Next Article in Journal
A Multiplatform BIM-Integrated Construction Waste Quantification Model during Design Phase. The Case of the Structural System in a Spanish Building
Next Article in Special Issue
A Synthesis of Express Analytic Hierarchy Process (EAHP) and Partial Least Squares-Structural Equations Modeling (PLS-SEM) for Sustainable Construction and Demolition Waste Management Assessment: The Case of Malaysia
Previous Article in Journal
Cost Analysis of Various Factors for Geopolymer 3D Printing of Construction Products in Factories and on Construction Sites
Previous Article in Special Issue
A Systematic Review of Construction and Demolition Waste Management in Australia: Current Practices and Challenges
 
 
Review

Article Versions Notes

Action Date Notes Link
article xml file uploaded 15 September 2021 11:28 CEST Original file -
article xml uploaded. 15 September 2021 11:28 CEST Update https://www.mdpi.com/2313-4321/6/3/61/xml
article pdf uploaded. 15 September 2021 11:28 CEST Version of Record https://www.mdpi.com/2313-4321/6/3/61/pdf
article html file updated 15 September 2021 11:29 CEST Original file -
article html file updated 30 July 2022 05:54 CEST Update https://www.mdpi.com/2313-4321/6/3/61/html
Back to TopTop