Moholwa, M.S.; Tsebe, S.P.; Hayman, D.; Moloane, S.; Steenkamp, J.; Sitefane, M.; Bezuidenhout, D.
The Effect of Ore Pre-Heating on the Operation of a 300 kVA Submerged Arc Furnace for High Carbon Ferromanganese Alloy Production—Pilot Study Results. Minerals 2025, 15, 968.
https://doi.org/10.3390/min15090968
AMA Style
Moholwa MS, Tsebe SP, Hayman D, Moloane S, Steenkamp J, Sitefane M, Bezuidenhout D.
The Effect of Ore Pre-Heating on the Operation of a 300 kVA Submerged Arc Furnace for High Carbon Ferromanganese Alloy Production—Pilot Study Results. Minerals. 2025; 15(9):968.
https://doi.org/10.3390/min15090968
Chicago/Turabian Style
Moholwa, Matale Samuel, Sello Peter Tsebe, Derek Hayman, Sanda Moloane, Joalet Steenkamp, Martin Sitefane, and Driaan Bezuidenhout.
2025. "The Effect of Ore Pre-Heating on the Operation of a 300 kVA Submerged Arc Furnace for High Carbon Ferromanganese Alloy Production—Pilot Study Results" Minerals 15, no. 9: 968.
https://doi.org/10.3390/min15090968
APA Style
Moholwa, M. S., Tsebe, S. P., Hayman, D., Moloane, S., Steenkamp, J., Sitefane, M., & Bezuidenhout, D.
(2025). The Effect of Ore Pre-Heating on the Operation of a 300 kVA Submerged Arc Furnace for High Carbon Ferromanganese Alloy Production—Pilot Study Results. Minerals, 15(9), 968.
https://doi.org/10.3390/min15090968