Next Article in Journal
Towards Sustainable and Smart Cities: Replicable and KPI-Driven Evaluation Framework
Next Article in Special Issue
Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control
Previous Article in Journal
The Genius loci Issue in the Revalorization of Post-Military Complexes: Selected Case Studies in Legnica (Poland)
Previous Article in Special Issue
Check and Validation of Building Information Models in Detailed Design Phase: A Check Flow to Pave the Way for BIM Based Renovation and Construction Processes
 
 
Article

Article Versions Notes

Buildings 2022, 12(2), 231; https://doi.org/10.3390/buildings12020231
Action Date Notes Link
article xml file uploaded 17 February 2022 14:21 CET Original file -
article xml uploaded. 17 February 2022 14:21 CET Update https://www.mdpi.com/2075-5309/12/2/231/xml
article pdf uploaded. 17 February 2022 14:21 CET Version of Record https://www.mdpi.com/2075-5309/12/2/231/pdf
article html file updated 17 February 2022 14:22 CET Original file https://www.mdpi.com/2075-5309/12/2/231/html
Back to TopTop