A Scientometric Analysis of Construction Bidding Research Activities
Abstract
:1. Introduction
2. Significance of the Study
3. Materials and Methods
3.1. Data Collection
3.2. Scientometric Analysis
4. Results and Discussion
4.1. Top 20 Journals
4.2. Top 10 Articles
4.3. Keywords Analysis
4.4. Cluster Analysis
4.5. Strongest Burst Detection
4.6. Distribution of Published Documents Co-Citation Authors
4.7. Top 10 Institutes and Countries
5. Discussions
6. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
References
- Démurger, S. Infrastructure Development and Economic Growth: An Explanation for Regional Disparities in China? J. Comp. Econ. 2001, 29, 95–117. [Google Scholar] [CrossRef]
- Moavenzadeh, F. Construction industry in developing countries. World Dev. 1978, 6, 97–116. [Google Scholar] [CrossRef]
- Datta, M. Challenges Facing the Construction Industry in Developing Countries. In Proceedings of the 2nd International Conference on Construction in Developing Countries, Gaborone, Botswana, 15–17 November 2000; Available online: https://www.london.gov.uk/sites/default/files/gla_migrate_files_destination/constructionreportFINAL.pdf (accessed on 21 September 2020).
- Ofori, G. Challenges of Construction Industries in Developing Countries: Lessons from Various Countries. In Proceedings of the 2nd International Conference on Construction in Developing Countries, Gaborone, Botswana, 15–17 November 2000. [Google Scholar]
- Wibowo, M.A.; Astana, I.N.Y.; Rusdi, H.A. An analysis of bidding strategy, project performance and company performance relationship in construction. Procedia Eng. 2015, 125, 95–102. [Google Scholar] [CrossRef] [Green Version]
- Lee, K.-W.; Kim, K.-H. Analyzing Cost and Schedule Growths of Road Construction Projects, Considering Project Characteristics. Sustainability 2021, 13, 13694. [Google Scholar] [CrossRef]
- Ofori, G. The Construction Industry: Aspects of Its Economics and Management; NUS Press: Singapore, 1990; Available online: https://www.amazon.com/Construction-Industry-Aspects-Economics-Management/dp/9971691485 (accessed on 21 September 2020).
- Zavadskas, E.K.; Vilutiene, T.; Turskis, Z.; Tamosaitiene, J. Contractor Selection for Construction Works by Applying SAW-G and TOPSIS Grey Techniques. J. Bus. Econ. Manag. 2010, 11, 34–55. [Google Scholar] [CrossRef]
- Ballesteros-Pérez, P.; González-Cruz, M.C.; Cañavate-Grimal, A. On competitive bidding: Scoring and position probability graphs. Int. J. Proj. Manag. 2013, 31, 434–448. [Google Scholar] [CrossRef]
- Ballesteros-Pérez, P.; Skitmore, M.; Das, R.; del Campo-Hitschfeld, M.L. Quick abnormal-bid-detection method for construction contract auctions. J. Constr. Eng. Manag. 2015, 141, 04015010. [Google Scholar] [CrossRef] [Green Version]
- Ballesteros-Pérez, P.; González-Cruz, M.; Cañavate-Grimal, A.; Pellicer, E. Detecting abnormal and collusive bids in capped tendering. Aut. Con. 2013, 31, 215–229. [Google Scholar] [CrossRef] [Green Version]
- Ballesteros-Pérez, P.; Skitmore, M.; Pellicer, E.; González-Cruz, M.C. Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Constr. Manag. Econ. 2015, 33, 259–278. [Google Scholar] [CrossRef] [Green Version]
- Chotibhongs, R.; Arditi, D. Detection of collusive behavior. J. Constr. Eng. Manag. 2012, 138, 1251–1258. [Google Scholar] [CrossRef]
- Porter, R.H.; Zona, J.D. Detection of Bid Rigging in Procurement Auctions. J. Political Econ. 1993, 101, 518–538. [Google Scholar] [CrossRef]
- Ballesteros-Pérez, P.; Skitmore, M. Estimating the number of new and repeated bidders in construction auctions. Constr. Manag. Econ. 2016, 34, 919–934. [Google Scholar] [CrossRef]
- Friedman, L. A Comparative- Bidding Strategy. Oper. Res. 1956, 4, 104–112. [Google Scholar] [CrossRef]
- Gates, M. Bidding Strategies and Probabilities. J. Constr. Div. 1967, 93, 75–110. [Google Scholar] [CrossRef]
- Ahmad, I.; Minkarah, I.A. Optimum Mark-Up for Bidding: A Preference-Uncertainty Trade off Approach. Civ. Eng. Syst. 1987, 4, 170–174. [Google Scholar] [CrossRef]
- Fayek, A. A competitive tendering strategy model and software system based on fuzzy set theory. Proc. Intell. Inf. Syst. 1997, IIS’97, 236–240. [Google Scholar] [CrossRef]
- Wanous, M.; Boussabaine, H.A.; Lewis, J. A neural network bid/no bid model: The case for contractors in Syria. Constr. Manag. Econ. 2003, 21, 737–744. [Google Scholar] [CrossRef]
- Dias, W.P.S.; Weerasinghe, R.L.D. Artificial neural networks for construction bid decisions. Civ. Eng. Syst. 1996, 13, 239–253. [Google Scholar] [CrossRef]
- Ahmad, I. Decision-support system for modeling bid/no-bid decision problem. J. Constr. Eng. Manag. 1991, 116, 595–608. [Google Scholar] [CrossRef]
- Bagies, A.; Fortune, C. Bid/no-bid decision modelling for construction projects. In Proceedings of the ARCOM 2006—Procs 22nd Annual ARCOM Conference, Birmingham, UK, 4–6 September 2006; Association of Researchers in Construction Management; Volume 1, pp. 511–521. [Google Scholar]
- Lin, C.T.; Chen, Y.T. Bid/no-bid decision-making—A fuzzy linguistic approach. Int. J. Proj. Manag. 2004, 22, 585–593. [Google Scholar] [CrossRef]
- Skitmore, M.; Picken, D.H. The accuracy of pre-tender building price forecasts: An analysis of USA data. Aust. Inst. Quant. Surv. Ref. J. 2000, 4, 33–39. Available online: https://eprints.qut.edu.au/secure/00004140/01/Picken.doc (accessed on 18 August 2020).
- Nesan Lenin, J. Integrated E-Bidding Framework for Construction. Int. J. Constr. Educ. Res. 2011, 7, 243–258. [Google Scholar] [CrossRef]
- Arslan, G.; Mustafa, T.; Birgönül, M.T.; Dikmen, İ. E-bidding proposal preparation system for construction projects. Build. Environ. 2006, 41, 1406–1413. [Google Scholar] [CrossRef]
- Aibinu, A.A.; Al-Lawati, A.M. Using PLS-SEM technique to model construction organizations’ willingness to participate in e-bidding. Aut. Con. 2010, 19, 714–724. [Google Scholar] [CrossRef]
- Idoro, G.I. Comparing the planning and performance of direct labour and design-bid-build construction projects in Nigeria. J. Civ. Eng. Manag. 2012, 18, 184–196. [Google Scholar] [CrossRef] [Green Version]
- Banki, M.T.; Esmaeeli, B.; Ravanshadnia, M. The assessment of bidding strategy of iranian construction firm. Int. J. Manag. Sci. Eng. Manag. 2009, 4, 153–160. [Google Scholar] [CrossRef]
- Hassanein, A.A.G.; Hakam, Z.H.R. A bidding decision index for construction contractors: This study presents the application of a systematic decision making methodology to aid contractors in deciding whether or not to bid for a certain project. Build. Res. Inf. 2007, 24, 237–244. [Google Scholar] [CrossRef]
- Gheorghe, A.V. Neural networks in consulting engineering management: A framework for bid-decision management. Cybern. Syst. 2007, 24, 525–546. [Google Scholar] [CrossRef]
- Drew, D.S.; Skitmore, R.M. Competitiveness in bidding: A consultant’s perspective. Constr. Manag. Econ. 1992, 10, 227–247. [Google Scholar] [CrossRef]
- Aladag, H.; Demirdögen, G.; Isik, Z. Building Information Modeling (BIM) Use in Turkish Construction Industry. Procedia Eng. 2016, 161, 174–179. [Google Scholar] [CrossRef] [Green Version]
- Cobo, M.J.; López-Herrera, A.G.; Herrera-Viedma, E.; Herrera, F. Science mapping software tools: Review, analysis, and cooperative study among tools. J. Am. Soc. Inf. Sci. Technol. 2011, 62, 1382–1402. [Google Scholar] [CrossRef]
- Pouris, A.; Pouris, A. Scientometrics of a pandemic: HIV/AIDS research in South Africa and the World. Scientometrics 2011, 86, 541–552. [Google Scholar] [CrossRef]
- Song, J.; Zhang, H.; Dong, W. A review of emerging trends in global PPP research: Analysis and visualization. Scientometrics 2016, 107, 1111–1147. [Google Scholar] [CrossRef]
- Zhu, J.; Liu, W. A tale of two databases: The use of Web of Science and Scopus in academic papers. Scientometrics 2020, 123, 321–335. [Google Scholar] [CrossRef] [Green Version]
- Shaw, R.L.; Booth, A.; Sutton, A.J.; Miller, T.; Smith, J.A.; Young, B.; Jones, D.R.; Dixon-Woods, M. Finding qualitative research: An evaluation of search strategies. BMC Med. Res. Methodol. 2004, 4, 5. [Google Scholar] [CrossRef] [Green Version]
- Methley, A.M.; Campbell, S.; Chew-Graham, C.; McNally, R.; Cheraghi-Sohi, S. PICO, PICOS and SPIDER: A comparison study of specificity and sensitivity in three search tools for qualitative systematic reviews. BMC Health Serv. Res. 2014, 14, 579. [Google Scholar] [CrossRef] [Green Version]
- Liberati, A.; Altman, D.G.; Tetzlaff, J.; Mulrow, C.; Gøtzsche, P.C.; Ioannidis, J.P.; Clarke, M.; Devereaux, P.J.; Kleijnen, J.; Moher, D. The PRISMA statement for reporting systematic reviews and meta-analyses of studies that evaluate health care interventions: Explanation and elaboration. J. Clin. Epidemiol. 2009, 62, e1–e34. [Google Scholar] [CrossRef] [Green Version]
- Ke, Y.; Wang, S.Q.; Chan, A.P.; Cheung, E. Research trend of public-private partnership in construction journals. J. Constr. Eng. Manag. 2009, 135, 1076–1086. [Google Scholar] [CrossRef]
- Zheng, X.; Le, Y.; Chan, A.P.C.; Hu, Y.; Li, Y. Review of the application of social network analysis (SNA) in construction project management research. Int. J. Proj. Manag. 2016, 34, 1214–1225. [Google Scholar] [CrossRef]
- Ofori, G. Globalization and construction industry development: Research opportunities. Constr. Manag. Econ. 2000, 18, 257–262. [Google Scholar] [CrossRef]
- Ofori, G.; Toor, S.U.R. Leadership and construction industry development in developing countries. J. Constr. Dev. Ctries. 2012, 17 (Suppl. 1), 1–21. [Google Scholar]
- Hou, J.; Yang, X.; Chen, C. Emerging trends and new developments in information science: A document co-citation analysis (2009–2016). Scientometrics 2018, 115, 869–892. [Google Scholar] [CrossRef]
- Tho, S.W.; Yeung, Y.Y.; Wei, R.; Chan, K.W.; So, W.M.W. A Systematic Review of Remote Laboratory Work in Science Education with the Support of Visualizing its Structure through the HistCite and CiteSpace Software. Int. J. Sci. Math. Educ. 2017, 15, 1217–1236. [Google Scholar] [CrossRef]
- Ganbat, T.; Chong, H.Y.; Liao, P.; Wu, Y. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction. Adv. Civ. Eng. 2018, 2018, 8351679. [Google Scholar] [CrossRef] [Green Version]
- Li, X.; Wu, P.; Shen, G.Q.; Wang, X.; Teng, Y. Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach. Aut. Con. 2017, 84, 195–206. [Google Scholar] [CrossRef]
- Li, Y.; Lu, Y.; Taylor, J.E.; Han, Y. Bibliographic and comparative analyses to explore emerging classic texts in megaproject management. Int. J. Proj. Manag. 2018, 36, 342–361. [Google Scholar] [CrossRef]
- Xue, X.; Wang, L.; Yang, R.J. Exploring the science of resilience: Critical review and bibliometric analysis. Nat. Hazards 2018, 90, 477–510. [Google Scholar] [CrossRef]
- Chen, J.; Su, Y.; Si, H.; Chen, J. Managerial areas of construction and demolition waste: A scientometric review. Int. J. Environ. Res. Public Health 2018, 15, 2350. [Google Scholar] [CrossRef] [Green Version]
- Ocholla, D.N.; Onyancha, O.B.; Britz, J. Can information ethics be conceptualized by using the core/periphery model? J. Informetr. 2010, 4, 492–502. [Google Scholar] [CrossRef] [Green Version]
- Soheili, F.; Khasseh, A.A.; Mousavi-Chelak, A. The most influential researchers in information behaviour: An integrative view on influence indicators. Aslib J. Inf. Manag. 2017, 69, 215–229. [Google Scholar] [CrossRef]
- Garfield, E. From the science of science to Scientometrics visualizing the history of science with HistCite software. J. Informetr. 2009, 3, 173–179. [Google Scholar] [CrossRef] [Green Version]
- Liu, Z.; Yin, Y.; Liu, W.; Dunford, M. Visualizing the intellectual structure and evolution of innovation systems research: A bibliometric analysis. Scientometrics 2015, 103, 135–158. [Google Scholar] [CrossRef]
- Liu, Z.; Lu, Y.; Peh, L.C. A review and scientometric analysis of Global Building Information Modeling (BIM) Research in the Architecture, Engineering and Construction (AEC) industry. Buildings 2019, 9, 210. [Google Scholar] [CrossRef] [Green Version]
- Chen, C. CiteSpace: A Practical Guide for Mapping Scientific Literature, Novinka. 2016. Available online: http://cluster.cis.drexel.edu/~cchen/citespace/books/ (accessed on 7 November 2020).
- Chen, C.; Ibekwe-Sanjuan, F.; Hou, J. The Structure and Dynamics of Co-Citation Clusters: A Multiple-Perspective. J. Am. Soc. Inf. Sci. Technol. 2010, 61, 1386–1409. [Google Scholar] [CrossRef] [Green Version]
- Aljuaid, H.; Iftikhar, R.; Ahmad, S.; Asif, M.; Afzal, M.T. Important citation Identification using Sentiment Analysis of In-text citations. Telemat. Inform. 2020, 56, 101492. [Google Scholar] [CrossRef]
- Hu, Y.; Chan, A.P.C.; Le, Y.; Jin, R.-Z. From construction megaproject management to complex project management: Bibliographic analysis. J. Manag. Eng. 2015, 31, 04014052. [Google Scholar] [CrossRef] [Green Version]
- Song, J.; Regan, A. Approximation algorithms for the bid construction problem in combinatorial auctions for the procurement of freight transportation contracts. Transp. Res. Part B Methodol. 2005, 39, 914–933. [Google Scholar] [CrossRef] [Green Version]
- Dyer, D.; Kagel, J.H. Bidding in common value auctions: How the commercial construction industry corrects for the winner’s curse. Manag. Sci. 1996, 42, 1463–1475. [Google Scholar] [CrossRef] [Green Version]
- Chen, Z.S.; Zhang, X.; Rodríguez, R.M.; Pedrycz, W.; Martínez, L. Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III. Aut. Con. 2021, 125, 103578. [Google Scholar] [CrossRef]
- Lo, W.; Lin, C.L.; Yan, M.R. Contractor’s opportunistic bidding behavior and equilibrium price level in the construction market. J. Constr. Eng. Manag. 2007, 133, 409–416. [Google Scholar] [CrossRef]
- Ho, S.P.; Liu, L.Y. Analytical model for analyzing construction claims and opportunistic bidding. J. Constr. Eng. Manag. 2004, 130, 94–104. [Google Scholar] [CrossRef] [Green Version]
- Dikmen, I.; Birgonul, M.T.; Gur, A.K. A case-based decision support tool for bid mark-up estimation of international construction projects. Aut. Con. 2007, 17, 30–44. [Google Scholar] [CrossRef]
- Sullivan, J.; Asmar, M.E.; Chalhoub, J.; Obeid, H. Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. J. Constr. Eng. Manag. 2017, 143, 04017009. [Google Scholar] [CrossRef]
- Moselhi, O.; Hegazy, T.; Fazio, P. DBID: Analogy-based DSS for bidding in construction. J. Constr. Eng. Manag. 1993, 119, 466–479. [Google Scholar] [CrossRef]
- Bageis, A.S.; Fortune, C. Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Constr. Manag. Econ. 2009, 27, 53–71. [Google Scholar] [CrossRef]
- Chen, C. CiteSpace: Visualizing Trends and Patterns in Scientific Literature Outline. J. Am. Soc. Inform. Sci. Technol. 2015, 57, 359–377. [Google Scholar]
- Rawat, K.S.; Sood, S.K. Knowledge mapping of computer applications in education using CiteSpace. Comput. Appl. Eng. Educ. 2021, 29, 1324–1339. [Google Scholar] [CrossRef]
- Chen, Y.; Okudan, G.E.; Riley, D.R. Sustainable performance criteria for construction method selection in concrete buildings. Aut. Con. 2010, 19, 235–244. [Google Scholar] [CrossRef]
- Herbsman, Z. The Bidding Volume Effect on Public Work Cost a Case Study. J. Cost Anal. 1986, 4, 27–45. [Google Scholar] [CrossRef]
- Subulan, K.; Baykasoglu, A.; Akyol, D.E.; Yildiz, G. Metaheuristic-based simulation optimization approach to network revenue management with an improved self-adjusting bid price function. Eng. Econ. 2017, 62, 3–32. [Google Scholar] [CrossRef]
- Olcaytu, E.; Kuyzu, G. Location-based distribution estimation for stochastic bid price optimization. Transp. Lett. 2021, 13, 21–35. [Google Scholar] [CrossRef]
- Lansley, P. Analysing construction organizations. Constr. Manag. Econ. 1994, 12, 337–348. [Google Scholar] [CrossRef]
- Kleinberg, J. Bursty and hierarchical structure in streams. In Proceedings of the Eighth ACM SIGKDD International Conference on Knowledge Discovery and Data Mining, Edmonton, AB, Canada, 23–26 July 2002; pp. 91–101. [Google Scholar] [CrossRef]
- Brandão, L.C.; Soares de Mello, J.C.C.B. A multi-criteria approach to the h-index. Eur. J. Oper. Res. 2019, 276, 357–363. [Google Scholar] [CrossRef]
- Maqsoom, A.; Bajwa, S.; Zahoor, H.; Thaheem, M.J.; Dawood, M. Optimizing contractor’s selection and bid evaluation process in construction industry: Client’s perspective. Rev. De La Construcción 2019, 18, 445–458. [Google Scholar] [CrossRef]
- Birjandi, A.K.; Akhyani, F.; Sheikh, R.; Sana, S.S. Evaluation and selecting the contractor in bidding with incomplete information using MCGDM method. Soft Comput. 2019, 23, 10569–10585. [Google Scholar] [CrossRef]
- Su, L.; Wang, T.; Li, H.; Chao, Y.; Wang, L. Multi-criteria decision making for identification of unbalanced bidding. J. Civ. Eng. Manag. 2020, 26, 43–52. [Google Scholar] [CrossRef]
- Hyari, K.H. The controversy around unbalanced bidding in construction: Seeking a fair balance. J. Prof. Issues Eng. Educ. Pract. 2017, 143, 04016015. [Google Scholar] [CrossRef]
- Hyari, K.H. Handling unbalanced bidding in construction projects: Prevention rather than detection. J. Constr. Eng. Manag. 2016, 142, 04015060. [Google Scholar] [CrossRef]
- Signor, R.; Love, P.E.; Olatunji, O.; Vallim, J.J.; Raupp, A.B. Collusive bidding in Brazilian infrastructure projects. Proc. Inst. Civ. Eng. Forensic Eng. 2017, 170, 113–123. [Google Scholar] [CrossRef] [Green Version]
- Huber, M.; Imhof, D. Machine learning with screens for detecting bid-rigging cartels. Int. J. Ind. Organ. 2019, 65, 277–301. [Google Scholar] [CrossRef]
- Imhof, D.; Karagök, Y.; Rutz, S. Screening for bid rigging—Does it work? J. Compet. Law Econ. 2018, 14, 235–261. [Google Scholar] [CrossRef] [Green Version]
- Reeves-Latour, M.; Morselli, C. Bid-rigging networks and state-corporate crime in the construction industry. Soc. Netw. 2017, 51, 158–170. [Google Scholar] [CrossRef]
- Gupta, S. The effect of bid rigging on prices: A study of the highway construction industry. Rev. Ind. Organ. 2001, 19, 451–465. [Google Scholar] [CrossRef]
- Liu, W.; Gao, Y.; Yan, T.; Cao, L. Risk evaluation of project bidding based on TOPSIS model. In International Conference on Application of Intelligent Systems in Multi-Modal Information Analytics; Springer: Cham, Switzerland, 2020; pp. 150–157. [Google Scholar]
- Leśniak, A.; Kubek, D.; Plebankiewicz, E.; Zima, K.; Belniak, S. Fuzzy AHP application for supporting contractors’ bidding decision. Symmetry 2018, 10, 642. [Google Scholar] [CrossRef] [Green Version]
- Aziz, R.F.; Aboelmagd, Y.M. Integration between different construction bidding models to improve profitability and reduce prices. Alex. Eng. J. 2019, 58, 151–162. [Google Scholar] [CrossRef]
- Zaqout, I.S.; Islam, M.S.; Hadidi, L.A.; Skitmore, M. Modeling bidding decisions and bid markup size for construction projects: A fuzzy approach. Eng. Appl. Artif. Intell. 2022, 113, 104982. [Google Scholar] [CrossRef]
- Kempitiya, T.; Sierla, S.; De Silva, D.; Yli-Ojanperä, M.; Alahakoon, D.; Vyatkin, V. An Artificial Intelligence framework for bidding optimization with uncertainty in multiple frequency reserve markets. Appl. Energy 2020, 280, 115918. [Google Scholar] [CrossRef]
Rank | Journal | IF (2021) | Quartile (2021) | No. Articles | No. Citation | CPP |
---|---|---|---|---|---|---|
1 | Management Science | 6.172 | Q2 | 1 | 70 | 70 |
2 | Automation in Construction | 10.517 | Q1 | 5 | 274 | 54.8 |
3 | Journal of Industrial Economics | 1.054 | Q4 | 1 | 53 | 53 |
4 | Energy | 8.857 | Q1 | 1 | 49 | 49 |
5 | Journal of Construction Engineering and Management | 5.292 | Q1 | 4 | 180 | 45 |
6 | Transportation Research Part B-Methodological | 7.632 | Q1 | 2 | 78 | 39 |
7 | Social Networks | 4.144 | Q1 | 1 | 38 | 38 |
8 | International Journal of Project Management | 9.037 | Q1 | 1 | 36 | 36 |
9 | Building and Environment | 7.093 | Q1 | 2 | 67 | 33.5 |
10 | Journal of Financial Management of Property and Construction | 0.49 | Q3 | 1 | 32 | 32 |
11 | Review of Industrial Organization | 0.35 | Q3 | 1 | 29 | 29 |
12 | International Journal of Computational Intelligence Systems | 2.259 | Q3 | 1 | 28 | 28 |
13 | Journal of the Operational Research Society | 3.051 | Q2 | 2 | 48 | 24 |
14 | Canadian Journal of Civil Engineering | 1.771 | Q3 | 2 | 47 | 23.5 |
15 | Operations Research Perspectives | 3.382 | Q2 | 1 | 22 | 22 |
16 | Construction Management and Economics | 0.80 | Q2 | 7 | 148 | 21.14 |
17 | Omega-International Journal of Management Science | 8.673 | Q1 | 1 | 21 | 21 |
18 | Iranian Journal of Science and Technology Transaction B-Engineering | 0.719 | Q2 | 1 | 20 | 20 |
19 | Journal of Computing in Civil Engineering | 5.802 | Q2 | 1 | 20 | 20 |
20 | Construction Innovation-England | 2.667 | Q2 | 2 | 38 | 19 |
Rank | Information | Year | Citations | Reference | |
---|---|---|---|---|---|
1 | Author(s) | Aibinu AA, Al-Lawati AM | 2010 | 123 | [28] |
Title | Using PLS-SEM technique to model construction organizations’ willingness to participate in e-bidding | ||||
Journal | Automation in Construction. | ||||
2 | Author(s) | Ho SP, Liu LY | 2004 | 85 | [66] |
Title | Analytical model for analyzing construction claims and opportunistic bidding | ||||
Journal | Journal of Construction Engineering and Management. | ||||
3 | Author(s) | Song J, Regan A | 2005 | 74 | [62] |
Title | Approximation algorithms for the bid construction problem in combinatorial auctions for the procurement of freight transportation contracts | ||||
Journal | Transportation Research Part B-Methodological. | ||||
4 | Author(s) | Sullivan J, El Asmar M, Chalhoub J, Obeid H | 2017 | 73 | [68] |
Title | Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality | ||||
Journal | Journal of Construction Engineering and Management. | ||||
5 | Author(s) | Dyer D, Kagel JH | 1996 | 70 | [63] |
Title | Bidding in common value auctions: How the commercial construction industry corrects for the winner’s curse | ||||
Journal | Management Science. | ||||
6 | Author(s) | Dikmen I, Birgonul MT, Gur AK | 2007 | 67 | [67] |
Title | A case-based decision support tool for bid mark-up estimation of international construction projects | ||||
Journal | Automation in Construction. | ||||
7 | Author(s) | Chen ZS, Zhang X, Rodriguez RM, Pedrycz W, Martinez L | 2021 | 63 | [64] |
Title | Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III | ||||
Journal | Automation in Construction. | ||||
8 | Author(s) | Moselhi O, Hegazy T, Fazio P | 1993 | 60 | [69] |
Title | DBID—Analogy-Based Dss for Bidding in Construction | ||||
Journal | Journal of Construction Engineering and Management. | ||||
9 | Author(s) | Bageis AS, Fortune C | 2009 | 58 | [70] |
Title | Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors | ||||
Journal | Construction Management and Economics. | ||||
10 | Author(s) | Lo W, Lin CL, Yan MR | 2007 | 54 | [65] |
Title | Contractor’s opportunistic bidding behavior and equilibrium price level in the construction market | ||||
Journal | Journal of Construction Engineering and Management. |
Cluster | Size | Silhouette | Top Keywords |
---|---|---|---|
#0 Public work | 29 | 0.89 | Construction contracting, Bidding phase, Environmental [74] |
#1 Construction bid price evaluation | 28 | 0.898 | Clients’ perspective, Bid evaluation process, Construction industry [75,76] |
#2 Construction organization’s willingness | 26 | 0.878 | The critical factor, using PLS-SEM technique, Bid/no bid decision [77] |
#3 Highway construction industry | 26 | 0.819 | Bid evaluation, Indian government, Construction projects |
#4 Transportation construction | 21 | 0.883 | Contractor bid, Highway construction industry, Transportation procurement auction |
#5 Demand bidding construction | 18 | 0.886 | Hybrid IGDT-probability methodology, large consumer, Heterogeneous fleet |
#6 Clients’ perspective | 14 | 0.942 | Bid evaluation, Construction industry, Bid evaluation process |
#7 Bid construction problem | 13 | 0.982 | Heuristic solution approaches, Preventing construction dispute |
#8 Risk perception | 13 | 0.918 | The Australian construction industry, Bidding phase |
Rank | Author | H-Index | No. of Articles | Percent | Citation | CPP |
---|---|---|---|---|---|---|
1 | Bee Lan Oo | - | 10 | 3.34 | 167 | 16.70 |
2 | Martin Skitmore | 82 | 10 | 3.34 | 116 | 11.60 |
3 | Khaled Hesham Hyari | 16 | 6 | 2.01 | 128 | 21.33 |
4 | Kunhui Ye | 20 | 6 | 2.01 | 121 | 20.17 |
5 | Ballesteros-Perez P | 26 | 5 | 1.67 | 191 | 38.20 |
6 | Islam H. El-adaway | 28 | 5 | 1.67 | 87 | 17.40 |
7 | Liu Jianbing | 3 | 5 | 1.67 | 85 | 17.00 |
8 | Muaz O. Ahmed | 5 | 4 | 1.34 | 45 | 11.25 |
9 | Tian JX | - | 4 | 1.34 | 93 | 23.25 |
10 | Zhen-Song Chen | 21 | 3 | 1.00 | 83 | 27.67 |
Rank | Institution | No. of Articles | Percent | Citation | CPP |
---|---|---|---|---|---|
1 | Chongqing University | 14 | 4.68 | 57 | 4.07 |
2 | Tianjin University | 10 | 3.34 | 72 | 7.20 |
3 | Queensland University of Technology | 8 | 2.68 | 104 | 13.00 |
4 | Hashemite University | 7 | 2.34 | 37 | 5.29 |
5 | Deakin University | 5 | 1.67 | 44 | 8.80 |
6 | Jiangxi University of Science and Technology | 5 | 1.67 | 1 | 0.20 |
7 | N China Elect Power University | 5 | 1.67 | 9 | 1.80 |
8 | Sichuan University | 5 | 1.67 | 29 | 5.80 |
9 | University of Alberta | 5 | 1.67 | 146 | 29.2 |
10 | University of Sydney | 5 | 17 | 49 | 9.8 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Rashidi, A.; Tamošaitienė, J.; Ravanshadnia, M.; Sarvari, H. A Scientometric Analysis of Construction Bidding Research Activities. Buildings 2023, 13, 220. https://doi.org/10.3390/buildings13010220
Rashidi A, Tamošaitienė J, Ravanshadnia M, Sarvari H. A Scientometric Analysis of Construction Bidding Research Activities. Buildings. 2023; 13(1):220. https://doi.org/10.3390/buildings13010220
Chicago/Turabian StyleRashidi, Amirreza, Jolanta Tamošaitienė, Mehdi Ravanshadnia, and Hadi Sarvari. 2023. "A Scientometric Analysis of Construction Bidding Research Activities" Buildings 13, no. 1: 220. https://doi.org/10.3390/buildings13010220
APA StyleRashidi, A., Tamošaitienė, J., Ravanshadnia, M., & Sarvari, H. (2023). A Scientometric Analysis of Construction Bidding Research Activities. Buildings, 13(1), 220. https://doi.org/10.3390/buildings13010220