Legal Conditions for Investments in Renewable Energy in the Overburden Disposal Areas in Poland
Abstract
:1. Introduction
2. Materials and Methods
2.1. Reclamation as a First Stage
2.2. Overview of Requirements for a Wind Farm Location
2.2.1. Wind Characteristics
2.2.2. Rights to the Land
2.2.3. Geotechnical Conditions
2.2.4. Grid Limitations
Grid Connection Conditions
Distance to Electricity Transformer Stations
2.2.5. Transport Limitations
2.2.6. Spatial Planning Limitations
Distance to Residential Buildings and Nature Protection Areas
Limitations to Investment on Rural Land
Protected Landscapes
- −
- The implementation of projects that may have a significant impact on the environment;
- −
- locating construction objects within a 100 m wide strip from shores of rivers, lakes and other water reservoirs, except for facilities for water tourism, water management or fishing;
- −
- locating construction objects within a 200 m wide strip from cliff edges and in a seashore technical strip.
Distance to Public Roads
- −
- 30 m for highways;
- −
- 20 m for expressways;
- −
- 10 m for national roads;
- −
- 8 m for regional roads;
- −
- 6 m for municipal roads.
- −
- 50 m for highways;
- −
- 40 m for expressways;
- −
- 25 m for national roads;
- −
- 20 m for regional roads;
- −
- 15 m for municipal roads.
Distance to Overhead Power Transmission Lines
- −
- Low voltage lines (up to 1 kV)
- −
- 20 m for single lines
- −
- 25 m for double lines
- −
- Medium voltage lines (up to 45 kV)
- −
- 25 m for single lines
- −
- 30 m for double lines
- −
- if the line does not have vibration dampers, the distance of the wind turbine blade tip from the most external power line should be 3 d;
- −
- if the line has vibration dampers, the distance between the end of the turbine blade and the most external power line should be d.where d is the diameter of the circle used by the blades of the wind turbine.
Air Traffic Conditions
2.2.7. Environmental Conditions
- −
- monitoring of living organisms, which the investment can have impact on. In the case of wind power plants, this usually requires the monitoring of birds and bats, less frequently of particular species of amphibians and reptiles or vegetation;
- −
- description of natural components of the environment influenced by the anticipated environmental impact;
- −
- analysis of noise pollution caused by the investment;
- −
- description of the investment’s impact on air, soil, water, landscape, climate, material goods, monuments, and people.
- −
- 45 dB (day) and 40 dB (night) for the protection zone “A” of spa towns and hospital areas located outside towns;
- −
- 50 dB (day) and 45 dB (night) for single-family housing areas, areas of buildings related to permanent or temporary stay of children and adolescents, areas of social care homes and hospital areas in cities;
- −
- 55 dB (day) and 45 dB (night) for areas of multi-family housing and collective housing, farm buildings, leisure and recreation areas, residential-commercial areas as well as downtown areas of cities with more than 100,000 inhabitants.
2.3. Overview of Requirements for a Photovoltaic Farm Location
Type of a Requirement/Limitation | Wind Farm | Solar Farm | Legal Basis | |
---|---|---|---|---|
Energy potential related to meteorological/topographic conditions | Energy resource must be investigated in order to calculate the resulting power output and prove profitability of an investment | - | ||
Rights to use the land | Must be secured in order to get a building permit | Act of 7 July 1994 Construction Law (Journal of Laws of 2020, item 1333) [35] | ||
Geotechnical conditions of the site | Ground investigation report, geotechnical design report and geological-engineering documentation must be delivered in addition to construction design and geotechnical opinion | Act of 7 July 1994 Construction Law (Journal of Laws of 2020, item 1333) [35] Regulation of the Minister of Transport, Construction and Maritime Economy of 25 April 2012 on the determination of geotechnical conditions for the foundation of buildings (Journal of Laws of 2012, item 463) [36] Act of 9 June 2011 Geological and Mining Law (Journal of Laws 2020, item 1064) [37] Regulation of the Minister of the Environment of 18 November 2016 on hydrogeological documentation and geological-engineering documentation (Journal of Laws of 2016, item 2033) [38] | ||
Grid limitations | Grid connection conditions | Must be agreed with regional power grid operator | Act of 10 April 1997 Energy Law (Journal of Laws 2020, item 833) [39] | |
Distance to the nearest electric substation | Main power point (GPZ) is usually located in the direct vicinity of the former mine’s border | - | ||
Possibility of heavy material transportation to the site | Usually possible; various roads available in the vicinity of the former mine | - | ||
Spatial limitations | Established local land use plan | The plan must indicate possibility for wind power plant construction | The plan must indicate possibility for solar plant construction; if there is no local land use plan established, a zoning and land use decision for a plot of land in question must be obtained | Act of 27 March 2003 on spatial planning and development (Journal of Laws of 2020, item293) [40] Act of 20 May 2016 on wind farm investments (Journal of Laws of 2016, item 961) [34] |
Distance to residential/nature protection areas | The distance must be at least ten times a total height of a wind power plant. Therefore, villages in the immediate vicinity of the mine waste dump may “block” construction of high wind turbines | No fixed standards regarding the minimum distance | Act of 20 May 2016 on wind farm investments (Journal of Laws of 2016, item 961) [34] | |
Investment on rural land | If the land was reclaimed for agricultural purposes, it has to be excluded from agricultural use (regardless of the class of agricultural land) | Act of 3 February 1995 on the protection of agricultural and forest land (Journal of Laws of 2017, item 1161) [33] | ||
Distance to public roads | Minimum distances are specified in the Act for different types of roads. If smaller, a consent of a relevant road administrator must be obtained | Act of 21 March 1985 on public roads (Journal of Laws 2020, item 470) [41] | ||
Distance to overhead power transmission lines | Minimum distances are specified by power distribution companies and depend on voltage of the power lines | Location of a power plant in a close distance to a power line, especially within a technical lane going along the line, must be agreed with a relevant power distribution company | Regulation of the Minister of Infrastructure of 6 February 2003 on occupational health and safety during construction works (Journal of Laws 2003, No. 47, item 401) [42] Regulation of the Minister of Health of 17 December 2019 on the permissible levels of electromagnetic fields in the environment (Journal of Laws of 2019, item 2448) [43] | |
Location of air traffic | Areas with limited development of constructed objects due to air traffic must be checked in the local land use plan | n/a | Act of 3 July 2002, Aviation Law (Journal of Laws 2020, item 1970) [44] | |
Location of protected landscape | Priority landscapes may be indicted in local land use plans. Restrictions on spatial development set for landscape protection zones (that are designated in landscape parks and protected landscape areas) are binding for local land use plans/zoning and land use decisions | Act of 24 April 2015 amending certain acts in connection with the strengthening of landscape protection tools (Journal of Laws of 2015, item 774) [45] Act of 16 April 2004 on nature protection (Journal of Laws of 2020, item 55) [46] | ||
Environmental conditions/EIA | Obtaining decision on environmental conditions | Required for wind power plants of a total height of more than 30 m or located within nature protection areas | Required for photovoltaic farms covering the area larger than 1 ha or 0.5 ha if located within a nature protection area | Act of 20 May 2016 on wind farm investments (Journal of Laws of 2016, item 961) [34] Act of 27 April 2001 Environmental Protection Law (Journal of Laws 2020, item 1219) [47] Act of 16 April 2004 on nature protection (Journal of Laws of 2020, item 55) [46] Act of 3 October 2008 on the provision of information about the environment and its protection, public participation in environmental protection and environmental impact assessments (Journal of Laws 2020, item 283) [48] Regulation of the Council of Ministers of September 10, 2019 on projects that may significantly affect the environment (Journal of Laws 2020, item 1333) [49] Regulation of the Minister of the Environment of 14 June 2007 on permissible noise levels in the environment (Journal of Laws of 2019, item 1839) [50] |
Location of nature protection areas | Location of a power plant within some nature protection areas (such as national parks, nature reserves, landscape parks and Natura 2000 sites) is not possible. Location within other nature protection areas or its impact on the nearest nature protection areas is important in terms of EIA | Location of a power plant within a nature protection area or its impact on the nearest nature protection areas is important in terms of EIA | ||
Acoustic influence | If a distance between a wind power plant and a residential area must be at least ten times a total height of the plant, the noise standards are always met | Noise analysis may need to be performed with regard to permissible noise levels during the day and night regarding a transformer station | ||
Location of birds and bats corridors | Monitoring of birds and bats, usually one year-long, is required for an environmental impact assessment report | |||
Location of protected landscape | Impact on landscape must be analyzed in frame of EIA |
2.3.1. Solar Radiation Characteristics
2.3.2. Rights to the Land
2.3.3. Geotechnical Conditions
2.3.4. Grid Limitations
2.3.5. Spatial Planning Limitations
Distance to Residential Buildings and Nature Protection Areas
Limitations to Investment on Rural Land
Protected Landscapes
Distance to Public Roads
Distance to Overhead Power Transmission Line
2.3.6. Environmental Conditions
- −
- 0.5 ha in nature protection areas (i.e., national parks; nature reserves; landscape parks; protected landscape areas; Natura 2000 sites; ecological areas; nature and landscape complexes) or in buffer zones of nature protection areas such as national parks; nature reserves and landscape parks;
- −
- 1 ha in areas other than those mentioned above.
- −
- the monitoring of living organisms, which the investment can have impact on, particularly birds and bats;
- −
- the description of natural components of the environment, especially protected species, influenced by the anticipated environmental impact;
- −
- the analysis of acoustic (inverters and transformer stations cause noise) and electromagnetic effects of the investment;
- −
- the assessment of the impact of light reflections accompanying photovoltaic investments on birds;
- −
- the description of the investment’s impact on people and possible social conflicts.
3. Results
Meeting the Requirements in the Study Area
- −
- an area of ca. 420 ha within the Jóźwin IIB open pit inner overburden disposal area, selected as a potential site for wind or solar power plant location;
- −
- an area of almost 300 ha within the Jóźwin IIA open pit inner overburden disposal area, selected as a potential site for solar power plant location.
4. Discussion
Author Contributions
Funding
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- The European Green Deal. Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions. COM (2019) 640 Final. Available online: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52019DC0640 (accessed on 28 December 2021).
- Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the Promotion of the Use of Energy from Renewable Sources (Text with EEA Relevance.) PE/48/2018/REV/1. OJ L 328, 21.12.2018, pp. 82–209. Available online: https://eur-lex.europa.eu/eli/dir/2018/2001/oj (accessed on 28 December 2021).
- Proposal for a Directive of the European Parliament and of the Council amending Directive (EU) 2018/2001 of the European Parliament and of the Council, Regulation (EU) 2018/1999 of the European Parliament and of the Council and Directive 98/70/EC of the European Parliament and of the Council as Regards the Promotion of Energy from Renewable Sources, and Repealing Council Directive (EU) 2015/652. COM/2021/557 Final. Available online: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52021PC0557 (accessed on 28 December 2021).
- Marks-Bielska, R.; Bielski, S.; Pik, K.; Kurowska, K. The Importance of Renewable Energy Sources in Poland’s Energy Mix. Energies 2020, 13, 4624. [Google Scholar] [CrossRef]
- Serowaniec, M. Sustainable Development Policy and Renewable Energy in Poland. Energies 2021, 14, 2244. [Google Scholar] [CrossRef]
- Kosiorek, K.; Jarzynka, A. Renewable energy sources in legal terms. Kortowski Przegląd Praw. 2017, 1, 163–169, (In Polish with English abstract). [Google Scholar]
- Dolega, W. Problems, Barriers and Perspectives of RES Development in Poland. In Power Systems, Energy Markets and Renewable Energy Sources in South-Eastern Europe; Mavromatakis, F., Siderakis, K., Eds.; Trivent Publishing: Budapest, Hungary, 2016; Volume 3, pp. 265–282. [Google Scholar]
- Przybylska-Cząstkiewicz, M. Legal conditions for the development of renewable energy in Poland after 2015. Polityka Energetyczna Energy Policy J. 2017, 20, 103–116, (In Polish with English abstract). [Google Scholar]
- Stolińska, B. The factors of wind turbines location. Świat Nieruchom. 2014, 88, 27–31, (In Polish with English abstract). [Google Scholar]
- Energetyka Wiatrowa. Kodeks Dobrych Praktyk. PSEW 2019. Available online: http://psew.pl/biblioteka/opracowania/ (accessed on 30 September 2021).
- Igliński, B.; Iglińska, A.; Koziński, G.; Skrzatek, M.; Buczkowski, R. Wind energy in Poland—History, current state, surveys, Renewable Energy Sources Act, SWOT analysis. Renew. Sustain. Energy Rev. 2016, 64, 19–33. [Google Scholar] [CrossRef]
- Zajdler, R. Regulacje Prawa Krajowego Dotyczące Inwestycji w Farmy Wiatrowe (Wybrane Aspekty); Instytut Sobieskiego: Warszawa, Poland, 2012. [Google Scholar]
- Stryjecki, M.; Mielniczuk, K.I. Wytyczne w Zakresie Prognozowania Oddziaływań na Środowisko Farm Wiatrowych; Generalna Dyrekcja Ochrony Środowiska: Warszawa, Poland, 2011. [Google Scholar]
- Majer, E.; Sokołowska, M.; Frankowski, Z. (Eds.) Zasady Dokumentowania Geologiczno-Inżynierskiego (w Świetle Wymagań Eurokodu 7); Państwowy Instytut Geologiczny—Państwowy Instytut Badawczy: Warszawa, Poland, 2018. [Google Scholar]
- Sobieski, G.; Zaremba, A.; Stankiewicz, D.; Dalak, D. Posadowienie turbin wiatrowych w kontekście nowego systemu wsparcia OZE. Paliwa Energetyka 2016, 1, 60–63. [Google Scholar]
- Pardela, T. Posadowienie wysokich wież elektrowni wiatrowych o mocy 2.0–2.5 MW na słabym podłożu gruntowym. Nowocz. Bud. Inżynieryjne 2012, 3, 70–73. [Google Scholar]
- Utility-Scale Solar Photovoltaic Power Plants: A Project Developer’s Guide; International Finance Corporation: Washington, DC, USA, 2015.
- Łaganowska, Z. Prawne aspekty budowy farmy PV. Globnergia 2013, 3, 40–42. [Google Scholar]
- Przywoźna, A. Poradnik Inwestora Fotowoltaicznego (cz. 1). Ambiens Sp. z o.o. 2013. Available online: http://www.ambiens.pl/blog/poradnik-inwestora-fotowoltaicznego-1/ (accessed on 25 March 2021).
- Przywoźna, A. Poradnik Inwestora Fotowoltaicznego (cz. 2). Ambiens Sp. z o.o. 2013. Available online: http://www.ambiens.pl/blog/poradnik-inwestora-fotowoltaicznego-2/ (accessed on 25 March 2021).
- Zwolińska-Mańczak, A.; Tarka, M. 2013: Przeprowadzanie ocen oddziaływania farm fotowoltaicznych na środowisko. Paliwa Energetyka 2013, 3, 70–73. [Google Scholar]
- Więcka, A.; Zarzeczna, J. Rynek Fotowoltaiki w Polsce 2019; EC BREC Instytut Energetyki Odnawialnej Sp. z o.o.: Warszawa, Poland, 2019; 65p. [Google Scholar]
- Farcas, V.; Ilies, N. Aspects Regarding Soil Investigation and Foundation Design for Photovoltaic Power Plants. In International Congress on Energy Efficiency and Energy Related Materials (ENEFM2013); Oral, A., Bahsi, Z., Ozer, M., Eds.; Springer Proceedings in Physics; Springer: Cham, Switzerland, 2014; Volume 155, pp. 391–396. [Google Scholar]
- Annavarapu, S.; Wilson, T.; Momayez, M.; Cronin, A. Geotechnical considerations for solar panel installation on mine tailings. In Proceedings of the 26th Annual Meetings of the American Society of Mining and Reclamation and 11th Billings Land Reclamation Symposium 2009; American Society of Mining and Reclamation: Lexington, KY, USA, 2009; Volume 1, pp. 37–43. [Google Scholar]
- Foks, A.; Całka, B.; Bielecka, E. Torzym Multi-criteria spatial analysis in search of the potential location of solar farms in Torzym commune. Polskie Towarzystwo Informacji Przestrzennej. Roczniki Geomatyki 2019, 3, 171–182, (In Polish with English abstract). [Google Scholar]
- Hajto, M.; Cichocki, Z.; Bidłasik, M.; Borzyszkowski, J.; Kuśmierz, A. Constraints on Development of Wind Energy in Poland due to Environmental Objectives. Is There Space in Poland for Wind Farm Siting? Environ. Manag. 2017, 59, 204–217. [Google Scholar] [CrossRef] [PubMed] [Green Version]
- Synowiec, W.; Luc, M. A multicriterial evaluation of land suitability for wind energy development, as exemplified by Poland’s gmina of Rymanów. Przegląd Geogr. 2013, 85, 323–352, (In Polish with English abstract). [Google Scholar] [CrossRef]
- Wang, Q.; M’Ikiugu, M.M.; Kinoshita, I.; Luo, Y. GIS-Based Approach for Municipal Renewable Energy Planning to Support Post-Earthquake Revitalization: A Japanese Case Study. Sustainability 2016, 8, 703. [Google Scholar] [CrossRef]
- Zalhaf, A.S.; Elboshy, B.; Kotb, K.M.; Han, Y.; Almaliki, A.H.; Aly, R.M.H.; Elkadeem, M.R. A High-Resolution Wind Farms Suitability Mapping Using GIS and Fuzzy AHP Approach: A National-Level Case Study in Sudan. Sustainability 2022, 14, 358. [Google Scholar] [CrossRef]
- Regulation (EU) 2021/1056 of the European Parliament and of the Council of 24 June 2021 Establishing the Just Transition Fund. PE/5/2021/REV/1. OJ L 231, 30.6.2021, pp. 1–20. Available online: https://eur-lex.europa.eu/eli/reg/2021/1056/oj (accessed on 28 December 2021).
- Regulation of the Minister of Environment of 24 April 2012 on Detailed Requirements for Deposit Development Projects (Journal of Laws of 2012, item 511). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20120000511 (accessed on 30 September 2021).
- Regulation of the Minister of the Environment of December 8, 2017 on Mining Plant Operation Plans (Journal of Laws of 2017, item 2293). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20170002293 (accessed on 30 September 2021).
- Act of February 3, 1995 on the Protection of Agricultural and Forest Land (Journal of Laws 2017, item 1161). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20170001161 (accessed on 30 September 2021).
- Act of May 20, 2016 on Wind Farm Investments (Journal of Laws of 2016, item 961). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20160000961 (accessed on 30 September 2021).
- Act of 7 July 1994 Construction Law (Journal of Laws of 2020, item 1333). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200001333 (accessed on 30 September 2021).
- Regulation of the Minister of Transport, Construction and Maritime Economy of 25 April 2012 on the Determination of Geotechnical Conditions for the Foundation of Buildings (Journal of Laws of 2012, item 463). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20120000463 (accessed on 30 September 2021).
- Act of 9 June 2011 Geological and Mining Law (Journal of Laws 2020, item 1064). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200001064 (accessed on 30 September 2021).
- Regulation of the Minister of the Environment of November 18, 2016 on Hydrogeological Documentation and Geological-Engineering Documentation (Journal of Laws of 2016, item 2033). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20160002033 (accessed on 30 September 2021).
- Act of April 10, 1997 Energy Law (Journal of Laws 2020, item 833). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200000833 (accessed on 30 September 2021).
- Act of 27 March 2003 on Spatial Planning and Development (Journal of Laws of 2020, item 293). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200000293 (accessed on 30 September 2021).
- Act of March 21, 1985 on Public Roads (Journal of Laws 2020, item 470). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200000470 (accessed on 30 September 2021).
- Regulation of the Minister of Infrastructure of February 6, 2003 on Occupational Health and Safety during Construction Works (Journal of Laws 2003, No. 47, item 401). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20030470401 (accessed on 30 September 2021).
- Regulation of the Minister of Health of 17 December 2019 on the Permissible Levels of Electromagnetic Fields in the Environment (Journal of Laws of 2019, item 2448). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20190002448 (accessed on 30 September 2021).
- Act of July 3, 2002, Aviation Law (Journal of Laws 2020, item 1970). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200001970 (accessed on 30 September 2021).
- Act of April 24, 2015 Amending Certain Acts in Connection with the Strengthening Of Landscape Protection Tools (Journal of Laws of 2015, item 774). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=wdu20150000774 (accessed on 30 September 2021).
- Act of April 16, 2004 on Nature Protection (Journal of Laws of 2020, item 55). Available online: http://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200000055 (accessed on 30 September 2021).
- Act of 27 April 2001 Environmental Protection Law (Journal of Laws 2020, item 1219). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200001219 (accessed on 30 September 2021).
- Act of 3 October 2008 on the Provision of Information about the Environment and Its Protection, Public Participation in Environmental Protection and Environmental Impact Assessments (Journal of Laws 2020, item 283). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20200000283 (accessed on 30 September 2021).
- Regulation of the Council of Ministers of September 10, 2019 on Projects That May Significantly Affect the Environment (Journal of Laws 2019, item 1839). Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20190001839 (accessed on 30 September 2021).
- Regulation of the Minister of the Environment of 14 June 2007 on Permissible Noise Levels in the Environment (Journal of Laws of 2014, item 112). Available online: httpshttp://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20140000112 (accessed on 30 September 2021).
- Global Wind Atlas. Available online: https://globalwindatlas.info (accessed on 30 May 2021).
- Geoportal Krajowy. Available online: https://www.geoportal.gov.pl/ (accessed on 30 May 2021).
- Global Solar Atlas. Available online: https://globalsolaratlas.info (accessed on 30 May 2021).
- Projekt Ustawy o Zmianie Ustawy o Inwestycjach w Zakresie Elektrowni Wiatrowych Oraz Niektórych Innych Ustaw. Rządowy Proces Legislacyjny. Available online: https://legislacja.rcl.gov.pl/projekt/12346353/katalog/12785203#12785203 (accessed on 30 September 2021).
Type of a Requirement/Limitation | The Area within the Jóźwin II B Open Pit inner Dumping Space | |
---|---|---|
Energy potential related to meteorological/topographic conditions |
| |
Rights to use the land | The land is owned by Konin Lignite Mine | |
Geotechnical conditions of the site |
| |
Grid limitations | Grid connection conditions | Must be agreed with ENERGA-OPERATOR S.A. (regional power grid operator) |
Distance to the nearest electric substation |
| |
Possibility of heavy material transportation to the site |
| |
Spatial limitations | Established local land use plan | The plan must indicate possibility for wind power plant construction |
Distance to residential/nature protection areas |
| |
Investment on rural land | If the land is reclaimed for agricultural purposes, it will have to be excluded from agricultural use (regardless of the class of agricultural land) | |
Distance to public roads | Minimum distances are specified in the Act for different types of roads. If smaller, a consent of a relevant road administrator must be obtained | |
Distance to overhead power transmission lines | Minimum distances are specified by power distribution companies and depend on voltage of the power lines | |
Location of air traffic | No area with limited development of constructed objects due to air traffic in the vicinity | |
Location of protected landscape |
| |
Environmental conditions/EIA | Obtaining decision on environmental conditions | Required |
Location of nature protection areas | impact on the nearest nature protection areas is important in terms of EIA | |
Acoustic influence | If a distance between a wind power plant and a residential area must be at least ten times larger than a total height of the plant, the noise standards are always met | |
Location of birds and bats corridors | Monitoring of birds and bats, usually one year-long, is required for an environmental impact assessment report | |
Location of protected landscape | Impact on landscape must be analyzed in frame of EIA |
Type of a Requirement/Limitation | The Area within the Jóźwin IIB inner Dumping Space | The Area within the Jóźwin IIA inner Dumping Space | |
---|---|---|---|
Energy potential related to meteorological/topographic conditions |
Global tilted irradiation at optimum angle −1307 kWh/m2/yr (Data obtained from the “Global Solar Atlas 2.0, a free, web-based application is developed and operated by the company Solargis s.r.o. on behalf of the World Bank Group, utilizing Solargis data, with funding provided by the Energy Sector Management Assistance Program (ESMAP). For additional information: https://globalsolaratlas.info (accessed on 30 May 2021)) [52].
| ||
Rights to use the land | the land is owned by the Konin Lignite Mine/PAK KWB Konin S.A. | ||
Geotechnical conditions of the site |
| ||
Grid limitations | Grid connection conditions | Must be agreed with ENERGA-OPERATOR S.A. (regional power grid operator) | |
Distance to the nearest electric substation |
|
| |
Possibility of heavy material transportation to the site | Possible—various roads available in the vicinity | ||
a regional road no. 263 is located ca. 400 m from the southern border of the dump (Figure 6) | regional roads no. 263 and 264 are adjacent to the northern and southern parts of the area, respectively (Figure 9) | ||
Spatial limitations | Established local land use plan |
| |
Distance to residential/nature protection areas | No fixed standards regarding the minimum distance | ||
Investment on rural land | If the land is reclaimed for agricultural purposes, it has to be excluded from agricultural use (regardless of the class of agricultural land) | ||
Distance to public roads | Minimum distances are specified in the Act for different types of roads. If smaller, a consent of a relevant road administrator must be obtained | ||
Distance to overhead power transmission lines | Location of a power plant in a close distance to a power line, especially within a technical lane going along the line, must be agreed with a relevant power distribution company | ||
Location of protected landscape | Landscape audit for the Wielkopolska Region, which indicates priority landscapes and landscape protection zones, not yet completed | ||
The nearest landscape protection takes place in the protected landscape area called Powidzko-Bieniszewski Obszar Chronionego Krajobrazu located ca. 3 km west from the study area (Figure 8) | The nearest landscape protection takes place in the protected landscape area called Powidzko-Bieniszewski Obszar Chronionego Krajobrazu located ca. 5 km west from the study area (Figure 8) | ||
Environmental conditions/EIA | Obtaining decision on environmental conditions | Required for photovoltaic farms covering the area larger than 1 ha | |
Location of nature protection areas | the impact on the nearest nature protection areas is important in terms of EIA | ||
the borders of the nearest nature protection areas are located 3–10 km from the study area (Figure 8) | the borders of the nearest nature protection areas are located 5–9 km from the study area (Figure 8) | ||
Acoustic influence | Noise analysis may need to be performed with regard to permissible noise levels during the day and night regarding a transformer station | ||
Location of birds and bats corridors | Monitoring of birds and bats, usually one year-long, may be required for an environmental impact assessment report | ||
Location of protected landscape | Impact on landscape must be analyzed in frame of EIA |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Resak, M.; Rogosz, B.; Szczepiński, J.; Dziamara, M. Legal Conditions for Investments in Renewable Energy in the Overburden Disposal Areas in Poland. Sustainability 2022, 14, 1065. https://doi.org/10.3390/su14031065
Resak M, Rogosz B, Szczepiński J, Dziamara M. Legal Conditions for Investments in Renewable Energy in the Overburden Disposal Areas in Poland. Sustainability. 2022; 14(3):1065. https://doi.org/10.3390/su14031065
Chicago/Turabian StyleResak, Marta, Barbara Rogosz, Jacek Szczepiński, and Mariusz Dziamara. 2022. "Legal Conditions for Investments in Renewable Energy in the Overburden Disposal Areas in Poland" Sustainability 14, no. 3: 1065. https://doi.org/10.3390/su14031065
APA StyleResak, M., Rogosz, B., Szczepiński, J., & Dziamara, M. (2022). Legal Conditions for Investments in Renewable Energy in the Overburden Disposal Areas in Poland. Sustainability, 14(3), 1065. https://doi.org/10.3390/su14031065