dispersion for the ten-unit system.
Figure 1. Cost dispersion for the ten-unit system.
Energies 16 05370 g001
Figure 2. Cost dispersion for the larger systems.
Figure 2. Cost dispersion for the larger systems.
Energies 16 05370 g002
Table 1. Example of RM.
Table 1. Example of RM.
HourU1U2U3U4
11009820
2100100991
3100100982
4100100100100
51001002377
61009280
Table 2. Data on the ten-unit system.
Table 2. Data on the ten-unit system.
Unit12345678910
a1000970700680450370480660665670
b16.1917.2616.616.519.722.2627.7425.9227.2727.79
c0.000480.000310.0020.002110.003980.007120.000790.004130.002220.00173
Pg i max 4554551301301628085555555
Pg i min 1501502020252025101010
MUT i 8855633111
MDT i 8855633111
s i hot 45005000550560900170260303030
s i cold 900010,000110011201800340520606060
t csu i 5544422000
IC88−5−5−6−3−3−1−1−1
Table 3. Reduction alternatives and their impacts.
Table 3. Reduction alternatives and their impacts.
Total Amount of
Binary Variables
CaseNumber of
Fixed Variables
Reduction (%)
240100
210443.33
35422.5
48937.08
519380.42
Table 4. Optimization results with RM space reduction — ten-unit system.
Table 4. Optimization results with RM space reduction — ten-unit system.
GapCaseC ($)NBST (s)
0%1563,937.68584372.45
2563,937.68127711.80
3563,937.689446.49
4563,937.68360.58
5563,937.68230.58
0.05%1563,937.68569367.5
2563,937.6810209.80
3563,937.689426.73
4563,978.82240.42
5563,978.8280.45
0.25%1563,989.991703.13
2564,189.161542.14
3563,989.852582.08
4564,916.1680.39
5564,218.9100.38
0.5%1564,241.32981.94
2565,486.4360.72
3564,444.31981.38
4564,916.1500.25
5564,218.9100.09
Table 5. Operation costs regarding the 1000 HPLs.
Table 5. Operation costs regarding the 1000 HPLs.
System20 Units20 Units40 Units60 Units80 Units
Minimum cost$1,125,747$2,249,574$3,381,603$4,501,392$5,619,591
Median cost$1,135,242$2,265,708$3,454,001$4,528,932$5,656,563
Table 6. Optimization results with RM space reduction applied to large systems.
Table 6. Optimization results with RM space reduction applied to large systems.
20 Units40 Units60 Units80 Units100 Units
GapCaseC ($)NBST (s)C ($)NBST (s)C ($)NBST (s)C ($)NBST (s)C ($)NBST (s)
0%1***************
21,123,297165,4183367.5************
3***************
41,124,27411,62179.1************
51,124,274264914.5************
0.05%1***************
21,123,30021,979426.7************
3***************
41,124,27410,65164.5************
51,124,274222412.92,246,107266,7203299.1*********
0.25%11,123,46423,389799.4************
21,123,783974.812,242,96510,106813.83,366,37121,2222687.64,481,48913,1533108.5***
31,123,89328,230755.3************
41,124,527981.52,247,5214269.83,371,7691616363.34,489,47145345.75,604,3556915495.5
51,125,07400.42,246,5751944.73,370,97435630.84,490,66538032.15,605,44280347.9
0.5%11,125,77046616.12,247,39187934.83,364,026585171.24,488,501671327.25,607,777742309.4
21,123,783973.92,244,48853916.93,373,45005.94,484,954489112.45,602,995739263.6
31,125,2651927.12,246,94978823.83,371,815621131.34,484,159597116.85,611,380686303.4
41,127,30500.42,252,60400.43,376,79853180.24,494,19500.95,610,94802.5
51,127,29000.22,251,59300.23,373,51202.914,496,67400.95,609,35001.6
Table 7. Optimization results with RM space reduction applied to large systems considering ramp constraints.
Table 7. Optimization results with RM space reduction applied to large systems considering ramp constraints.
10 Units20 Units40 Units60 Units80 Units100 Units
GapCaseC ($)NBST (s)C ($)NBST (s)C ($)NBST (s)C ($)NBST (s)C ($)NBST (s)C ($)NBST (s)
0%1565,18628,732434.3***************
2565,186155519***************
3565,186355926.8***************
4565,186710.61,126,54125,551310.6************
5565,186390.41,126,541460737.7************
0.05%1565,18628,572387.4***************
2565,186125814.31,125,57673,9001890.1************
3565,186355922.6***************
4565,186710.561,126,54124,273212.5************
5565,227280.441,126,541322522.3************
0.25%1565,2278485100***************
2565,5182383.11,126,160132245.1************
3565,2548465.4***************
4565,42100.21,126,9853035.32,251,37216,1976003,376,4573656276.34,496,09471465.85,612,0401791251.2
5565,42100.11,126,6051822.82,251,8182348.83,376,66433839.64,498,48483958.05,614,5171218113.3
0.50%1565,829982.31,127,22227211.22,248,55141852.23,370,788716116.84,495,848852510.45,615,3921141350.9
2565,711982.11,126,9281927.52,248,02929124.63,372,52940552.44,490,705544103.35,612,895675166.1
3565,5091781.81,127,11536912.82,249,39235325.83,374,61258561.34,492,980729271.15,614,996736288.9
4565,42100.11,128,091981.92,255,74801.03,379,952504424,506,25503.85,622,63203.1
5565,42100.11,128,04700.12,256,50601.13,376,66433831.44,502,98901.25,618,62301.9
Table 8. Literature comparison for the TUC problem without ramp constraints.
Table 8. Literature comparison for the TUC problem without ramp constraints.
Ref.Year10 Units20 Units40 Units60 Units80 Units100 Units
C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)
[24]1996565,8252211,126,2437332,251,91126973,376,62558404,504,93310,0365,627,43715,733
[32]2011570,00618.341,139,00565.872,277,396317.33,420,438572.34,554,34610695,706,2011735
[33]2014563,937-1,123,996-2,246,445-3,364,665-4,488,039-5,607,838-
[34]2016563,9381.31,123,58742,243,68826.73,362,95139.34,484,49790.15,602,364144.2
[14]2017564,8350.1541,126,2310.1692,250,4050.1943,370,8320.2154,495,8730.2465,616,3030.275
[35]2017563,977-1,124,056-2,243,721-3,362,485-4,484,974-5,605,622-
[36]2018563,93728.191,123,29742.642,242,957115.53,361,298176.24,481,7703105,601,726381
[37]2019565,807231.3----------
[38]2019563,937204.31,124,931427.82,251,8912688------
[39]2020564,81020.47----
[40]2020563,937-1,124,389-2,246,837-3,367,348-4,491,179-5,611,494-
[41]2021563,9770.181,124,9260.232,248,4130.323,368,1500.454,492,1880.615,611,8860.76
[42]2021563,977-1,123,311---------
[43]2021563,97817.781,123,82526.222,247,16543.273,369,73162.334,493,82576.625,618,03896.64
[44]2015563,93814.761,123,29736.962,243,99686.523,364,076188.24,486,5283235,605,748452
[45]2022563,93740.441,124,389-2,246,837-3,367,348-4,491,179-5,611,494-
Proposed563,9370.581,123,7833.92,244,48816.93,373,5122.914,484,159116.85,602,995263.6
Table 9. Literature comparison for the TUC problem with ramp constraints.
Table 9. Literature comparison for the TUC problem with ramp constraints.
Ref.Year10 Units20 Units40 Units60 Units80 Units100 Units
C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)C ($)ST (s)
[46]2004566,4047.41,127,24422.42,254,12358.33,378,108117.34,498,9431765,630,838242.5
[31]2006565,9883.351,127,95516.82,252,12588.28--4,501,1564055,624,301696.4
[44]2015565,67135.491,126,63487.362,252,544212.93,375,3683964,500,742614.75,628,8531007
[34]2016565,7232.41,128,27314.62,251,13433.73,376,48088.54,501,6411235,625,921210.9
[36]2018565,19541.561,125,66765.82,247,774157.63,369,320238.24,494,574404.25,616,689485.3
[47]2020565,67121.711,126,46159.742,251,398157.83,373,241244.94,498,081382.55,609,984597.5
[48]2020565,527-1,126,702-2,249,413-3,370,854-4,495,995-5,618,169-
Proposed565,1860.41,126,54122.32,248,02924.63,376,66431.44,490,705103.35,614,517113.3
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

de Oliveira, L.M.; da Silva Junior, I.C.; Abritta, R. A Space Reduction Heuristic for Thermal Unit Commitment Considering Ramp Constraints and Large-Scale Generation Systems. Energies 2023, 16, 5370. https://doi.org/10.3390/en16145370

AMA Style

de Oliveira LM, da Silva Junior IC, Abritta R. A Space Reduction Heuristic for Thermal Unit Commitment Considering Ramp Constraints and Large-Scale Generation Systems. Energies. 2023; 16(14):5370. https://doi.org/10.3390/en16145370

Chicago/Turabian Style

de Oliveira, Layon Mescolin, Ivo Chaves da Silva Junior, and Ramon Abritta. 2023. "A Space Reduction Heuristic for Thermal Unit Commitment Considering Ramp Constraints and Large-Scale Generation Systems" Energies 16, no. 14: 5370. https://doi.org/10.3390/en16145370