1. Introduction
Access to safe water, sanitation, and sound management of freshwater ecosystems are essential to human health and to environmental sustainability and economic prosperity. Currently, water, sanitation, and hygiene (WASH) are a global concern and a priority area as the goal 6 in the sustainable development goals (SDGs) of the United Nations (UN) [
1,
2,
3,
4,
5].
According to the UN [
5], a majority of the world’s population still lacks safe sanitation, and 3 in 10 lack safe drinking water. In 2015, 71% of the global population used safely managed drinking water services (an improved water source located on premises, available when needed and free from contamination) and 17% of the population used a basic drinking water service (an improved water source not more than 30 min away). Otherwise, the remaining 13% of the global population still lacked even a basic level of service for drinking water [
5].
With respect to sanitation, on the basis of estimates from 84 countries in 2015 [
5], 39% of the global population used safely managed sanitation services (basic facilities safely disposing of human waste) and an additional 29% of the population utilized a basic sanitation service (an improved facility that is not shared). In 2015, 892 million people continued to practice open defecation [
4].
In 2015, conflict, violence, and instability in fragile states based on the World Bank’s harmonized classification of fragile situation [
6] curtailed progress on water and sanitation services [
5]. Moreover, untreated wastewater from households degrades overall water quality, posing a risk to both public health and the environment.
For instance, in 2002, WASH-related deaths and disabilities occurred globally among children 14 years old and younger at rates of 25% and 22%, respectively [
7]. Frequently, WASH-borne illness results directly from the exclusion of the urban poor in national WASH policy, planning, and intervention processes. One of the fundamental causes of this exclusion has been the long-standing inability of utility and city managers and their advisers to plan and implement water and sanitation systems, which respond to the realities faced by the urban poor [
8]. Moreover, in both urban and peri-urban (or rural) settlements, including slums, the provision of sanitation, drinking water, and wastewater treatment services is absent or ignored, particularly in low-income countries [
1,
9,
10]. The peri-urban areas in Mongolia are no exception to this kind of attitude being adopted by the national government [
1,
4].
Mongolia is a landlocked country bordered with China in the south and Russia in the north. The country is one of the least densely populated countries in the world, with an estimated population of 3.16 million in 2017, occupying an area of 1.5 million km
2 [
11,
12]. Of the fresh water in the country, 82% is groundwater [
13]. The annual mean temperature of the capital city, Ulaanbaatar, is −3.7 °C, known as the coldest capital city in the world, with a low precipitation of approximately 200 mm/year [
12,
14].
A high proportion of the country population and economy is concentrated in the capital city, having over 1.4 million people in 2016 [
15]. Ulaanbaatar is experiencing on-going urban growth due to a large number of nomadic immigrants from rural areas, resulting in environmental, health, and socio-economic problems. Sixty percent of the total population of Ulaanbaatar reside in peri-urban informal settlements, called ger areas (a ger is a portable round yurt/tent used in traditional nomadic settlements), without supporting infrastructure and services for water supply, drainage, sewage, and central heating.
Moreover, Mongolia experiences climatic hazards—these being drought and severe winters (
zud is the Mongolian local term for severe winter, and
dzud is the local term for the combination of drought and
zud), affecting the nomadic people in rural areas.
Dzud is a major natural disaster caused by harsh climate conditions in winter/spring, causing livestock loss because of hunger due to inability of grazing [
16]. Then, herders who have lost their entire livestock in rural areas have to migrate to the capital city and settle down in the ger areas. This is one of the main causes of the aforementioned urban growth of Ulaanbaatar [
17].
A lack of a safe water supply and unimproved sanitation have been found to be the key issues in the ger areas. Simple, unimproved, and unventilated pit latrines and soak pits are generally used for on-site sanitation and household greywater (used water from kitchens, sinks, washing, and other household sources other than sewage and toilet), resulting in unhygienic living conditions [
18]. The daily average water consumption of 7.3 L per person in the ger areas is low compared to the world standard of 25 L, and far lower than the 291 L average used by residents of the city core in Ulaanbaatar [
13]. As a result, less greywater is produced in the ger areas (approximately 4–5 L/person/day) [
13]. The low usage in the ger areas can be attributed to mainly deficiencies in the water supply system.
The sanitation practices in ger areas has significant and cumulative impacts on the soil and groundwater. Although pathogens from human waste eventually degrade in the ground, these processes are slowed by the cold climate, with an average annual temperature of 1.0 °C [
19], an average summer temperature of 15 °C, and an average winter temperature of −19 °C [
20]. The large amounts of waste going into the soil can be transported by ground water and surface water during the spring thaw and summer rains and can affect the health of the residents because of the lack of hygienic sanitation, which likely contributes directly to higher disease rates. The lack of adequate wastewater disposal systems is one barrier to increasing the quantity of water supplied to residents. The lack of basic urban services and infrastructure in the ger area settlements has become a source of urban environmental issues such as air, water, and soil pollution [
20].
With respect to current states of the ger areas on services and infrastructure (e.g., water supply, sanitation, solid waste management, heating, electricity, street lighting, roads and footpaths, transportation services, flood control and drainage, health services, emergency services, education, and greening), detailed information is well described in a series of reports by the UN Habitat [
20,
21,
22].
However, there are very few studies reporting on the improvement of WASH-related issues. Uddin et al. reported field experiments on greywater treatment systems, and improvements in household water supply (use) and wastewater treatment in the ger area of Ulaanbaatar [
13,
23]. Uddin et al. also raised WASH-borne hazards and risk issue in the ger area [
1,
18].
Effective water and sanitation management relies on the participation of various stakeholders, including local communities [
4]. However, as described, the provision of sanitation, drinking water, and wastewater treatment services and the participation of local communities in peri-urban or rural areas are absent or ignored by the national or local governments in low-income countries [
1,
9,
10,
24], including the Mongolia [
1,
4].
Therefore, for the participation of various stakeholders in the sustainable development plan of ger areas, this study aims to estimate the willingness to pay (WTP) of residents for improving the water supply and wastewater treatment services by using the contingent valuation (CV) method. To the extent of authors’ knowledge, there is no study reported on residents’ WTP for a water supply and wastewater treatment services in ger areas of Ulaanbaatar. In this study, a field survey on WTP for water and wastewater services had been conducted in a ger area defined in the development plan. Much of the literature uses the CV method to examine the WTP for non-market products and services in various contexts, for example, in carbon tax on air passengers [
25], health services [
26], water and wastewater services [
27,
28,
29,
30,
31,
32,
33,
34,
35,
36], grassland restoration [
37], beach management [
38], storm surge protection [
39], electricity service [
40], marine conservation parks [
41], mortality risk reduction [
42], toll road services [
43], and urban forestation to mitigate climate change [
44]. In all cases, the CV method allows for the obtaining of the economic valuation of the proposed non-market goods or services, on the basis of an improvement in the living conditions of the beneficiaries.
This paper is structured as follows. The study area, Damba planning unit, is described in
Section 2, and the field survey, data, and methodology are presented in
Section 3. The results and discussions on their implications are described in
Section 4 and
Section 5, respectively. The conclusions, including the limitations of this study, are presented in
Section 6.
2. Study Area
Ulaanbaatar is the capital and the largest city of Mongolia and serves as the economic and cultural center of the country (
Figure 1). The Ulaanbaatar ger areas are now permanently occupied. While the housing density of the ger areas is too high for a traditional lifestyle, it is too low for the efficient provision of basic urban services to low-income households. Small ger areas could rely on the adjacent developed city core for basic urban services, but now that the ger area population has increased to over 58% [
20] of the total city, the resulting spatial expansion is forcing new settlements many kilometers away from the developed city core area.
Ger areas are located around the city core (primarily to the north), and because of their lower population density, they comprise most of the settled areas of the city. Ger area buildings are rarely over two stories high. The most distinguishing feature of the ger areas is the 2 m high wooden fences that enclose all the residential plots and their typically irregular layout. Housing in the ger areas is predominantly single-family and is a mix of traditional gers and owner-built houses, constructed of either brick or wood.
The Damba planning unit, one of the ger districts defined by the Urban Development Trend 2030 (
Figure 1), was chosen for the study area since it has one decentralized wastewater treatment plant (100 m
3 per day) in the center, supporting a limited number of households because of the sewage line connection. Therefore, it would be useful to investigate the willingness to pay for the wastewater treatment improvement from local residents. It is located in the northeast part of Ulaanbaatar city, and residents in the area all live in ger and owner-built houses. The population of the Damba unit was approximately 32,100, and the number of households was approximately 8700 in 2010 [
45]. In the Damba area, in addition to the decentralized wastewater treatment plant, there are 20 mainline-connected water supply stations, 7 truck water supply stations, and 12 bathhouses.
4. Results
4.1. Descriptive Survey Results
Figure 2 illustrates the summary of field survey on WTP for water supply and wastewater treatment in the Damba planning unit.
Table 2 shows the current water supply and wastewater treatment facility types and the number of respondents. In the study area, 98.1% of the respondents can access an improved water supply but only 23.7% said they were satisfied, 66.4% said it was just passable, and 8% said they were unsatisfied with the water quality. Eight percent of the respondents could use improved wastewater treatment and sanitation facilities, while 92% of the respondents could not use improved wastewater treatment and sanitation facilities.
A number of factors were hypothesized to be relevant to the revealed WTP for improving the water supply and wastewater treatment conditions. The dummy variable in the bid function was equal to 1 if the residents’ education was greater than high school and otherwise was equal to 0. Additionally, if the residents lived in their own built house, then the dummy variable was equal to 1; otherwise, it became 0. The expected effect of water access time and housing on WTP is uncertain. Residents living in their own built house were hypothesized to have more opportunities to improve their water conditions; thus, they were expected to have a greater WTP for the improved water supply and wastewater treatment. Four categorical income variables were defined to represent monthly income levels. WTP was expected to increase as income increased and water consumption increased. The expected effect of the current monthly payment and education on water supply (thousand MNT) was unclear.
A summary of the statistics for the entire sample and for the censored and uncensored sub-samples are presented in
Table 3. The mean WTP for the water supply and the improved wastewater treatment facility installation for the entire sample was less than 1000 (thousand MNT). In the subsample (62.8%) that answered “yes” on question F1 (“If there is a chance to improve the water supply and the wastewater (sanitation) conditions, how much would you pay for it?”), the WTP for the installation of the water supply and wastewater treatment facility was 1500 (thousand MNT).
The mean WTP for the O&M of the water supply and wastewater treatment improvement facility from the entire sample was less than 3 (thousand MNT). In the subsample (66.3%) that answered “yes” on question F7 (“If answer F-1 is yes, what would you pay for water, wastewater, and sanitation fees for monthly (O&M)?”), the WTP for O&M was 6 (thousand MNT).
A greater proportion of the respondents that indicated a zero bid on both the installation and the O&M WTP were from lower income categories (income levels 1 and 2).
In the subsample indicating a positive WTP for the installation of the water supply and wastewater treatment facility, 62% of the respondents had an education level greater than high school, 9% were at income level 1, 41% were at income level 2, 8% were at income level 3, 3% were at income level 4, 71% lived in a detached house, 87% could access water within 30 min, and 88% were willing to pay for O&M. In addition, in terms of WTP for the installation, 139 respondents (73.5%) from the subsample answered option 1 (less than 1000 thousand MNT), 40 (21.2%) chose option 2 (between 1000 and 1500 thousand MNT), 7 (3.7%) chose option 3 (between 1500 and 2000 thousand MNT), and 3 (1.6%) answered option 4 (more than 2000 thousand MNT).
In the subsample indicating a positive WTP for the O&M of the water supply and wastewater treatment improvement, 65% of the respondents had an education level greater than high school, 12% were at income level 1, 37% were at income level 2, 8% were at income level 3, 3% were at income level 4, 68% lived in a detached house, 85% could access water within 30 min, and 84% were willing to pay for the facility installation. In addition, in terms of WTP for O&M, 74 respondents (30.1%) from the subsample answered option 1 (less than 1000 MNT), 75 (31.1%) chose option 2 (between 3000 and 6000 MNT), 41 (17.0%) chose option 3 (between 6000 and 9000 MNT), 20 (8.3%) answered option 4 (between 6000 and 9000 MNT), and 31 (13.5%) answered option 5 (more than 12,000 MNT).
People who had an education level greater than high school were willing to pay more. The effect of water access time was that those who could not access water within 30 min had a lower WTP. People who lived in their own built house were willing to pay more.
4.2. Modeling Results
To determine which factors affected individual’s WTP for water supply and wastewater treatment and by how much, the results relied on the OLS and Tobit analysis. With respect to the WTP for the installation, the OLS and Tobit analysis results are presented in
Table 4. The significance of the individual variables in the WTP for the installation was very similar between the OLS and Tobit models’ estimations. The results indicated that the housing, household income, education, and current monthly payment for water supply had significant impacts on WTP for installation in order of importance based on the OLS result, whereas the housing, current monthly payment, education, and household income were significant in that order of importance from the Tobit analysis. On the basis of both results, the household income (in level 1) depicted a negative influence on WTP for installation.
With respect to the WTP for the O&M, the OLS, and Tobit analysis results are presented in
Table 5. The significances of the individual variables in the WTP for the O&M from the OLS result were the household income level 1, level 2, level 3, housing, and time for water access in that order, with 0.1%, 5%, 5%, 10%, and 10%, respectively. On the other hand, from the Tobit analysis result, the family size indicated the most significant impact with 0.1%, followed by the household income level 1, level 2, housing, time for water access, and education, with 5%, 5%, 10%, 10%, and 10%, respectively. In the OLS result, all significant factors except for housing had negative impacts on the WTP for O&M, while in the Tobit result, family size and housing exhibited positive influences on the WTP for O&M.
The additional information on the goodness of fit statistics and the evaluation of the model fit can be found in
Appendix A.
5. Discussion
In this study, the determinant of the WTP for installation and O&M were analyzed using the OLS and Tobit models. In the OLS model result, there may have been some issues due to potential sample selection bias and censored data. However, by comparing the results between the OLS and Tobit models, the consistency of parameter estimates can be determined in the WTP for installation and O&M.
First, in both results of the WTP for installation from the OLS and Tobit models, the parameter estimates were very consistent in that housing was the most significant factor, followed by household income, education, and current monthly payment for water supply. In each case of the WTP for installation, people who lived in their own detached houses were more willing to pay for the installation of water supply and wastewater treatment facilities and services. The detached houses in ger areas were more permanent settlement types than the round tents. Thus, it can be concluded that people who settled longer in a permanent housing type showed more WTP for installation. Furthermore, people who were educated (greater than high school) and who paid more currently for water showed more positive significance with a high WTP. Income level 1 was negatively significant, indicating that low-income people had a lower WTP.
Second, in both results of the WTP for O&M, people who had a low income (income levels 1 and 2) were less willing to pay for O&M. In the Tobit model result, family size was the most important factor for the WTP with a 0.1% level, while it was not a significant factor in the OLS result. Families with larger numbers of members were more willing to pay for O&M. In both results, people who accessed water within 30 min were more willing to pay and people who were educated greater than high school showed more WTP for O&M. It is interesting that the housing type was not that much of a significant factor in the WTP for O&M as it was the most important factor in the WTP for installation of water supply and wastewater treatment. People who lived in a detached house were negatively significant.
With respects to the WTP for water and wastewater services in Canberra, Australia, the WTP depended on the interruption time of water service and overflow time of wastewater. Moreover, the respondents valued those that traditionally receive less attention by water utilities, such as customer call [
27]. In a survey of 21 shrinking U.S. cities, the temporal dynamic of WTP for water and wastewater service was investigated and the result indicated that the influencing geographic and socioeconomic factors (e.g., age, income) were changing as well. Therefore, it highlighted that public perceptions should be periodically investigated to continually identify times of greater public support and needs for water and wastewater service [
28]. For the drinking water service in Parral, Mexico, at the time of 2009, the WTP for safe drinking water service was 1.8 to 7.55% of reported household income [
30]. In the case of Puno, Peru, the WTP for improvements in the wastewater treatment system was investigated by household field survey, and the result indicated that the mean WTP of
$1.46 USD estimated was affected by socioeconomic variables such as household budget, educational level, and geographic location of the household [
32]. These results, particularly those of Mexico and Peru, indicate that the affecting socioeconomic factors on WTP, such as household income, education level, and location, are similar with this Mongolian case, as the people living in their own detached house were more willing to pay.
In the individual’s WTP in the CV method survey, there are several concerns related to bias, and these potential biases associated with the CV method are stated in Lantz et al. [
54], including protest votes and ‘yea-sayers’. Respondents may strategically state a WTP rather than stating how much they would (and could) actually pay [
39]. In recent literature, it is indicated that the WTP estimated in CV method studies can be as much as two to three times actual WTP in markets, and methodology to reduce the hypothetical bias is introduced [
55,
56,
57,
58]. However, additional questions to the WTP questions to identify the protest votes or yea-sayers were not implemented in the field survey of this study. Therefore, the actual amount of payment that the respondents can pay for the water supply and wastewater treatment could be much lower than the answers to the questions.
The questionnaire used in the survey did not include any variables related to nomadic culture. Thus, it would be important to investigate how the nomadic culture influences the WTP for water supply and wastewater treatment in a future study.
6. Conclusions
This study aimed to estimate the WTP of ger residents for the installation and O&M costs of improved water supply and wastewater treatment services in Ulaanbaatar city, on the basis of a field survey in Damba planning unit using the CV method.
The Tobit model result of the field survey indicated that the important factors affecting the WTP for installation were the housing type, current monthly payment for water supply, income level, and education, in order of significance. People living in their own detached house and who were educated greater than high school were shown to be more willing to pay for the installation of water supply and wastewater treatment facilities. Those who were paying higher for their monthly water supply were more willing to pay for the installation cost.
In terms of the WTP for O&M cost, WTP was associated with the family size, income level, housing, time for water access, and education, in order of significance from the Tobit model. Families with a larger number of members were more willing to pay, and low-income people were less willing to pay for O&M. Education showed a positive influence on the WTP for O&M. Water access time also affected the WTP of those who could not access water within 30 min, as they indicated low WTP values.
The average total WTP for the water supply and wastewater treatment facility installation was less than 1000 thousand MNT, and the average total WTP for the O&M was less than 3000 MNT.
In comparison of the WTP for water and wastewater service in other countries, it was found that more information on the service and related plan given to people plays a positive role in the WTP, and that socioeconomic factors are very important in WTP. As indicated in the temporal dynamic of WTP in the U.S. case study [
28], it is necessary to continuously investigate the WTP of ger areas and the effects of nomadic culture in water and wastewater services.
In this study, the potential bias in the survey result due to protest votes or yea-sayers was not eliminated. Thus, the actual amount of payment for water supply and wastewater treatment services could be less than the answers from the respondents. Also, the nomadic cultural influence on the WTP was not dealt with in this survey. Therefore, these limitations should be improved in future studies.
We hope that this study of the WTP for the water supply and wastewater treatment based on field survey results can encourage public participation in the urban decision-making process and assist various planners and authorities in formulating a suitable plan for the ger area development in Ulaanbaatar city, Mongolia.