Next Article in Journal
Research on the Control of Excavation Deformation of Super Deep Foundation Pit Adjacent to the Existing Old Masonry Structure Building
Previous Article in Journal
The Impact of Information Infrastructure Construction on Carbon Emissions
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Towards Energy Sustainability in University Campuses: A Case Study of Beirut Arab University

1
ECE Department, Faculty of Engineering, Beirut Arab University, Beirut 11-5020, Lebanon
2
College of Engineering and Technology, American University of the Middle East, Kuwait
*
Author to whom correspondence should be addressed.
Sustainability 2023, 15(9), 7695; https://doi.org/10.3390/su15097695
Submission received: 31 March 2023 / Revised: 3 May 2023 / Accepted: 6 May 2023 / Published: 8 May 2023
(This article belongs to the Special Issue Sustainable Supply Chain and Logistic Management)

Abstract

:
Lebanon has been suffering from severe challenges in its electric sector for decades owing to chronic supply shortages and faults in its aging power grid infrastructure. The deplorable situation of the Lebanese electric sector has been made worse by the economic meltdown that started in 2019, which eventually led to total power blackouts across the country. In this paper, we present a case study on the design and implementation of a solar microgrid system for Beirut Arab University, Lebanon. As a first step, simulation software for a microgrid and a distributed generation power system is used to compare different design scenarios. Considering the available installation area and the fact that the greatest demand occurs during the daytime, when both the educational and managerial facilities are running, it is found that a 500-kW photovoltaic system tied to the university’s already present diesel generators is the optimal solution in terms of return on investment. The second step details the actual implementation of the system in the Beirut campus and the evaluation of the system’s performance in terms of diesel cost savings and emissions reduction. We expect that the results of this case study will encourage other institutions and communities to adopt sustainable and renewable energy sources.

1. Introduction

The availability of electricity has emerged as a fundamental necessity in today’s world and is widely recognized as a key catalyst for driving progress, spurring economic growth, and mitigating poverty [1,2,3]. It plays an indispensable role in enabling us to carry out our daily routines with ease while also serving as an essential component of human rights [4]. Despite its undeniable importance, the challenge of generating adequate electricity continues to persist. The global community finds itself grappling with critical shortages exacerbated by various factors such as international disputes and soaring fuel prices caused by inflation. These obstacles have made it increasingly challenging for nations worldwide to meet their energy demands efficiently. For instance, Nigeria, the largest economy on the African continent, has struggled with its power sector due to its rapidly growing population [5]. Even developed nations are taking steps to regulate their energy consumption and manage rising energy prices [6]. Another important aspect of power generation from rapidly depleting nonrenewable resources is pollution and its harmful effects [7]. The production of electricity affects the environment significantly; thermal plants emit hazardous chemicals into the atmosphere, while nuclear plants produce even more dangerous waste. Moreover, both transmission and distribution systems leave undeniable visual impacts on their surroundings [8].
Our planet receives an immense amount of solar radiation and wind movement from the sun [9]. To address the decline in global electrical sectors and to satisfy the demand for sustainable, environmentally friendly energy sources, nations have turned to renewable energy options as a substitute for thermal power methods that rely on fossil fuels [10]. Renewable energy sources, including wind and solar, produced a total of 915 GW worldwide in 2018, as per [11], with an increasing trend expected for the coming years. Figure 1 shows the global energy production of various energy sources from 1965 to 2021 [12]. Predictions suggest that by 2030, renewable energy could make up 65% of global energy production and reach nearly zero net emissions by achieving a share of up to 90% by 2050 [13,14]. This proves that sustainable energy solutions have become an integral part of modern society. Different sectors across the world are taking steps towards becoming more environmentally friendly and reducing their carbon footprint. In this regard, sustainability on campus has become a crucial aspect that needs to be addressed to reduce the negative impacts of electricity generation on the environment and to reduce energy costs.
Lebanon, a tiny nation on the eastern edge of the Mediterranean Sea, has long grappled with recurring blackouts and an immense electricity deficit [15] that amounts to 40% of its national debt. This scarcity was exacerbated by the economic turmoil that began in Lebanon in 2019, which resulted in currency inflation reaching as high as 8580%, where USD 1 equaled LBP 1515 at the start of that year but rose to a staggering figure of LBP 130,000 LL early 2023. In addition to this existing shortfall, more challenges were added, such as Beirut’s port explosion during August 2020, damaging an enormous area encompassing Electricité Du Liban (EDL), which is responsible for almost all Lebanese power production. Furthermore, there is the current worldwide fuel crisis contributing collectively toward creating one of history’s worst energy crises. The entire country entered a complete blackout for days and months, and in best cases, power was provided for 4 h each day. Yet, Lebanon is blessed with abundant sunlight, wind, and water. The variety and availability of renewable energy sources in a country such as Lebanon make them an optimal choice to supplement electricity generation. Indeed, Lebanon enjoys a mild Mediterranean climate offering 7 months (from April to October) of dry season per year [16], which makes it perfect for one of the most popular forms of renewable energy, namely solar energy. This was proved by the vast increase in the amount of installed solar systems all over Lebanon, which reached a maximum of 89.84 MWp of solar power with a cumulative investment of USD 135.19 million by 2020, with USD 11.11 million invested in 2020 alone [17].
Beirut Arab University (BAU) is an institution that requires a significant amount of electrical energy to run its facilities. As an institution that focuses more on the practical part of education, the demand for electrical power is higher. Therefore, electricity is a must that should be put at the top of its priorities. An institution of this size under these circumstances is comparable to the small island mentioned in [18], where solar energy was considered to be the optimal solution for electricity generation. Additionally, similar case studies using HOMER were presented in [19]. An on-grid solar power system coupled with the already present diesel generators can reduce fuel costs and completely cover the daily demand for electric power. Moreover, isolating BAU into a semi-independent microgrid has its advantages, such as enhancing power quality, system stability, and voltage and frequency regulation.
This paper discusses, in detail, the on-grid solar system that BAU, as a microgrid, installed to secure its energy demands. Several scenarios are first studied to show that the on-grid system is the most efficient and economical solution. The system is then checked using HOMER software to validate the grid-tied solution. The rest of this paper is divided into the following sections. Section 2 gives the problem statement and the system design. In Section 3, HOMER simulations are performed to check the system design. Section 4 presents the implementation of the selected system, and finally, Section 5 draws the conclusions of this study.

2. System Design

As an educational institution, BAU requires a significant amount of energy to operate, making it a microgrid by itself. Normally, five low-voltage (380 V, 50 Hz) generators are used to cover the demand of the Beirut campus, which is 1700 kVA, but with soaring fuel prices, this solution is no longer considered economically feasible. Given the limited availability of utility power supply, these generators operate in a primary mode and establish a microgrid, which will henceforth be referred to as the grid. In other words, the grid in on-grid and off-grid terms refers to the microgrid formed by the diesel generators. On the other hand, for an institution such as BAU, reducing supply is not an option. Lebanon has many sunny days per year, and the same naturally goes for BAU. Here, solar energy is a practical solution to this problem. Based on this, three scenarios are considered, studied, and compared, and the most feasible solution is chosen. The first scenario is the strategy that was originally used, where diesel generators supply the load without any additional energy sources. In the second scenario, no generators are used, and the solar panels, together with a battery storage system, supply the load alone, making it an off-grid system. The third and final scenario to be discussed is an on-grid system in which the solar system is installed in conjunction with generators to feed the load.

2.1. Diesel Generators System

Thermal energy generation is one of the oldest ways to generate electricity. It is still the most common method of generating energy worldwide. Diesel generators are an example of this type and are currently the main suppliers of electric power in Lebanon, where electricity from the grid is practically absent. In BAU, five diesel generators are already present with a total capacity of 4500 kVA, satisfying the 2N + 1 redundancy method, which supplies the full load of the university but comes with the huge cost of both the fuel that keeps it running as well as the price of oil and filters for the generators. The generators, without the presence of any other energy sources, consume approximately 60,000 L of diesel per month in the study semesters, which is equivalent to USD 57,660. This is in addition to approximately USD 500 for oil, filter changes, and maintenance. This adds up to USD 58,110 per month, which is clearly too expensive to pay only for electricity. In addition, in Beirut, a big city where trees are rare, the emissions from these generators and the pollution they cause can never be taken lightly. Hence, things cannot continue as they are, and if no action is taken, serious health and economic consequences will be inevitable. Table 1 lists the advantages and disadvantages of the proposed method.

2.2. Off-Grid System

Another appealing solution to the electricity problem is an off-grid solar system. In this system, solar panels are used to feed the microgrid and charge the batteries whenever the sun is present; when sunlight is absent, the batteries are responsible for feeding the load. Therefore, there is no need for diesel generators, and they can be disconnected. Such systems are becoming more popular all over Lebanon and have proved to work well on a domestic scale. In this study, the number of batteries considered can feed the normal load of the university on a study day for eight continuous hours without other energy sources. The load considered is approximated to 1700 kW for 8 h; thus, 13,600 kWh of energy storage will be required. Lithium-ion batteries will be considered for this study owing to their advantages over other battery types. Hence, a 15 kWh LiFePO4 battery, with a unit price of around USD 2200 as per the Felicity brand in November 2022, will be considered. To supply the load for the required duration, 907 of these batteries will be needed. As a result, the cost of the batteries alone will be USD 1,995,000. In addition, to both feed the load and charge the batteries, more panels are required. The number of panels required was calculated to be 3000 panels. Each panel has an area of 2 m2, and the total area needed is 6000 m2, which far exceeds the available area of 2000 m2. With 3000 panels, the cost of the system without batteries will be USD 3,100,000, so the overall cost of the project will sum up to USD 5,095,000. Therefore, this scenario presents great difficulties in terms of both economic and physical aspects, making it difficult to achieve. Table 2 presents the advantages and disadvantages of this scenario.

2.3. On-Grid System

In this system, the solar system is coupled with generators to supply the load. Such systems are especially popular in advanced countries with proper grid supply but are inapplicable in cases where the grid supply is unstable or, in Lebanon’s case, absent. However, BAU possesses diesel generators large enough to make a micro-grid system; in this case, an on-grid system composed of a solar power system aided by the diesel generators becomes possible. Compared to the off-grid system, the on-grid system requires less solar generation capacity, which significantly reduces the investment cost. At the same time, the stress on the diesel generators significantly decreases, thus cutting down on both fuel and maintenance costs. The on-grid system requires 960,550 W solar panels and a number of on-grid inverters, amounting to USD 330,000, which is more logical than the high monthly cost of the diesel generators and the prohibitive investment cost of the off-grid system. In addition, 960 panels with an area of 2 m2 per panel will occupy 1920 m2, which is compatible with the available area of 2000 m2. Table 3 presents the advantages and disadvantages of the proposed scenario. Additionally, BAU is a full-time higher educational institution that requires power for critical equipment, especially in laboratories; hence, the reliability of the power supply is necessary, which is also achieved in this system owing to the existence of diesel generators in the event of extended cloudy periods.

2.4. Feasiblity Study

BAU’s main facilities usually operate for 176 h per month, and for every 100 kVA, a generator uses about 20 L of diesel per hour. For a main load of 1700 kVA, the amount of diesel needed is equal to 60,000 L per month, costing approximately USD 57,610 and increasing to USD 58,110 per month after adding the maintenance costs. It is possible now to determine the payback period of the off-grid system. For an overall cost of USD 5,095,000, knowing that the university spends USD 58,110 USD per month and that each study semester consists of four months, we conclude that the project has a payback period of 22 semesters or 11 years, which is too long based on the evaluation methods used in [20], especially considering that the batteries are to be replaced every 7 to 8 years. For the on-grid system, installing a 550 kW solar system decreases the load on the generators to 1150 kVA, hence consuming 230 L/hour or 40,000 L/month and decreasing the monthly fuel cost to USD 38,407. In addition, the maintenance cost decreases to half of the original owing to decreased stress and fewer operation hours, hence making the monthly cost USD 38,657, which shows a significant decrease of USD 19,453 against the original costs for a relatively low capital investment. As for the payback period of this system, where capital investment is USD 330,000, it is calculated to be four semesters, so this project returns its value in less than two years, which is a relatively short period for such a project. Figure 2 shows bar graphs for the monthly costs and investment costs of the different systems.

3. HOMER Simulation

Three HOMER simulations were performed to further understand the system and validate the study. The HOMER software was chosen to perform the simulation owing to its wide range of applications and the large variety of systems it can model [21]. These three simulations mimicked the three systems presented previously, which are the diesel generator system, the off-grid system, and the on-grid system. Figure 3 shows schematics of the three simulated systems. Table 4 shows the load that was used for the study, which was based on the real load of BAU’s Beirut campus. Figure 4 shows this load as a color plot provided by HOMER software.

3.1. Simulation of the Diesel Generator System

The first simulated scenario was the diesel generator scenario. Five generators were used here from HOMER’s library with the same capacity as those present at BAU. This system represents the status quo and has no initial costs. Figure 5 shows the yearly cash flow of this scenario that was computed by HOMER. The graph shows that the diesel generator has a yearly expense of USD 668,150, which is approximately equal to the calculated value in the study of USD 670,000 after taking the holidays and the season differences into consideration. Figure 6 also shows the cumulative cash flow of this system based on the cash flow graph, which shows that if no actions are taken, the amount of money that will be paid over the years will become prohibitive.
Figure 7 shows the monthly electric production of the different generators used in this scenario, calculated using HOMER. This graph shows that the peak month (July), as well as the vacation months (January, June, and September), were considered.
Another important aspect that should be mentioned is the fuel (mainly diesel) consumed by the system, as well as the emissions resulting from burning this fuel. Table 5 and Table 6 present the HOMER results of the amounts of fuel consumed and the resulting gas emissions, respectively. These two tables show that this system has high emissions, which is obviously undesirable from environmental and health perspectives.
If a single car emits 4600 kg/year of CO2 [22], then in this scenario, the university will be equivalent to the addition of 480 cars to the streets in Beirut. Therefore, continuing with the current situation might seem appealing for the time being, but in the long run, it will be extremely costly, which might hinder BAU’s growth while also imposing health and environmental hazards due to the large amounts of emissions produced.

3.2. Simulation of the Off-Grid System

The second scenario studied was an off-grid system. In this system, the entire load is supplied purely by solar energy, while a battery storage system is added to support the load when the sun is absent. This system has approximately no operating cost in comparison with the other studied scenarios, but at the same time, as computed by HOMER and similar to the previously calculated value, the cost of this system, including the panels, inverters, batteries, and connections, is approximately USD 5.07 million, which is too high for investment and has a long payback time. Figure 8 shows the cash flow graph of this scenario, which consists of only the investment and replacement costs. Additionally, Figure 9 shows the cumulative cash flow of this system, which continues to be higher than the graph given in Figure 6 until around year 11, validating the payback period computed in the feasibility study.
Figure 10 shows the power production of the off-grid system and the extra production needed in this system compared to the previous one. The main reason for the need for this extra production is that in the off-grid system, it is necessary to both supply the load and charge the batteries.
One more concern to be taken into consideration when having batteries in the system is their state of charge, which is also calculated by HOMER and provided in Figure 11. This graph shows that, on average, the maximum depth of discharge that the system may reach is approximately 50%, which is below the 90% depth of discharge of LiFePO4 batteries.
It is also worth noting that this scenario has no emissions, which is ideal for the environmental and health aspects. In conclusion, this scenario has many advantages. From a sustainability perspective, it is ideal, but the investment cost here is too high, and the payback period is too long, making this scenario unfeasible from an economic perspective. Moreover, in case of consecutive cloudy days, the system will be off due to a lack of sun, hence lowering the reliability of the power system, which may cause damage to critical loads such as servers, medicine refrigerators, and some equipment in laboratories.

3.3. Simulation of the On-Grid System

The third and final scenario to be simulated is the on-grid system. In this system, both the PV array and diesel generators supply the load simultaneously. According to HOMER’s calculations, which came in conjunction with the calculations presented in the study, the initial capital investment of this project was approximately USD 330,000, with an operational cost of USD 491,000 for the diesel generators’ fuel and maintenance. The complete cash flow graph is presented in Figure 12, with Figure 13 giving the cumulative cash flow graph of the system to better understand the economics of this system in the long run, which shows that even after 25 years, the money spent would be less than in the other two systems presented in Figure 6 and Figure 9.
Figure 14 shows the monthly power generated by the generators and the solar array. It shows that the amount of generated power is similar to that of the first system due to the absence of the need to charge any batteries, but at the same time, it shows the contribution of the PV array to power generation, which reduces the burden on the generators.
An important issue to address in the case of the diesel generator system is fuel consumption and the resulting emissions. Table 7 and Table 8 list the amount of diesel consumed and the resulting emissions, respectively. These two tables, when compared with those presented in the first scenario, show a significant reduction in both fuel consumption and emissions.
The emissions in this scenario are equivalent to 352 cars. Therefore, when comparing this result with the one in the diesel generator system, which is equivalent to 480 cars, we deduce that by implementing the on-grid system, we can remove emissions equivalent to the removal of 128 cars from the streets with a fairly low investment cost. This scenario is logical in terms of health, environmental, and economic aspects.
As shown from these simulations, adopting the diesel generator system incurs no initial costs, but the operating and fuel costs are far too high, and emissions are significant. As for the off-grid system, the operating and fuel costs are negligible in comparison with the other two systems for the amount of emissions, which makes it favorable environmentally and health-wise, but its investment cost is too high, and its return-on-investment time is too long, making it economically unfeasible and with low power system reliability. For the on-grid system, the amount of consumed fuel and emissions are moderate in comparison with the generator-only scenario while maintaining an acceptable investment cost and preserving system reliability. This, in agreement with the results obtained in the feasibility study, indicates that the on-grid system is the optimal solution for the electricity problem in BAU, and based on this, BAU adopted this solution and implemented it on its Beirut campus.

4. Implementation

As concluded in the previous sections, an on-grid solar system coupled with diesel generators is the most feasible solution for the electricity problem in both the short and long terms. As a result, BAU implemented an on-grid solar system on its Beirut campus. An overview of the different parts of the implemented system is given in this section.

4.1. Diesel Generators

The five diesel generators present at BAU have a combined generation capacity of 4500 kVA. Figure 15 shows one of those existing generators. It should be noted that the capacity of the generators was designed to follow the 2N + 1 redundancy standard to ensure optimal reliability.
A specialized control system is used to turn the generators on and off properly, based on both the changes in the load and the power generated by the solar system. This system, as shown in Figure 16, is placed inside a metal compartment to protect it from external factors and interference.

4.2. PV Panels

The panels used in this system are the Trina 550 W modules with the specifications presented in Table 9.
These panels are spread all over the roofs of the facilities present at BAU at different angles to capture the most available solar radiation throughout the day (see Figure 17). This spread also helps make utmost use of the limited area available.

4.3. Inverters

In this system, nine 50 kW, SMA on-grid inverters are coupled together and then synchronized with the diesel generators via a DEIF controller to feed the required load throughout the day. Figure 18 shows the inverters used in the real system. It is worth mentioning that the inverters were positioned in different places all over the campus close to the PV sub-arrays to minimize losses during transmission as much as possible.

4.4. Functionality

This system has proven to be able to feed the load even during winter days when the sun’s angle is low and the days are short. Figure 19 shows the generation details of the controller used to monitor the system at 10:30 am on 1 December 2022. We can see that, for a total load of 300 kW (representing only the main building), the solar system supplies 67% of the load at a power factor of 86%.

5. Conclusions

Lebanon has always been hanging on the verge of collapse and has started falling in recent years. Prices are skyrocketing because of the local currency’s deteriorating value. Amidst this, the electrical power supply has become a memory owing to the tremendous leap in fuel prices. As for BAU, for which electricity is an indispensable necessity, finding a solution for the electricity problem took priority above all else. In this study, three systems that can solve the problem were studied, the first of which is continuing with the current solution and continuing to rely on the originally present diesel generators, which proved to be impractical owing to the high fuel and operating costs as well as the health and pollution issues associated with it. The second scenario consists of an off-grid solar power system, which is considered the best solution in terms of sustainability and environmental aspects but was considered unfeasible because of the high investment cost of USD 5,095,000 as well as the very long payback period of 11 years, the low system reliability, and the area needed. The third scenario suggested an on-grid system by coupling a solar system with the already present diesel generators; this solution has a relatively low cost of USD 330,000 and, at the same time, decreases the stress on the generators, which cuts down on fuel and operation costs. Therefore, it is considered to be the most feasible solution. To further validate and understand the system, HOMER simulations of the three studied scenarios were performed, and the obtained results were consistent with the results obtained in the scenarios and feasibility studies. In addition, as shown by HOMER, the emission reduction caused by applying the on-grid system was equivalent to removing 128 cars while maintaining a relatively low investment cost. These results confirm that, in comparison with the first two scenarios, the on-grid solution strikes a balance between initial investment, payback time, and emission reduction. Regarding the implementation aspect, the system’s power output was 208 kW in December. It is anticipated that the system will achieve its maximum output of approximately 450 kW by June, based on prevailing weather conditions. We anticipate that the outcome of this study will inspire and motivate other organizations and communities to embrace sustainable and renewable energy sources as viable alternatives to traditional energy sources. This shift in approach would have a positive impact on the environment and promote a more sustainable future.

Author Contributions

Conceptualization, M.T. and A.E.G.; methodology, K.C.; software, M.A. and A.E.G.; validation A.E.G. and K.C.; formal analysis, M.T. and M.A.; investigation, M.T. and M.A.; resources, M.T.; data curation, M.T.; writing—original draft preparation, M.T. and M.A.; writing—review and editing, A.E.G. and K.C.; visualization, K.C.; supervision, K.C.; project administration, A.E.G.; funding acquisition, M.T. and A.E.G. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Smil, V. Energy in Nature and Society: General Energetics of Complex Systems; The MIT Press: Cambridge, MA, USA, 2008; ISBN 9780262693561. [Google Scholar]
  2. Schneider, N. Population Growth, Electricity Demand and Environmental Sustainability in Nigeria: Insights from a Vector Auto-Regressive Approach. Int. J. Environ. Stud. 2022, 79, 149–176. [Google Scholar] [CrossRef]
  3. Subramanyam, S.A.; Zhang, X. Effect of Loss of Load Probability Distribution on Operating Reserve Demand Curve Performance in Energy-Only Electricity Market. IEEE Trans. Power Syst. 2020, 35, 3297–3300. [Google Scholar] [CrossRef]
  4. Tully, S. The Human Right to Access Electricity. Electr. J. 2006, 19, 30–39. [Google Scholar] [CrossRef]
  5. Mukhtar, M.; Obiora, S.; Yimen, N.; Quixin, Z.; Bamisile, O.; Jidele, P.; Irivboje, Y.I. Effect of Inadequate Electrification on Nigeria’s Economic Development and Environmental Sustainability. Sustainability 2021, 13, 2229. [Google Scholar] [CrossRef]
  6. International Energy Agency. World Energy Outlook 2022; OECD: Paris, France, 2022; ISBN 9789264425446. [Google Scholar]
  7. Afzal, S.; Mokhlis, H.; Illias, H.A.; Mansor, N.N.; Shareef, H. State-of-the-art Review on Power System Resilience and Assessment Techniques. IET Gener. Transm. Distrib. 2020, 14, 6107–6121. [Google Scholar] [CrossRef]
  8. Health and Environmental Impacts of Electricity Generation Systems: Procedures for Comparative Assessment; Internationale Atomenergie-Organisation (Ed.) Technical Reports Series; International Atomic Energy Agency: Vienna, Austria, 1999; ISBN 9789201029997. [Google Scholar]
  9. Iqbal, M. An Introduction to Solar Radiation; Academic Press: Toronto, ON, Canada; New York, NY, USA, 1983; ISBN 9780123737502. [Google Scholar]
  10. Sharifi, V.; Abdollahi, A.; Rashidinejad, M.; Heydarian-Forushani, E.; Alhelou, H.H. Integrated Electricity and Natural Gas Demand Response in Flexibility-Based Generation Maintenance Scheduling. IEEE Access 2022, 10, 76021–76030. [Google Scholar] [CrossRef]
  11. Craig, M.T.; Losada Carreño, I.; Rossol, M.; Hodge, B.-M.; Brancucci, C. Effects on Power System Operations of Potential Changes in Wind and Solar Generation Potential under Climate Change. Environ. Res. Lett. 2019, 14, 034014. [Google Scholar] [CrossRef]
  12. Modern Renewable Energy Generation by Source. Available online: https://ourworldindata.org/grapher/modern-renewable-prod (accessed on 3 May 2023).
  13. Nations, U. Renewable Energy—Powering a Safer Future. Available online: https://www.un.org/en/climatechange/raising-ambition/renewable-energy (accessed on 23 March 2023).
  14. GLOBAL Renewables Outlook: Energy Transformation 2050; IRENA: Abu Dhabi, United Arab Emirates, 2020; ISBN 9789292602383.
  15. Julian, M.; Bassil, N.; Dellagi, S. Lebanon’s Electricity from Fuel to Solar Energy Production. Energy Rep. 2020, 6, 420–429. [Google Scholar] [CrossRef]
  16. Mahfouz, P.; Mitri, G.; Jazi, M.; Karam, F. Investigating the Temporal Variability of the Standardized Precipitation Index in Lebanon. Climate 2016, 4, 27. [Google Scholar] [CrossRef]
  17. Publications|LCEC. Available online: https://lcec.org.lb/publications (accessed on 22 March 2023).
  18. Jung, T.; Kim, D.; Moon, J.; Lim, S. A Scenario Analysis of Solar Photovoltaic Grid Parity in the Maldives: The Case of Malahini Resort. Sustainability 2018, 10, 4045. [Google Scholar] [CrossRef]
  19. Nikhilesh, J.; Singh, S.B. Homer Based: A Real Time Case Study on Optimization and Simulation of Hybrid Energy System at NIT Kurukshetra and the Effect on the Environment. In Proceedings of the 2020 First IEEE International Conference on Measurement, Instrumentation, Control and Automation (ICMICA), Kurukshetra, India, 24–26 June 2020; pp. 1–5. [Google Scholar]
  20. Ani, M.K.A. A Strategic Framework to Use Payback Period (PBP) in Evaluating the Capital Budgeting in Energy and Oil and Gas Sectors in Oman. IJEFI 2015, 5, 469–475. [Google Scholar]
  21. Nallolla, C.A.; Perumal, V. Optimal Design of a Hybrid Off-Grid Renewable Energy System Using Techno-Economic and Sensitivity Analysis for a Rural Remote Location. Sustainability 2022, 14, 15393. [Google Scholar] [CrossRef]
  22. Greenhouse Gas Emissions from a Typical Passenger Vehicle. Available online: https://www.epa.gov/greenvehicles/greenhouse-gas-emissions-typical-passenger-vehicle (accessed on 27 March 2023).
Figure 1. The global growth of renewable energy generation.
Figure 1. The global growth of renewable energy generation.
Sustainability 15 07695 g001
Figure 2. Comparison between the systems in terms of (a) monthly cost and (b) investment cost.
Figure 2. Comparison between the systems in terms of (a) monthly cost and (b) investment cost.
Sustainability 15 07695 g002
Figure 3. HOMER schematics of the three systems: (a) diesel generator system, (b) off-grid system, and (c) on-grid system.
Figure 3. HOMER schematics of the three systems: (a) diesel generator system, (b) off-grid system, and (c) on-grid system.
Sustainability 15 07695 g003
Figure 4. Yearly profile of the studied load.
Figure 4. Yearly profile of the studied load.
Sustainability 15 07695 g004
Figure 5. Cash flow graph of the diesel generator system.
Figure 5. Cash flow graph of the diesel generator system.
Sustainability 15 07695 g005
Figure 6. Cumulative cash flow of the diesel generator system.
Figure 6. Cumulative cash flow of the diesel generator system.
Sustainability 15 07695 g006
Figure 7. Monthly power generation of the diesel generator system.
Figure 7. Monthly power generation of the diesel generator system.
Sustainability 15 07695 g007
Figure 8. Cash flow graph of the off-grid system.
Figure 8. Cash flow graph of the off-grid system.
Sustainability 15 07695 g008
Figure 9. Cumulative cash flow of the off-grid system.
Figure 9. Cumulative cash flow of the off-grid system.
Sustainability 15 07695 g009
Figure 10. Monthly power generation of the off-grid system.
Figure 10. Monthly power generation of the off-grid system.
Sustainability 15 07695 g010
Figure 11. State of charge of the batteries around the year.
Figure 11. State of charge of the batteries around the year.
Sustainability 15 07695 g011
Figure 12. Cash flow graph of the on-grid system.
Figure 12. Cash flow graph of the on-grid system.
Sustainability 15 07695 g012
Figure 13. Cumulative cash flow of the on-grid system.
Figure 13. Cumulative cash flow of the on-grid system.
Sustainability 15 07695 g013
Figure 14. Monthly power generation of the on-grid system.
Figure 14. Monthly power generation of the on-grid system.
Sustainability 15 07695 g014
Figure 15. Main body of the larger generator.
Figure 15. Main body of the larger generator.
Sustainability 15 07695 g015
Figure 16. Control system coupling the five generators.
Figure 16. Control system coupling the five generators.
Sustainability 15 07695 g016
Figure 17. The complete solar array installed at BAU Beirut campus.
Figure 17. The complete solar array installed at BAU Beirut campus.
Sustainability 15 07695 g017
Figure 18. The installed inverters.
Figure 18. The installed inverters.
Sustainability 15 07695 g018
Figure 19. Controller display showing the actual generation of the on-grid solar system.
Figure 19. Controller display showing the actual generation of the on-grid solar system.
Sustainability 15 07695 g019
Table 1. Advantages and disadvantages of using only diesel generators.
Table 1. Advantages and disadvantages of using only diesel generators.
AdvantagesDisadvantages
Low initial costHigh operation cost
ExistingHigh fuel cost
No need for additional networksHigh emissions
ReliableSevere effects on environment
and health
Table 2. Advantages and disadvantages of the off-grid system.
Table 2. Advantages and disadvantages of the off-grid system.
AdvantagesDisadvantages
Complete independenceHigh investment cost
No fuel costsLow reliability
Environmentally friendlyLarge numbers of panels required
SustainableNeeds a lot of space
Table 3. Advantages and disadvantages of the on-grid system.
Table 3. Advantages and disadvantages of the on-grid system.
AdvantagesDisadvantages
Lower investment costDependent on generators
Lower fuel costModerate pollution
Less maintenance
Compatible with the available space
Reliable
Sustainable
Table 4. Yearly profile of the load in kW.
Table 4. Yearly profile of the load in kW.
HourJanFebMarAprMayJunJulAugSeptOctNovDec
04069758392601009850837569
14069758392601009850837569
24069758392601009850837569
34069758392601009850837569
44069758392601009850837569
54069758392601009850837569
6120208225250275180300293150250225208
7200346375417458300500488250417375346
85449411020113312478161360132668011331020941
95449411020113312478161360132668011331020941
105449411020113312478161360132668011331020941
115449411020113312478161360132668011331020941
125449411020113312478161360132668011331020941
135449411020113312478161360132668011331020941
145449411020113312478161360132668011331020941
155449411020113312478161360132668011331020941
165449411020113312478161360132668011331020941
174006927508339176001000975500833750692
18200346375417458300500488250417375346
19120208225250275180300293150250225208
2080138150167183120200195100167150138
214069758392601009850837569
224069758392601009850837569
234069758392601009850837569
Table 5. Fuel consumed in the diesel generator system.
Table 5. Fuel consumed in the diesel generator system.
QuantityValueUnits
Total fuel consumed835,176L/year
Average fuel per day2288L/day
Average fuel per hour95.3L/hour
Table 6. Gas emissions of the diesel generator system.
Table 6. Gas emissions of the diesel generator system.
QuantityValueUnits
Carbon Dioxide2,205,901kg/year
Carbon Monoxide1419kg/year
Unburned Hydrocarbons506kg/year
Particulate Matter196kg/year
Sulfur Dioxide5475kg/year
Nitrogen Oxides14,121kg/year
Table 7. Fuel consumed in the on-grid system.
Table 7. Fuel consumed in the on-grid system.
QuantityValueUnits
Total fuel consumed612,389L/year
Average fuel per day1678L/day
Average fuel per hour69.9L/hour
Table 8. Gas emissions of the on-grid system.
Table 8. Gas emissions of the on-grid system.
QuantityValueUnits
Carbon Dioxide1,617,031kg/year
Carbon Monoxide1594kg/year
Unburned Hydrocarbons236kg/year
Particulate Matter90.8kg/year
Sulfur Dioxide4015kg/year
Nitrogen Oxides9750kg/year
Table 9. Specifications of Trina solar panels.
Table 9. Specifications of Trina solar panels.
QuantityValue
Pmax550 W
Vmp31.6 V
Imp17.4 A
Voc37.9 V
Isc18.52 A
Maximum series fuse30 A
Power selection0 ± 5 W
Maximum system voltageIEC 1500 V
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Tarnini, M.; Alsayed, M.; El Ghaly, A.; Chahine, K. Towards Energy Sustainability in University Campuses: A Case Study of Beirut Arab University. Sustainability 2023, 15, 7695. https://doi.org/10.3390/su15097695

AMA Style

Tarnini M, Alsayed M, El Ghaly A, Chahine K. Towards Energy Sustainability in University Campuses: A Case Study of Beirut Arab University. Sustainability. 2023; 15(9):7695. https://doi.org/10.3390/su15097695

Chicago/Turabian Style

Tarnini, Mohamad, Mohammad Alsayed, Abdallah El Ghaly, and Khaled Chahine. 2023. "Towards Energy Sustainability in University Campuses: A Case Study of Beirut Arab University" Sustainability 15, no. 9: 7695. https://doi.org/10.3390/su15097695

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop