1. Introduction
“Community energy” is a highly contested issue not only in the German energy transition governance but also in the recent legislative procedure to recast energy market legislation within the EU’s “Winter Package” [
1].
In Germany, “community energy actors” significantly pushed the deployment of renewable energies (RE) in the past. In the course of the shift of the support scheme for renewable energies from a price-based feed-in tariff to a volume-based competitive auction, the German Government for the first time legally defined the term “citizens’ energy companies”. This term was officially established in order to select those energy actors who were privileged by special auction rules. These special rules were justified by the policy objectives to enhance actor plurality and societal acceptance of the energy transition.
The paper analyses effects of the German provisions to privilege “community energy actors” against the background of the objectives of the revised German renewable energy policy. It finds that the results of these provisions for community energy actors in the German auction scheme do not just represent an acceptable level of losses due to recognized trade-offs between the three main objectives—controlled RE expansion, actor plurality and cost efficiency—but instead a complete failure with regard to all three of these objectives.
The paper takes a closer look at the motivations that officially underpinned these special provisions for citizens’ energy actors in order to draw lessons from that policy pilot. These lessons might also help other European countries implementing the envisaged EU energy market legislation in the future. The EU-Parliament’s version of the recast renewable energy directive suggests that member states have “[…] to put in place an enabling framework to promote and facilitate participation by renewable energy communities in the generation, consumption, storage and sale of renewable energy” [
2] (article 22(2a)).
The paper suggests to clearly distinguish between the risks for small actors to take part in auctions from the added societal value, attributed to the energy related activities of these actors. This approach will help to define the necessary policy design elements that are suitable to enable small and community energy actors to participate in energy market activities, to provide the politically desired benefits, and to prevent disastrous policy failures similar to those in the German case.
3. Impact of Special Regulation for Citizens’ Energy Companies
3.1. Success of Citizens’ Energy?
In contrast to any expectation and to many concerns of citizens’ energy advocates about potential shortcomings of the EEG’s provisions for citizens’ energy, the results of the first auction in May 2017 surprised with an overwhelming success of bidders that made use of the special rules for citizens’ energy companies. The privileges for CEC, conceptualized as exceptions, became the rule in the market “game”.
Shocked by this unintended result which seriously threatened the achievement of the planned RE expansion and climate targets, the German Bundestag immediately announced a moratorium regarding § 36g(1) and stopped the possibility for CEC to offer a bid before the construction permit has been granted. However, this moratorium took force only for the fourth and fifth auction rounds in 2018, before a final adaptation of the EEG will be implemented. Consequently, also in the second and third auction round in 2017, citizens’ energy companies won almost all of the awards (see
Figure 1).
How to interpret these results? Do they represent the legislator’s failure to assess ex-ante the strength and volume of the citizens’ energy segment? Or, did the legal definition not suffice to address the intended actors—citizens which initiate on their own wind energy projects in their neighborhood? Or, is the privilege offered to citizens’ energy companies so economically attractive that even professional energy actors altered their projects into projects which fit with the legal definition of a CEC-project? Or is there something inconsistent within the whole policy design?
3.2. CEC as Business Model for Rational Economic Actors
The press release of the Federal Network Agency (Bundesnetzagentur) regarding the results of the first auction round in May 2017 [
14] rather neutrally reported the success of citizens’ energy. The press release following the second bidding round already revealed the Agency’s awareness about the character of the successful CEC bidders: “The majority of the awards for bids of citizens’ energy companies go to companies whose bids make it clear that they are at least organisationally assigned to a single project developer” (author’s translation of the press release, [
15]).
The single project developer mentioned in the press release—the Saxonian UKA-Group—is ac-cording to data from 2016 the second biggest developer of on-shore wind energy project in Germany. In an interview for the magazine “Erneuerbare Energien” in November 2017 the company’s managing partner, Gernot Gauglitz, publicly explained the company’s strategy as the most adaptive business model to comply with the induced competitive pressure in the German auction scheme [
16] According to him, UKA was forced to emulate the behaviour of other project developers that won in the first bidding round, where UKA failed to win any of its “ordinary” bids. The adaptation of its strategy was so successful that UKA-connected CEC dominated the second bidding round with a 68 percent share of the total awarded volume (see
Table 1).
In sum, the successful bidders privileged as CEC were set up by a very small number of professional project developers, who do not act as shareholders or members of the CEC—according to the legal definition—but as general contractors or service providers. A brief analysis of data of the Bundesnetzagentur [
13] and the online-trade register [
17] about the winners of the second round revealed that a lot of the successful CEC were formally founded just a few days before the auction deadline. They also have similar names, for example “Umweltgerechte Bürgerenergie”, and—although the planned erection site is located in different municipalities—the registered office of those formally distinct CEC is the same and situated in the Saxonian town Meißen, identical with the postal address of UKA.
In fact, those project developers, who transformed their projects into CEC-projects made use of the privileges for CEC:
- -
to take part in the bidding procedure without having a construction permit, and
- -
the longer time span between awards and realisation deadline (up to 4.5 years).
These provisions offered opportunities for underbidding other “ordinary” bidders, a well–known phenomenon of competitive auction schemes. The exceptions—intended to support a small segment of rather unprofessional citizen-based projects—were used by typical business actors in an economically rational way. They calculated their expected returns (bids) with more effective wind turbines which according to their market analyses will only be developed in the near future. Thus, these special provisions for CEC have been used by professional actors to an extent that devaluated all existing construction permits for wind energy projects, as these permissions always have to relate to a specific type of an available wind turbine technology [
18] (p. 4).
In sum, it can be stated that professional project developers, like UKA, have carefully analysed the market as well as the political framework conditions, and have rationally adapted their business model. Although diverse media—such as the German newspaper “Die Welt”—criticized “the dirty tricks with citizens’ energy” [
19] (author’s translation), the CEC connected with these project developers meet all legal requirements of a CEC. Thus, the expressed complaint, it would be “fake” CEC that won the awards does suggest a knowledge, what “real” CEC is. Unfortunately, “real” CEC is not clearly defined—neither in scientific literature nor in the definition of citizens’ energy in the EEG.
3.3. Evaluation: Total Failure Regarding the Intended Triangle of Objectives
As almost 95% of the auctioned volume in 2017 was awarded to bidders without a construction permit, it is doubtful how many of these projects will actually be realised. This results in uncertainty whether one core element of the instrumental shift—the volume-based approach to steer RE expansion—can be actually achieved. Additionally, the longer implementation deadlines of up to 54 months for these projects indicate that most of them—if ever—will not be realised before the year 2020. According to the Green Party in the German parliament, this would cause a sharp decline of the annual expansion of wind energy in Germany to 1500 MW or less in 2019 and 2020 compared with 5000 MW per year in 2016 and 2017. Moreover, this would imply missing the German and the mandatory European renewable energy targets [
20].
The wind energy industry is complaining tremendously about these results as they represent a serious threat to their business model: uncertainties regarding the actual demand of wind turbines and/or the expected delay of the installation of wind turbines that is assumed to create a serious investment gap for the wind energy industry [
18] (p. 4).
As explained above, the auctions were not able to foster actor plurality, the second core objective of the specific provisions, either. Instead, a small number of professional project developers dominated.
What about cost efficiency, the third objective of the German volume-based auction scheme and the core argument of proponents of competitive approaches to determine the price for RE?
At first glance,
Figure 1 obviously illustrates a considerable decrease in the average price per kWh of wind energy in the first three bidding rounds, from 5.71 Ct/kWh to 3.82 Ct/kWh. The remuneration that would have been paid according to the previous administratively fixed feed-in-tariff (EEG 2014) would be—nominally averaged—6.16 Ct/kWh for plants erected at the beginning of 2018 [
21]. Thus, it was claimed by the government that this core objective was reached by the German auction scheme.
However, the price results presented in
Figure 1 are determined by the calculated prices of the bids. They do not show the actual remuneration according to the wind situation at the erection site as defined in the above-mentioned reference yield model. The awarded projects of the auctions in 2017 are planned to be erected at locations of a middle wind quality of 90% (first bidding round) or 85% (second and third bidding round) of the wind quality at the standard reference side [
21]. That means that actual remuneration payments will be higher than prices calculated for the bids.
Researchers of the German Fraunhofer Institute IEE and IZES have questioned the alleged cost-cutting effect [
21]. They simulated a comparison of remunerations based on the previous price-based support scheme and the results of the current volume-based support scheme by considering the reference yield model—i.e., the wind-quality at the erection site of the awarded CEC projects in the first three bidding rounds in 2017. They discovered up to one-fourth higher costs of the awards for CEC projects in the first bidding round compared to the previous remuneration based on the feed-in tariff scheme. Only the results of the third bidding round have shown a 10 percent reduction of the level of remuneration compared to the previous system [
21]. Keeping in mind that these prices were a result of the very specific underbidding approach of successful bidders incentivized by the special provisions of § 36g, the magnitude of this decrease can be seriously questioned. The subsequent increase in the average prices per kWh after the moratorium took force in 2018 confirms this assessment (see
Figure 1). Energy experts had expected this price increase [
21]. All bidders with construction permits, including the unsuccessful bidders of the first three rounds, had to calculate their bids based on the available wind technology and no longer needed to adjust their bids to the expected underbidding strategy of privileged bidders without permits.
4. Discussion
What kind of lessons can we draw from this severe policy failure to meet the intended objectives?
The German legislator has integrated secondary policy objectives—a geographically more balanced distribution of wind energy plants and actor plurality—into an economic instrument, which mainly addresses the economic efficiency of the price building process. A trade-off with the economic efficiency objective of the auction scheme was—according to the legislator’s justification of the German auction design [
22] (p. 147)—politically accepted. Such trade-offs are quite common outcomes of political processes, whose protagonists have to find compromises between interdependent policy objectives.
4.1. Inadequate Integration of Secondary Objectives
However, the results of the German auction scheme do not represent a more or less acceptable level of assumed losses due to recognized trade-offs between the three main objectives of controlled RE expansion, actor plurality and cost efficiency. Instead, we see a complete failure with regard to all of these three objectives (see above).
There might be economists that feel confirmed in their assessment that any intervention into a market would be a market distortion and should therefore be avoided. However, the renewable energy market would not exist without state intervention and a piecemeal criticism of (presumed) market distortion would be the wrong lesson from the German “disastrous” policy pilot to create a level playing field for new citizens-based energy actors.
A closer look at the policy motivation underlying the definition of citizens’ energy companies and the relation between these motivations and their operationalisation might give us more insights to draw adequate lessons.
Integrating the objective of “actor plurality” into the policy design of the German auctions scheme was motivated by, first, purely competition concerns to prevent market dominance of a few big energy actors [
22]. This challenge was met by general provisions that may counteract the risks of small actors—e.g., a generalized de-minimis threshold of 750 kW. However, the German legislator additionally defined an enabling policy framework for certain small actors to participate in wind energy auctions. The sole argument to explain that specific focus on citizen-based energy companies can be derived from the official justification of § 36g EEG 2017: “In particular, locally anchored citizen energy companies have made a significant contribution to the necessary acceptance of new on-shore wind energy projects. Without this acceptance, the expansion of wind energy cannot be achieved in the planned amount” (author’s translation, [
22] (p. 217)).
However, if citizens’ energy is perceived by the legislator as the provider of the necessary acceptance of wind energy expansion, then it seems to be inconsequential, that the citizens’ energy segment was implicitly conceptualized as just a small segment among the potential bidders. To reiterate, all the special rules for CEC are a fundamental derivation from the core principle of the German “late” auction design (see above).
4.2. The Need to Decouple Multiple Motives
A possible approach to learn from these failures is to distinguish clearly between the two motivations underlying the objective “actor plurality”. The first one addresses the risks of small actors, and the second one addresses the added value provided by citizen energy actors. De-coupling these two motivations might be helpful to find an adequate policy design.
4.2.1. Addressing the Risks of Small Actors
If design elements are supposed to help to safeguard market access for small actors for com-petition concerns, then the very specific risks of small actors must be addressed. This could be realized either with support measures outside of the auction, e.g., by providing counselling during preparation of a bid, or by exempting small actors from auctions altogether. Currently, the German generalized de-minimis threshold for exemptions from competitive tendering is at 750 kW. However, this threshold has in fact no relevance for wind energy projects, as the market standard of available wind turbines is above this threshold at 2.5 to 3 MW on average. The German Government rejected to use the full room for maneuver to exempt smaller projects from tendering which has been given by the European Commission state aid guidelines [
3]. According to the EU Competition Commissioner’s clarification from January 2016 about the misleading formulation of the de-minimis rule for wind power in the state aid guidelines, there is a possibility of “exemption from the competitive tendering requirement [...] for wind projects with a maximum of 18 MW installed power” [
23] (author’s translation of the answer of Competition Commissioner Margrethe Vestager to the German Federal Wind Association).
4.2.2. Addressing the Added Value Attributed to Community Energy Actors
However, if acceptance is the determining criterion, then we need to look in more detail at what in fact contributes to societal acceptance, as the legislator did not specify sufficiently, why citizen energy actors have significantly contributed to this objective. The items “majority of natural persons” of the members or shareholders of the CEC and their “place of residence” in the district of the planned wind energy plant have been used to operationalize characteristics of citizen-based energy actors and local embeddedness. Both characteristics are often linked in the literature with acceptance issues (e.g., [
24]).
Yet, it is not too difficult to imagine that ten individual citizens who invest in a joint local economic undertaking can also act in a purely egoistic manner, i.e., without taking into account economic welfare or social acceptance in their neighborhood in a more caring manner than other economic actors. The acceptance issue, thus, was not operationalized, but only attributed a priori to community energy actors.
The acceptance issue is also a core objective of the EU’s so-called Winter Package “Clean Energy for All Europeans” [
1]. Currently the Recast Renewable Energy Directives and the Recast Electricity Market Directive are subject of the Trilogue between Commission, Council and Parliament. Both recast directives include definitions and special provisions for local (renewable) energy communities. Whereas the Commission and the Parliament strongly favor an enabling framework for community energy actors in their positions concerning theses directives, the Council’s amendments to the Commission’s proposals [
25] indeed rather pronounce the costs induced by community energy actors and their financial responsibility “… for the imbalances they cause in the system” [
26] (p. 62).
The European Commission (EC), assisted by the European Parliament, has “discovered” the added value that local community energy can provide. In its proposal for the Recast Electricity Directive the EC defines local energy communities (LEC) in the following way (article2(6)): “Local energy community means: an association, a cooperative, a partnership, a nonprofit organisation or other legal entity which is
effectively controlled by local shareholders or members,
generally value rather than profit-driven, involved in distributed generation and in performing activities of a distribution system operator, supplier or aggregator at local level, including across borders.” [
25] (p. 52, author’s emphasis).
Thus, the Commission includes in its definition not only the various energy business activities a LEC can perform, but also declares “local control” and “value-driven” as key features making community energy actors distinct from other energy business actors. The added value for the European energy transformation process the EC attributes to LEC in its recitals for the recast electricity directive can be summarized as follows: LEC provide common goods: “Community energy […] help[s] fight energy poverty […] enables certain groups of household consumers to participate in the energy market […] Where they have been successfully operated such initiatives have delivered economic, social and environmental value to the community that goes beyond the mere benefits derived from the provision of energy services.” [
25] (recital 30).
5. Conclusions
Citizen energy actors combine their energy business activities with a broader common good orientation in terms of local development, inclusive democracy, citizens’ engagement and social innovation. All of these contributions are increasingly needed to counteract the observable loss in acceptance and the growing strength of populism not only with regard to energy issues.
However, attributing these contributions in legislation to a rather narrowly defined group of actors such as in the German definition of citizens’ energy companies does not seem to be adequate. It excludes a couple of well-known other decentralized initiatives as the municipality-based 100% Energy Regions or certain municipal utilities and other actors which include common good provisions into their energy business activities (see [
5]). Moreover, it seems questionable whether the provision of those common goods that help raise acceptance can be realized via a definition of privileges for a defined category of actors. It will always be difficult—as evidenced by the German auctions—to find selective criteria to define the eligible actors that are not vulnerable for “abuse”.
If acceptance is perceived as a result of the provision of those common goods as regional development, participation, the experience of self-efficacy as well as social inclusion of vulnerable people, then it seems to be more appropriate to change the bid evaluation criteria, i.e., the criteria defining how bids are awarded.
Currently, the bid selection in the German scheme works as a price-only selection process, comparable to the majority of auction schemes in the EU.
However, there are examples of multi-criteria approaches to select the winning bids in order to pursue multiple policy goals (e.g., [
27]). In France for example, the bid evaluation in the PV auctions is based on the offered price (two thirds) and the environmental impact in the form of the panels’ carbon footprint (one third). The German solar branch has repeatedly referred to the French approach as more suitable than the German price-only approach, because it better protects domestic producers of solar panels as they perform better with the environmental criteria then their competitors for non-European countries.
Another example is the South-African “Renewable Energy Independent Power Project Procurement Program” that strongly relies on non-price factors in bid evaluation. The bid price counts for 70 percent, whereas the remaining 30 percent are given to a “composite score covering job creation, local content, ownership, management control, preferential procurement, enterprise development and socioeconomic development” [
28].
Including these secondary objectives into the bid evaluation criteria means—of course—com-promising on the economic efficiency of auction schemes. It clearly increases costs for bidders and the regulator in evaluating these bids. However, in most of the countries where these secondary objectives have been applied in bid evaluation, they helped to promote social acceptability of RE expansion policy and local economic development [
27] (p. 39).
Whether to exempt those projects which are assumed to provide such added value from competitive auctions altogether or whether to include these objectives into bid evaluation criteria, depends on a sophisticated cost-benefit analysis, which goes beyond the mere consideration of static cost efficiency. If the proclaimed “secondary” objectives of the German auction scheme are more than just lip service, then policy makers have to devote more attention to them.
Having in mind the increasing share of citizens who feel disconnected to their political elites in Germany as well as in other countries of the European Union—and energy transition mirrors that development—it becomes clear that addressing public welfare and social inclusion have to be key objectives of further energy transition effort.
The added value provided so far by community energy actors—including municipalities, cooperatives and other decentralized community-based actors—in the form of democratization of energy business, opening opportunities to experience social self-efficacy, local development and social inclusion should be honored by democratic policy makers facing growing voter’s mistrust and populist political competitors.
It will not suffice to think only in terms of providing a level playing field in energy related economic activities in an imperfect market for purely competition concerns. Instead, there is a need to create a level playing field for common-good-oriented visions and paradigms on societal and energy transition trajectories.