Dong, C.; Wang, H.; Zhang, H.; Zhang, M.; Guan, J.; Zhang, Z.; Lin, Q.; Zuo, Z.
Research on Fine Scheduling and Assembly Planning of Modular Integrated Building: A Case Study of the Baguang International Hotel Project. Buildings 2022, 12, 1892.
https://doi.org/10.3390/buildings12111892
AMA Style
Dong C, Wang H, Zhang H, Zhang M, Guan J, Zhang Z, Lin Q, Zuo Z.
Research on Fine Scheduling and Assembly Planning of Modular Integrated Building: A Case Study of the Baguang International Hotel Project. Buildings. 2022; 12(11):1892.
https://doi.org/10.3390/buildings12111892
Chicago/Turabian Style
Dong, Changyin, Hao Wang, Haipeng Zhang, Ming Zhang, Jun Guan, Zongjun Zhang, Qian Lin, and Zewen Zuo.
2022. "Research on Fine Scheduling and Assembly Planning of Modular Integrated Building: A Case Study of the Baguang International Hotel Project" Buildings 12, no. 11: 1892.
https://doi.org/10.3390/buildings12111892
APA Style
Dong, C., Wang, H., Zhang, H., Zhang, M., Guan, J., Zhang, Z., Lin, Q., & Zuo, Z.
(2022). Research on Fine Scheduling and Assembly Planning of Modular Integrated Building: A Case Study of the Baguang International Hotel Project. Buildings, 12(11), 1892.
https://doi.org/10.3390/buildings12111892