Patel, M.S.; Liew, M.S.; Mustaffa, Z.; Yee, N.C.; Whyte, A.
Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling. J. Mar. Sci. Eng. 2020, 8, 7.
https://doi.org/10.3390/jmse8010007
AMA Style
Patel MS, Liew MS, Mustaffa Z, Yee NC, Whyte A.
Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling. Journal of Marine Science and Engineering. 2020; 8(1):7.
https://doi.org/10.3390/jmse8010007
Chicago/Turabian Style
Patel, M. S., M. S. Liew, Zahiraniza Mustaffa, Ng Cheng Yee, and Andrew Whyte.
2020. "Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling" Journal of Marine Science and Engineering 8, no. 1: 7.
https://doi.org/10.3390/jmse8010007
APA Style
Patel, M. S., Liew, M. S., Mustaffa, Z., Yee, N. C., & Whyte, A.
(2020). Development of Downtime Cost Calculator for Offloading Operations Influenced by Parametric Rolling. Journal of Marine Science and Engineering, 8(1), 7.
https://doi.org/10.3390/jmse8010007