Nobil, E.; Cárdenas-Barrón, L.E.; Garza-Núñez, D.; Treviño-Garza, G.; Céspedes-Mota, A.; Loera-Hernández, I.d.J.; Smith, N.R.; Nobil, A.H.
Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem. Mathematics 2023, 11, 1740.
https://doi.org/10.3390/math11071740
AMA Style
Nobil E, Cárdenas-Barrón LE, Garza-Núñez D, Treviño-Garza G, Céspedes-Mota A, Loera-Hernández IdJ, Smith NR, Nobil AH.
Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem. Mathematics. 2023; 11(7):1740.
https://doi.org/10.3390/math11071740
Chicago/Turabian Style
Nobil, Erfan, Leopoldo Eduardo Cárdenas-Barrón, Dagoberto Garza-Núñez, Gerardo Treviño-Garza, Armando Céspedes-Mota, Imelda de Jesús Loera-Hernández, Neale R. Smith, and Amir Hossein Nobil.
2023. "Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem" Mathematics 11, no. 7: 1740.
https://doi.org/10.3390/math11071740
APA Style
Nobil, E., Cárdenas-Barrón, L. E., Garza-Núñez, D., Treviño-Garza, G., Céspedes-Mota, A., Loera-Hernández, I. d. J., Smith, N. R., & Nobil, A. H.
(2023). Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem. Mathematics, 11(7), 1740.
https://doi.org/10.3390/math11071740