A Techno-Economic Viability Analysis of Wind-Powered Power Plants in Panjgur, Balochistan †
Abstract
:1. Introduction
2. Materials and Methods
- 2 to 3 houses (3 KW);
- 4 to 6 houses (6 KW);
- 6 to 8 houses (10.5 KW);
- 15 to 20 houses (25.5 KW).
3. Results and Discussion
4. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
References
- Pakistan Economic Survey 2021–2022. Available online: https://www.finance.gov.pk/survey/chapter_22/PES14-ENERGY.pdf (accessed on 13 January 2023).
- Pakistan and Fossil Gas—Global Energy Monitor. Available online: https://www.gem.wiki/Pakistan_and_fossil_gas#cite_note-:0-5 (accessed on 23 June 2023).
- Haroon, M.; Ayub, A.; Sheikh, N.A.; Ahmed, M.; Shalaby, A.-B. Harnessing Ocean Thermal Energy from Offshore Locations in Pakistan Using an Organic Rankine Cycle. Eng. Proc. 2022, 23, 24. [Google Scholar] [CrossRef]
- Effect of Yaw Angle on the Global Performances of Horizontal Axis Wind Turbine—QBlade Simulation—IOPscience. Available online: https://iopscience.iop.org/article/10.1088/1757-899X/595/1/012047/meta (accessed on 24 June 2023).
- Global Wind Atlas. Available online: https://globalwindatlas.info (accessed on 24 June 2023).
Item | Turbine | Battery | Controller | Invertor |
---|---|---|---|---|
Type | M2-2 (1500) HAWT for Home | Li-ion Battery 48 V 200 ah lifepo4 | Automatic MPPT Charge Controller Wind Charge Controller | Pure Sine Wave Power Inverter |
Unit Price (PKR) | 84,000 | 72,000 | 50,700 | 13,800 |
Quantity | 4 | 1 | 1 | 1 |
Life Span (Years) | 20 | 6.7 | 5 | 10~15 |
Annual Maintenance cost (Excluding Consumables) | 2–3% of initial cost | 2–3% of initial cost | 2–3% of initial cost | 2–3% of initial cost |
Shipping Cost | 336,000 PKR | 432,000 PKR | 202,800 PKR | 27,600 PKR |
Total Cost (20 Years) | 806,400 PKR | 921,600 PKR | 42,5880 PKR | 60,720 PKR |
Total Cost of the Plant/ Net Present Cost (NPC) | 2,214,600 PKR | |||
Energy Production | 13,140 KWh (Annual) and 262,800 KWh (20 years) | |||
Payback period (N) | 9.36 years (Cost/Annual earning) | |||
LCOE | 8.42 PKR |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Rehman, H.U.; Ullah, H.; Zakarya, M.; Kakar, F.; Abid, Q.u.D.; Haroon, M.; Munawar, M.A.; Khan, M.A. A Techno-Economic Viability Analysis of Wind-Powered Power Plants in Panjgur, Balochistan. Eng. Proc. 2023, 45, 15. https://doi.org/10.3390/engproc2023045015
Rehman HU, Ullah H, Zakarya M, Kakar F, Abid QuD, Haroon M, Munawar MA, Khan MA. A Techno-Economic Viability Analysis of Wind-Powered Power Plants in Panjgur, Balochistan. Engineering Proceedings. 2023; 45(1):15. https://doi.org/10.3390/engproc2023045015
Chicago/Turabian StyleRehman, Habeeb Ur, Hafeez Ullah, Muhammad Zakarya, Fasihullah Kakar, Qamar ud Din Abid, Muhammad Haroon, Muhammad Arsalan Munawar, and Muhammad Aqil Khan. 2023. "A Techno-Economic Viability Analysis of Wind-Powered Power Plants in Panjgur, Balochistan" Engineering Proceedings 45, no. 1: 15. https://doi.org/10.3390/engproc2023045015
APA StyleRehman, H. U., Ullah, H., Zakarya, M., Kakar, F., Abid, Q. u. D., Haroon, M., Munawar, M. A., & Khan, M. A. (2023). A Techno-Economic Viability Analysis of Wind-Powered Power Plants in Panjgur, Balochistan. Engineering Proceedings, 45(1), 15. https://doi.org/10.3390/engproc2023045015