Next Article in Journal
Plant Protein and Plant-Based Meat Alternatives: Consumer and Nutrition Professional Attitudes and Perceptions
Next Article in Special Issue
Cross-Organizational Learning Approach in the Sustainable Use of Fly Ash for Geopolymer in the Philippine Construction Industry
Previous Article in Journal
Linking Critical Thinking and Knowledge Management: A Conceptual Analysis
Previous Article in Special Issue
A Systematic Literature Review of Multi-Criteria Decision-Making Methods for Sustainable Selection of Insulation Materials in Buildings
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Sustainability Indicator Selection by a Novel Triangular Intuitionistic Fuzzy Decision-Making Approach in Highway Construction Projects

1
School of Civil Engineering, Iran University of Science and Technology, P.O. Box 16765-163, Narmak, Tehran 1684613114, Iran
2
School of Architecture and Built Environment, Deakin University, Geelong, VIC 3220, Australia
*
Author to whom correspondence should be addressed.
Sustainability 2021, 13(3), 1477; https://doi.org/10.3390/su13031477
Submission received: 1 October 2020 / Revised: 12 November 2020 / Accepted: 13 November 2020 / Published: 1 February 2021
(This article belongs to the Special Issue Sustainable Construction Engineering and Management)

Abstract

:
The construction industry has been criticized as being a non-sustainable industry that requires effective tools to monitor and improve its sustainability performance. The multiplicity of indicators of the three pillars of sustainability—economic, social, and environmental—complicates construction sustainability assessments for project managers. Therefore, prioritizing and selecting appropriate sustainability indicators (SIs) is essential prior to conducting a construction sustainability assessment. The main purpose of this research is to select the most appropriate set of SIs to address all three pillars of highway sustainability by a new group decision-making approach. The proposed approach accounts for risk attitudes of experts and entropy measures under a triangular intuitionistic fuzzy (TIF) environment, to handle the inherent uncertainty and vagueness that is present throughout the evaluation process. Furthermore, new separation measures and ranking scores are introduced to distinguish the preference order of SIs. Eventually, the approach is implemented in a case study of highway construction projects and the applicability of the approach is examined. To investigate the stability and validity of computational results, a sensitivity analysis is carried out and a comparison is made between the obtained ranking outcomes and the traditional decision-making methods.

1. Introduction

The preliminary concept of sustainable development was introduced in the 1980s [1]. According to the World Commission on Environment and Development (WCED) report, sustainable development refers to development that can be useful for nature, not harmful and aids in meeting the needs of present generations without compromising the needs of future generations. Sustainable development is generally balanced among three aspects or pillars: economic, environmental and social sustainability and aims to meet all these needs/objectives simultaneously [2].
In recent decades, sustainable construction—as a fundamental contributor towards sustainable development—has been the focus of a great deal of research. Recent research efforts have largely concentrated on the performance measurement process and sustainability assessment in building and construction projects, based on analytical and computational evaluation approaches, sustainable construction tools, standards and rating systems, or a combination of these. Indeed, these studies have attempted—by various techniques—to aid the construction industry in reaching sustainable development ideals and goals. As illustrated below, some of these research studies have been reviewed. Yu et al. [3] provided the project management team with planning strategies using a sustainability-assessing system. The proposed system was developed to monitor and evaluate the sustainability of whole activities throughout the construction projects’ life cycle. Goubran and Cucuzzella [4] presented two analytical mapping tools for design teams of building projects to utilize Sustainable Development Goals (SDGs) as a sustainability analyzing framework in the design process. The first tool was constructed based on distinguishing between the architectural, engineering and operational concerns, while the second tool was designed based on the characteristics of the design approach (either product or human-focused) and its inspiration (history vs. future driven). Karaca et al. [5] developed a rapid sustainability assessment method using indicators and their relative weights attained from stakeholders, and an assessment approach based on the responses of buildings’ occupants to measure the sustainability performance of residential buildings in Nur-Sultan, Kazakhstan. Li et al. [6] provided a comprehensive analysis of various stakeholder groups associated with sustainable construction in China. In addition, the level of stakeholder influence in decision/evaluations was measured using semi-structured interviews and the Delphi technique. Omer and Noguchi [7] developed a conceptual framework for the selection of appropriate building materials considering the implementation of the 2030 Agenda for Sustainable Development. Indeed, they presented a knowledge-based decision support system to assist policymakers, designers and construction stakeholders in making appropriate decisions towards the achievement of SDGs. Xu et al. [8] evaluated the sustainability of the construction industry by an assessment model based on the entropy method in China. The level of sustainability in construction projects was determined by two indices named the social, economic, and environmental benefits index and the ecological costs index. Illankoon et al. [9] suggested a scoring model regarding the inter-links between the Leadership in Energy and Environmental Design (LEED) credits and SDGs to evaluate buildings constructed in Australia. Their proposed model identified a Comprehensive Contribution to Development Index (CCDI) to policymakers as a guideline for evaluating building projects in order to achieve the United Nations (UN)’s SDGs. Olawumi et al. [10] introduced a grading system of buildings in Nigeria, named the Building Sustainability Assessment Method (BSAM) scheme. The scheme involves the identification of key sustainability assessment criteria and assigns weighted-scores to the various criteria by the multi-expert consultation method. Mansell et al. [11] used empirical evidence to identify a golden thread between sustainability reporting frameworks at the project level and the organizational level, and impacts of the UN’s SDGs. The frameworks benefit from the Ceequal reporting methodology at the project level and the Global Reporting Initiative (GRI) methodology at the organizational level. Accordingly, a database of indicators was extracted that aligned with the specific SDG targets. Additionally, a robust investment appraisal was provided for the design stage of infrastructure projects.
Since highway projects are one of the most important aspects for the development of transportation infrastructure—necessary due to higher population concentrations and greater transportation demands in urban areas [12,13]—they have been considered as one of the most crucial components of sustainable development. Moreover, highway construction projects use a vast quantity of energy and natural materials, generate waste, and produce greenhouse gases that can greatly affect the sustainability of the construction industry.
The sustainability indicators (SIs) are significant factors in the sustainability assessment of highway projects. Various studies and tools have introduced numerous SIs for the assessment of the sustainability of construction projects that has led to the complication of the assessment process. Therefore, the prioritization of indicators and the adoption of an optimal number of SIs are major issues. In addition, the evaluation of SIs is complex for decision-makers, owing to inadequate evidence and uncertainty surrounding highway construction projects [13,14,15]. Hence, Multi-Criteria Decision-Making (MCDM) techniques under uncertainty are useful tools to cope with these problems [16,17,18,19,20]. While the construction industry plays an important role in global sustainable development, numerous research efforts have studied different subjects regarding the sustainability of the construction industry and the use of multi-criteria decision making to evaluate sustainability in this industry. Huang and Yeh [21] developed a framework to analyze the green highway projects applying the max-min fuzzy Delphi method to recognize the main classifications and related items. Chen et al. [22] proposed a model called the construction method selection model aimed at lending support to assess the prefabrication feasibility at the initial level utilizing the simple multi-attribute rating technique and subsequently to adopt the best strategy to employ prefabrication at the following level. Reza et al. [23] proposed a thorough assessment technique using Triple Bottom Line (TBL) criteria to assess flooring systems with respect to the combination of Analytic Hierarchy Process (AHP) and Life Cycle Analysis (LCA) techniques. Waris et al. [24] established criteria for selecting sustainable construction equipment based on qualitative and quantitative feedbacks of construction industry experts and finally selected the top five criteria. Li et al. [25] proposed a comprehensive methodology using entropy, which is suitable for calculating weights, and the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods at the same time to evaluate the development of highway transportation. Kucukvar et al. [26] presented a fuzzy MCDM method for prioritizing pavements and selecting the best one based on the respective sustainability performance using the TOPSIS method. Medineckiene et al. [27] proposed a novel MCDM technique to adopt criteria from which their sets and weights are determined in accordance with the Swedish certification system Miljöbyggnad and used AHP for building sustainability assessment. Kamali and Hewage [28] identified sustainability performance indicators to evaluate life cycle sustainability. Subsequently, an organized framework was developed based on designing and conducting a survey to choose the most suitable sustainability performance indicators for modular and conventional construction methods in North America. Pan et al. [29] developed a sustainability indicator framework to reliably assess the performance of construction automation and robotics in the building industry context. Indeed, the study proposed guidelines for sustainable automated and robotic options for advanced construction technology. Zolfani et al. [30] presented a hybrid MCDM methodology applying Step-wise Weight Assessment Ratio Analysis (SWARA) and Complex Proportional Assessment (COPRAS) for criteria weights and prioritizing alternatives, respectively.
Liu and Qian [31] developed an integrated sustainability assessment methodology in accordance with the life cycle sustainability assessment framework. In addition, a combination of AHP and ELimination Et Choice Translating REality (ELECTRE) was applied to derive criteria weights and prioritize alternatives. Reddy et al. [32] introduced a decision-making method to adopt a sustainable material without Life Cycle Inventory (LCI) information requirements. In this method, criteria that highly influence material sustainability were investigated and consequently applied to analyze the performance of materials in different aspects of the material life cycle to develop a sustainable material performance index utilizing AHP. Chen [33] used a new multi-criteria assessment approach integrating the Grey Relational Analysis (GRA) and TOPSIS techniques, which operate according to the intuitionistic fuzzy entropy method, for selection of the appropriate sustainable supplier of construction materials. Roy et al. [34] developed a combinative distance-based evaluation method utilizing Interval-Valued Intuitionistic Fuzzy Numbers (IVIFNs) to decide comprehensively and logically to deal with the problem of material adoption under uncertainty. Tseng et al. [35] introduced various features and measures to build a model and assess the construction projects in Ecuador, employing fuzzy decision-making trials with Decision Making Trial and Evaluation Laboratory (DEMATEL) in addition to an Analytic Network Process (ANP) to evaluate interdependence between the features of a sustainable product–service system. Hendiani and Bagherpour [14] presented a novel social sustainability performance assessment in construction projects using fuzzy numbers to evaluate the present social sustainability position associated with construction. Furthermore, the barriers that reduce the value of the social sustainability index were recognized and addressed. Alawneh et al. [36] proposed a novel framework that identifies and weighs SIs for sustainable non-residential buildings and contributes to achieving the SDGs in Jordan. The framework applies the Delphi technique to identify and categorize SIs and then integrates AHP and Relative Importance Index (RII) methods to weigh SIs. In addition, a management tool (Gantt chart) integrates SIs into the project phases towards sustainable construction management. Dabous et al. [37] proposed a multi-criteria decision-support approach to handle decision-making in sustainable pavement adoption. The main sustainable decision factors were recognized through a hierarchy structure in their approach. In addition, the AHP technique in combination with multi-attribute utility theory was used to rank the networks of pavement sections. For sustainable landfill site selection, Rahimi et al. [38] introduced a Geographical Information System (GIS)-MCDM methodology considering the group fuzzy Best-Worst Method (BWM), fuzzy MULTIMOORA method and GIS-based suitability maps. The methodology was employed in Mahallat city, Iran, and it could provide suitable guidance for the waste management department of municipalities. Navarro et al. [39] developed an assessment methodology to measure the sustainability performance of the concrete bridge deck based on a neutrosophic group AHP approach. In addition, the TOPSIS technique was utilized to aggregate the sustainability criteria.
The aforementioned studies demonstrate that the previous research did not pay much attention to the sustainability performance of highway construction projects. Furthermore, there are no studies focusing on prioritizing and selecting the indicators of the three sustainability pillars. For the recognized gaps, a new multi-criteria weighting and ranking approach, according to group decision-making, is presented in the present study to analyze and adopt SIs in highway construction projects. Initially, SIs and criteria are collected and listed concerning experts’ views and the literature review. Thus, triangular intuitionistic fuzzy (TIF) decision matrices are constructed based on experts’ views in terms of linguistic variables. Subsequently, the weights of experts are gained according to the concept of entropy. Afterward, primary weight vectors of criteria are specified by entropy measures and experts’ views. Finally, SIs are ranked based on the positive and negative ideal separation matrices via presenting a new ranking score. Moreover, a case study in highway construction projects is addressed to demonstrate the efficiency of the presented approach.
The rest of this paper is organized as follows. In Section 2, a novel multi-criteria group decision-making approach is proposed and applied in a case study of a highway construction project. Section 3 presents the results of the approach implementation in detail. The obtained results are compared with the prevalent decision-making methods and other mentioned SIs in the cited literature, and the sensitivity analyses are conducted in Section 4. To conclude the paper, Section 5 depicts the concluding remarks.

2. Materials and Methods

2.1. TIF Group Decision-Making Approach

The proposed approach aims to assist project managers in selecting the most significant SIs for sustainability assessment of highway construction projects based on a novel TIF group decision-making approach. Figure 1 presents the proposed approach for the selection of SIs.
The phases of the presented approach are as follows:
  • Step 1. Constitute a group of experts ( E e ; e = 1 ,   2 , , t ) , whose views and judgments will be employed to build and assess the problem.
  • Step 2. Gather a list of indicators that are possible to be applied for the sustainability evaluation of highway construction projects ( I i ; i = 1 ,   2 , , m ).
  • Step 3. Recognize a set of criteria for analyzing SIs through consensus of experts’ views ( C j ; j = 1 ,   2 , , n ).
  • Step 4. Assign the risk attitude to each expert and incorporate it into the related triangular intuitionistic fuzzy numbers (TIFNs) (Definition A1).
Each expert is assigned a risk attitude according to his or her character. The risk attitudes are able to be specified by a higher management level and expressed by linguistic variables, like absolutely optimistic (AO), optimistic (O), neutral (N), pessimistic (P), and absolutely pessimistic (AP) [40,41], for 5-scale TIFNs (Table 1).
In Table 1, π indicates the hesitation degree of TIFN ( a , b , c ) ; μ ,   ν and is equal to 1 μ ν .
  • Step 5. Construct the primary decision matrices based on the experts’ views.
The primary decision matrices are constructed from the performance rating of each indicator versus each criterion based on the experts’ view in terms of linguistic terms (Table 2) and converted into TIFNs.
X ˜ e = [ x ˜ i j e ] m × n = [ ( a x ˜ i j e ,   b x ˜ i j e ,   c x ˜ i j e ) ; μ x ˜ i j e ,   ν x ˜ i j e ] m × n
  • Step 6. Convert the primary decision matrices to the individual decision matrices based on each expert’s risk attitude.
The primary decision matrices are converted to decision matrices taking into account each expert’s risk attitude according to Table 1.
R ˜ e = [ r ˜ i j e ] m × n = [ ( a r ˜ i j e ,   b r ˜ i j e ,   c r ˜ i j e ) ; μ r ˜ i j e ,   ν r ˜ i j e ] m × n
  • Step 7. Compute each expert’s entropy-weight according to the individual decision matrices.
The entropy measure F i j e is calculated by [42]:
F i j e = f i j e ln ( f i j e ) ln t ,
where
f i j e = ( a r ˜ i j e +   b r ˜ i j e + c r ˜ i j e ) × ( 1 + μ r ˜ i j e   ν r ˜ i j e ) e = 1 t [ ( a r ˜ i j e +   b r ˜ i j e + c r ˜ i j e ) × ( 1 + μ r ˜ i j e   ν r ˜ i j e ) ] .
Thus, each expert’s entropy-weight is determined as follows [42,43]:
α i j e = e = 1 t F i j e + 1 2 × F i j e e = 1 t ( e = 1 t F i j e + 1 2 × F i j e ) ,
where 0 α i j e 1 , and e = 1 t α i j e = 1 .
  • Step 8. Build the aggregated TIF decision matrix taking into account the entropy-weights of experts.
According to the TIF weighted geometric aggregation (TIFWGA) operator [44], the aggregated TIF decision matrix concerning the entropy-weights of experts is gained as follows:
R ˜ = [ r ˜ i j ] m × n = [ ( a r ˜ i j ,   b r ˜ i j ,   c r ˜ i j ) ; μ r ˜ i j ,   ν r ˜ i j ] m × n
where r ˜ i j = ( r ˜ i j 1 ) α i j 1 ( r ˜ i j 2 ) α i j 2 ( r ˜ i j t ) α i j t .
  • Step 9. Construct the primary weight vectors of criteria based on experts’ views.
The significance of criteria is provided based on the experts’ views in terms of linguistic terms (Table 3).
ω ˜ e = { ω ˜ j e } =   { ( a ω ˜ j e ,   b ω ˜ j e ,   c ω ˜ j e ) ; μ ω ˜ j e ,   ν ω ˜ j e } ,
  • Step 10. Convert the primary weight vectors to the individual weight vectors based on each expert’s risk attitude.
The primary weight vectors are converted to the individual weight vectors taking into account each expert’s risk attitude according to Table 1.
w ˜ e = { w ˜ j e } =   { ( a w ˜ j e ,   b w ˜ j e ,   c w ˜ j e ) ; μ w ˜ j e ,   ν w ˜ j e } ,
  • Step 11. Compute each expert’s entropy-weight according to the weight vectors.
The entropy measure G j e is calculated by [42]:
G j e = g j e ln ( g j e ) ln t ,
where
g j e = ( a w ˜ j e +   b w ˜ j e + c w ˜ j e ) × ( 1 + μ w ˜ j e   ν w ˜ j e ) e = 1 t [ ( a w ˜ j e +   b w ˜ j e + c w ˜ j e ) × ( 1 + μ w ˜ j e   ν w ˜ j e ) ] .
Thus, each expert’s entropy-weight according to the expert-based weight vector is determined as follows [42,43]:
β j e = e = 1 t G j e + 1 2 × G j e e = 1 t ( e = 1 t G j e + 1 2 × G j e ) ,
where 0 β j e 1 , and e = 1 t β j e = 1 .
  • Step 12. Provide the TIF weight vector of the criteria.
The TIF weight vector W ˜ is built according to experts’ entropy-weight by using Definition A2 as follows:
W ˜ = { W ˜ j } = { W ˜ 1 , W ˜ 2 , , W ˜ n } ,
where
W ˜ j = ( a W ˜ j ,   b W ˜ j ,   c W ˜ j ) ; μ W ˜ j ,   ν W ˜ j = ( w ˜ j 1 ) β j 1 ( w ˜ j 2 ) β j 2 ( w ˜ j t ) β j t .
  • Step 13. Compute the TIF positive-ideal solution (PIS) and the TIF negative-ideal solution (NIS) vectors.
The TIF PIS r ˜ j * and the TIF NIS r ˜ j are, respectively, defined as follows:
r ˜ j * = { ( a r ˜ j * ,   b r ˜ j * ,   c r ˜ j * ) ; μ r ˜ j * ,   ν r ˜ j * } = { { ( m a x i ( c r ˜ i j ) ,   m a x i ( c r ˜ i j ) ,   m a x i ( c r ˜ i j ) ) ; m a x i ( μ r ˜ i j ) , m i n i ( ν r ˜ i j ) }           f o r   j J 1 { ( m i n i ( a r ˜ i j ) ,   m i n i ( a r ˜ i j ) ,   m i n i ( a r ˜ i j ) ) ; m i n i ( μ r ˜ i j ) , m a x i ( ν r ˜ i j ) }                 f o r   j J 2 ,
and
r ˜ j = { ( a r ˜ j ,   b r ˜ j ,   c r ˜ j ) ; μ r ˜ j ,   ν r ˜ j } = { { ( m i n i ( c r ˜ i j ) ,   m i n i ( c r ˜ i j ) ,   m i n i ( c r ˜ i j ) ) ; m i n i ( μ r ˜ i j ) , m a x i ( ν r ˜ i j ) }           f o r   j J 1 { ( m a x i ( a r ˜ i j ) ,   m a x i ( a r ˜ i j ) ,   m a x i ( a r ˜ i j ) ) ; m a x i ( μ r ˜ i j ) , m i n i ( ν r ˜ i j ) }                 f o r   j J 2 ,
where J 1 and J 2 are the benefit criteria and cost criteria, respectively.
  • Step 14. Determine the positive-ideal separation (PISE) and the negative-ideal separation (NISE) matrices.
The PISE matrix ( * ) and the NISE matrix ( ) are defined based on hamming distance [45].
* = [ i j * ] m × n = [ Δ ( r ˜ 1 * ,   r ˜ 11 ) Δ ( r ˜ 2 * ,   r ˜ 12 ) Δ ( r ˜ n * ,   r ˜ 1 n ) Δ ( r ˜ 1 * ,   r ˜ 21 ) Δ ( r ˜ 2 * ,   r ˜ 22 ) Δ ( r ˜ n * ,   r ˜ 2 n ) Δ ( r ˜ 1 * ,   r ˜ m 1 ) Δ ( r ˜ 2 * ,   r ˜ m 2 ) Δ ( r ˜ n * ,   r ˜ m n ) ] ,
and
= [ i j ] m × n = [ Δ ( r ˜ 1 ,   r ˜ 11 ) Δ ( r ˜ 2 ,   r ˜ 12 ) Δ ( r ˜ n ,   r ˜ 1 n ) Δ ( r ˜ 1 ,   r ˜ 21 ) Δ ( r ˜ 2 ,   r ˜ 22 ) Δ ( r ˜ n ,   r ˜ 2 n ) Δ ( r ˜ 1 ,   r ˜ m 1 ) Δ ( r ˜ 2 ,   r ˜ m 2 ) Δ ( r ˜ n ,   r ˜ m n ) ] .
  • Step 15. Compute the A i ,   B i , A i , and B i values.
The A i ,   B i , A i , and B i values are computed according to the score function [46] as follows:
A i = j = 1 n i j *   W ˜ j = 1 4 ( j = 1 n i j * a W ˜ j + 2 i j * b W ˜ j + i j * c W ˜ j ) ( 1 j = 1 n ( 1 μ W ˜ j ) i j * j = 1 n ν W ˜ j i j * )
B i = m a x j ( d i j *   W ˜ j ) = m a x j ( 1 4 ( i j * a W ˜ j + 2 i j * b W ˜ j + i j * c W ˜ j ) ( 1 ( 1 μ W ˜ j ) i j * ν W ˜ j i j * ) )
A i = j = 1 n i j   W ˜ j = 1 4 ( j = 1 n Δ i j a W ˜ j + 2 Δ i j b W ˜ j + Δ i j c W ˜ j ) ( 1 j = 1 n ( 1 μ W ˜ j ) Δ i j j = 1 n ν W ˜ j Δ i j )
B i = m a x j ( Δ i j   W ˜ j ) = m a x j ( 1 4 ( Δ i j a W ˜ j + 2 Δ i j b W ˜ j + Δ i j c W ˜ j ) ( 1 ( 1 μ W ˜ j ) Δ i j ν W ˜ j Δ i j ) )
  • Step 16. Calculate the κ i and ϑ i values.
The values of indices κ i and ϑ i are calculated as follows:
κ i = χ ( A i A * A A * ) + ( 1 χ ) ( B i B * B B * ) ,
and
ϑ i = ψ ( A i A A * A ) + ( 1 ψ ) ( B i B B * B ) ,
where { A * = min i A i A = max i A i   , { B * = min i B i B = max i B i   , { A * = max i A i A = min i A i , { B * = max i B i B = min i B i   , χ and ψ are regarded as the relative importance for the strategy of the majority attributes, whereas 1 χ and 1 ψ are the relative importance of the individual regret.
  • Step 17. Compute the novel ranking score.
The ranking scores   i are defined as follows:
c i = η ( κ i κ * κ κ * + ϑ * ϑ i ϑ * ϑ ) + ( 1 η ) ( κ i κ * κ κ * × ϑ * ϑ i ϑ * ϑ ) ,
i = c i γ λ γ
where { κ * = min i κ i κ = max i κ i , { ϑ * = max i ϑ i ϑ = min i ϑ i ,   γ = min i c i ,   λ = max i c i and 0 η 1 .
  • Step 18. Rank the SIs according to the ranking score ( i values).
The SIs are sorted by the i values in decreasing order. The maximum value of the i indicates the higher importance.

2.2. Case Study

The efficiency of the presented approach was examined through a case study of a highway construction project. To that end, an Iranian construction firm was involved in transportation infrastructures. The firm has numerous highway construction projects being built in various areas of the country. To evaluate the projects according to sustainable construction principles, the firm managers intended to recognize and prioritize SIs to adopt the key evaluation indicators from a pool of numerous SIs in these projects.
According to step 1, five experts working on highway projects were adopted from employees of the firm. The participants comprised construction project managers and sustainable construction experts. They had enough experience and knowledge of nearly all the sustainable aspects of construction projects. As such, a group of five experts (E1, E2, …, E5) was considered for analyzing potential SIs. After forming the committee, the experts picked out a set of potential SIs in addition to a set of relevant criteria for SIs assessment (Steps 2 and 3). To that end, a brainstorming session was held with the experts and thirty sustainability indicators (SoI1, SoI2, …, SoI9, EcI1, EcI2,…, EcI9, EnI1, EnI2,…, EnI12), as well as seven criteria (C1, C2, …,C7) were obtained from the various investigations in the literature (e.g., [22,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64]) and the consensus opinion of the group members (Table 4 and Table 5). Furthermore, the project manager utilizing Table 1 specifies the experts’ risk attitude according to his or her recognition of them. The outcomes are represented in Table 6 (Step 4).

3. Results

The primary decision matrices are constructed by experts employing linguistic terms in Table 2. The matrices are shown in Table 7 (Step 5). Afterward, the primary decision matrices are converted to decision matrices taking into account each expert’s risk attitude according to Table 1 (Table 8) (Step 6). Owing to space limitations, only the outcomes associated with three SIs (SoI6, EcI4 and EnI10) are shown as a sample of each dimension of sustainability in some of the following tables.
Then, each expert’s entropy-weight and aggregated TIF decision matrix is calculated. The outcomes of these steps are represented in Table 9 and Table 10, respectively (Steps 7 and 8). In addition, the criteria weight vector is achieved according to experts’ preferences and is illustrated in Table 11 (Step 9). According to steps 10 to 12, based on criteria weight vector, expert’s risk attitude and expert’s entropy-weight, the TIF criteria weight vectors are built. The results are presented in Table 12. Next, the TIF PIS and NIS vectors are specified as given in Table 13 (Step 13). Then, as shown in Table 14, the PISE matrix ( D * ) and NISE matrix ( D ) are built (Step 14).
Ultimately, the A i ,   B i , A i , B i , κ i and ϑ i values are calculated ( χ and ψ are considered 0.5). Then, the novel ranking score is calculated ( η considered 0.5), and SIs are prioritized according to ranking score ( i values). The gathered results are presented in Table 15 (Step 15 to 18).

4. Discussion

The results achieved from the presented approach are examined comprehensively, and the accuracy, precision, and sensitivity of the answers are investigated in this section. A thorough sensitivity analysis is performed on ten SIs with a higher priority for various values of approach variables. Furthermore, the comparisons are made between the outcomes of the presented approach and other cited literature.

4.1. Sensitivity Analysis

A comprehensive sensitivity analysis is conducted in this subsection. First, the sensitivity of ranking score ( values) and ranking orders are investigated for values of χ ,   ψ and η ranging from 0 to 1 (Figure 2 and Figure 3).
In Figure 2a,b, the values and ranking orders are represented for various values of χ and ψ ranging from 0 to 1, respectively. As represented in Figure 2a, the graph of the values for various SIs versus χ and ψ values ranging from 0 to 1 has three states of almost constant, ascending or descending. However, in most cases, the graphs of indicators are parallel, and only a few intersections are represented for χ and ψ values above 0.7.
As can be seen in Figure 2b, changing the graph for χ and ψ values above 0.7 leads to few changes in the ranking order of SIs. In addition, for variations of χ and ψ between 0.2 and 0.7, the rank of all SIs remains unchanged, and also a set of the top ten SIs remains in a range from 1 to 10. Hence, the conclusion can be drawn that the top ten SIs have the lowest sensitivity to the values of χ and ψ between 0.2 and 0.7, and the assumed value of 0.5 for this variable in the case study is suitable.
In Figure 3a,b, values and ranking orders versus η values ranging from 0 to 1 are represented, respectively. Figure 3a represents that the graph of values for all SIs is ascending by increasing the η value from 0 to 1. However, according to the figure, the gap between the values of increases by decreasing η . Thus, for smaller values of η, the gap between the values of different SIs is larger, allowing an accurate distinction for decision-makers. In addition, according to Figure 3b, it can be concluded that the ranking order of all top SIs is constant for η values other than EnI2 for the value of η = 0.2 .
With these in mind, this conclusion can be drawn that values and ranking orders have no sensitivity to η . Hence, choosing 0.5 as a median number of the interval for η in the case study is a suitable choice.

4.2. Comparison between the Proposed Approach and Other Cited Literature

To validate the presented approach outcomes, a comparison is made between the achieved results by the proposed approach and the traditional fuzzy MCDM methods. Table 16 shows the outcomes of this comparison. The comparison results for the top ten SIs are also represented in Figure 4.
As presented in Table 16 and Figure 4, the priority of SIs derived from the presented approach is not very different from other methods in most cases (in most cases, the number of ranks is changed by up to three or four rank shifts in SIs priority). Besides, EcI4 has the first priority in all methods, and EnI5 has the last priority in the presented approach and all methods. For the ten first priorities that are key indicators, despite some changes of ranks (at most four ranks) in some methods, the priorities of indicators remain within the ten first priorities except EnI2. Furthermore, as can be observed in the figure, most key indicators have the same ranks in the proposed approach and all traditional methods. However, SoI4 had relatively more changes, which can be considered as the most sensitive key indicator.
From the above, the conclusion can be drawn that the proposed approach is reliable and its results benefit from the merits of taking into account risk attitudes of experts, concepts of entropy in determining weights of experts, and a new TIFS-ranking approach concurrently.
As another aspect, the results of the approach for ten SIs with a higher priority are compared with the indicators provided by seven cited literature studies and tools. The comparison results are indicated in Table 17.
As presented in Table 17, most of the ten first priorities have been utilized as SIs’ assessment in the cited literature. Much higher adaptation is related to Yao et al. [59] and Envision [64] and less adaptation is related to Awasthi et al. [47]. Three SIs of ten key indicators, SoI1, SoI4 and EnI2, exist in all cited literature. In addition, EnI10 is introduced in all the literature except Awasthi et al. [47]. In addition, it can be observed that the social and environmental indicators have been incorporated in all cited tools (except SoI6 in Invest) but economic indicators have not been considered in the cited tools (except EcI4). These comparisons demonstrate that the outcomes of the approach are reliable and can be employed in a sustainable assessment of highway construction projects.

5. Concluding Remarks

Analyzing sustainability indicators (SIs) in construction projects between different potential indicators and considering various assessment criteria concurrently can be considered as a complicated group decision problem. A new triangular intuitionistic fuzzy set (TIFS) group decision approach for the multi-criteria evaluation is presented in this study to deal with this problem under uncertainty. A novel multi-criteria group decision-making approach considers experts’ risk attitudes and views and entropy concepts were developed in the TIFS environment. Furthermore, new ranking scores were proposed through similarity to ideal solutions by the concept of closeness coefficient to prioritize and choose the sustainable indicators. A case study regarding highway construction projects was presented to analyze the sustainable indicators under uncertainty. The considered case study was solved using the introduced group-decision approach.
The primary aim of this paper is to present a sound approach for the assessment and adoption of SIs in highway construction projects. The principal novelties of this study are as follows:
  • To cope with uncertainty in highway construction projects, triangular intuitionistic fuzzy sets (TIFSs) are used. The TIFSs make the process of decision-making more flexible regarding degrees of agreement, disagreement, and hesitancy utilizing a triangular function.
  • Risk attitudes of experts are considered within the assessment and process of group decision-making because they can have various perspectives, such as optimistic or pessimistic, in their views owing to their various backgrounds and characteristics.
  • A novel methodology is proposed to specify experts’ weights within the process of group decision-making based on the concepts of entropy.
  • A new compromise ranking score is proposed to evaluate and choose sustainability indicators in highway construction projects.
Ultimately, some sensitivity analyses were performed on the preference order ranking of the top ten SIs in a case study according to the change of approach coefficients and different risk attitudes of experts. The drawn conclusion of the sensitivity analyses was that approach coefficients selected in the case study were suitable choices. Moreover, the presented approach was compared with the traditional fuzzy MCDM techniques, including fuzzy SAW and fuzzy VIKOR. The computational results represented that there was no major difference between the proposed approach and other fuzzy MCDM techniques regarding the priority of SIs in most cases. In addition, both the first and last priorities derived from this approach were the same in all the aforementioned methods.
The introduced comprehensive approach has proposed an efficient decision-making method for highway construction regarding sustainable development principles. In fact, it presented a dependable model in which the results benefited from the merits of taking into account the risk attitudes of experts and the new TIFS-ranking method. Furthermore, the applied fundamental concepts were intelligible to the committee of experts and project managers, and the required calculations were straightforward. Hence, by introducing evaluated sustainable indicators, this paper helps project managers improve highway projects’ sustainability and make the most sustainable decisions. As future research, a holistic framework can be developed that utilizes the mentioned criteria and considers environmental and social impacts as criteria in the evaluation of sustainability indicators. In addition, the ranked SIs with higher priority can be used as key indicators in the sustainability assessment of highway construction projects.

Author Contributions

H.H. presented the research methodology, performed the development and experiments of this study; P.G. and F.N. provided extensive advice throughout the study. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Conflicts of Interest

The authors declare no conflict of interest.

Appendix A

Definition A1.
[68] The membership function of TIFN A ˜ = ( a , b , c ) ; μ , ν is defined as follows:
μ A ˜ ( x ) = { x a b a μ i f   a x < b μ i f   x = b c x c b μ i f   b < x c 0 o t h e r w i s e
and non-membership function is defined as follows:
ν A ˜ ( x ) = { b x + ( x a ) ν b a i f   a x < b ν i f   x = b x b + ( c x ) ν c b i f   b < x c 0 o t h e r w i s e
where a , b and c are real numbers, 0 μ 1 , 0 ν 1 and 0 μ + ν 1 .
Definition A2.
[44] Let A ˜ = ( a , b , c ) ; μ , ν   and B ˜ = ( a , b , c ) ; μ , ν   be two TIFNs, then the arithmetic operations are defined as follows:
A ˜ B ˜ = ( a + a , b + b , c + c ) ; μ + μ μ . μ , ν . ν ,
A ˜ B ˜ = ( a . a , b . b , c . c ) ; μ . μ , ν + ν ν . ν ,
λ A ˜ = ( λ a , λ b , λ c ) ; 1 ( 1 μ ) λ , ν λ   ( λ 0 ) ,
A ˜ λ = ( a λ , b λ , c λ ) ; μ λ , 1 ( 1 ν ) λ   ( λ 0 ) .

References

  1. WCED. Our Common Future-Brundtland Report; Oxford University Press: Oxford, UK, 1987. [Google Scholar]
  2. Shen, L.Y.; Li Hao, J.; Tam, V.W.Y.; Yao, H. A checklist for assessing sustainability performance of construction projects. J. Civ. Eng. Manag. 2007, 13, 273–281. [Google Scholar] [CrossRef]
  3. Yu, W.D.; Cheng, S.T.; Ho, W.C.; Chang, Y.H. Measuring the sustainability of construction projects throughout their lifecycle: A Taiwan lesson. Sustainability 2018, 10, 1523. [Google Scholar] [CrossRef] [Green Version]
  4. Goubran, S.; Cucuzzella, C. Integrating the sustainable development goals in building projects. J. Sustain. Res. 2019, 1, e190010. [Google Scholar] [CrossRef] [Green Version]
  5. Karaca, F.; Guney, M.; Kumisbek, A.; Kaskina, D.; Tokbolat, S. A new stakeholder opinion-based rapid sustainability assessment method (RSAM) for existing residential buildings. Sustain. Cities Soc. 2020, 60, 102155. [Google Scholar] [CrossRef]
  6. Li, H.; Zhang, X.; Ng, S.T.; Skitmore, M. Quantifying stakeholder influence in decision/evaluations relating to sustainable construction in China—A Delphi approach. J. Clean. Prod. 2018, 173, 160–170. [Google Scholar] [CrossRef] [Green Version]
  7. Omer, M.A.; Noguchi, T. A conceptual framework for understanding the contribution of building materials in the achievement of Sustainable Development Goals (SDGs). Sustain. Cities Soc. 2020, 52, 101869. [Google Scholar] [CrossRef]
  8. Xu, X.; Wang, Y.; Tao, L. Comprehensive evaluation of sustainable development of regional construction industry in China. J. Clean. Prod. 2019, 211, 1078–1087. [Google Scholar] [CrossRef]
  9. Illankoon, I.C.S.; Tam, V.W.; Le, K.N. United Nation’s sustainable development goals: Establishing baseline for Australian building sector. Intell. Build. Int. 2020. [Google Scholar] [CrossRef]
  10. Olawumi, T.O.; Chan, D.W.; Chan, A.P.; Wong, J.K. Development of a building sustainability assessment method (BSAM) for developing countries in sub-Saharan Africa. J. Clean. Prod. 2020, 263, 121514. [Google Scholar] [CrossRef]
  11. Mansell, P.; Philbin, S.P.; Broyd, T.; Nicholson, I. Assessing the impact of infrastructure projects on global sustainable development goals. Proc. Inst. Civ. Eng. Eng. Sustain. 2020, 173, 196–212. [Google Scholar] [CrossRef]
  12. Mousavi, S.M.; Tavakkoli-Moghaddam, R.; Azaron, A.; Mojtahedi, S.M.H.; Hashemi, H. Risk assessment for highway projects using jackknife technique. Expert Syst. Appl. 2011, 38, 5514–5524. [Google Scholar] [CrossRef]
  13. Ghoddousi, P.; Nasirzadeh, F.; Hashemi, H. Evaluating Highway Construction Projects’ Sustainability Using a Multicriteria Group Decision-Making Model Based on Bootstrap Simulation. J. Constr. Eng. Manag. 2018, 144, 04018092. [Google Scholar] [CrossRef]
  14. Hendiani, S.; Bagherpour, M. Developing an integrated index to assess social sustainability in construction industry using fuzzy logic. J. Clean. Prod. 2019, 230, 647–662. [Google Scholar] [CrossRef]
  15. Rostamnezhad, M.; Nasirzadeh, F.; Khanzadi, M.; Jarban, M.J.; Ghayoumian, M. Modeling social sustainability in construction projects by integrating system dynamics and fuzzy-DEMATEL method: A case study of highway project. Eng. Constr. Archit. Manag. 2020, 27, 1595–1618. [Google Scholar] [CrossRef]
  16. Hashemi, H.; Mousavi, S.M.; Zavadskas, E.K.; Chalekaee, A.; Turskis, Z. A new group decision model based on grey-intuitionistic fuzzy-ELECTRE and VIKOR for contractor assessment problem. Sustainability 2018, 10, 1635. [Google Scholar] [CrossRef] [Green Version]
  17. Mousavi, S.M.; Antuchevičienė, J.; Zavadskas, E.K.; Vahdani, B.; Hashemi, H. A new decision model for cross-docking center location in logistics networks under interval-valued intuitionistic fuzzy uncertainty. Transport 2019, 34, 30–40. [Google Scholar] [CrossRef] [Green Version]
  18. Stojčić, M.; Zavadskas, E.K.; Pamučar, D.; Stević, Ž.; Mardani, A. Application of MCDM methods in sustainability engineering: A literature review 2008–2018. Symmetry 2019, 11, 350. [Google Scholar] [CrossRef] [Green Version]
  19. Zavadskas, E.K.; Antucheviciene, J.; Kar, S. Multi-Objective and Multi-Attribute Optimization for Sustainable Development Decision Aiding. Sustainability 2019, 11, 3069. [Google Scholar] [CrossRef] [Green Version]
  20. Hashemi, H.; Bazargan, J.; Mousavi, S.M.; Vahdani, B. An extended compromise ratio model with an application to reservoir flood control operation under an interval-valued intuitionistic fuzzy environment. Appl. Math. Model. 2014, 38, 3495–3511. [Google Scholar] [CrossRef]
  21. Huang, R.Y.; Yeh, C.H. Development of an assessment framework for green highway construction. J. Chin. Inst. Eng. 2008, 31, 573–585. [Google Scholar] [CrossRef]
  22. Chen, Y.; Okudan, G.E.; Riley, D.R. Sustainable performance criteria for construction method selection in concrete buildings. Autom. Constr. 2010, 19, 235–244. [Google Scholar] [CrossRef]
  23. Reza, B.; Sadiq, R.; Hewage, K. Sustainability assessment of flooring systems in the city of Tehran: An AHP-based life cycle analysis. Constr. Build. Mater. 2011, 25, 2053–2066. [Google Scholar] [CrossRef]
  24. Waris, M.; Liew, M.S.; Khamidi, M.F.; Idrus, A. Criteria for the selection of sustainable onsite construction equipment. Int. J. Sustain. Built Environ. 2014, 3, 96–110. [Google Scholar] [CrossRef] [Green Version]
  25. Li, Y.; Zhao, L.; Suo, J. Comprehensive assessment on sustainable development of highway transportation capacity based on entropy weight and TOPSIS. Sustainability 2014, 6, 4685–4693. [Google Scholar] [CrossRef] [Green Version]
  26. Kucukvar, M.; Gumus, S.; Egilmez, G.; Tatari, O. Ranking the sustainability performance of pavements: An intuitionistic fuzzy decision making method. Autom. Constr. 2014, 40, 33–43. [Google Scholar] [CrossRef]
  27. Medineckiene, M.; Zavadskas, E.K.; Björk, F.; Turskis, Z. Multi-criteria decision-making system for sustainable building assessment/certification. Arch. Civ. Mech. Eng. 2015, 15, 11–18. [Google Scholar] [CrossRef]
  28. Kamali, M.; Hewage, K. Development of performance criteria for sustainability evaluation of modular versus conventional construction methods. J. Clean. Prod. 2017, 142, 3592–3606. [Google Scholar] [CrossRef]
  29. Pan, M.; Linner, T.; Pan, W.; Cheng, H.; Bock, T. A framework of indicators for assessing construction automation and robotics in the sustainability context. J. Clean. Prod. 2018, 182, 82–95. [Google Scholar] [CrossRef] [Green Version]
  30. Zolfani, S.H.; Pourhossein, M.; Yazdani, M.; Zavadskas, E.K. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework. Alex. Eng. J. 2018, 57, 357–365. [Google Scholar] [CrossRef]
  31. Liu, S.; Qian, S. Towards sustainability-oriented decision making: Model development and its validation via a comparative case study on building construction methods. Sustain. Dev. 2019, 27, 860–872. [Google Scholar] [CrossRef]
  32. Reddy, A.S.; Kumar, P.R.; Raj, P.A. Preference based multi-criteria framework for developing a Sustainable Material Performance Index (SMPI). Int. J. Sustain. Eng. 2019, 12, 390–403. [Google Scholar] [CrossRef]
  33. Chen, C.H. A new multi-criteria assessment model combining GRA techniques with intuitionistic fuzzy entropy-based TOPSIS method for sustainable building materials supplier selection. Sustainability 2019, 11, 2265. [Google Scholar] [CrossRef] [Green Version]
  34. Roy, J.; Das, S.; Kar, S.; Pamučar, D.; Roy, J.; Das, S.; Kar, S.; Pamučar, D. An extension of the CODAS approach using interval-valued intuitionistic fuzzy set for sustainable material selection in construction projects with incomplete weight information. Symmetry 2019, 11, 393. [Google Scholar] [CrossRef] [Green Version]
  35. Tseng, M.L.; Lin, S.; Chen, C.C.; Sarmiento, L.S.C.; Tan, C.L. A causal sustainable product-service system using hierarchical structure with linguistic preferences in the Ecuadorian construction industry. J. Clean. Prod. 2019, 230, 477–487. [Google Scholar] [CrossRef]
  36. Alawneh, R.; Ghazali, F.; Ali, H.; Sadullah, A.F. A novel framework for integrating United Nations Sustainable Development Goals into sustainable non-residential building assessment and management in Jordan. Sustain. Cities Soc. 2019, 49, 101612. [Google Scholar] [CrossRef]
  37. Dabous, S.A.; Zeiada, W.; Zayed, T.; Al-Ruzouq, R. Sustainability-informed multi-criteria decision support framework for ranking and prioritization of pavement sections. J. Clean. Prod. 2020, 244, 118755. [Google Scholar] [CrossRef]
  38. Rahimi, S.; Hafezalkotob, A.; Monavari, S.M.; Hafezalkotob, A.; Rahimi, R. Sustainable landfill site selection for municipal solid waste based on a hybrid decision-making approach: Fuzzy group BWM-MULTIMOORA-GIS. J. Clean. Prod. 2020, 248, 119186. [Google Scholar] [CrossRef]
  39. Navarro, I.J.; Yepes, V.; Martí, J.V. Sustainability assessment of concrete bridge deck designs in coastal environments using neutrosophic criteria weights. Struct. Infrastruct. Eng. 2020, 16, 949–967. [Google Scholar] [CrossRef]
  40. Ebrahimnejad, S.; Mousavi, S.M.; Tavakkoli-Moghaddam, R.; Hashemi, H.; Vahdani, B. A novel two-phase group decision making approach for construction project selection in a fuzzy environment. Appl. Math. Model. 2012, 36, 4197–4217. [Google Scholar] [CrossRef]
  41. Fenton, N.; Wang, W. Risk and confidence analysis for fuzzy multicriteria decision making. Knowl. Based Syst. 2006, 19, 430–437. [Google Scholar] [CrossRef] [Green Version]
  42. Zhang, X.; Jin, F.; Liu, P. A grey relational projection method for multi-attribute decision making based on intuitionistic trapezoidal fuzzy number. Appl. Math. Model. 2013, 37, 3467–3477. [Google Scholar] [CrossRef]
  43. Zhou, H.C.; Zhang, G.H.; Wang, G.L. Multi-objective decision making approach based on entropy weights for reservoir flood control operation. J. Hydraul. Eng. 2007, 38, 100–106. [Google Scholar]
  44. Chen, Y.; Li, B. Dynamic multi-attribute decision making model based on triangular intuitionistic fuzzy numbers. Sci. Iran. 2011, 18, 268–274. [Google Scholar] [CrossRef] [Green Version]
  45. Wan, S.P.; Wang, F.; Lin, L.L.; Dong, J.Y. Some new generalized aggregation operators for triangular intuitionistic fuzzy numbers and application to multi-attribute group decision making. Comput. Ind. Eng. 2016, 93, 286–301. [Google Scholar] [CrossRef]
  46. Wang, J.Q.; Nie, R.; Zhang, H.Y.; Chen, X.H. New operators on triangular intuitionistic fuzzy numbers and their applications in system fault analysis. Inf. Sci. 2013, 251, 79–95. [Google Scholar] [CrossRef]
  47. Awasthi, A.; Chauhan, S.S.; Omrani, H. Application of fuzzy TOPSIS in evaluating sustainable transportation systems. Expert Syst. Appl. 2011, 38, 12270–12280. [Google Scholar] [CrossRef]
  48. Diabat, A.; Kannan, D.; Mathiyazhagan, K. Analysis of enablers for implementation of sustainable supply chain management—A textile case. J. Clean. Prod. 2014, 83, 391–403. [Google Scholar] [CrossRef]
  49. Govindan, K.; Shankar, K.M.; Kannan, D. Sustainable material selection for construction industry—A hybrid multi criteria decision making approach. Renew. Sustain. Energy Rev. 2016, 55, 1274–1288. [Google Scholar] [CrossRef]
  50. Kandziora, M.; Burkhard, B.; Müller, F. Interactions of ecosystem properties, ecosystem integrity and ecosystem service indicators—A theoretical matrix exercise. Ecol. Indic. 2013, 28, 54–78. [Google Scholar] [CrossRef]
  51. Michael, F.L.; Noor, Z.Z.; Figueroa, M.J. Review of urban sustainability indicators assessment—Case study between Asian countries. Habitat Int. 2014, 44, 491–500. [Google Scholar] [CrossRef]
  52. Nasirzadeh, F.; Ghayoumian, M.; Khanzadi, M.; Rostamnezhad Cherati, M. Modelling the social dimension of sustainable development using fuzzy cognitive maps. Int. J. Constr. Manag. 2020, 20, 223–236. [Google Scholar] [CrossRef]
  53. Niemeijer, D.; de Groot, R.S. A conceptual framework for selecting environmental indicator sets. Ecol. Indic. 2008, 8, 14–25. [Google Scholar] [CrossRef]
  54. Oltean-Dumbrava, C.; Watts, G.; Miah, A. Transport infrastructure: Making more sustainable decisions for noise reduction. J. Clean. Prod. 2013, 42, 58–68. [Google Scholar] [CrossRef] [Green Version]
  55. Roy, R.; Chan, N.W. An assessment of agricultural sustainability indicators in Bangladesh: Review and synthesis. Environmentalist 2012, 32, 99–110. [Google Scholar] [CrossRef]
  56. Shen, L.Y.; Tam, V.W.; Tam, L.; Ji, Y.B. Project feasibility study: The key to successful implementation of sustainable and socially responsible construction management practice. J. Clean. Prod. 2010, 18, 254–259. [Google Scholar] [CrossRef]
  57. Shen, L.; Wu, Y.; Zhang, X. Key assessment indicators for the sustainability of infrastructure projects. J. Constr. Eng. Manag. 2010, 137, 441–451. [Google Scholar] [CrossRef] [Green Version]
  58. Ugwu, O.O.; Haupt, T.C. Key performance indicators and assessment methods for infrastructure sustainability—A South African construction industry perspective. Build. Environ. 2007, 42, 665–680. [Google Scholar] [CrossRef]
  59. Yao, H.; Shen, L.; Tan, Y.; Hao, J. Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects. Autom. Constr. 2011, 20, 1060–1069. [Google Scholar] [CrossRef]
  60. Yuan, H. Key indicators for assessing the effectiveness of waste management in construction projects. Ecol. Indic. 2013, 24, 476–484. [Google Scholar] [CrossRef]
  61. Zhao, Z.Y.; Zhao, X.J.; Davidson, K.; Zuo, J. A corporate social responsibility indicator system for construction enterprises. J. Clean. Prod. 2012, 29, 277–289. [Google Scholar] [CrossRef]
  62. CEEQUAL Version 6: Technical Manual—International Projects. Watford, UK. Available online: https://www.ceequal.com/version-6/ (accessed on 30 September 2019).
  63. Reid, L.; Bevan, T.; Davis, A.; Neuman, T.; Penney, K.; Seskin, S.; VanZerr, M.; Anderson, J.; Muench, S.; Weiland, C.; et al. Invest v1.3: Sustainable Highways Self-Evaluation Tool. Available online: https://www.sustainablehighways.org/files/4735.pdf (accessed on 12 February 2019).
  64. Envision v3: Sustainable Infrastructure Framework Manual. Available online: https://sustainableinfrastructure.org/envision-version-3/ (accessed on 18 February 2019).
  65. Opricovic, S. Fuzzy VIKOR with an application to water resources planning. Expert Syst. Appl. 2011, 38, 12983–12990. [Google Scholar] [CrossRef]
  66. Chou, S.Y.; Chang, Y.H.; Shen, C.Y. A fuzzy simple additive weighting system under group decision-making for facility location selection with objective/subjective attributes. Eur. J. Oper. Res. 2008, 189, 132–145. [Google Scholar] [CrossRef]
  67. Chu, T.C. Facility location selection using fuzzy TOPSIS under group decisions. Int. J. Uncertain. Fuzziness Knowl. Based 2002, 10, 687–701. [Google Scholar] [CrossRef]
  68. Li, D.F. A ratio ranking method of triangular intuitionistic fuzzy numbers and its application to MADM problems. Comput. Math. Appl. 2010, 60, 1557–1570. [Google Scholar] [CrossRef] [Green Version]
Figure 1. The proposed approach for the selection of sustainability indicators (SIs).
Figure 1. The proposed approach for the selection of sustainability indicators (SIs).
Sustainability 13 01477 g001
Figure 2. (a) Sensitivity analysis on the values and (b) preference ranking order of top ten SIs related to majority attributes ( χ and ψ ).
Figure 2. (a) Sensitivity analysis on the values and (b) preference ranking order of top ten SIs related to majority attributes ( χ and ψ ).
Sustainability 13 01477 g002
Figure 3. (a) Sensitivity analysis on the values and (b) preference ranking order of top ten SIs related to η coefficient.
Figure 3. (a) Sensitivity analysis on the values and (b) preference ranking order of top ten SIs related to η coefficient.
Sustainability 13 01477 g003
Figure 4. Preference order ranking of top ten SIs prioritized by the proposed approach and other fuzzy MCDM methods.
Figure 4. Preference order ranking of top ten SIs prioritized by the proposed approach and other fuzzy MCDM methods.
Sustainability 13 01477 g004
Table 1. Linguistic variables of the risk attitudes assigned to each expert for 5-scale triangular intuitionistic fuzzy numbers (TIFNs).
Table 1. Linguistic variables of the risk attitudes assigned to each expert for 5-scale triangular intuitionistic fuzzy numbers (TIFNs).
Linguistic VariablesTIFN Derived
from ( a , b ,   c ) ; μ ,   ν for Benefit Criteria
TIFN Derived
from ( a , b ,   c ) ; μ ,   ν   for Cost Criteria
Absolutely optimistic (AO) ( a ,   c ,   c ) ; μ + π ,   ν ( a ,   a ,   c ) ; μ ,   ν + π
Optimistic (O) ( a ,   ( b + c ) / 2 ,   c ) ; μ + π / 2 , ν ( a ,   ( a + b ) / 2 ,   c ) ; μ , ν + π / 2
Neutral (N) ( a , b ,   c ) ; μ ,   ν ( a , b ,   c ) ; μ ,   ν
Pessimistic (P) ( a ,   ( a + b ) / 2 ,   c ) ; μ , ν + π / 2 ( a ,   ( b + c ) / 2 ,   c ) ; μ + π / 2 , ν
Absolutely pessimistic (AP) ( a ,   a ,   c ) ; μ ,   ν + π ( a ,   c ,   c ) ; μ + π ,   ν
Table 2. Linguistic variables applied for the rating of SIs.
Table 2. Linguistic variables applied for the rating of SIs.
Linguistic VariablesTriangular Intuitionistic Fuzzy Numbers
Extremely high (EH) ( 0.95 ,   1.00 ,   1.00 ) ; 0.95 ,   0.05
Very very high (VVH) ( 0.90 ,   1.00 ,   1.00 ) ; 0.90 ,   0.10
Very high (VH) ( 0.80 ,   0.90 ,   1.00 ) ; 0.80 ,   0.10
High (H) ( 0.70 ,   0.80 ,   0.90 ) ; 0.70 ,   0.20
Medium high (MH) ( 0.50 ,   0.60 ,   0.70 ) ; 0.60 ,   0.30
Medium (M) ( 0.30 ,   0.50 ,   0.70 ) ; 0.50 ,   0.40
Medium low (ML) ( 0.30 ,   0.40 ,   0.50 ) ; 0.40 ,   0.50
Low (L) ( 0.10 ,   0.20 ,   0.30 ) ; 0.25 ,   0.60
Very low (VL) ( 0.00 ,   0.10 ,   0.20 ) ; 0.10 ,   0.75
Very very low (VVL) ( 0.00 ,   0.00 ,   0.10 ) ; 0.10 ,   0.90
Table 3. Linguistic variables applied for rating the significance of criteria.
Table 3. Linguistic variables applied for rating the significance of criteria.
Linguistic VariablesTriangular Intuitionistic Fuzzy Numbers
Very important (VI) ( 0.80 ,   0.90 ,   1.00 ) ; 0.90 ,   0.10
Important (I) ( 0.60 ,   0.70 ,   0.80 ) ; 0.75 , 0.20
Medium (M) ( 0.40 ,   0.50 ,   0.60 ) ; 0.50 ,   0.45
Unimportant (UI) ( 0.20 ,   0.30 ,   0.40 ) ; 0.35 ,   0.60
Very unimportant (VUI) ( 0.00 ,   0.10 ,   0.20 ) ; 0.10 ,   0.90
Table 4. List of obtained sustainability indicators.
Table 4. List of obtained sustainability indicators.
Sustainability IndicatorsDescription
Sustainability aspectsSocialSoI1: HealthHighlighting on-site sanitation, and the provision of health care
SoI2: EducationNumber and time of training course to different levels of employees
SoI3: Culture and heritageMeasure of negative impacts from construction operations on any cultural heritage
SoI4: SafetyNumber of accidents, the supply rate of on-site supervision and training course to employees to provide a safe and reliable workplace
SoI5: Stakeholder satisfaction Measure of stakeholder satisfaction by using stakeholder management models
SoI6: Job opportunitiesProviding direct and indirect jobs
SoI7: TourismImpacts on tourism development
SoI8: TrafficVehicle traffic congestion
SoI9: Access to public transportation Extension of public transportation services and proximity to it
EconomicEcI1: Net present value (NPV) N P V = t = 1 n R t ( 1 + i ) t where Rt is the net cash inflow-outflows during a single period t, i is the discount rate of return that could be earned in alternative investments and t is the number of time periods
EcI2: Payback periodInitial Investment/Net Cash Flow per Period
EcI3: Investment planningCompliance with the investment plan
EcI4: Benefit–cost ratioRelationship between the relative costs and benefits of a proposed project expressed in monetary or qualitative terms
EcI5: Debt–asset ratio(Short-term Debt + Long-term Debt)/Total Assets
EcI6: Project budgetCompliance with budget
EcI7: Internal rate of return (IRR) N P V = t = 1 T C t ( 1 + I R R ) t C 0 = 0 where C t is the net cash inflow during the period t, C 0 is the total initial investment cost and t is the number of time periods
EcI8: Financial riskPossibility of losing money on the investment
EcI9: Life-cycle costTotal cost for a construction project over its life
EnvironmentalEnI1: Material consumption Efficiency rate of using materials and resources
EnI2: Air pollutionMeasure of mixture of solid particles and gases in the air
EnI3: landscape respect Protection of landscape features during construction
EnI4: Noise emissionsRate of noise pollution during the construction phase in the environment of the project
EnI5: ErosionRate of soil erosion during the construction phase in the environment of the project
EnI6: Ecological impactsMeasure of negative impacts from project to flora, fauna, and ecosystems
EnI7: Habitat loss and damageDestructive effects on the living environment for both human being and animals
EnI8: Soil contamination Measure of alteration in the physical, chemical and biological characteristics of the soil environment
EnI9: Aesthetical and visual impactsAesthetic quality of the project during the construction phase
EnI10: Water pollution Measure of alteration in the physical, chemical and biological characteristics of water environment
EnI11: Water saving Rate of reduction water consumption during the construction phase
EnI12: Hazardous wasteProduction rate of hazardous waste
Table 5. List of obtained criteria.
Table 5. List of obtained criteria.
CriteriaCriteria TypeDescription
BenefitCost
C1: Measurability Measurability in qualitative or quantitative terms
C2: Applicability Practicality and straightforward use of sustainability indicator (SI) for evaluation
C3: Data availability Relative simplicity to gather the necessary data for evaluation of SI
C4: Acceptant Acceptance of SI by major stakeholders
C5: Complexity Relative difficulty in meaningful interpretation of SI
C6: Time consuming Required time for the evaluation of SI
C7: Uncertainty Ambiguity in assigning the value to SI during evaluation
Table 6. Experts’ risk attitudes.
Table 6. Experts’ risk attitudes.
ExpertsE1E2E3E4E5
Risk attitudesNeutralAbsolutely optimisticPessimisticOptimisticNeutral
Table 7. Performance rating of each indicator versus each criterion based on experts’ views in terms of linguistic terms.
Table 7. Performance rating of each indicator versus each criterion based on experts’ views in terms of linguistic terms.
SIsExpertsCriteria
C1C2C3C4C5C6C7
SoI1E1HVHMLVHLVLM
E2HVHMVVHVLVLMH
E3VHHMVVHVLVVLM
E4HVVHMHVHVVLLML
E5VHVVHMVVHVVLVLML
SoI2E1HMLMHHLLM
E2MMMMHVLMLM
E3MHMHHLMLML
E4MMLMMHMLMM
E5MHLMHMHLMLM
SoI3E1VLMLMHMHHMHVH
E2LLHHMHHH
E3VVLLHVHVHHVH
E4VLVLVHHHMHVH
E5VLLVHVHMHMHH
SoI4E1HMHHHMLLML
E2VHMHVHVHMVVLL
E3HMVVHVHMLVLML
E4HMVHHLVVLL
E5VHMHVHVVHMLVLL
SoI5E1LHMLVHVHHH
E2VLVHLHHMHVVH
E3MLVHVLVVHHVHVH
E4MLVVHVLVHVHHVH
E5LVVHMLVHVVHVHH
SoI6E1VHVHHMHLLL
E2MHHHHVLMLL
E3HHMHMHVLLM
E4HVHMHMLMLM
E5VHVVHHHLLL
SoI7E1VHMHMHLMHH
E2VHHMMHVLMHVH
E3VVHHMLVHVLHH
E4VHMHMLHVVLHMH
E5VVHMHMLHVLVHMH
SoI8E1HMHMMHLHVH
E2MHHMHMHVLVHVVH
E3HHMHMVLHVH
E4HVHMHMVVLVHVVH
E5VHHMHLVHVH
SoI9E1VHMHLMLVLMH
E2HHMLMHVLMLM
E3VHMHMLMLVLLM
E4HVHMLMVLLH
E5HHMMVVLMLMH
EcI1E1EHEHHMLVLVVLH
E2EHVVHVVHMVVLVVLMH
E3EHEHVHMHVLVVLMH
E4EHVHVHMHVVLVVLM
E5EHEHVVHMLVVLVVLH
EcI2E1VVHHHMLVLMH
E2VHVHHMLVLLH
E3VHHHLLLVH
E4VHHHLLVLH
E5VVHHVHMLVLVLVH
EcI3E1HMHMHLMMLH
E2MHMHMVLMMLMH
E3HHMLMHMVH
E4VHHMLVLMHMMH
E5VHHMMLMHMHH
EcI4E1EHEHVHMLMLML
E2EHVVHVVHMHMLLM
E3EHVVHVVHMLLML
E4EHEHVVHMHLMLML
E5EHEHEHMHVLLL
EcI5E1VHHHMLLMLH
E2HHMHLLMLMH
E3VVHMHHLMLMMH
E4HMHMHLLMH
E5HHMHMLLMMH
EcI6E1HVHHMLLMMH
E2VHVHHMVLMHH
E3HHMHMLVVLMH
E4VHVHVHMLVLMHMH
E5VHVVHVHMVVLMLH
EcI7E1VVHEHVHMLVLVLMH
E2EHEHVHMLVVLVLH
E3EHEHVHMVVLVLMH
E4EHEHHMVLVVLMH
E5EHEHVVHMHVVLVVLML
EcI8E1MLVVHMMLHMHEH
E2MHMLMLMHMHVVH
E3MHMLLMHHVH
E4MLMHMLMHVVH
E5MVVHMMLMMHVH
EcI9E1MHHMMHMVHH
E2MHVHMLHMLHVH
E3HVHMLHMHVHVH
E4HHLVHMLVVHH
E5HVVHMLHMHMHMH
EnI1E1HMHHMHLLH
E2HMHVHMLLVLMH
E3HMHHMLVLVLM
E4HHVHMHLLH
E5VHHVVHMVLVVLM
EnI2E1VHVHMLMHMMLVH
E2HHMHMHMHMH
E3HHMHHMMLVH
E4VHVHMLHMHMLH
E5HVVHMHHMLH
EnI3E1MLLMLMMHHVH
E2LLMLMHHHH
E3LMLMLMMHVHMH
E4VLLMLMHHMH
E5MLMLMMHMHHVH
EnI4E1MMLMMLMHH
E2MHMLVLMHMMH
E3MLMLLMMLMLMH
E4MLMLMLMLMVH
E5MHMMLMHLMLMH
EnI5E1MHMLLMLHHVH
E2MLVLLMHVHH
E3MLVLVLLHVHVH
E4MLLLVLVHHH
E5MHLMLMLMHHMH
EnI6E1MHHMMHHH
E2MMHMLMHVHMHVH
E3MHMMHMHH
E4MHHMMLVHHMH
E5HVHMHMHVVHVHMH
EnI7E1MLMHMLMMLMHH
E2MMLLMLMLMMH
E3MHMHMLLMMHMH
E4MMHMLMMH
E5MHMMMMLMH
EnI8E1HVHHMHMLMHH
E2MHHMHMHMLMMH
E3HMHMHVLMH
E4MHMHMHHMLMHVH
E5VHVHHHLMLMH
EnI9E1MMHMLMHMHMVH
E2MLHLHHMH
E3MLMHVLHHMHH
E4MLMHLVHMHHMH
E5MHMLVHMHMMH
EnI10E1HHMHHMMM
E2VHHHHMMHMH
E3HMHMVHMMMH
E4VHHMHMLMHM
E5VVHVHMHVHMLMML
EnI11E1HHMHHVLMH
E2HMHHMHVLMLVH
E3HMHMHHVLMHH
E4HHMMHLMLH
E5VHVHMHVHVLMLMH
EnI12E1VHLMHMHVLMLVH
E2HMLMHLLH
E3MHLHMVLMLVH
E4MHMLMHMHVLMLH
E5HLHHVVLLMH
Table 8. Experts’ view concerning the rating of sample indicators with respect to the criteria by taking into account each expert’s risk attitude.
Table 8. Experts’ view concerning the rating of sample indicators with respect to the criteria by taking into account each expert’s risk attitude.
CriteriaExpertsSIs
SoI6EcI4EnI10
C1E1 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200
E2 ( 0.500 ,   0.700 ,   0.700 ) ; 0.700 ,   0.300 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.800 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100
E3 ( 0.700 ,   0.750 ,   0.900 ) ; 0.700 ,   0.250 ( 0.950 ,   0.975 ,   1.000 ) ; 0.950 ,   0.050 ( 0.700 ,   0.750 ,   0.900 ) ; 0.700 ,   0.250
E4 ( 0.700 ,   0.850 ,   0.900 ) ; 0.750 ,   0.200 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.800 ,   0.950 ,   1.000 ) ; 0.850 ,   0.100
E5 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.900 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100
C2E1 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200
E2 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200 ( 0.900 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200
E3 ( 0.700 ,   0.750 ,   0.900 ) ; 0.700 ,   0.250 ( 0.900 ,   0.950 ,   1.000 ) ; 0.900 ,   0.100 ( 0.500 ,   0.550 ,   0.700 ) ; 0.600 ,   0.350
E4 ( 0.800 ,   0.950 ,   1.000 ) ; 0.850 ,   0.100 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.700 ,   0.850 ,   0.900 ) ; 0.750 ,   0.200
E5 ( 0.900 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100
C3E1 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100 ( 0.500 ,   0.600 ,   0.700 ) ; 0.600 ,   0.300
E2 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200 ( 0.900 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200
E3 ( 0.500 ,   0.550 ,   0.700 ) ; 0.600 ,   0.350 ( 0.900 ,   0.950 ,   1.000 ) ; 0.900 ,   0.100 ( 0.300 ,   0.400 ,   0.700 ) ; 0.500 ,   0.450
E4 ( 0.500 ,   0.650 ,   0.700 ) ; 0.650 ,   0.300 ( 0.900 ,   1.000 ,   1.000 ) ; 0.900 ,   0.100 ( 0.300 ,   0.600 ,   0.700 ) ; 0.550 ,   0.400
E5 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200 ( 0.950 ,   1.000 ,   1.000 ) ; 0.950 ,   0.050 ( 0.500 ,   0.600 ,   0.700 ) ; 0.600 ,   0.300
C4E1 ( 0.500 ,   0.600 ,   0.700 ) ; 0.600 ,   0.300 ( 0.300 ,   0.500 ,   0.700 ) ; 0.500 ,   0.400 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200
E2 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200 ( 0.500 ,   0.700 ,   0.700 ) ; 0.700 ,   0.300 ( 0.700 ,   0.900 ,   0.900 ) ; 0.800 ,   0.200
E3 ( 0.500 ,   0.550 ,   0.700 ) ; 0.600 ,   0.350 ( 0.300 ,   0.400 ,   0.700 ) ; 0.500 ,   0.450 ( 0.800 ,   0.850 ,   1.000 ) ; 0.800 ,   0.150
E4 ( 0.300 ,   0.600 ,   0.700 ) ; 0.550 ,   0.400 ( 0.500 ,   0.650 ,   0.700 ) ; 0.650 ,   0.300 ( 0.700 ,   0.850 ,   0.900 ) ; 0.750 ,   0.200
E5 ( 0.700 ,   0.800 ,   0.900 ) ; 0.700 ,   0.200 ( 0.500 ,   0.600 ,   0.700 ) ; 0.600 ,   0.300 ( 0.800 ,   0.900 ,   1.000 ) ; 0.800 ,   0.100
C5E1 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.300 ,   0.500 ,   0.700 ) ; 0.500 ,   0.400
E2 ( 0.000 ,   0.000 ,   0.200 ) ; 0.100 ,   0.900 ( 0.300 ,   0.300 ,   0.500 ) ; 0.400 ,   0.600 ( 0.300 ,   0.300 ,   0.700 ) ; 0.500 ,   0.500
E3 ( 0.000 ,   0.100 ,   0.200 ) ; 0.175 ,   0.750 ( 0.100 ,   0.167 ,   0.300 ) ; 0.325 ,   0.600 ( 0.300 ,   0.400 ,   0.700 ) ; 0.550 ,   0.400
E4 ( 0.100 ,   0.150 ,   0.300 ) ; 0.250 ,   0.675 ( 0.100 ,   0.150 ,   0.300 ) ; 0.250 ,   0.675 ( 0.300 ,   0.350 ,   0.500 ) ; 0.400 ,   0.550
E5 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.000 ,   0.100 ,   0.200 ) ; 0.100 ,   0.750 ( 0.300 ,   0.400 ,   0.500 ) ; 0.400 ,   0.500
C6E1 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.300 ,   0.400 ,   0.500 ) ; 0.400 ,   0.500 ( 0.300 ,   0.500 ,   0.700 ) ; 0.500 ,   0.400
E2 ( 0.300 ,   0.300 ,   0.500 ) ; 0.400 ,   0.600 ( 0.100 ,   0.100 ,   0.300 ) ; 0.250 ,   0.750 ( 0.500 ,   0.500 ,   0.700 ) ; 0.600 ,   0.400
E3 ( 0.100 ,   0.167 ,   0.300 ) ; 0.325 ,   0.600 ( 0.100 ,   0.167 ,   0.300 ) ; 0.325 ,   0.600 ( 0.300 ,   0.400 ,   0.700 ) ; 0.550 ,   0.400
E4 ( 0.300 ,   0.350 ,   0.500 ) ; 0.400 ,   0.550 ( 0.300 ,   0.350 ,   0.500 ) ; 0.400 ,   0.550 ( 0.500 ,   0.550 ,   0.700 ) ; 0.600 ,   0.350
E5 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.300 ,   0.500 ,   0.700 ) ; 0.500 ,   0.400
C7E1 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.300 ,   0.400 ,   0.500 ) ; 0.400 ,   0.500 ( 0.300 ,   0.500 ,   0.700 ) ; 0.500 ,   0.400
E2 ( 0.100 ,   0.100 ,   0.300 ) ; 0.250 ,   0.750 ( 0.300 ,   0.300 ,   0.700 ) ; 0.500 ,   0.500 ( 0.500 ,   0.500 ,   0.700 ) ; 0.600 ,   0.400
E3 ( 0.300 ,   0.400 ,   0.700 ) ; 0.550 ,   0.400 ( 0.300 ,   0.300 ,   0.500 ) ; 0.450 ,   0.500 ( 0.500 ,   0.433 ,   0.700 ) ; 0.650 ,   0.300
E4 ( 0.300 ,   0.400 ,   0.700 ) ; 0.500 ,   0.450 ( 0.300 ,   0.350 ,   0.500 ) ; 0.400 ,   0.550 ( 0.300 ,   0.400 ,   0.700 ) ; 0.500 ,   0.450
E5 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.100 ,   0.200 ,   0.300 ) ; 0.250 ,   0.600 ( 0.300 ,   0.400 ,   0.500 ) ; 0.400 ,   0.500
Table 9. Entropy-weight assigned to each expert.
Table 9. Entropy-weight assigned to each expert.
SIsExpertsCriteria
C1C2C3C4C5C6C7
SoI6E10.1960.1990.1970.2020.1870.2060.208
E20.2070.2020.1950.1930.2280.1910.217
E30.2020.2050.2070.2040.2080.2050.184
E40.1990.1980.2040.2070.1900.1900.184
E50.1960.1970.1970.1940.1870.2060.208
EcI4E10.2000.1990.2020.2040.1960.1880.196
E20.2000.2010.2000.1950.1870.2140.193
E30.2000.2010.2000.2070.1950.2040.197
E40.2000.1990.2000.1960.2000.1890.198
E50.2000.1990.1980.1970.2220.2050.217
EnI10E10.2040.1990.1990.2020.1960.2020.200
E20.1970.1970.1910.2000.2000.1980.196
E30.2050.2100.2080.1990.1960.2020.195
E40.1980.1980.2030.2010.2050.1970.202
E50.1970.1950.1990.1980.2030.2020.208
Table 10. Aggregated triangular intuitionistic fuzzy (TIF) decision matrix ( R ˜ ).
Table 10. Aggregated triangular intuitionistic fuzzy (TIF) decision matrix ( R ˜ ).
CriteriaSIs
SoI6EcI4EnI10
C1 ( 0.688 ,   0.814 ,   0.890 ) ; 0.748 ,   0.196 ( 0.950 ,   0.995 ,   1.000 ) ; 0.950 ,   0.050 ( 0.775 ,   0.892 ,   0.958 ) ; 0.803 ,   0.154
C2 ( 0.776 ,   0.895 ,   0.958 ) ; 0.806 ,   0.153 ( 0.930 ,   0.990 ,   1.000 ) ; 0.930 ,   0.070 ( 0.670 ,   0.784 ,   0.872 ) ; 0.724 ,   0.216
C3 ( 0.610 ,   0.726 ,   0.812 ) ; 0.685 ,   0.254 ( 0.888 ,   0.969 ,   1.000 ) ; 0.888 ,   0.090 ( 0.432 ,   0.596 ,   0.734 ) ; 0.600 ,   0.338
C4 ( 0.512 ,   0.674 ,   0.772 ) ; 0.642 ,   0.297 ( 0.405 ,   0.557 ,   0.700 ) ; 0.583 ,   0.355 ( 0.738 ,   0.859 ,   0.938 ) ; 0.769 ,   0.171
C5 ( 0.000 ,   0.000 ,   0.251 ) ; 0.188 ,   0.746 ( 0.000 ,   0.169 ,   0.302 ) ; 0.234 ,   0.654 ( 0.300 ,   0.384 ,   0.610 ) ; 0.465 ,   0.475
C6 ( 0.152 ,   0.232 ,   0.365 ) ; 0.316 ,   0.591 ( 0.151 ,   0.210 ,   0.364 ) ; 0.315 ,   0.614 ( 0.367 ,   0.487 ,   0.700 ) ; 0.548 ,   0.390
C7 ( 0.150 ,   0.222 ,   0.410 ) ; 0.328 ,   0.587 ( 0.236 ,   0.300 ,   0.478 ) ; 0.386 ,   0.533 ( 0.366 ,   0.444 ,   0.653 ) ; 0.521 ,   0.415
Table 11. Criteria weight vector based on experts’ preferences.
Table 11. Criteria weight vector based on experts’ preferences.
ExpertsCriteria
C1C2C3C4C5C6C7
E1IIIIMMI
E2MVIIVIIUII
E3IIIIIMI
E4MIVIIMMVI
E5IVIIIIMVI
Table 12. TIF and crisp criteria weight vectors.
Table 12. TIF and crisp criteria weight vectors.
CriteriaWeight Vectors
W ˜
C1 ( 0.509 ,   0.637 ,   0.712 ) ; 0.655 ,   0.317
C2 ( 0.672 ,   0.789 ,   0.874 ) ; 0.811 ,   0.167
C3 ( 0.635 ,   0.752 ,   0.836 ) ; 0.788 ,   0.186
C4 ( 0.635 ,   0.750 ,   0.836 ) ; 0.783 ,   0.186
C5 ( 0.509 ,   0.587 ,   0.712 ) ; 0.640 ,   0.328
C6 ( 0.346 ,   0.413 ,   0.552 ) ; 0.469 ,   0.504
C7 ( 0.672 ,   0.751 ,   0.874 ) ; 0.811 ,   0.173
Table 13. TIF positive-ideal solution (PIS) and TIF negative-ideal solution (NIS) vectors.
Table 13. TIF positive-ideal solution (PIS) and TIF negative-ideal solution (NIS) vectors.
CriteriaIdeal Solutions
TIF PISTIF NIS
C1 ( 0.950 ,   0.995 ,   1.000 ) ; 0.950 ,   0.050 ( 0.000 ,   0.248 ,   0.332 ) ; 0.302 ,   0.625
C2 ( 0.950 ,   0.995 ,   1.000 ) ; 0.950 ,   0.050 ( 0.151 ,   0.263 ,   0.363 ) ; 0.318 ,   0.584
C3 ( 0.888 ,   0.969 ,   1.000 ) ; 0.888 ,   0.090 ( 0.000 ,   0.190 ,   0.301 ) ; 0.243 ,   0.676
C4 ( 0.858 ,   0.959 ,   1.000 ) ; 0.869 ,   0.100 ( 0.000 ,   0.202 ,   0.278 ) ; 0.253 ,   0.672
C5 ( 0.123 ,   0.176 ,   0.330 ) ; 0.279 ,   0.637 ( 0.775 ,   0.788 ,   0.958 ) ; 0.786 ,   0.171
C6 ( 0.151 ,   0.210 ,   0.364 ) ; 0.315 ,   0.614 ( 0.758 ,   0.773 ,   0.958 ) ; 0.769 ,   0.171
C7 ( 0.151 ,   0.199 ,   0.363 ) ; 0.305 ,   0.623 ( 0.867 ,   0.865 ,   1.000 ) ; 0.878 ,   0.090  
Table 14. Positive-ideal separation (PISE) and negative-ideal separation (NISE) matrices.
Table 14. Positive-ideal separation (PISE) and negative-ideal separation (NISE) matrices.
Ideal SeparationSIsCriteria
C1C2C3C4C5C6C7
PISESoI60.3130.2080.3440.3920.0490.0060.016
EcI40.0000.0280.0000.4900.0220.0000.063
EnI100.2110.3480.4860.1560.1460.2150.188
NISESoI60.5540.6290.4660.3920.6600.5720.718
EcI40.8670.8100.8100.2940.6330.5780.670
EnI100.6560.4900.3240.6280.4650.3630.545
Table 15. Computational results of the proposed approach and final ranking of SIs.
Table 15. Computational results of the proposed approach and final ranking of SIs.
SIs A i B i A i B i κ i ϑ i i Final Ranking
SoI10.6270.0932.7660.2500.2080.8140.7865
SoI21.6200.2731.7990.1160.6010.4750.36316
SoI32.4150.3841.0410.0840.8730.3060.15428
SoI40.5530.1282.7520.2400.2390.7980.7566
SoI52.3040.2761.0260.2000.7170.4580.29521
SoI60.684−0.0022.6390.2270.0950.7610.8224
SoI71.5020.1341.9370.0660.4050.4320.43814
SoI81.9600.2131.4660.0550.5800.3390.30220
SoI91.5950.1811.8480.0230.4790.3600.36117
EcI10.5480.0752.8500.3080.1710.9030.8703
EcI21.2760.1832.1990.1040.4290.5260.48013
EcI32.0030.2501.3360.0110.6350.2590.23823
EcI40.1060.0323.1210.3200.0440.9651.0001
EcI51.5270.2051.8370.0090.4980.3400.34118
EcI61.1710.1132.2440.1890.3220.6450.6109
EcI70.4800.0882.9020.3470.1760.9630.9072
EcI82.4890.2400.7770.1000.7020.2830.22024
EcI91.7420.1771.6210.1600.4990.5040.43015
EnI11.1800.0772.2760.1640.2780.6180.6188
EnI21.4440.0901.9170.1600.3380.5530.54410
EnI32.8180.3380.3960.0000.8810.0880.06229
EnI42.3460.2670.933−0.0080.7130.1670.16127
EnI53.1350.3900.119−0.0041.0000.0360.00030
EnI62.2650.0921.0610.0580.4760.2750.31519
EnI72.3180.1740.972−0.0310.5900.1420.19726
EnI81.3640.0072.0080.0400.2200.4080.51511
EnI92.1520.2661.1820.0820.6800.3260.25122
EnI101.0040.0312.3090.1250.1910.5720.6377
EnI111.3540.0372.0730.0350.2560.4130.50012
EnI121.8570.3471.5720.0080.7330.2940.21125
Table 16. Comparative outcomes of the presented approach and other traditional fuzzy multi-criteria decision-making (MCDM) methods.
Table 16. Comparative outcomes of the presented approach and other traditional fuzzy multi-criteria decision-making (MCDM) methods.
SIsProposed ApproachFuzzy MCDM Methods
Fuzzy VIKOR [65] Fuzzy SAW [66]Fuzzy TOPSIS [67]
Ranking ScorePreference Order RankingRanking ScorePreference Order RankingRanking ScorePreference Order RankingRanking ScorePreference Order Ranking
SoI10.78650.17850.86650.6485
SoI20.363160.486150.756160.48316
SoI30.154280.721250.678240.39123
SoI40.75660.16040.87630.6802
SoI50.295210.755260.685230.40121
SoI60.82240.24160.85160.6286
SoI70.438140.490160.757150.49015
SoI80.302200.707230.701210.38924
SoI90.361170.491170.755170.46517
EcI10.87030.15030.87540.6674
EcI20.480130.380100.796100.53710
EcI30.238230.607200.712200.40520
EcI41.00010.00010.93710.7351
EcI50.341180.459140.766140.49214
EcI60.61090.36790.79890.5609
EcI70.90720.12520.88520.6743
EcI80.220240.839280.646280.30628
EcI90.430150.586190.731180.45718
EnI10.61880.35380.80280.5648
EnI20.544100.450130.770130.50313
EnI30.062290.916290.612290.25029
EnI40.161270.704220.677250.37025
EnI50.000301.000300.588300.19530
EnI60.315190.802270.662270.31027
EnI70.197260.712240.674260.36426
EnI80.515110.426120.775120.52911
EnI90.251220.661210.692220.39622
EnI100.63770.30470.82070.6037
EnI110.500120.420110.778110.52712
EnI120.211250.557180.730190.44119
Table 17. Comparison of ten SIs with higher priority and other literature studies and tools.
Table 17. Comparison of ten SIs with higher priority and other literature studies and tools.
Related Literature SocialEconomicEnvironmental
SoI1SoI4SoI6EcI1EcI4EcI6EcI7EnI1EnI2EnI10
Awasthi et al. [47]S **✓ *– *
Shen et al. [56]S
Shen et al. [57]S
Yao et al. [59]S
CEEQUAL [62]T **
Invest [63]T
Envision [64]T
* Note: The symbol ✓ indicates that the study/tool includes the SI, whereas—indicates that it does not. ** S: Study; T: Tool.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Hashemi, H.; Ghoddousi, P.; Nasirzadeh, F. Sustainability Indicator Selection by a Novel Triangular Intuitionistic Fuzzy Decision-Making Approach in Highway Construction Projects. Sustainability 2021, 13, 1477. https://doi.org/10.3390/su13031477

AMA Style

Hashemi H, Ghoddousi P, Nasirzadeh F. Sustainability Indicator Selection by a Novel Triangular Intuitionistic Fuzzy Decision-Making Approach in Highway Construction Projects. Sustainability. 2021; 13(3):1477. https://doi.org/10.3390/su13031477

Chicago/Turabian Style

Hashemi, Hassan, Parviz Ghoddousi, and Farnad Nasirzadeh. 2021. "Sustainability Indicator Selection by a Novel Triangular Intuitionistic Fuzzy Decision-Making Approach in Highway Construction Projects" Sustainability 13, no. 3: 1477. https://doi.org/10.3390/su13031477

APA Style

Hashemi, H., Ghoddousi, P., & Nasirzadeh, F. (2021). Sustainability Indicator Selection by a Novel Triangular Intuitionistic Fuzzy Decision-Making Approach in Highway Construction Projects. Sustainability, 13(3), 1477. https://doi.org/10.3390/su13031477

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop