Uncertainty Analysis of a Two-Dimensional Hydraulic Model
Abstract
1. Introduction
2. Methods
2.1. Study Area
2.2. Hydraulic Model of the Richelieu River
2.3. Point Estimate Method
3. Quantification of Uncertainty
3.1. Flow Rate
3.2. Manning’s n Coefficient
3.3. Topography
4. Uncertainty in the Model Output
5. Conclusions
Acknowledgments
Author Contributions
Conflicts of Interest
References
- Bates, P.D.; Pappenberger, F.; Romanowicz, R.J. Uncertainty in flood inundation modelling. In Applied Uncertainty Analysis for Flood Risk Management; Beven, K., Hall, J., Eds.; Imperial College Press: Singapore, 2014; pp. 232–269. [Google Scholar]
- Aronica, G.; Franza, F.; Bates, P.; Neal, J. Probabilistic evaluation of flood hazard in urban areas using monte carlo simulation. Hydrol. Processes 2012, 26, 3962–3972. [Google Scholar] [CrossRef] [Scilit]
- Fewtrell, T.; Bates, P.D.; Horritt, M.; Hunter, N. Evaluating the effect of scale in flood inundation modelling in urban environments. Hydrol. Processes 2008, 22, 5107–5118. [Google Scholar] [CrossRef] [Scilit]
- Uusitalo, L.; Lehikoinen, A.; Helle, I.; Myrberg, K. An overview of methods to evaluate uncertainty of deterministic models in decision support. Environ. Model. Softw. 2015, 63, 24–31. [Google Scholar] [CrossRef] [Scilit]
- Apel, H.; Aronica, G.; Kreibich, H.; Thieken, A. Flood risk analyses—How detailed do we need to be? Nat. Hazards 2009, 49, 79–98. [Google Scholar] [CrossRef] [Scilit]
- Aronica, G.; Hankin, B.; Beven, K. Uncertainty and equifinality in calibrating distributed roughness coefficients in a flood propagation model with limited data. Adv. Water Resour. 1998, 22, 349–365. [Google Scholar] [CrossRef] [Scilit]
- Hall, J.; Tarantola, S.; Bates, P.; Horritt, M. Distributed sensitivity analysis of flood inundation model calibration. J. Hydraul. Eng. 2005, 131, 117–126. [Google Scholar] [CrossRef] [Scilit]
- Horritt, M. Stochastic modelling of 1-d shallow water flows over uncertain topography. J. Comput. Phys. 2002, 180, 327–338. [Google Scholar] [CrossRef] [Scilit]
- Hunter, N.M.; Bates, P.D.; Horritt, M.S.; Wilson, M.D. Simple spatially-distributed models for predicting flood inundation: A review. Geomorphology 2007, 90, 208–225. [Google Scholar] [CrossRef] [Scilit]
- Pappenberger, F.; Beven, K.; Horritt, M.; Blazkova, S. Uncertainty in the calibration of effective roughness parameters in hec-ras using inundation and downstream level observations. J. Hydrol. 2005, 302, 46–69. [Google Scholar] [CrossRef] [Scilit]
- Cimorelli, L.; Cozzolino, L.; Della Morte, R.; Pianese, D. An improved numerical scheme for the approximate solution of the parabolic wave model. J. Hydroinform. 2013, 15, 913–925. [Google Scholar] [CrossRef] [Scilit]
- Cimorelli, L.; Cozzolino, L.; Della Morte, R.; Pianese, D. Analytical solutions of the linearized parabolic wave accounting for downstream boundary condition and uniform lateral inflows. Adv. Water Resour. 2014, 63, 57–76. [Google Scholar] [CrossRef] [Scilit]
- Cimorelli, L.; Cozzolino, L.; Della Morte, R.; Pianese, D.; Singh, V.P. A new frequency domain analytical solution of a cascade of diffusive channels for flood routing. Water Resour. Res. 2015, 51, 2393–2411. [Google Scholar] [CrossRef] [Scilit]
- Cozzolino, L.; Cimorelli, L.; Covelli, C.; Della Morte, R.; Pianese, D. Boundary conditions in finite volume schemes for the solution of shallow-water equations: The non-submerged broad-crested weir. J. Hydroinform. 2014, 16, 1235–1249. [Google Scholar] [CrossRef] [Scilit]
- Cozzolino, L.; Cimorelli, L.; Covelli, C.; Morte, R.D.; Pianese, D. Novel numerical approach for 1d variable density shallow flows over uneven rigid and erodible beds. J. Hydraul. Eng. 2013, 140, 254–268. [Google Scholar] [CrossRef] [Scilit]
- Cozzolino, L.; Della Morte, R.; Cimorelli, L.; Covelli, C.; Pianese, D. A broad-crested weir boundary condition in finite volume shallow-water numerical models. Procedia Eng. 2014, 70, 353–362. [Google Scholar] [CrossRef] [Scilit]
- Kjeldsen, T.R.; Lamb, R.; Blazkova, S.D. Uncertainty in flood frequency analysis. In Applied Uncertainty Analysis for Flood Risk Management; Imperial College Press: London, UK, 2014; pp. 153–197. [Google Scholar]
- Nachtnebel, H.-P.; Faber, R. Assessment and management of flood risks in austria. Struct. Infrastruct. Eng. 2009, 5, 333–339. [Google Scholar] [CrossRef] [Scilit]
- Di Baldassarre, G. Floods in a Changing Climate: Inundation Modelling; Cambridge University Press: Cambridge, UK, 2012; Volume 3. [Google Scholar]
- Stedinger, J.; Vogel, R.; Foufoula-Georgiou, E. Frequency Analysis of Extreme Events. In Handbook of Hydrology; Chapter 18; Maidment, D.R., Ed.; McGraw-Hill: New York, NY, USA, 1993. [Google Scholar]
- Domeneghetti, A.; Castellarin, A.; Brath, A. Effects of Rating-Curve Uncertainty on the Calibration of Numerical Hydraulic Models; First IAHR European Congress: Edinburgo, UK, 2010. [Google Scholar]
- Bates, P.D.; Horritt, M.S.; Aronica, G.; Beven, K. Bayesian updating of flood inundation likelihoods conditioned on flood extent data. Hydrol. Processes 2004, 18, 3347–3370. [Google Scholar] [CrossRef] [Scilit]
- Noack, M.; Yoeruek, A. Uncertainty in hydrodynamic-numerical modelling of flood areas. Hydrol. Wasserbewirtschaftung 2008, 52, 173–178. [Google Scholar]
- Hunter, N.; Bates, P.; Neelz, S.; Pender, G.; Villanueva, I.; Wright, N.; Liang, D.; Falconer, R.A.; Lin, B.; Waller, S. Benchmarking 2d hydraulic models for urban flood simulations. Proc. Inst. Civ. Eng.: Water Manag. 2008, 161, 13–30. [Google Scholar]
- Wohl, E.E. Uncertainty in flood estimates associated with roughness coefficient. J. Hydraul. Eng. 1998, 124, 219–223. [Google Scholar] [CrossRef] [Scilit]
- Johnson, P.A. Uncertainty of hydraulic parameters. J. Hydraul. Eng. 1996, 122, 112–114. [Google Scholar] [CrossRef] [Scilit]
- Cesare, M. First-order analysis of open-channel flow. J. Hydraul. Eng. 1991, 117, 242–247. [Google Scholar] [CrossRef] [Scilit]
- Horritt, M. A linearized approach to flow resistance uncertainty in a 2-d finite volume model of flood flow. J. Hydrol. 2006, 316, 13–27. [Google Scholar] [CrossRef] [Scilit]
- Mays, L.W.; Tung, Y.-K. Hydrosystems Engineering and Management; Water Resources Publication: Glasgow, UK, 2002. [Google Scholar]
- Burnham, M.W.; Davis, D.W. Accuracy of Computed Water Surface Profiles; Hydrologic Engineering Center: Davis, CA, USA, 1986. [Google Scholar]
- Huang, Y.; Qin, X. Uncertainty analysis for flood inundation modelling with a random floodplain roughness field. Environ. Syst. Res. 2014, 3, 1. [Google Scholar] [CrossRef] [Scilit]
- Altarejos-García, L.; Escuder-Bueno, I.; Serrano-Lombillo, A.; de Membrillera-Ortuño, M.G. Methodology for estimating the probability of failure by sliding in concrete gravity dams in the context of risk analysis. Struct. Saf. 2012, 36, 1–13. [Google Scholar] [CrossRef] [Scilit]
- Merwade, V.; Olivera, F.; Arabi, M.; Edleman, S. Uncertainty in flood inundation mapping: Current issues and future directions. J. Hydrol. Eng. 2008, 13, 608–620. [Google Scholar] [CrossRef] [Scilit]
- Hardy, R.; Bates, P.; Anderson, M. The importance of spatial resolution in hydraulic models for floodplain environments. J. Hydrol. 1999, 216, 124–136. [Google Scholar] [CrossRef] [Scilit]
- Monte, B.E.O.; Costa, D.D.; Chaves, M.B.; Magalhães, L.D.O.; Uvo, C.B. Hydrological and hydraulic modelling applied to the mapping of flood-prone areas. RBRH 2016, 21, 152–167. [Google Scholar] [CrossRef] [Scilit]
- Cook, A.; Merwade, V. Effect of topographic data, geometric configuration and modeling approach on flood inundation mapping. J. Hydrol. 2009, 377, 131–142. [Google Scholar] [CrossRef] [Scilit]
- Abdullah, A.; Vojinovic, Z.; Price, R.; Aziz, N. Improved methodology for processing raw lidar data to support urban flood modelling–accounting for elevated roads and bridges. J. Hydroinform. 2012, 14, 253–269. [Google Scholar] [CrossRef] [Scilit]
- Mercer, B. Dems created from airborne ifsar—An update. In Proceedings of the ISPRS Congress International Archives of Photogrammetry and Remote Sensing, Istanbul, Turkey, 12–23 July 2004. [Google Scholar]
- Goncalves, J.; Oliveira, A. Accuracy analysis of dems derived from aster imagery. Int. Arch. Photogramm. Remote Sens. 2004, 35, 168–172. [Google Scholar]
- Kornus, W.; Alamús, R.; Ruiz, A.; Talaya, J. Assessment of dem accuracy derived from spot-5 high resolution stereoscopic imagery. Int. Arch. Photogramm. Remote Sens. 2004, 35, 445–453. [Google Scholar]
- Liu, D.; Matthies, H. Uncertainty quantification with spectral approximations of a flood model. In IOP Conference Series: Materials Science and Engineering; IOP Publishing: Bristol, UK, 2010; p. 012208. [Google Scholar]
- Alho, P.; Hyyppä, H.; Hyyppä, J. Consequence of dtm precision for flood hazard mapping: A case study in sw finland. Nordic J. Surv. Real Estate Res. 2009, 6, 21–39. [Google Scholar]
- Savage, J.T.S.; Bates, P.; Freer, J.; Neal, J.; Aronica, G. When does spatial resolution become spurious in probabilistic flood inundation predictions? Hydrol. Processes 2016, 30, 2014–2032. [Google Scholar] [CrossRef] [Scilit]
- Vojinovic, Z.; Seyoum, S.; Mwalwaka, J.; Price, R. Effects of model schematisation, geometry and parameter values on urban flood modelling. Water Sci. Technol. 2011, 63, 462–467. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Vojinovic, Z.; Tutulic, D. On the use of 1d and coupled 1d-2d modelling approaches for assessment of flood damage in urban areas. Urban Water J. 2009, 6, 183–199. [Google Scholar] [CrossRef] [Scilit]
- Pappenberger, F.; Iorgulescu, I.; Beven, K.J. Sensitivity analysis based on regional splits and regression trees (sars-rt). Environ. Model. Softw. 2006, 21, 976–990. [Google Scholar] [CrossRef] [Scilit]
- Parodi, U.; Ferraris, L. Influence of stage discharge relationship on the annual maximum discharge statistics. Nat. Hazards 2004, 31, 603–611. [Google Scholar] [CrossRef] [Scilit]
- Montanari, A. What do we mean by ‘uncertainty’? The need for a consistent wording about uncertainty assessment in hydrology. Hydrol. Processes 2007, 21, 841–845. [Google Scholar] [CrossRef] [Scilit]
- Solomatine, D.P.; Maskey, M.; Shrestha, D.L. Instance-based learning compared to other data-driven methods in hydrological forecasting. Hydrol. Processes 2008, 22, 275–287. [Google Scholar] [CrossRef] [Scilit]
- Tung, Y.-K. Uncertainty and reliability analysis in water resources engineering. J. Contemp. Water Res. Educ. 2011, 103, 13–21. [Google Scholar]
- Beven, K.; Binley, A. The future of distributed models: Model calibration and uncertainty prediction. Hydrol. Processes 1992, 6, 279–298. [Google Scholar] [CrossRef] [Scilit]
- Blazkova, S.; Beven, K. A limits of acceptability approach to model evaluation and uncertainty estimation in flood frequency estimation by continuous simulation: Skalka catchment, czech republic. Water Resour. Res. 2009, 45. [Google Scholar] [CrossRef] [Scilit]
- Liu, Y.; Gupta, H.V.; Sorooshian, S.; Bastidas, L.A.; Shuttleworth, W.J. Constraining land surface and atmospheric parameters of a locally coupled model using observational data. J. Hydrometeorol. 2005, 6, 156–172. [Google Scholar] [CrossRef] [Scilit]
- Melching, C. An improved first-order reliability approach for assessing uncertainties in hydrologic modeling. J. Hydrol. 1992, 132, 157–177. [Google Scholar] [CrossRef] [Scilit]
- Kuczera, G.; Parent, E. Monte carlo assessment of parameter uncertainty in conceptual catchment models: The metropolis algorithm. J. Hydrol. 1998, 211, 69–85. [Google Scholar] [CrossRef] [Scilit]
- Krzysztofowicz, R. Bayesian theory of probabilistic forecasting via deterministic hydrologic model. Water Resour. Res. 1999, 35, 2739–2750. [Google Scholar] [CrossRef] [Scilit]
- Maskey, S.; Guinot, V.; Price, R.K. Treatment of precipitation uncertainty in rainfall-runoff modelling: A fuzzy set approach. Adv. Water Resour. 2004, 27, 889–898. [Google Scholar] [CrossRef] [Scilit]
- Romanowicz, R.; Beven, K. Estimation of flood inundation probabilities as conditioned on event inundation maps. Water Resour. Res. 2003, 39. [Google Scholar] [CrossRef] [Scilit]
- Pappenberger, F.; Beven, K.J. Ignorance is bliss: Or seven reasons not to use uncertainty analysis. Water Resour. Res. 2006, 42. [Google Scholar] [CrossRef] [Scilit]
- Neal, J.; Villanueva, I.; Wright, N.; Willis, T.; Fewtrell, T.; Bates, P. How much physical complexity is needed to model flood inundation? Hydrol. Processes 2012, 26, 2264–2282. [Google Scholar] [CrossRef] [Scilit]
- Aronica, G.; Bates, P.; Horritt, M. Assessing the uncertainty in distributed model predictions using observed binary pattern information within glue. Hydrol. Processes 2002, 16, 2001–2016. [Google Scholar] [CrossRef] [Scilit]
- Van der Sluijs, J.P. Uncertainty and precaution in environmental management: Insights from the upem conference. Environ. Model. Softw. 2007, 22, 590–598. [Google Scholar] [CrossRef] [Scilit]
- Riboust, P.; Brissette, F. Climate change impacts and uncertainties on spring flooding of lake champlain and the richelieu river. JAWRA J. Am. Water Resour. Assoc. 2015, 51, 776–793. [Google Scholar] [CrossRef] [Scilit]
- Secretan, Y. H2D2 Software. 2013. Available online: http://www.gre-ehn.ete.inrs.ca/H2D2 (accessed on 22 April 2014).
- Heniche, M.; Secretan, Y.; Boudreau, P.; Leclerc, M. A two-dimensional finite element drying-wetting shallow water model for rivers and estuaries. Adv. Water Resour. 2000, 23, 359–372. [Google Scholar] [CrossRef] [Scilit]
- Dhatt, G.; Touzot, G.; Lefrançois, E. Méthode des Éléments Finis; Hermès Lavoisier: Paris, France, 2005. [Google Scholar]
- Secretan, Y.; Matte, P. H2d2: Développement de Stratégies de Résolutions Non-Stationnaires et Non-Linéaires; Institut national de la recherche scientifique (INRS): Québec, Canada, 2010. [Google Scholar]
- Da Silva Holanda, P.; Blanco, C.J.C.; Mesquita, A.L.A.; Junior, A.C.P.B.; de Figueiredo, N.M.; Macêdo, E.N.; Secretan, Y. Assessment of hydrokinetic energy resources downstream of hydropower plants. Renew. Energy 2017, 101, 1203–1214. [Google Scholar] [CrossRef] [Scilit]
- Holanda, P.D.S.; Blanco, C.J.C.; Cruz, D.O.D.A.; Lopes, D.F.; Barp, A.R.B.; Secretan, Y. Hydrodynamic modeling and morphological analysis of lake gua preta: One of the water sources of belém-pa-brazil. J. Braz. Soc. Mech. Sci. Eng. 2011, 33, 117–124. [Google Scholar] [CrossRef] [Scilit]
- Boudreau, P.; Cantin, J.-F.; Bouchard, A.; Champoux, O.; Fortin, P.; Fiset, J.-M.; Fortin, N.; Thérien, J.; Morin, Groupe de travail technique international du lac Champlain et de la rivière Richelieu. Création d’un Modèle Hydraulique 2d de la Rivière Richelieu Entre Rouses Point et sorel (tâche 2-3); Environnement Canada: Gatineau, QC, Canada, 2015.
- Rosenblueth, E. Point estimates for probability moments. Proc. Natl. Acad. Sci. USA 1975, 72, 3812–3814. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Che-Hao, C.; Yeou-Koung, T.; Jinn-Chuang, Y. Evaluation of probability point estimate methods. Appl. Math. Model. 1995, 19, 95–105. [Google Scholar] [CrossRef] [Scilit]
- Harr, M.E. Probabilistic estimates for multivariate analyses. Appl. Math. Model. 1989, 13, 313–318. [Google Scholar] [CrossRef] [Scilit]
- Christian, J.T.; Baecher, G.B. Point-estimate method as numerical quadrature. J. Geotech. Geoenviron. Eng. 1999, 125, 779–786. [Google Scholar] [CrossRef] [Scilit]
- Chow, V.T.; Maidment, D.R.; Mays, L.W. Applied Hydrology; Tata McGraw-Hill Education: New York, NY, USA, 1988. [Google Scholar]
- Pukelsheim, F. The three sigma rule. Am. Stat. 1994, 48, 88–91. [Google Scholar]









| Preprocessing | Processing | Postprocessing |
|---|---|---|
| PEM approach sampling | H2D2 model | Propagation of uncertainty |
![]() | ||
| Number of Node (N) | Coordinate | Weights |
|---|---|---|
| 0 | 0 | 1 |
| 1 | −1,1 | |
| 2 |
| Case | Topography | Manning’s | Flow Rate | Weight |
|---|---|---|---|---|
| Case H1 | Min | Min | Min | |
| Case H2 | Min | Min | Mean | |
| Case H3 | Min | Min | Max | |
| Case H4 | Min | Mean | Min | |
| Case H5 | Min | Mean | Mean | |
| Case H6 | Min | Mean | Max | |
| Case H7 | Min | Max | Min | |
| Case H8 | Min | Max | Mean | |
| Case H9 | Min | Max | Max | |
| Case H10 | Mean | Min | Min | |
| Case H11 | Mean | Min | Mean | |
| Case H12 | Mean | Min | Max | |
| Case H13 | Mean | Mean | Min | |
| Case H14 | Mean | Mean | Mean | |
| Case H15 | Mean | Mean | Max | |
| Case H16 | Mean | Max | Min | |
| Case H17 | Mean | Max | Mean | |
| Case H18 | Mean | Max | Max | |
| Case H19 | Max | Min | Min | |
| Case H20 | Max | Min | Mean | |
| Case H21 | Max | Min | Max | |
| Case H22 | Max | Mean | Min | |
| Case H23 | Max | Mean | Mean | |
| Case H24 | Max | Mean | Max | |
| Case H25 | Max | Max | Min | |
| Case H26 | Max | Max | Mean | |
| Case H27 | Max | Max | Max |
| 759 | 39.4 | 690.75 | 827.24 |
| 824 | 36 | 761.64 | 886.35 |
| 936 | 33.7 | 877.62 | 994.37 |
| 1113 | 39.4 | 1044.75 | 1181.24 |
© 2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Share and Cite
Oubennaceur, K.; Chokmani, K.; Nastev, M.; Tanguy, M.; Raymond, S. Uncertainty Analysis of a Two-Dimensional Hydraulic Model. Water 2018, 10, 272. https://doi.org/10.3390/w10030272
Oubennaceur K, Chokmani K, Nastev M, Tanguy M, Raymond S. Uncertainty Analysis of a Two-Dimensional Hydraulic Model. Water. 2018; 10(3):272. https://doi.org/10.3390/w10030272
Chicago/Turabian StyleOubennaceur, Khalid, Karem Chokmani, Miroslav Nastev, Marion Tanguy, and Sebastien Raymond. 2018. "Uncertainty Analysis of a Two-Dimensional Hydraulic Model" Water 10, no. 3: 272. https://doi.org/10.3390/w10030272
APA StyleOubennaceur, K., Chokmani, K., Nastev, M., Tanguy, M., & Raymond, S. (2018). Uncertainty Analysis of a Two-Dimensional Hydraulic Model. Water, 10(3), 272. https://doi.org/10.3390/w10030272