Next Article in Journal
Challenge and Awareness for Implemented Integrated Project Delivery (IPD) in Indonesian Projects
Next Article in Special Issue
Automatic Generation Construction Shop Design Model of the MEP Hanger Based on BIM
Previous Article in Journal
An FPGA-Based Laser Virtual Scale Method for Structural Crack Measurement
Previous Article in Special Issue
Autonomous Concrete Crack Semantic Segmentation Using Deep Fully Convolutional Encoder–Decoder Network in Concrete Structures Inspection
 
 
Case Report

Article Versions Notes

Buildings 2023, 13(1), 257; https://doi.org/10.3390/buildings13010257
Action Date Notes Link
article xml file uploaded 16 January 2023 12:59 CET Original file -
article xml uploaded. 16 January 2023 12:59 CET Update https://www.mdpi.com/2075-5309/13/1/257/xml
article pdf uploaded. 16 January 2023 12:59 CET Version of Record https://www.mdpi.com/2075-5309/13/1/257/pdf
article html file updated 16 January 2023 13:00 CET Original file -
article html file updated 16 January 2023 13:01 CET Update -
article html file updated 7 March 2023 23:51 CET Update https://www.mdpi.com/2075-5309/13/1/257/html
Back to TopTop