Next Article in Journal
Manufacturing Strategies for a Family of Integrated Photovoltaic-Fuel Cell Systems
Previous Article in Journal
Review and Evaluation of Multi-Agent Control Applications for Energy Management in Buildings
Previous Article in Special Issue
Prediction of Key Development Indicators for Offshore Oilfields Based on Artificial Intelligence
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
This is an early access version, the complete PDF, HTML, and XML versions will be available soon.
Article

Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs

1
No. 12 Oil Production Plant, Changqing Oilfield Company, China National Petroleum Corporation (CNPC), Qingyang 745400, China
2
College of Petroleum Engineering, China University of Petroleum (Beijing), Beijing 102249, China
*
Authors to whom correspondence should be addressed.
Energies 2024, 17(19), 4838; https://doi.org/10.3390/en17194838
Submission received: 17 August 2024 / Revised: 20 September 2024 / Accepted: 24 September 2024 / Published: 26 September 2024
(This article belongs to the Special Issue Petroleum and Natural Gas Engineering)

Abstract

Asynchronous injection–production cycle (AIPC) in a horizontal–vertical well pattern is an efficient strategy for enhancing water injection in tight reservoirs. However, current studies lack consideration of waterflood-induced fractures (WIFs) caused by long-term water injection. This paper takes block Z in the Ordos Basin, China, as the research object and first clarifies the formation conditions of WIFs considering the horizontal principal stress and flow line. Then, the pressure-sensitive permeability equations for the induce-fracture region between wells are derived. Finally, the WIFs characteristics in a horizontal–vertical well network with different injection modes are discussed by numerical simulation. The results show that WIFs preferentially form where flow aligns with the maximum principal stress, influencing permeability distribution. Controlling the injection rate of vertical wells on the maximum principal stress and flow line and cyclically adjusting the production rate of horizontal wells can regulate the appropriate propagation of WIFs and expand the swept areas. The parallel injection mode (PIM) and the half-production injection mode are superior to the full-production injection mode. This study can provide theoretical support for the effective development of tight oil reservoirs.
Keywords: asynchronous injection–production cycle (AIPC); waterflood-induced fracture; horizontal–vertical well network; numerical simulation asynchronous injection–production cycle (AIPC); waterflood-induced fracture; horizontal–vertical well network; numerical simulation

Share and Cite

MDPI and ACS Style

Chen, J.; Cai, D.; Zhang, T.; Yu, L.; Zhou, D.; Cheng, S. Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs. Energies 2024, 17, 4838. https://doi.org/10.3390/en17194838

AMA Style

Chen J, Cai D, Zhang T, Yu L, Zhou D, Cheng S. Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs. Energies. 2024; 17(19):4838. https://doi.org/10.3390/en17194838

Chicago/Turabian Style

Chen, Jianwen, Dingning Cai, Tao Zhang, Linjun Yu, Dalin Zhou, and Shiqing Cheng. 2024. "Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs" Energies 17, no. 19: 4838. https://doi.org/10.3390/en17194838

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop