Next Article in Journal
Operational Wind Turbine Blade Damage Evaluation Based on 10-min SCADA and 1 Hz Data
Next Article in Special Issue
Best Practice Data Sharing Guidelines for Wind Turbine Fault Detection Model Evaluation
Previous Article in Journal
Effect of Residual Water in Sediments on the CO2-CH4 Replacement Process
Previous Article in Special Issue
Topic Taxonomy and Metadata to Support Renewable Energy Digitalisation
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Assessment of Conservation Voltage Reduction in Distribution Networks with Voltage Regulating Distribution Transformers

1
Institute of new Energy Systems, Technische Hochschule Ingolstadt, 85049 Ingolstadt, Germany
2
Maschinenfabrik Reinhausen GmbH, 93059 Regensburg, Germany
*
Author to whom correspondence should be addressed.
Energies 2023, 16(7), 3155; https://doi.org/10.3390/en16073155
Submission received: 10 March 2023 / Revised: 27 March 2023 / Accepted: 29 March 2023 / Published: 31 March 2023
(This article belongs to the Special Issue Energy Digitalisation and Data)

Abstract

:
The application of voltage reduction in medium and low voltage grids to reduce peak power demand or energy consumption has been implemented since the 1980s using several approaches. Conservation Voltage Reduction (CVR), as one such approach, uses a voltage control device to reduce or increase the voltage setpoint on a busbar, thereby reducing or increasing the amount of active and reactive power supply in the network. Voltage regulation for CVR is always implemented according to established network planning standards in each country. Research in this field has proven that a CVR factor ( C V R f ) of 0.7–1.5 for peak demand reduction can be achieved. This is an evaluation metric of CVR. The aim of this research is to determine and validate C V R f for peak demand reduction by comparing actual results obtained during regular tap changes with other randomly distributed periods outside tap change operations, using a set of measurement data. It is important to understand CVR deployment capability by evaluating CVR potentials from historical random tap operations before a robust network-wide deployment is introduced. This research provides such guidance. It also provides a novel approach to determining tap changes from voltage measurements using a time-based algorithm. A C V R f ranging from 0.95 to 1.61 was estimated using a measurement dataset from a test field. The result of the entire evaluation shows that the C V R f are smaller during peak PV production and greater during peak demand periods. Further evaluation using statistical hypotheses testing and a control chart was used to validate the evaluation.

1. Introduction

The increase in power demand due to the rise of electric mobility, heat pumps, distributed generation, and overall economic development has stretched the current German electricity distribution network to its maximum capacity [1]. Network expansion is considered to be an inherent challenge as a result of increasing electricity demand from current and future building construction in the distribution network [1]. Although the infrastructure cost of expansion can be curbed by implementing new grid optimization technologies, a few challenges remain. These challenges include a limited regulatory framework for wide adoption of the new technologies, additional equipment upgrades to improve grid compatibility, and implementation of Supervisory Control and Data Acquisition (SCADA) or advanced measurement devices for proper monitoring and measurement [2,3].
Demand is met with an increasing generation (at the distribution level) from Renewable Energy Sources (RES) such as photovoltaic (PV) or wind power. Integrating RES into the grid requires a proper evaluation of voltage stability and other factors that can negatively influence the power supply. Consequently, optimizing power supply by deploying Demand Response (DR) and Volt/Var Optimization (VVO) can save huge infrastructure costs in additional generation and expansion while achieving set emission reduction targets for 2050 [4,5,6]. DR relies on demand-side collaboration in establishing a load control protocol. Such a protocol can be initiated through an advanced distribution management system (ADMS). VVO concepts apply voltage regulation techniques in power flow control and assessment. It also makes use of CVR application techniques such as capacitor banks, voltage regulators, or tap changers [7].
CVR factor evaluation techniques define a systematic methodology for determining the ratio between voltage and power reduction. Its results help the grid operator to plan and understand the periods where CVR deployment will be most beneficial [8]. From a bottom-up approach, load models are analyzed for each feeder connection on the secondary substation using several methods categorized as static, dynamic [9], and composite load models [10,11]. The most used model is the ZIP model for static load modeling [12]. It represents constant impedance, constant current, and constant power loads on the consumer side from which active and reactive power responses can be computed [11]. A simplified method for obtaining CVR factors from the reactive and active power responses in a ZIP model has been researched [8]. A composite load model was developed in [13] by combining individual load profiles of representative loads from domestic appliances for each load class of the ZIP model. In [12], a ZIP model was developed for nationwide CVR evaluation. Top-down CVR evaluation techniques make use of a reduced voltage setpoint to achieve load demand reduction from residential and industrial consumers in a distribution grid. It determines the amount of load demand reduction during peak and total energy savings achieved for a specific duration. By carrying out this operation regularly or based on a scheme, the utility can channel the excess energy toward critical demand areas or new expansion. In this context, the CVR factor ( C V R f ) is the ratio between a percentage change in power or energy corresponding to a percentage change in the voltage.
C V R f = % P % U
U and P represent voltage and power, respectively [5]. A similar equation can be used to express C V R f for energy by replacing % P with % E . In the recent past, the application of CVR has resulted in noticeable savings in energy based on the results of the research conducted so far. In such an application, the voltage can be lowered to a specific limit that will not affect the end-user appliances. These limits are usually around ±10% which is always sustained in the medium voltage (MV) and till the end of the line on the low voltage (LV) level [14].
Many North American and a few European utilities have carried out CVR assessments in several test sites. In their research, the C V R f results range from 0.71 to 1.34 [7,15,16,17,18]. The Smart Street project by Electricity Northwest (ENWL) in the United Kingdom achieved energy savings of 5–8% in rural, urban, and dense urban LV networks [19]. In North America, the CVR project for peak demand reduction of the Snohomish County in Washington achieved 0.59–0.89 C V R f [20]. Current research in this field with influence from RES, with the implementation of DR, shows that more savings can be achieved by improving and automating voltage reduction during peak demand.
In Figure 1, the voltage regulating distribution transformer (VRDT) equipped with an on-load tap changer (OLTC) which can be used to deploy CVR, is becoming prevalent in distribution substations in Germany. The economic benefits of peak power reduction have inspired this research. The OLTC components perform the tap operations that reset the voltage to a desired level. This device can consist of a simple or complex mechanism depending on size and manufacturer. One such mechanism is the high-speed-resistor-type technology combined with vacuum tubes [21]. Therefore, the component price relative to the VRDT can range from 20% to 40% [1]. Using measurement data from test fields, statistical evaluations can be carried out to find out (1) how much power can be saved by implementing CVR through VRDTs, (2) does PV integration in the network impact the daily variation of C V R f , and (3) what effect does the estimation of mean power for each tap operation have on C V R f . Several statistical and programming tools have been deployed during this evaluation. This research applied Big Data analytic processes in determining and validating CVR.

1.1. Literature Review

1.1.1. Operating Principles of VRDTs

Distribution transformers are electrical devices used to regulate voltage within a distribution network. Distribution transformers operated at the secondary substations can regulate the voltage at the desired setpoint. Voltage regulation can be deployed manually or automatically in response to power demand. This kind of transformer is the last power asset where such control can be deployed before reaching the end users. The demand for VRDTs is determined based on terminal voltage limit deviation. According to EN 50160, VRDTs can be installed selectively within the network [14]. The decoupling between the MV and LV is necessary to create a voltage transition from the VRDTs [14]. Voltage limit violations are set at ±10% of nominal voltage, such as the IEV 601-25-25 specification. A 230 V nominal voltage will reach its upper and lower thresholds at 253 V and 207 V, respectively. However, a voltage setpoint is required in order to trigger a tap change. A permitted bandwidth of ±2.5% is applied during the VRDT operation configuration.

1.1.2. Data-Driven CVR Evaluation

The estimation of CVR using measurement data from test fields has proven to be an efficient top-down approach. Datasets recorded by SCADA systems in a digitized distribution network can easily be transmitted to a central data center and retrieved in batches for CVR evaluation, network monitoring, and other performance management implementations. The methodology presented in this research supports the need for a rapid and automated evaluation of CVR in a distribution network. Network operators can simply host CVR evaluation algorithms natively within their network planning infrastructure and supply it with data. Feeder data were collected from test fields for this research. Characteristic test fields are selected based on the defining factors that can influence DR [5,12,23,24,25]. A comprehensive report on extensive field testing of CVR across substations in the USA showed that for a 5% reduction in voltage, a corresponding 1–3% reduction in peak power demand was observed [26].
The methodologies identified for computing C V R f are comparison-based, regression-based, synthesis-based, and simulation-based [27]. The two-feeder approach implemented in two studies [20,24] is a typical comparison-based method where two similar feeders are used for testing. The first feeder is used for measuring voltage ( U ), active power ( P ), and reactive power ( Q ) during normal operating (CVR-off) conditions. The second feeder is used for measuring U , Q , and P at a reduced voltage setpoint (CVR-on). However, using one feeder, the CVR on/off test can be carried out at different times but under similar weather and load conditions. In two investigations [28,29], a regression-based model was used for estimating the load for CVR off during testing. Using a linear regression model [29], C V R f ranging from 0.5–0.9 were obtained. Other researchers applied the synthetic approach to individual load types based on their voltage sensitivity function and used it to estimate energy consumption for industrial, commercial, and residential consumers [30]. This estimation method does not consider weather dependency on energy demand. The common approach of estimating load during normal operations for the testing period has been applied in multiple investigations [27,31,32] using various forms of statistical modeling. These methods emphasize understanding the load composition and the relationship between voltage changes and changes in load composition. In terms of error handling and uncertainty mitigation, their approaches vary from one another. A load uncertainty prediction from the normal distribution of the time series of response loads was applied by Hossan and Chowdhury [31]. The magnitude of the uncertainty was directly determined by the 95% confidence limits of the standard deviation of the load. Approaching C V R f estimation by modeling load changes analytically; the emphasis should be placed on the accuracy of the estimated load. This is the center of methodology verification adopted in this study—the difference in estimated C V R f and that of an expected C V R f . This approach was tested using nine months of data from five feeders during peak demand.
Another methodology to consider is the one developed in the KEPCO pilot testing project [5]. C V R f was computed using P , Q , and U measurements from the various feeders, using the Mean Absolute Deviation (MAD) direct method. This method applies various filtering measures to the U and P , Q changes based on their magnitude, causality, and direction of the initiating tap change. Percentage changes are determined at the point of switching on the VRDT from measurement points on the feeders. Changes in power are calculated directly from the corresponding datasets without estimating CVR-off power using regression models, hence the direct method. To account for uncertainties and variations in load, MAD considers the maximum and minimum load in the dataset. Applying these to the KEPCO pilot project, C V R f for active power obtained was in the range of 0.72–0.78. For reactive power, the range was 7.36–18.73. One key observation is that voltage changes of 0.5–1.5% that was used to evaluate C V R f are below the magnitude of noise and measurement uncertainties found in our dataset. Therefore, tap changes of ±1.5% cannot be used to compute C V R f due to the uncertainties in the measurement data.
This research provides a novel approach for identifying tap changes associated with CVR using a measurement-based algorithm. It also provides a statistical approach for validating C V R f results. Energy digitalization and the resulting power system data help to feed the measurement-based algorithms and strengthen the knowledge of system behavior to apply CVR techniques. In Section 2, this paper presents the methodology for identifying tap changes, and in Section 3, the method is applied to a dataset to compute C V R f and validated with respect to the obtained results. In Section 4, the conclusions of the research work are given, and further research potential is provided.

2. Materials and Methods

Power demand reduction from CVR can be computed using known tap positions from the VRDT. A well-planned measurement campaign takes measurements of U , P , Q , and tap positions at a particular time and known intervals. It ensures that the measurement interval is set at an adequate granularity so that enough CVR events are recorded in order to improve the statistical accuracy of the computation. In the literature, sample size can influence the error magnitude of a derived function or key performance indicator (KPI), such as C V R f . To achieve higher accuracy in this research, the duration of the evaluation was extended to include all tap changes in 2020.

2.1. CVR Factor Evaluation Methodology

The best C V R f computation methodology accounts for natural variations in voltage and power by applying several filters for maximum and minimum limits of power and voltage changes resulting from sudden events such as outages and natural distortions. In order to ensure that voltage response magnitudes are significantly higher than the noise magnitudes of the natural variations in the given voltage measurement, tap operations were carried out within a percentage voltage change interval of 2.1–5.5%. This range falls approximately within the common execution intervals of CVRs which is 2–5% [4]. In this research, the averaging interval ( t m ) was used to determine the average voltage change before and after a tap change. A time-step resolution t i found in the interval for evaluation constitutes the number of samples in t m . The interval of t i is 10 s. This interval represents the delay time before a tap change and the OLTC switching operation time. An accurate interval for t m is affected by the standard deviation of voltage variations before and after a tap change.
C V R f estimation by the direct method is defined as the ratio of the percentage change in power to the percentage change in voltage. The number of samples that will be adequate for estimating an accurate C V R f was determined from the number of tap changes detected during the testing period. A complete tap operation consists of a tap down and tap up or vice versa. For each C V R f estimate, the magnitude of variation in load affects its accuracy. The distribution of P m should be Gaussian. This results from the nature of the measurement data as independent and identically distributed within a short duration of the measurement. Sample data with a 20% change in P have lesser variation than another with a 50% change. Let the number of samples for the t m interval be n m . As shown in Figure 2, P m i is defined as the mean value of active power before a tap change ( h i ) while P m j is defined as the mean value of active power after a tap change ( j k ). The C V R f for P and Q can be defined using the equations below. The tap change was measured from the changes in U —similar to Figure 2.
P m i = 1 n m i = t i n m P i ,           P m j = 1 n m j = t i n m P j
% P = P m i P m j P m i × 100
% Q = Q m i Q m j Q m i × 100
C V R f _ P = % P % U ,             C V R f _ Q = % Q % U
If the magnitude of deviation ( D i , D j ) approaches zero, the degree of uncertainty in the estimated mean power reduces. High uncertainty in Q affects the accuracy of C V R f _ Q . This tendency was often encountered when Q is stationary around zero.

2.2. Dataset

The dataset for this evaluation was obtained from a test field in eastern Bavaria, Germany. It consists of a continuous 10 s measurement of U , P , and Q in the three phases during random tap operations. It is an LV grid with PV (98 kWp) integration supplying 85 residential consumers. According to the annual profile, the PV output is low or zero (on some days) during the winter months and at night times. The period of testing was 12 months in 2020. The monthly datasets were compiled into CSV file format and were provided for evaluation. After data processing and cleaning, the monthly U measurements in three phases were individually evaluated for tap change detection. Tap change was detected across all phases at the same time. Based on the expected output of the PV system, four time groups (TG) were specified. 16:00–22:00, 22:00–04:00, 04:00–10:00, and 10:00–16:00 are T G 1 , T G 2 , T G 3 and T G 4 respectively. In T G 2 , zero yields are expected from the PV system. Our targeted time group for evaluating the C V R f results without PV influence was T G 2 . PV influence was isolated because it impacts the power demand from the grid.

2.3. Tap Change Detection

The entire duration of a tap change operation was captured in two data points across the whole measurement dataset.
d ( t + 2 ) = U t + 2 U t U m
d t + 3 = U t + 3 U t + 1 U m
i f d ( t + 2 ) > d ( t + 3 ) : t d ( t + 3 ) > d ( t + 2 ) : t + 1
U m is the magnitude of voltage noise in volts. This was calculated using the value of 2.0% tap change from the nominal voltage setpoint. In this case, it was 4.0 V. The voltage differencing functions d ( t + 2 ) and d ( t + 3 ) defines the change in voltage from U t to U t + 2 and from U t + 1 to U t + 3 . At some point, the value of d ( t + 3 ) is known to be greater than d ( t + 2 ) . When d ( t + 2 ) is greater than d ( t + 3 ) , the point of origin of the tap change is t. When d ( t + 3 ) is greater than d ( t + 2 ) , the point of origin of the tap change is t + 1 (c.f. Figure 3 and Figure 4). A list of potential tap change timestamps is recorded for the individual voltage phases ( U 1 , U 2 , U 3 ) according to the daily sample sizes (c.f. Figure 5).
The averaging interval ( t m ) value is 1 min; a resolution of 10 s implies that n m = 6 . If the same timestamps are found across the three phases simultaneously, then a tap change is recorded. With spacing greater than t m , the timestamp was recorded as the starting point of a new tap change. When there was a detection of two tap changes within the interval t m , the second timestamp was rejected—physically not possible. In the voltage profile of 20 January 2020, there were seven tap changes that were detected by the algorithm. This process was repeated iteratively on the individual daily profiles of complete days in the season, and their corresponding timestamps were determined.
The voltage patterns observed across the lines were identical at the point of tap change, such that the number of tap operations on each line on the same day was the same. T G 1 and T G 2 contains 969 and 603 values, respectively. The C V R f evaluation was initially focused on the overnight time group ( T G 2 = 22:00–04:00) and evening time ( T G 1 = 16:00–22:00). They both contained 524 tap operations during three months of measurement (c.f. Figure 6).
Daily timestamps without tap changes were recorded; it served as a benchmark for comparing the results of the CVR factors with tap change and without tap change.

3. Results and Discussion

3.1. CVR Factor Computation

At the end of the C V R f evaluation according to Equation (1), the C V R f for P and Q are collected separately. Threshold values of outlier filtering conditions were applied to C V R f _ P and C V R f _ Q , respectively. By filtering, extreme conditions of voltage reduction because of natural changes in consumption patterns were eliminated. For the given dataset, the yearly average CVR factor values for active and reactive power are 1.30 and 4.96, respectively. This means that the CVR effect of a 1% change in the voltage could result in a 1.30% change in the active power and a corresponding 4.96% change in the reactive power. During the summer months, the CVR factors are the lowest. In the winter months, there was a higher result of the CVR factor at night. The CVR factor is generally lower during the day. This could also be a result of higher generation from PV systems on domestic rooftops. Spring months have the lowest CVR factors, as shown in Figure 6. The C V R f with known tap changes were benchmarked against the C V R f without tap changes.
These observations vary according to geographical region and climate. Climate and geographical impacts on CVR factor consist of external environmental factors such as temperature and humidity. Temperate climates require additional constant power loads, such as heat pumps and radiant flow heating systems that do not respond to CVR. Regions with a higher percentage of such load types will not experience higher savings from CVR. In tropical climates, however, CVR can produce extensive power savings resulting from higher demand for space cooling and increased load density.
The overall range of active power C V R f as shown in Figure 6, was 0.70 to 1.61. The reduction in power using a voltage reduction setpoint of 2.5% will be 1.75% to 4.03%. Assuming a peak power demand of 52.5 kW, CVR can yield a 0.92 kW to 2.11. Similarly, the average CVR factor during the peak period ( T G 1 ) was 0.97. Therefore, a peak demand reduction of 2.4% can be achieved using the current setup. This reduction has an economic impact on the overall tariff cost for the consumers. Studies [5,15,33] have shown that a CVR factor estimation of 0.70 to 1.61 is realistic. Our research has advanced further to implement CVR with VRDT in Germany and classify time periods where it is more prominent.

3.2. Result Validation

The hypothesis testing and control chart for C V R f validation is described subsequently.

3.2.1. Evaluation of Outliers

Distribution transformers operated at the secondary substations can regulate the voltage at the desired setpoint.
From Equation (1), C V R f is the ratio of percentage change in P and U . The observed range of + % U is 1.70–4.03 in December. Therefore, the outlier can be said to originate from load changes across the three phases. According to Figure 7, the sample interval of P contains both actual and outlier values. Using known filtering criteria [5], the outlier values from real changes in P were demarcated. With an average CVR factor of 0.94, the average % P is always between 1.60–3.80.
The four outliers that can be seen from these images show that they have a different magnitude from the rest of the changes in power. They occur randomly throughout the dataset and time sample groups, but they are more common in T G 1 and T G 4 .
These outliers can introduce a higher magnitude of standard deviation and variance to the average C V R f . Such deviation can result in an inaccurate estimation of C V R f . Therefore, the higher the number of samples, the higher the accuracy of the mean C V R f value estimation. Using 1000 samples of C V R f sufficiently produced a z -score of 1.96 at a 95% confidence level. The outliers considered for evaluation in this research were natural variations in the voltage signal and estimation errors. Estimation errors are errors associated with CVR factor computation. This error is encountered when a narrow range of voltage and power change is applied as filtering conditions during C V R f computation. It reduces estimation accuracy by reducing the number of samples used in mean estimation. However, the voltage and power measurements contain some magnitude of signal noise that did not affect the accuracy of the estimation.

3.2.2. Stationarity of CVR-Off Control Group

Let us consider the randomized control group. The average values of U and P are 0. This is the null hypothesis ( H 0 ) that is to be proven. A rejected null hypothesis ( H a ) disproves that the mean of U and P is zero. This is expressed in Equation (11). The stationarity originates from an equal distribution of U ¯ and P ¯ on the positive and negative real axis ± R . Alternatively, there is an equal probability of obtaining a positive or negative value from changes in voltage and power.
H 0 : X i ¯ t = 0 , i 1 , , n
H 0 : X k ¯ t = 0 , k 1 , , m
H 0 : X ¯ i t = X k ¯ t , w i t h   p v a l u e < 0.05
H a : X ¯ i t = X k ¯ t , w i t h   p v a l u e > 0.05
Let X i and X k be data points from two different sample groups of n and m. The values of X i and X k can be positive or negative, while n and m are the sample sizes drawn from a Gaussian normal distribution of independently and identically distributed (iid) random samples. According to Equations (8) and (9), the null hypothesis implies that the mean of the n and m samples should be zero. Equation (10) compares the similarity of the mean values X ¯ i t and X k ¯ t , and ensures that it falls within an acceptable statistical significance. The p -value (degree of statistical significance) is the test statistic that describes the error tolerance of the average value X i ¯ t . A test for stationarity on both sample groups was performed before proceeding to evaluate the null hypothesis. When Equations (8) and (9) pass with a p -value lesser than 0.05, then Equation (10) is tested. Figure 8 and Figure 9 show the depth of the changes in the random sample groups for voltage and power. One can observe that the average value is around zero.
The stationarity test using the Augmented Dickey-Fuller (ADF) and Kwiatkowski-Phillips-Schmidt-Shin (KPSS) tests produced a p -value of 0.047 for U samples and 0.100 for P samples. The p -value of U was less than 0.05 according to Equation (10). Conversely, the p -value of P was above the defined limit of Equation (11).
Therefore, U was stationary while P was non-stationary. Non-stationary data always have a trend. Using the z -test [34], p -values for Equations (8) and (9) were evaluated. U ¯   p -value was 0.0497, therefore the hypothesis of H 0 was accepted. P ¯   p -value was 0.0276, the hypothesis H 0 was accepted. Using the same z -test, Equation (10) was evaluated. For U i   and   U k , the p -value was 0.0362—null hypothesis H 0 was accepted, and for P i   and   P k , the p -value was 0.0249—null hypothesis H 0 was accepted. This evaluation shows that a random sample group of voltage and power changes produces zero effects of CVR.

3.2.3. Sensitivity to Averaging Intervals

The averaging interval for estimating U ¯ , P ¯ and Q ¯ was determined to be 1 min. In this section, the target was to study what effect an interval adjustment (halving and doubling) would have on the C V R f . Increasing the number of data points used in determining the averages has a significant statistical role to play in the final value of the C V R f and its accuracy. By extending the interval, there could be an improvement in the accuracy of the average values of voltage and power if the noise level, degree of randomness, or trend is insignificant.
The lower the number of C V R f outliers for a particular averaging interval, the more accurate the estimated mean factor is. Such observation can be seen in the reactive power profile in Figure 10, which is why this evaluation focused on the active power profile. However, if the interval were extended to introduce a trend, then natural variations in voltage and power would begin to influence the results. This was not a problem for a near-stationary profile such as the reactive power profile. The averaging intervals and corresponding results can be seen in Figure 10.
This figure shows that a rise in the interval size increases the percentage of outliers in the total C V R f evaluated. This means that such averaging interval includes natural variations in the power consumption that is not just attributed to a tap change. Thus, it can be concluded that a 1.0–1.5-min interval is adequate for estimating the most accurate C V R f because the average C V R f in the table above can be found between these intervals. This observation may be peculiar to this dataset.

4. Conclusions

In this project, the goal of validating C V R f for peak demand reduction using a set of measurement data from representative substations was achieved. CVR was introduced as a method of reducing power demand during peak periods in other to achieve lesser energy consumption and improve the potential for network expansion. The direct method of C V R f computation with result validation was implemented in this work. This involved the use of statistical significance and hypothesis testing. Our evaluation of average C V R f for active and reactive power gave 1.30 and 4.96, respectively. The result of the entire evaluation shows that the C V R f are smaller during peak PV production and greater during peak demand periods. During peak power demand, a reduction of 2.4% was achieved, corresponding to a 2.5% reduction in voltage. These results show that CVR can induce power demand reduction, and its benefits are significant for both utilities and consumers. Voltage optimization and reduction using CVR are excellent and reliable approaches to achieving peak shaving.
The new frontiers of research in CVR and VVO from an evaluation and technology perspective involve integrating digital solutions based on machine learning. Machine learning and AI solutions allow DNOs to evaluate large datasets with all forms of variables that represent the network configuration, consumer behavior, and weather changes. Research in this field should also include demand response management systems. The tools and processes of estimating energy savings from test field datasets have evolved through the years from simple mathematical evaluations and curve fittings to advance statistical and machine learning solutions. Therefore, CVR evaluation methodologies that implement all features of machine learning should be further studied.
Moreover, the sensitivity of reactive power to voltage changes needs to be studied further. It was discovered that changes in reactive power produced C V R f values that are significantly different from the active power C V R f . No research project has clearly defined the reason for this. Therefore, further research into this observation is required.

Author Contributions

Conceptualization, all authors; Formal analysis, A.I. and A.V.; Investigation, A.I. and A.V.; Methodology, A.I., A.V. and D.N.G.; Project administration, C.T.; Resources, C.T., D.N.G. and C.H.; Software, A.I.; Supervision, M.E. and D.N.G.; Validation, A.I., D.N.G. and A.V.; Visualization, A.I. and M.E.; Writing—original draft, A.I.; Writing—review and editing, M.E. and T.S. All authors have read and agreed to the published version of the manuscript.

Funding

We acknowledge support by the German Research Foundation and the Open Access Publication Fund of Technische Hochschule Ingolstadt.

Data Availability Statement

Restrictions apply to the availability of these data. Data was obtained from Maschinenfabrik Reinhausen GmbH and are available from the authors with the permission of Maschinenfabrik Reinhausen GmbH.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Bundesministerium für Wirtschaft und Klimaschutz (BMWK). Forschungsprojekt Nr. 44/12: Moderne Verteilernetze für Deutschland; Verteilernetzstudie; BMWK: Berlin, Germany, 2014.
  2. Deloitte Touche Tohmatsu Limited. Netzwirtschaft 2050: Szenarien für Deutsche Verteilnetze. 2021. Available online: https://www2.deloitte.com/content/dam/Deloitte/de/Documents/energy-resources/Deloitte-Future-of-Grid-2021.pdf (accessed on 27 March 2023).
  3. Grainger, J.J.; Stevenson, W.D., Jr. Power System Analysis; McGraw-Hill: New York, NY, USA, 1994; ISBN 0071133380. [Google Scholar]
  4. Le, B.; Canizares, C.A.; Bhattacharya, K. Incentive Design for Voltage Optimization Programs for Industrial Loads. IEEE Trans. Smart Grid 2015, 6, 1865–1873. [Google Scholar] [CrossRef]
  5. Shim, K.-S.; Go, S.-I.; Yun, S.-Y.; Choi, J.-H.; Nam-Koong, W.; Shin, C.-H.; Ahn, S.-J. Estimation of Conservation Voltage Reduction Factors Using Measurement Data of KEPCO System. Energies 2017, 10, 2148. [Google Scholar] [CrossRef]
  6. Wang, Z. Implementation and Assessment of Demand Response and Voltage/Var Control with Distributed Generators. Ph.D. Thesis, Georgia Institute of Technology, Atlanta, GA, USA, 2015. [Google Scholar]
  7. Sen, P.K.; Lee, K.H. Conservation Voltage Reduction Technique: An Application Guideline for Smarter Grid. IEEE Trans. Ind. Appl. 2016, 52, 2122–2128. [Google Scholar] [CrossRef]
  8. An, K.; Liu, H.; Zhu, H.; Dong, Z.; Hur, K. Evaluation of Conservation Voltage Reduction with Analytic Hierarchy Process: A Decision Support Framework in Grid Operations Planning. Energies 2016, 9, 1074. [Google Scholar] [CrossRef]
  9. Choi, B.-K.; Chiang, H.-D.; Li, Y.; Li, H.; Chen, Y.-T.; Huang, D.-H.; Lauby, M.G. Measurement-Based Dynamic Load Models: Derivation, Comparison, and Validation. IEEE Trans. Power Syst. 2006, 21, 1276–1283. [Google Scholar] [CrossRef]
  10. Arif, A.; Wang, Z.; Wang, J.; Mather, B.; Bashualdo, H.; Zhao, D. Load Modeling—A Review. IEEE Trans. Smart Grid 2018, 9, 5986–5999. [Google Scholar] [CrossRef]
  11. Renmu, H.; Jin, M.; Hill, D.J. Composite Load Modeling via Measurement Approach. IEEE Trans. Power Syst. 2006, 21, 663–672. [Google Scholar] [CrossRef]
  12. Nam, S.-R.; Kang, S.-H.; Lee, J.-H.; Ahn, S.-J.; Choi, J.-H. Evaluation of the effects of nationwide conservation voltage reduction on peak-load shaving using SOMAS data. Energies 2013, 6, 6322–6334. [Google Scholar] [CrossRef]
  13. Castro, M.; Moon, A.; Elner, L.; Roberts, D.; Marshall, B. The value of conservation voltage reduction to electricity security of supply. Electr. Power Syst. Res. 2017, 142, 96–111. [Google Scholar] [CrossRef]
  14. Forum Netztechnik/Netzbetrieb im VDE. Voltage Regulating Distribution Transformer (VRDT): Use in Grid Planning and Operation, Berlin. 2016. Available online: https://www.vde.com/resource/blob/1570326/c4c73c2670f47f82071b81eab368b85e/hinweis%E2%80%93ront%E2%80%93download-englisch-data.pdf (accessed on 27 March 2023).
  15. Hossein, Z.S.; Khodaei, A.; Fan, W.; Hossan, M.S.; Zheng, H.; Fard, S.A.; Paaso, A.; Bahramirad, S. Conservation Voltage Reduction and Volt-VAR Optimization: Measurement and Verification Benchmarking. IEEE Access 2020, 8, 50755–50770. [Google Scholar] [CrossRef]
  16. Peskin, M.A.; Powell, P.W.; Hall, E.J. Conservation Voltage Reduction with Feedback from Advanced Metering Infrastructure. In Proceedings of the 2012 IEEE/PES Transmission and Distribution Conference and Exposition (PES T&D), Orlando, FL, USA, 7–10 May 2012; pp. 1–8, ISBN 978-1-4673-1935-5. [Google Scholar]
  17. Global Energy Partners L.L.C. Distribution Efficiency Initiative: Market Progress Evaluation Report, No. 1. Report #E05-139. Available online: https://library.cee1.org/sites/default/files/library/1282/459.pdf (accessed on 27 March 2023).
  18. Fan, W.; Hossan, M.S.; Zheng, H.; Cook, A.; Zaid, S.; Fard, S.A.; Khodaei, A.; Paaso, A. A CVR On/Off Status Detection Algorithm for Measurement and Verification. In Proceedings of the 2021 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT), Washington, DC, USA, 16–18 February 2021; pp. 1–5, ISBN 978-1-7281-8897-3. [Google Scholar]
  19. Electricity North West (ELNW). Smart Street Closedown Report. 2018. Available online: https://enwl01master8xt6oprep.azurewebsites.net/globalassets/innovation/smart-street/smart-street-key-docs/smart-street-closedown--report.pdf (accessed on 18 January 2021).
  20. Kennedy, B.W.; Fletcher, R.H. Conservation voltage reduction (CVR) at Snohomish County PUD. IEEE Trans. Power Syst. 1991, 6, 986–998. [Google Scholar] [CrossRef]
  21. Mokkapaty, S.; Weiss, J.; Schalow, F.; Declercq, J. New generation voltage regulation distribution transformer with an on load tap changer for power quality improvement in the electrical distribution systems. CIRED Open Access Proc. J. 2017, 2017, 784–787. [Google Scholar] [CrossRef]
  22. J. Schneider Elektrotechnik. PDF Catalogs—Voltage Regulated Distribution Transformer|Technical Documentation|Brochure. Available online: https://pdf.directindustry.com/pdf/j-schneider-elektrotechnik/voltage-regulated-distribution-transformer/16461-824847.html (accessed on 27 March 2023).
  23. Lefebvre, S.; Gaba, G.; Ba, A.-O.; Asber, D.; Ricard, A.; Perreault, C.; Chartrand, D. Measuring the Efficiency of Voltage Reduction at Hydro-Québec Distribution. In Proceedings of the 2008 IEEE Power and Energy Society General Meeting—Conversion and Delivery of Electrical Energy in the 21st Century, Pittsburgh, PA, USA, 20–24 July 2008; pp. 1–7, ISBN 978-1-4244-1905-0. [Google Scholar]
  24. Liu, H.; Macwan, R.; Alexander, N.; Zhu, H. A Methodology to Analyze Conservation Voltage Reduction Performance Using Field Test Data. In Proceedings of the IEEE International Conference on Smart Grid Communications 2014, Venice, Italy, 3–6 November 2014; pp. 529–534. [Google Scholar]
  25. Zhao, J.; Wang, Z.; Wang, J. Robust Time-Varying Load Modeling for Conservation Voltage Reduction Assessment. IEEE Trans. Smart Grid 2018, 9, 3304–3312. [Google Scholar] [CrossRef]
  26. PJM Interconnection. PJM Manual 13: Emergency Operations No. 77; PJM Interconnection: Norristown, PA, USA, 2021. [Google Scholar]
  27. Wang, Z.; Wang, J. Review on Implementation and Assessment of Conservation Voltage Reduction. IEEE Trans. Power Syst. 2014, 29, 1306–1315. [Google Scholar] [CrossRef]
  28. Wang, Z.; Begovic, M.; Wang, J. Analysis of Conservation Voltage Reduction Effects Based on Multistage SVR and Stochastic Process. IEEE Trans. Smart Grid 2014, 5, 431–439. [Google Scholar] [CrossRef]
  29. Short, T.A.; Mee, R.W. Voltage Reduction Field Trials on Distributions Circuits. In Proceedings of the 2012 IEEE/PES Transmission and Distribution Conference and Exposition (PES T&D), Orlando, FL, USA, 7–10 May 2012; ISBN 978-1-4673-1935-5. [Google Scholar]
  30. Chen, C.-S.; Wu, T.-H.; Lee, C.-C.; Tzeng, Y.-M. The application of load models of electric appliances to distribution system analysis. IEEE Trans. Power Syst. 1995, 10, 1376–1382. [Google Scholar] [CrossRef]
  31. Hossan, M.S.; Chowdhury, B. Time-Varying Stochastic and Analytical Assesment of CVR in DER Integrated Distribution Feeder. In Proceedings of the 2017 North American Power Symposium (NAPS), Morgantown, WV, USA, 17–19 September 2017. [Google Scholar]
  32. El-Shahat, A.; Haddad, R.J.; Alba-Flores, R.; Rios, F.; Helton, Z. Conservation Voltage Reduction Case Study. IEEE Access 2020, 8, 55383–55397. [Google Scholar] [CrossRef]
  33. Diskin, E.; Fallon, T.; O’Mahony, G.; Power, C. Conservation Voltage Reduction and Voltage Optimisation on Irish Distribution networks. In Proceedings of the CIRED 2012 Workshop: Integration of Renewables into the Distribution Grid, Lisbon, Portugal, 29–30 May 2012; p. 264, ISBN 978-1-84919-628-4. [Google Scholar]
  34. Seabold, S.; Perktold, J. Statsmodels: Econometric and Statistical Modeling with Python. In Proceedings of the Python in Science Conference SciPy, Austin, TX, USA, 28–30 June 2010; ISBN 2575-9752. [Google Scholar]
Figure 1. A VRDT with an OLTC [22].
Figure 1. A VRDT with an OLTC [22].
Energies 16 03155 g001
Figure 2. Estimating CVR by the direct method.
Figure 2. Estimating CVR by the direct method.
Energies 16 03155 g002
Figure 3. Line plot of voltage rise.
Figure 3. Line plot of voltage rise.
Energies 16 03155 g003
Figure 4. Flow chart of the algorithm used for this study.
Figure 4. Flow chart of the algorithm used for this study.
Energies 16 03155 g004
Figure 5. Voltage profiles on 20 January 2020.
Figure 5. Voltage profiles on 20 January 2020.
Energies 16 03155 g005
Figure 6. Annual CVR factors for active power.
Figure 6. Annual CVR factors for active power.
Energies 16 03155 g006
Figure 7. Line plot of outliers.
Figure 7. Line plot of outliers.
Energies 16 03155 g007
Figure 8. Voltage changes in the random group.
Figure 8. Voltage changes in the random group.
Energies 16 03155 g008
Figure 9. Load changes in the random group.
Figure 9. Load changes in the random group.
Energies 16 03155 g009
Figure 10. Averaging interval effect on CVR factors.
Figure 10. Averaging interval effect on CVR factors.
Energies 16 03155 g010
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Igiligi, A.; Vielhauer, A.; Ehrenwirth, M.; Hurm, C.; Summ, T.; Trinkl, C.; Navarro Gevers, D. Assessment of Conservation Voltage Reduction in Distribution Networks with Voltage Regulating Distribution Transformers. Energies 2023, 16, 3155. https://doi.org/10.3390/en16073155

AMA Style

Igiligi A, Vielhauer A, Ehrenwirth M, Hurm C, Summ T, Trinkl C, Navarro Gevers D. Assessment of Conservation Voltage Reduction in Distribution Networks with Voltage Regulating Distribution Transformers. Energies. 2023; 16(7):3155. https://doi.org/10.3390/en16073155

Chicago/Turabian Style

Igiligi, Anthony, Armin Vielhauer, Mathias Ehrenwirth, Christian Hurm, Thorsten Summ, Christoph Trinkl, and Daniel Navarro Gevers. 2023. "Assessment of Conservation Voltage Reduction in Distribution Networks with Voltage Regulating Distribution Transformers" Energies 16, no. 7: 3155. https://doi.org/10.3390/en16073155

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop