Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs
Abstract
Share and Cite
Chen, J.; Cai, D.; Zhang, T.; Yu, L.; Zhou, D.; Cheng, S. Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs. Energies 2024, 17, 4838. https://doi.org/10.3390/en17194838
Chen J, Cai D, Zhang T, Yu L, Zhou D, Cheng S. Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs. Energies. 2024; 17(19):4838. https://doi.org/10.3390/en17194838
Chicago/Turabian StyleChen, Jianwen, Dingning Cai, Tao Zhang, Linjun Yu, Dalin Zhou, and Shiqing Cheng. 2024. "Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs" Energies 17, no. 19: 4838. https://doi.org/10.3390/en17194838