1. Introduction
Water transportation, compared to other modes of transportation, is environmentally friendly and pollution-free, which is conducive to the sustainable development of society and has played an essential role in economic construction from ancient civilizations to the present day [
1]. Waterway improvement buildings are important infrastructure for water transportation; they are mainly used to improve and maintain the passage conditions of waterways and enhance waterway traffic capacity. However, due to water erosion, riverbed deformation, material aging, and human-related factors, the improvement structures continuously sustain damage during their service life, resulting in performance degradation and navigation condition deterioration [
2,
3]. Therefore, the technical condition assessment and repair of improvement buildings are important tasks for waterway maintenance [
4,
5]. Currently, the maintenance and management of waterway improvement buildings require vast funds, but cyclical operations have low efficiency. According to statistics, investment in Yangtze River trunk waterway improvement building projects, including completed, yet-to-be-completed, and presently underway projects, has exceeded CNY 40 billion over the past 30 years. In the meantime, improvement building maintenance has long work cycles, lasting up to a year in duration, and involves project tendering and bidding, evaluation, maintenance planning, funding, and implementation [
4]. Around the world, the economic resources allocated to transportation infrastructure maintenance are limited and often far from sufficient for fully maintaining the required reliability and service levels throughout the life cycle. Therefore, the optimal allocation of existing funds has become the most important goal [
6]. With the rapid development of the Yangtze River waterway construction, the comprehensive benefits of the improved buildings are becoming increasingly prominent. This requires rational resource allocation and the unified coordination and operation of waterway management [
7]. Assessing the technical condition and maintenance of these buildings is a challenging task. One of the key challenges faced here is the limited efficiency of the current periodic operational model, which further faces constraints due to limited economic resources allocation. Consequently, innovative methods are required to simplify maintenance operations and resource utilization. Additionally, current methods mainly focus on evaluating the current service status of individual building, often overlooking the critical aspect of future overall risks. Therefore, a paradigm shift is needed in the maintenance of harbor remediation buildings, moving from conventional maintenance practices to forward-looking and systematic approaches. Evaluation methods should not only be focused on current conditions but also on predicting future risks.
Researchers have already begun researching to assess the structural stability and performance of waterway improvement buildings. They have adopted various methods to assess factors such as hydraulic elements, scour pit parameters, damage volume ratios, and scour depths, with the aim of improving the safety and maintenance efficiency of these structures.
Scholars worldwide have long studied the structural stability evaluation of waterway improvement buildings. Using the back wall slopes of local erosion pits as the main index for spur dike erosion stability evaluation, Wang et al. [
8] established a reliability function to investigate the combined sensitivity of hydraulic elements, scour pit shape, and scour pit size on the index based on measured data with random parameters. Han et al. [
9] used the ratio of damage volume as a quantitative index to assess the safety of improvement buildings and the effectiveness of improvement. Yu et al. [
10] used the scour depth at the jetty head as a spur dike structural safety evaluation index and comparatively analyzed the extent to which different design parameters influence structural safety using experimental data. Scholars have also studied the performance of improvement buildings. Chen et al. [
11] used factors such as the amount and variation of incoming water and sand, water surface slope, riverbed morphology, and riverbed sand composition as evaluation indexes for the function of clearing sands with converging flow in spur dikes and employed the regression support vector machine theory to evaluate and predict the indexes. Muto et al. [
12] and Clark et al. [
13] included environmental impacts, economic impacts, and other factors in the evaluation indexes to analyze and predict the performance of dams. As can be seen, previous research focused mainly on evaluating a single aspect of improvement buildings. In practice, waterway improvement building service status maintenance is a multi-criteria decision-making (MCDM) problem. Accordingly, Jiang et al. [
2], Zhang et al. [
14], Wen et al. [
15], Li et al. [
16], and Wang et al. [
17] have also established multi-factor evaluation index sets in recent years. Based on aspects such as appearance deformation, damage degree, and functional operation of waterway improvement buildings, their service status was comprehensively evaluated through different theoretical approaches. However, these methods judge the current service status of improvement buildings and rarely predict their future risk status. While scholars have researched the temporal variations in the functional status of buildings, their focus was primarily on evaluating and predicting individual buildings in the lower reaches of the Yangtze River [
11], neglecting the distribution of building clusters and the overall risk status. Moreover, existing evaluation methods are highly intricate and demand extensive field data, including building deformation, damage severity, riverbed topography, and hydrological data. In addition, stress analysis needs to be conducted using hydraulic elements such as flow velocity, water level, flow rate, and sediment. Often, the overly complex operational procedures and the difficulties in obtaining many indicator data mean that it is challenging to promote and apply such evaluation methods on a large scale in practical engineering.
Traditional maintenance methods for waterway improvement buildings have limitations, as they operate in a reactive and periodic manner which makes it difficult to efficiently utilize resources and improve operational efficiency. Current evaluation models are mainly focused on individual and passive assessments, evaluating only after issues have already occurred rather than proactively predicting future risks. This limits the effective maintenance of waterway transportation infrastructure and hinders optimal allocation of limited maintenance funding. Although research has advanced our understanding of various aspects of improvement building evaluation, there remains a pressing need for a transition towards more comprehensive and forward-looking maintenance methods.
Research on road transportation infrastructure has divided the evaluation of bridge technical condition indicators into two categories: current assessment and condition development prediction. The former reflects the current structural conditions and mainly focuses on individual buildings, while the latter predicts future conditions (i.e., time-dependent conditions) and is mainly used for the overall assessment and maintenance decision optimization of bridges at the network level [
18], known as network-level assessment. Infrastructure management system experiences from the United States have shown that adopting a systematic approach to facility management can bring tremendous benefits in practice. For example, to minimize the life cycle cost of the road surface portion in the network, Arizona made maintenance and recovery resource allocation decisions through a project management system, which saved over USD 200 million in maintenance and repair costs over five years [
19]. Network-level assessment is the most commonly used and effective way to comprehensively evaluate and predict bridge network states from a systemic management perspective and is a crucial component of the bridge management system [
6,
20]. Martinez et al. [
21] conducted a network-level assessment of 2802 bridges in Ontario, Canada, based on various bridge condition prediction models, including k-nearest neighbors, decision trees, linear regression, artificial neural networks, and deep learning neural networks. By comprehensively comparing the prediction accuracy, performance, and certainty, the decision tree model was recommended. Adarkwa et al. [
22] explored and predicted the network-level performance of bridges in different states of the United States, focusing on the tensor decomposition data analysis method. They defined network-level performance indicators as the percentage of bridges with structural defects, functional obsolescence, or both in the network, calculated based on bridge area and quantity. Xia et al. [
23] proposed a comprehensive data-driven framework for network-level bridge condition assessment, incorporating data integration, condition assessment, and maintenance management and applied it to an actual highway bridge network in Hebei Province, China; this revealed the bridge’s condition and level of deterioration and the influence of maintenance actions over time through periodic bridge inspection reports obtained from thousands of bridges over multiple years. The results indicated that the proposed data-driven approach could guide bridge managers in estimating future conditions and allocating maintenance resources. Therefore, the network-level assessment approach for bridge system management can also be applied to maintenance decision making for buildings along the Yangtze River waterway improvement project.
In the field of transportation infrastructure, effective maintenance is crucial, as it not only relates to safety and reliability but also to the rational allocation of resources. Although effective maintenance decision models already exist in road transportation, research in this area is relatively scarce relative to waterway transportation. This has motivated our research to explore new methods for enhancing maintenance efficiency, optimizing resource allocation, and fostering the sustainable development of inland waterway transportation. This research aims to bridge existing research gaps and provide improved tools for management authorities to address maintenance challenges in inland waterway transportation infrastructure.
Maintenance decision optimization methods based on network-level assessment have long been used in the field of road transportation infrastructure, providing significant help to management authorities in saving maintenance costs. Therefore, maintenance decision making for the improvement buildings along the Yangtze River can also draw inspiration from the principles of bridge system management and adopt network-level assessment. The primary purpose of this study is to apply network-level assessment to waterborne transportation infrastructures, collect and organize historical inspection data of multiple waterway improvement buildings, propose a network-level assessment and maintenance prediction method for inland waterway improvement buildings from a system management perspective, and provide a new approach for optimizing the maintenance fund allocation and comprehensive navigational infrastructure management. The main research questions include the following: (1) How can we adjust and apply network-level assessment methods to the maintenance of waterway transportation infrastructure? (2) Is it feasible to use historical inspection data to predict the future risk status of channel improvement buildings?
Given this, the Yangtze River trunk waterway improvement building technical condition categories in recent years were recorded. A network-level evaluation framework with data collection, maintenance prediction, and maintenance decision-making modules was proposed. Through the integration of methods, including moving averages and regression analysis, we calculated the overall technical conditions of improvement buildings in each jurisdictional area, conducted an error test, and proposed a maintenance prediction model for inland waterway improvement building maintenance. The research results can facilitate fast prediction of the overall risk status of regional waterway improvement buildings and provide a scientific basis for the in-advance formulation of waterway improvement building maintenance budgets, thus improving the efficiency and fineness of waterway operation and management and enhancing resource allocation rationality.
3. Methods
3.1. Network-Level Assessment Framework
The infrastructure structure and performance within the region have certain correlations and continuities. Specifically, buildings under the same jurisdiction tend to show similar degradation patterns in similar environmental factors (such as hydrological environment, geographical location, navigational guarantee, etc.). In addition, the design specifications, construction standards, and quality of buildings in the same region also tend to converge [
25]. Based on this, this paper proposes a network-level assessment framework shown in
Figure 5, which consists of data collection, maintenance prediction, and maintenance decision modules.
The data collection module is mainly responsible for filtering and organizing the historical condition categories of improvement buildings within the jurisdiction area to form a reasonable and effective dataset. The dataset includes three attributes: jurisdiction area, time, and risk level. These are detailed in
Section 2.2.
The maintenance prediction module primarily performs data standardization, model calculation, and error testing with the purpose of predicting future maintenance quantities for regional buildings. Were there multiple models to choose from, the module would comprehensively evaluate the model performance and test results to select the best model.
The maintenance decision module converts the final prediction results into the basis for maintenance budgeting and optimizes the overall allocation plan for future funds, thus assisting the management department in maintenance decision making.
3.2. Data Standardization
The main purpose of data standardization is to eliminate the differences in quantity between different time periods and regions, making it easier to fit uniformly. The technical condition categorization parameters of the buildings are represented by “category proportion”, and the calculation formula is as follows:
Two points should be noted here: First, the number of “unevaluated” buildings is artificially controlled, mainly related to the maintenance and construction progress, and has nothing to do with the natural state, which will cause interference with the statistical results. Therefore, it should be excluded. Second, the standardized dataset must be divided into the calculation and testing sets. The time-series sample data from 2017 to 2021 are used for model calculation (or fitting) and performance evaluation. The data in 2022 are used for model testing to verify the accuracy and generalization ability of the model.
To ensure prediction accuracy, the range division of the prediction sample set should be as small as possible. Meanwhile, the number of samples per sample set should be over 25–50 to ensure statistical reliability. According to the statistics in
Table 1, the number of buildings meets the requirements for all jurisdictions except CQB. In practice, the maintenance of improvement buildings is carried out on a jurisdiction basis. Therefore, the sample set was divided according to jurisdictions to provide statistics and statistically standardizes on the technical condition categories of improvement buildings in each jurisdiction.
3.3. Prediction Models
The dataset contains small temporal samples covering only 4–5 historical years of improvement building category data within the jurisdiction. Considering the data characteristics and application scenarios, complex machine learning methods such as neural networks, genetic algorithms, and support vector machines do not apply, while simpler predictive methods such as moving average analysis and regression analysis are more appropriate. According to an in-depth analysis and complexity assessment of the problem, this study identifies three potential prediction models: moving average, linear regression, and quadratic regression. The next step involves testing the predictive performance of these three models based on actual data and determining which model to employ for practical forecasting purposes.
- (1)
Jurisdiction moving average (JMA)
This method is derived from moving average analysis, a classical time-series analysis method that calculates the average value of data over a certain time period by gradually moving through the temporal domain. It can better reflect the trends and changes in the time-series [
26]. The construction planning of the Yangtze River waterway is divided by decades, and the jurisdictional waterway status can be assumed to be relatively stable within each decade and will not undergo significant changes. Therefore, the moving average method is suitable for analyzing and predicting the building status.
First, the moving average method must be adjusted based on the data characteristics. For the dataset classifying the technical conditions of buildings in the Yangtze River trunk waterway, geographical parameters should be included in addition to the temporal parameters to form a two-parameter moving average method for network-level assessment and prediction. Furthermore, the excessively small number of sequential samples in the dataset necessitates further temporal division. Therefore, it can be simplified into a single-parameter moving average method, i.e., the jurisdiction moving average method.
The specific procedure is as follows: first, conduct a statistical division of jurisdictional areas (already completed during data standardization, with a moving window size of approximately 25–30 samples measured per unit of building sample); then, gradually calculate the time-series sample averages for each jurisdiction. The calculation formula is as follows:
where
represents the dependent variable of the predictive model, i.e., the proportion of buildings requiring maintenance within a jurisdiction in the upcoming year,
represents the time-series sample for a specific jurisdiction, and
represents the size of the time-series sample.
To calculate the possible range of fluctuations in the predicted results, confidence intervals are constructed using t-distribution critical values [
27]:
where
is the sample mean,
is the sample standard deviation,
is the sample size, and
represents the two-tailed critical value associated with the confidence interval and freedom degrees, which can be found in the t-distribution table. Here, α is set to 0.05, the confidence interval is 95%, and the freedom degrees are
.
The standard deviation of the time-series sample set is also the root mean square error (RMSE) of the calculation results, and the calculation formula is shown in Equation (6).
- (2)
Linear regression (LR)
Linear regression is commonly used to identify the linear relationship between the dependent and independent variables. The fundamental idea is establishing a linear equation to predict the dependent variable while minimizing prediction errors [
28]. The equation takes the following form:
where y is the dependent variable, x is the independent variable, and α and β are constants representing the intercept and slope, which are obtained through the least squares method [
27] based on historical data.
- (3)
Quadratic curve regression (QCR)
When the time-series sample exhibits significant fluctuations, leading to a large sample standard deviation and, consequently, larger expected deviations, a simple linear fit may not effectively describe the data. In such cases, introducing a quadratic term into the model can better fit the data and capture the curved relationship, which is known as quadratic curve regression [
28]. The equation takes the following form:
where a, b, and c represent the coefficients of the quadratic, linear, and constant terms, respectively. These coefficients are determined through the least squares method based on historical data.
After obtaining the fitting parameters, future-year proportions for a specific type of building are calculated using Formulas (3)–(5).
3.4. Error Test
After model calculation, it is essential to evaluate its performance and conduct model testing to recommend the final predictive model. In this study, a comprehensive comparison of three models is conducted through error tests, where the calculation error and final result error are considered. The considered error parameters include the root mean square error (RMSE) and the coefficient of determination (R2) for the calculation results, as well as the mean absolute error (MAE), mean square error (MSE), and significance level (p-value) for the test results.
RMSE and R
2 are used to assess the model’s explanatory power. A smaller RMSE value indicates a better fit or calculation performance. R
2 ranges between 0 and 1, with values closer to 1 indicating better explanatory power of the model. MAE and MSE, on the other hand, are used to evaluate the model’s prediction accuracy and generalization ability. Smaller values for both metrics indicate better predictive performance. The formulas are as follows:
where
represents the actual values of the calculation sample,
represents the corresponding calculated values,
represents the mean of the calculation sample, and n is the size of the calculation sample.
represents the actual values of the test sample,
represents the corresponding predicted values, and m is the size of the test sample.
The
p-value is used to test the significance of differences between the predicted results
and the actual values
, indicating the reliability of the model. Calculation is performed using paired
t-tests [
27], and the significance criterion is set at
p < 0.05.
3.5. Calculation of Future Maintenance Quantity
The projected number of buildings of a certain category within the jurisdiction in the coming year is calculated using the following equation:
5. Comparison and Discussion
5.1. The Advantages, Disadvantages, and Applicability of the Proposed Technology
The existing maintenance decision-making process is formulated based on assessing the technical conditions of waterway improvement buildings for the current year. In contrast, the network-level assessment framework proposed in this study involves forecasting maintenance quantities for the future year in advance. Subsequently, maintenance funds for different regions are allocated ahead of time based on these predictions, optimizing the maintenance decision-making process. Therefore, this proposed framework is more forward-thinking and efficient than the existing approach. The Network-level Evaluation Prediction Model (NEP) proposed in this paper was compared with the efficiency of known existing technologies, and each characteristic was summarized and listed in
Table 8. The existing technologies included the methods used in the Technical Code of Inland Waterway Maintenance [
24] (TCIWM), the AHP-Improved CRITIC Combination Weighting Optimization Model [
14] (AHP-ICRITIC), the Fuzzy Bayesian Network Model [
16] (FBN), and the SVM Predicting Model [
11] (SVMP).
From the table, it can be intuitively seen that the proposed technology has a higher overall efficiency compared to the known existing technologies. This means that this technology can more accurately predict the maintenance needs of buildings, thereby improving the efficiency of remedial work.
The network-level assessment predictive model proposed in this paper is straightforward, easy to understand, and does not require a large sample. It has demonstrated sufficient reliability, making it highly suitable for wide application in practical engineering. The model is particularly well-suited for small sample predictions. However, the prediction accuracy is still related to the size of the time-series sample. In real-world applications, new evaluation data can be continuously added to the sample set, allowing for ongoing refinement of model parameters and improving prediction accuracy over time.
The premise for applying this model is based on the assumption that the waterway conditions within the jurisdictional areas remain relatively stable with minimal changes over the preceding years. Therefore, this model is well-suited for predicting waterway improvement building maintenance status of the upcoming year and less suitable for scenarios with a significantly longer period. Similarly, the model does not apply to situations with a sudden and dramatic change in waterway conditions within the jurisdictional areas. Such changes may result from events like the construction of dams upstream, landslides affecting flow rates, flow velocities, water levels, riverbed alterations, or severe structural damage and deformations of buildings due to human activities. In such cases, a reevaluation of the structural stability of buildings, risk factors, and the extent of changes in waterway elements should be conducted through further simulation experiments or theoretical analyses.
Additionally, it is essential to note that the predictive accuracy of the proposed model is limited. Therefore, it should be utilized as a reference for optimizing regional waterway infrastructure maintenance strategies but should not be applied for individual building maintenance assessments. In practical applications, a comprehensive maintenance decision-making and assessment process should consider not only the model’s predictive outcomes but also various other relevant factors.
5.2. Further Discussion on the Research Results
Based on the final results presented in this paper, the JMA model demonstrates the best predictive performance. Conducting network-level assessments of improvement buildings on a jurisdictional basis is reasonable and aligns with practical management needs. The research results can provide a scientific basis for setting maintenance budgets for waterway improvement buildings and offer ideas for inland waterway management and maintenance. The proposed prediction method applies to not only the Yangtze River trunk waterway but also other inland waterways, which is of great practical significance.
The theoretical contribution of this study mainly revolves around the improvement of the network-level evaluation framework for optimizing maintenance decisions of inland waterway infrastructure. This is an important extension and new application, as most previous research was limited to road traffic and other related fields. As a result, this study enriches the literature on predictive maintenance models for infrastructure and paves the way for future research, promoting a theoretical understanding of water transport infrastructure management.
From a management perspective, this study provides insights into the optimal allocation of limited maintenance funds through predictive models. The proposed model provides a tool for a quick evaluation of overall risk, which may significantly improve management decision making and infrastructure maintenance practices. By comparing different models, this study also offers clear guidelines on the choice of predictive models, where the jurisdiction moving average (JMA) model was identified as the most ideal due to its larger confidence interval.
At the policy level, this study provides important insights for the improvement, management, and budgetary decision making for waterway infrastructures. By applying network-level evaluation, this study recommends a resource allocation approach that considers the condition of inland waterway construction technology. Decision makers can use the insights from this study to develop sound and efficient infrastructure maintenance policies, optimize budget allocation, and ultimately promote the sustainable development of the water transport industry.