Next Article in Journal
Integrated Process of Immediate One-Step Lime Precipitation, Atmospheric Carbonation, Constructed Wetlands, or Adsorption for Industrial Wastewater Treatment: A Review
Previous Article in Journal
Is the LSTM Model Better than RNN for Flood Forecasting Tasks? A Case Study of HuaYuankou Station and LouDe Station in the Lower Yellow River Basin
 
 
Article

Article Versions Notes

Water 2023, 15(22), 3927; https://doi.org/10.3390/w15223927
Action Date Notes Link
article xml file uploaded 10 November 2023 11:32 CET Original file -
article xml uploaded. 10 November 2023 11:32 CET Update -
article pdf uploaded. 10 November 2023 11:32 CET Version of Record -
article html file updated 10 November 2023 11:34 CET Original file -
article xml file uploaded 10 November 2023 13:24 CET Update -
article xml uploaded. 10 November 2023 13:24 CET Update https://www.mdpi.com/2073-4441/15/22/3927/xml
article pdf uploaded. 10 November 2023 13:24 CET Updated version of record https://www.mdpi.com/2073-4441/15/22/3927/pdf
article html file updated 10 November 2023 13:26 CET Update https://www.mdpi.com/2073-4441/15/22/3927/html
Back to TopTop