An Integrated Best-Worst and Interval Type-2 Fuzzy TOPSIS Methodology for Green Supplier Selection

1
Munzur University, Faculty of Engineering, Department of Mechanical Engineering, 62000 Tunceli, Turkey
2
Munzur University, Faculty of Engineering, Department of Industrial Engineering, 62000 Tunceli, Turkey
3
Munzur University, Faculty of Engineering, Department of Computer Engineering, 62000 Tunceli, Turkey
*
Author to whom correspondence should be addressed.
Mathematics 2019, 7(2), 182; https://doi.org/10.3390/math7020182
Submission received: 29 December 2018 / Revised: 30 January 2019 / Accepted: 31 January 2019 / Published: 15 February 2019

Abstract

:
Supplier selection is one of the most important multi-criteria decision-making (MCDM) problems for decision-makers in the competitive market. Today’s organizations are seeking new ways to reduce the negative effects they have on the environment and to achieve a greener system. Currently, the concept of green supplier selection has gained great importance for its ability to incorporate environmental or green criteria into classical supplier selection practices. Therefore, in this study, a multi-phase MCDM model based on the best-worst method (BWM) and the interval type-2 fuzzy technique for order preference by similarity to ideal solution (IT2F TOPSIS) is proposed. A case study in a plastic injection molding facility in Turkey was carried out to show the applicability of the proposed integrated methodology. The paper offers insights into decision-making, methodology, and managerial implications. Results of the case study are examined and suggestions for future research are provided.

1. Introduction

Supply chain management (SCM) includes the creation of information and material flows, production scheduling, and the planning of distribution systems [1]. Adding value to supply chain management is crucial for today’s businesses in order to improve organizational performance and provide a competitive advantage. This is necessary because competition no longer exists solely between institutions, but also in the area of SCM. SCM focuses not only on material resources but also on values such as knowledge. Information has become the most important source of SCM [2,3]. SCM builds an integrated approach by analyzing manufacturers, warehouses, production, and suppliers. Thus, enterprises produce and distribute products at the appropriate time and in appropriate quantities. SCM implements an entire system approach while managing materials and services. Decision-makers attach importance to the management of internal operations in order to increase the productivity of the enterprises. SCM requires the integration of internal and external activities in enterprises. With increasing global competition, the quality and price gaps between products are closing every day. Therefore, supplier selection is one of the most important multi-criteria decision-making (MCDM) problems for enterprises [4,5]. Choosing an appropriate supplier is one of the most important processes under the responsibility of the purchasing department. On the other hand, practices aimed at protecting the environment are gaining importance both in the private and public sectors. As environmental awareness increases, an environmentally-friendly approach also becomes an inevitable element in supply chain management applications. Currently, final consumers also consider environmentally sensitive products in their procurement processes.
The aim of green supply chain management (GSCM) is to minimize pollution and other factors affecting the environment. It helps suppliers recognize the significance of resolving environmental issues. In addition, GSCM helps enterprises achieve a balance between environmental and economic performance, thereby reducing the impact of their products and fostering an environmental image and environmentally friendly services. GSCM strives to increase the use of green products and encourage businesses to increase the market share of such products. In addition to traditional goals, GSCM also aims to establish and develop an environmentally friendly supply chain system. Therefore, environmental criteria should be used together with traditional criteria in selecting green suppliers. However, most of the green supplier selection studies in the literature are based on environmental criteria. The main criteria for the development of suppliers are green information transfer, investment and resource transfer, as well as management and organization practices. In the portfolio-based analysis, pollution prevention and avoidance of pollution are considered as major differences in the selection of green suppliers [6]. Some studies have also used criteria such as GSCM capabilities, strategic level of the procurement department, environmental commitment level, or degree of green supplier evaluation and cooperation. In the green purchasing process, regulation, customer pressure, social responsibility, and commercial benefits are among the most commonly used criteria [7].
This paper proposes an integrated best-worst and IT2F TOPSIS methodology for green supplier selection in the plastic injection molding industry. The methodology introduced for the selection of green suppliers was carried out under three phases. First, the selection criteria following the green concept were determined through a literature review and interviews with decision-makers. In the second phase, criteria weights were determined using best-worst method (BWM). Finally, to prioritize suppliers with respect to the weighted criteria, an IT2F TOPSIS method was utilized. This study is considered as the first attempt at integrating BWM and IT2F TOPSIS to obtain supplier selection knowledge. Since BWM is easier and more efficient than analytic hierarchy process (AHP) for pairwise comparisons, it was used in weighting the selection criteria. The use of the TOPSIS method extended with interval type-2 fuzzy sets (IT2FSs) allowed more uncertainty and ambiguity to be reflected in the decision-making process as well as including the concept of similarity to ideal solution.
The proposed approach was applied to the plastic injection molding industry to select a green supplier. The plastic injection products have been broadly used in high-tech commodities and different household necessities. In this regard, pipe and fitting production technology and raw material usage are intensive. In addition, the competition conditions of this production area are very fierce. Hence, choosing the right supplier plays a vital role in the success of the enterprises. There are few methods and studies covered in the literature for this area. Therefore, this paper proposes a multi-phase MCDM model to select which supplier is well-suited to the pipe manufacturing enterprise. The case design approach was carried out by incorporating data provided by a district -based small- and medium-sized enterprise. Specifically, the main contributions of this paper are summarized as follows: (i) An integrated approach based on best-worst and IT2F TOPSIS methodology was proposed. (ii) A case study was carried out for the plastic injection molding industry. This case study highlighted the implications of the methodology for the industry and the methodology followed can be easily adapted to another sector in this regard. (iii) IT2FSs were combined with BWM for the first time in the literature. As a result, uncertainty in the decision-making process can be clearly reflected as compared to type-1 fuzzy set theory [8,9,10,11,12].
The rest of the paper is presented as follows: A literature review regarding supply chain management and supplier selection is presented in the next section. The best-worst method is described and analyzed in Section 3. In Section 4, a case study is presented to help understand the proposed method, carried out for green supplier selection in an injection molding facility in Turkey. Finally, conclusions and directions for future research are presented in Section 5.

2. Literature Review

The literature review section is divided into two subsections. First, literature regarding green supplier selection is analyzed, then literature related to the best-worst method is addressed. Many studies related to green supplier selection and evaluation were found in the literature. Supplier selection can be defined as one of the most important phases in supply management function and purchasing [13]. A variety of MCDM methods have recently been used by researchers to deal with green supplier selection problems. In the literature, different supplier selection criteria were used such as quality, delivery, and cost for evaluating their suppliers [14]. A number of environmental factors were considered to select green suppliers [15]. Criteria such as pollution production [16,17], recycling utilization level of waste material [18], level of clean energy utilization [19], noise level [20], and level of environmental protection input [21] were considered by researchers. On the other hand, individual and hybrid methods were proposed for determining supplier selection in the literature [22]. A grey analytical network process (ANP)-based model to determine green supplier development programs to develop the performance of suppliers was introduced by [23]. The model was tested on real-world examples to show model effectiveness [24]. They proposed a preference ranking organization method for enrichment evaluation (PROMETHEE) method based on a hybrid multiple criteria decision-making approach to develop green supplier performance. A fuzzy axiomatic design approach was introduced to choose the best green supplier for a plastic manufacturing company in Singapore [16]. The requirements of the manufacturer and the supplier were evaluated using a proposed methodology with a multi-objective optimization model and fuzzy nature. Hashemi et al. [25] considered environmental and economic criteria and introduced a model based on improved grey relational analysis (GRA) and ANP for comprehensive green supplier selection. Uygun and Dede [26] proposed an integrated fuzzy MCDM method, which was based on fuzzy decision-making trial and evaluation laboratory (DEMATEL), fuzzy ANP, and fuzzy TOPSIS, to evaluate and select green suppliers by considering green purchasing, green design, green logistics, and reverse logistics. Yazdani et al. [19] designed a green supplier selection model. The proposed model focused on the interrelationships between the requirements of the customer with a DEMATEL method when constructing a relationship structure. Moreover, quality function deployment was used to determine the degree of relationship for the criteria of supplier selection pairs. Recently, three popular multi-criteria supplier selection applications, namely, TOPSIS, GRA, and Vise Kriterijumska Optimizacija I Kompromisno Resenje (VIKOR), were compared to each other by [13] under fuzzy environment. The method was applied to an actual company from the agri-food industry for green supplier evaluation and selection. Yu et al. [15] proposed a model based on the carbon footprint, including environmental and economic attributes to select a green supplier with a dynamic environment. Moreover, a literature review related to green supplier selection and estimation methods can be found in [27,28].
On the other hand, the best-worst method was first introduced by [29] to solve MCDM problems. In this method, many alternatives are considered according to different criteria in order to choose the best alternative. According to this method, two of the criteria, which are the best or most important criteria and the worst or least important criteria, are determined by the decision-maker. The method is a novel approach and has been applied to different research areas due to BWM’s flexibility and simplicity for solving problems. Rezaei et al. [30] applied BWM to supplier segmentation to find the relative weight of the criteria. Then, the method was applied to different research areas, such as supplier selection [31,32], multi-criteria decision-making [17,33], evaluating freight bundling configurations [34], and assessment of other factors affecting sustainability in SCM [35]. Guo and Zhao [36] proposed the BWM technique with MCDM under fuzzy environment. Van de Kaa et al. [37] used the BWM technique and expert opinions for calculating the relative importance of factors to evaluate and rank technologies. The method was applied to the technology battle for biomass conversion in the Netherlands. Omrani et al. [38] proposed an integrated approach including Taguchi-neural network BWM and TOPSIS under fuzzy environment. The proposed integrated approach was applied to a case study to find the optimal combination of different power plants.
In light of the above, this paper aims to fill the gap in the literature for an integrated best-worst and IT2F TOPSIS methodology for green supplier selection in the plastic injection molding industry in Turkey.

3. Materials and Methods

3.1. The Evaluation Criteria for Green Supplier Selection

Within the context of green supplier selection, the recent review of [27] identified Environmental Management Systems (EMS) as the most popular environmental criteria due to its flexibility. Nielsen et al. [39] reviewed 57 related papers and, like Govindan et al. [27], found EMS the most important and comprehensive environmental criteria amongst over 90 identified measures. Using these reviews and the identified criteria, a combination of conventional and green supplier selection criteria is used in our study for the purpose of supplier assessment. The criteria used in relevant literatures are listed in Table 1.

3.2. Best-Worst Method

The best-worst method (BWM) was introduced for the choice phase [29]. The BWM is characterized by some salient features such as (i) it provides a very structured pairwise comparison, which results in highly consistent and reliable results; (ii) it uses only two vectors instead of a full pairwise comparison matrix. This implies less data collection effort, taking less time from the analyst and the decision-maker. Interestingly, as these two vectors are more structured than a full matrix, less data here leads to more reliability; (iii) the method uses only integer values, which makes it more practically understandable compared to methods utilizing fractions [31].
Step 1. Determine a set of decision criteria. In this step, we consider the criteria (c_1, c_2, …, c_n) that should be used to arrive at a decision.
Step 2. Determine the best (e.g., most desirable, most important) and the worst (e.g., least desirable, least important) criteria. In this step, the decision-maker identifies the best and the worst criteria in general. No comparison is made at this stage.
Step 3. Determine the preference of the best criterion over all the other criteria using a number between 1 and 9. The resulting Best-to-Others vector would be:
A B = ( a B 1 , a B 2 , , a B n ) ,
where a B j indicates the preference of the best criterion B over criterion j. It is clear that a B B = 1 .
Step 4. Determine the preference of all the criteria over the worst criterion using a number between 1 and 9. The resulting Others-to-Worst vector would be
A B = ( a 1 W , a 2 W , , a n W ) T
where a j W indicates the preference of the criterion j over the worst criterion W. It is clear that a W W = 1 .
Step 5. Find the optimal weights ( w 1 * ,   w 2 * ,   , w n * ) .
The optimal weight for the criteria is the one where, for each pair of w B / w j and w j / w w we have w B / w j = a j w . To satisfy these for all j, we should find a solution where the maximum absolute differences | w B w j a B j | and | w j w W a j W | for all j is minimized. Considering the non-negativity and sum condition for the weights, the following problem is resulted:
  • min max j { | w B w j a B j | , | w j w W a j W | }
  • s.t
  • w j = 1
  • w j 0 for all j
Problem can be transferred to the following problem: ξ
  • min ξ
  • | w B w j a B j | ξ for all j
  • | w j w W a j W | ξ for all j
  • w j = 1
  • w j 0 , for all j
Solving problem, the optimal weights ( w 1 * ,   w 2 * ,   , w n * ) and ξ * are calculated. After that consistency ratio is calculated with consistency index (Table 2). It becomes clear that, the bigger the ξ * , the higher the consistency ratio, and the less reliable the comparisons become.

3.3. IT2F TOPSIS

TOPSIS approach aims to choose alternatives that simultaneously have the shortest distance from the positive ideal solution and the farthest distance from the negative-ideal solution [62,63,64]. IT2F TOPSIS, [65] Pythagorean fuzzy TOPSIS [66]. Ak and Gul [67] are developed as different versions of TOPSIS based on fuzzy sets. TOPSIS based on IT2FSs reflects uncertainty, vagueness, and ambiguity using advantages of IT2FSs [65,68,69,70,71,72] better than ordinary fuzzy TOPSIS. The proposed TOPSIS based on IT2FSs can be applied via a series of steps:
Step 1: Assume that there is a set S of alternatives, where S = { s 1 , s 2 , , s n } , and assume that there is a set C of criteria, C = { c 1 , c 2 , , c m } and there are K decision-makers D = { D 1 , D 2 , , D K } Each decision-maker is a participant in our questionnaire and s/he has her/his own perception value regarding the performance of supplier with respect to each criterion. The aggregate performance value of supplier with respect to each criterion can be calculated using Equation (1):
s 1 s 2 s n E c = ( c ˜ ˜ i j p ) m × n = c 1 c 2 c m [ c ˜ ˜ 11 p c ˜ ˜ 12 p c ˜ ˜ 1 n p c ˜ ˜ 21 p c ˜ ˜ 22 p c ˜ ˜ 2 n p c ˜ ˜ m 1 p c ˜ ˜ m 2 p c ˜ ˜ m n p ] ,
where c ˜ ˜ i j = ( c ˜ ˜ i j 1 c ˜ ˜ i j 2 c ˜ ˜ i j k k ) , s ˜ ˜ i j is an IT2FS 1 i m , 1 j n , 1 c k and k denotes the number of expert,
c ˜ ˜ i j = ( ( a i 1 U , a i 2 U , a i 3 U , a i 4 U ; H 1 ( A ˜ i U ) , H 2 ( A ˜ i U ) ) , ( a i 1 L , a i 2 L , a i 3 L , a i 4 L ; H 1 ( A ˜ i L ) , H 2 ( A ˜ i L ) ) )
Step 2: Obtain the weighting matrix W s of the criteria using the best-worst method,
c 1 c 2 c m W s = ( w i s ) 1 × m = [ w 1 s ,   w 2 s ,   ,   w m s ]
Step 3: Calculate the weighted decision matrix by multiplying the importance weights of criteria and the values in the decision matrix. The weighted decision matrix V ˜ ˜ for each criterion is defined as follows:
v ˜ ˜ i j = c ˜ ˜ i j × w i ,
where v ˜ ˜ i j denotes the weighted trapezoidal interval type-2 fuzzy numbers.
Step 4: Calculate the ranking value R a n k ( v ˜ ˜ i j ) of IT2FSs. The ranking weighted decision matrix E w is constructed.
Step 5: Determine the positive ideal solution x * = ( v 1 * , v 2 * , , v m * ) and the negative-ideal solution x = ( v 1 , v 2 , , v m ) where
v i * = { max i j n { R a n k ( v ˜ ˜ i j ) } ,   i f   f i B min i j n { R a n k ( v ˜ ˜ i j ) } ,   i f   f i C ,
v i = { min i j n { R a n k ( v ˜ ˜ i j ) } ,   i f   f i B max i j n { R a n k ( v ˜ ˜ i j ) } ,   i f   f i C .
Then, positive d * ( x j ) and negative d ( x j ) ideal solutions are determined for green supplier as follows:
d * ( x j ) = i I ( R a n k ( v ˜ ˜ i j ) v i * ) 2
d ( x j ) = i I ( R a n k ( v ˜ ˜ i j ) v i ) 2
The ranking value R a n k ( A ˜ ˜ i ) of the trapezoidal IT2FS A ˜ ˜ i is defined as follows:
R a n k ( v ˜ ˜ i ) = M 1 ( v ˜ i U ) + M 1 ( v ˜ i L ) + M 2 ( v ˜ i U ) + M 2 ( v ˜ i L ) + M 3 ( v ˜ i U ) + M 3 ( v ˜ i L ) 1 4 ( S 1 ( v ˜ i U ) + S 1 ( v ˜ i L ) + S 2 ( v ˜ i U ) + S 2 ( v ˜ i L ) + S 3 ( v ˜ i U ) + S 3 ( v ˜ i L ) + S 4 ( v ˜ i U ) + S 4 ( v ˜ i L ) ) + H 1 ( v ˜ i U ) + H 1 ( v ˜ i L ) + H 2 ( v ˜ i U ) + H 2 ( v ˜ i L )
where M p ( v ˜ ˜ i j ) denotes the average of the elements v i p j and v i ( p + 1 ) j , denotes the standard deviation of the elements v i p j and v i ( p + 1 ) j , M p ( v ˜ ˜ i j ) = ( v i p j + v i ( p + 1 ) j ) / 2 , 1 p 3 , denotes the standard deviation of the v i q j and v i ( q + 1 ) j , S q ( v ˜ i j ) = 1 2 k = q q + 1 ( v i k j 1 2 k = q q + 1 v i k j ) 2 , 1 q 3 , S 4 ( v ˜ i j ) denotes the standard deviation of the elements v i 1 j , v i 2 j , v i 3 j , v i 4 j , S 4 ( v ˜ i j ) = 1 4 k = 1 4 ( v i k j 1 4 k = 1 4 v i k j ) 2 H p ( v ˜ i j ) denotes the membership value of the element v i ( p + 1 ) j in the trapezoidal membership function v ˜ i j , 1 p 3 , j { U , L } ,   and   1 i n .
Step 6: Then the closeness coefficient C C ( x j ) is calculated.
C C ( x j ) = d ( x j ) d * ( x j ) + d ( x j )
Step 7: We can rank alternatives in decreasing order. The larger the value of C C ( x j ) , the higher the preference of the green supplier.

4. Case Study

Injection molding is one of the most common methods in plastic parts production. With this method, complex geometric products can be produced easily. Molding machine, raw plastic material and mold of the product to be produced are required for the production by injection molding. The raw material used in this production method is directly related to the quality of the product. In this respect, supplier choice plays an important role in the success of the operator. The injection molding method consists of four main stages as demonstrated in Figure 1. These stages are drying, blending and dosing, injection molding and regrinding, respectively. In the drying stage, the material (plastic beads and the reusable scrap) is fed into the dryer, to remove or reduce moisture to an acceptable level. In the second stage, material is further mixed with the additives. In the third stage, the injection molding process takes place, wherein the plastic mixture is melted and converted into a solid part. In the final stage, runner, gates, and any other unwanted plastic which is attached to the part, is removed and ground into appropriate granules [73]. In this study, we carried out the case study in an injection molding facility in Turkey.

4.1. The Calculation Process of the Proposed Model

In this paper, we applied the BWM to obtain importance weights of the green criteria for supplier selection in injection molding. This method is based on comparison matrices as in AHP [29]. It requires less pairwise comparison data compared to AHP. In applying the proposed model, five experts evaluated the predefined green criteria. Expert 1 works as the manager of the facility and has 10 years of experience. Expert 2 is a five year experienced chemical engineer. He is also responsible for quality control of the facility. Expert 3 serves as a machine technician. The responsibility of the Expert 3 is to determine the raw material ratios and connect the molds to the machines. Expert 4 is a machine technician, too and has the same duties as Expert 3. Expert 5 works as a purchasing manager in the facility. He works in coordination with the company manager for the determination of appropriate suppliers. The first process in the proposed model is application of BWM to obtain weights of green supplier selection criteria. As an example, to the calculation of the main criteria with respect to Expert 1, the following formulae is presented:
min ξ s t . | w 6 w 1 4 | ξ ,   | w 6 w 2 7 | ξ ,   | w 6 w 3 1 | ξ ,   | w 6 w 4 2 | ξ , | w 6 w 5 3 | ξ ,   | w 6 w 7 7 | ξ ,   | w 6 w 8 7 | ξ , | w 1 w 8 4 | ξ ,   | w 2 w 8 1 | ξ ,   | w 3 w 8 7 | ξ ,   | w 4 w 8 6 | ξ , | w 5 w 8 5 | ξ ,   ξ , | w 7 w 8 1 | ξ , w 1 + w 2 + w 3 + w 4 + w 5 + w 6 + w 7 + w 8 = 1 w 1 , w 2 , w 3 , w 4 , w 5 , w 6 , w 7 , w 8 0
Then, the BWM procedure is applied for each sub-criterion according to the five experts. Results of all calculations are presented in Table 3. The importance weights of green criteria are then used in evaluating suppliers by IT2F TOPSIS procedure. On the other hand, the calculated consistency ratios with respect to the experts are presented in Table 4. w1, w2, w3, w4, w5, w6, w7 and w8 are found as 0.100, 0.035, 0.205, 0.170, 0.135, 0.285, 0.035 and 0.035, respectively. We calculated the consistency ratios using ξ and the corresponding consistency index in Table 2 by Equation (9).
C o n s i s t e n c y   r a t i o = ξ C o n s i s t e n c y   i n d e x
For example, the consistency ratio for main criteria with respect to Expert 1 is calculated as ξ / 3.73 = 0.307 which implies a very good consistency.
The second process is concerned with IT2F TOPSIS application for suppliers. The suppliers are named as Supplier 1, Supplier 2 and Supplier 3. Supplier 1 is a local company. Compared to the other two companies, its production volume and transportation network is limited. Supplier 2 has a strong sales figure and its transportation network throughout the country is wide. This company makes production according to national and international quality standards. Supplier 3 is a global company. Technological levels are higher than the two other companies. Its number of defective products is relatively low, and its production volume is high. On the other hand, raw material prices are higher than the other two firms.
In this second process, the aggregated IT2F evaluation matrix for green supplier evaluation is obtained and it is shown in Table 5. Then, the weighted evaluation matrix is calculated multiplying the importance weights of green criteria and the aggregated IT2F evaluation matrix. The weighted evaluation matrix is presented in Table 6. Here, the importance weights of green criteria which are obtained from BWM are used as inputs of IT2F TOPSIS. Then, the ranking values for each green criterion with respect to three suppliers are calculated. The results are presented in Table 7.
Hereafter, the positive ideal and negative ideal solutions are calculated for green suppliers. The closeness coefficient for each green supplier is computed and rankings are determined in decreasing order (Table 8). In IT2F TOPSIS, the larger the value of closeness coefficient, the higher the preference of the green supplier. We determined the greenest supplier as Supplier 3 based on five expert evaluations using the proposed BWM and IT2F TOPSIS model.

4.2. The Comparative Analysis

The proposed approach is compared with a benchmarking model to validate its effectiveness. This benchmarking model concerns with IT2F VIKOR. For both approaches, the importance weights of green supplier selection criteria are obtained from BWM. In the second phase of the model, both are applied to rank suppliers. Results of final scores and ranking orders of suppliers in this new benchmarking model are given in Table 9. According to Table 9, ranking orders of three suppliers remain the same with our proposed model (integrated BWM and IT2F TOPSIS) when maximum group utility value (v) is set to 0.5 or higher than 0.5. This result demonstrates that the proposed approach yields reasonable results and presents suitable outcomes to decision-making in green supplier selection.

5. Conclusions

Selection of suppliers under green concept is a significant milestone for organizations that are moving towards a more environmental supply chain. In today’s world, organizations are following new ways to reduce negative effects of their organizations to the environment and to reach a greener system. At this point, green supplier selection concept has gained great importance with its ability to incorporate environmental or green criteria into the classical supplier selection practices. In the literature, lots of approaches are proposed regarding supplier selection and green supplier selection. Integration of fuzzy set theory and its various versions with classical MCDM methods is the forefront in the modeling of green supplier selection.
Therefore, in this study, we propose a multi-phase approach for green supplier selection. First, the selection of criteria under green motivation through literature review and interviews with decision-makers is performed. In the second phase, weights of green supplier selection criteria are determined using BWM. Finally, to obtain ranking order of suppliers with respect to previously weighted criteria, an IT2F TOPSIS method is used. Moreover, a comparative study between the proposed approach and BWM-IT2F VIKOR is provided to validate effectiveness of the proposed approach. This study is considered as the first attempt in the literature that integrates BWM and IT2F TOPSIS. BWM is preferred in weighting the selection criteria since it is more efficient and easier for pairwise comparisons versus Analytic Hierarchy Process. Use of TOPSIS method extended with IT2FSs enables reflecting more uncertainty and ambiguity in the decision-making process as well as including a concept of similarity to ideal solution. The proposed multi-phase approach is applied to the green supplier selection process in a plastic injection molding facility in Turkey.
The proposed approach with its case study has also some limitations. First concerns the integrated methodology.
This study proposes an incorporation of BWM and IT2F TOPSIS for green supplier selection. However, other MCDM methods like VIKOR, PROMETHEE and Elimination Et Choix Traduisant la Realité (ELECTRE) can also be used for this study. Moreover, different versions of fuzzy set theory that have recently been popular, such as Pythagorean fuzzy sets, hesitant fuzzy sets and intuitionistic fuzzy sets, can also be applied to our case study. Secondly, in this study the case study in a single facility has been taken. Therefore, the proposed approach can be adapted from this facility or industry to another one. Future attempts can include the following: (1) A comparative framework can be developed that can highlight the optimal method in selection of green suppliers. (2) A broader and multi-facility data can be used in the problem.

Author Contributions

All authors contributed equally.

Funding

No specific funding was received for this study.

Acknowledgments

The authors would like to thank the worthy referees and editor for their valuable suggestions for our paper in Mathematics.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Ketikidis, P.H.; Koh, S.C.L.; Dimitriadis, N.; Gunasekaran, A.; Kehajova, M. The use of information systems for logistics and supply chain management in South East Europe: Current status and future direction. Omega 2008, 36, 592–599. [Google Scholar] [CrossRef]
  2. Coulson-Thomas, C. The knowledge entrepreneurship challenge: Moving on from knowledge sharing to knowledge creation and exploitation. Learn. Organ. 2004, 11, 84. [Google Scholar] [CrossRef]
  3. Wang, C.N.; Nguyen, V.T.; Thai, H.T.N.; Tran, N.N.; Tran, T.L.A. Sustainable Supplier Selection Process in Edible Oil Production by a Hybrid Fuzzy Analytical Hierarchy Process and Green Data Envelopment Analysis for the SMEs Food Processing Industry. Mathematics 2018, 6, 302. [Google Scholar] [CrossRef]
  4. Yücenur, G.N.; Vayvay, Ö.; Demirel, N.Ç. Supplier selection problem in global supply chains by AHP and ANP approaches under fuzzy environment. Int. J. Adv. Manuf. Technol. 2011, 56, 823–833. [Google Scholar] [CrossRef]
  5. Kim, J.S.; Jeon, E.; Noh, J.; Park, J.H. A Model and an Algorithm for a Large-Scale Sustainable Supplier Selection and Order Allocation Problem. Mathematics 2018, 6, 325. [Google Scholar] [CrossRef]
  6. Zhu, Q.; Dou, Y.; Sarkis, J. A portfolio-based analysis for green supplier management using the analytical network process. Supply Chain Manag. Int. J. 2010, 15, 306–319. [Google Scholar] [CrossRef]
  7. ElTayeb, T.K.; Zailani, S.; Jayaraman, K. The examination on the drivers for green purchasing adoption among EMS 14001 certified companies in Malaysia. J. Manuf. Technol. Manag. 2010, 21, 206–225. [Google Scholar] [CrossRef]
  8. Tian, C.; Zhang, W.; Zhang, S.; Peng, J. An Extended Single-Valued Neutrosophic Projection-Based Qualitative Flexible Multi-Criteria Decision-Making Method. Mathematics 2019, 7, 39. [Google Scholar] [CrossRef]
  9. Liu, P.; Chen, S.M. Multiattribute group decision making based on intuitionistic 2-tuple linguistic information. Inf. Sci. 2018, 430, 599–619. [Google Scholar] [CrossRef]
  10. Liu, P.; Chen, S.M. Group decision making based on Heronian aggregation operators of intuitionistic fuzzy numbers. IEEE Trans. Cybern. 2017, 47, 2514–2530. [Google Scholar] [CrossRef]
  11. Liu, P.; Liu, J.; Merigó, J.M. Partitioned Heronian means based on linguistic intuitionistic fuzzy numbers for dealing with multi-attribute group decision making. Appl. Soft Comput. 2018, 62, 395–422. [Google Scholar] [CrossRef]
  12. Liu, P.; Wang, P. Some q-rung orthopair fuzzy aggregation operators and their applications to multiple-attribute decision making. Int. J. Intell. Syst. 2018, 33, 259–280. [Google Scholar] [CrossRef]
  13. Banaeian, N.; Mobli, H.; Fahimnia, B.; Nielsen, I.E.; Omid, M. Green supplier selection using fuzzy group decision making methods: A case study from the agri-food industry. Comput. Oper. Res. 2018, 89, 337–347. [Google Scholar] [CrossRef]
  14. Hlioui, R.; Gharbi, A.; Hajji, A. Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain. Int. J. Prod. Econ. 2017, 187, 53–67. [Google Scholar] [CrossRef]
  15. Yu, F.; Yang, Y.; Chang, D. Carbon footprint based green supplier selection under dynamic environment. J. Clean. Prod. 2018, 170, 880–889. [Google Scholar] [CrossRef]
  16. Kannan, D.; Govindan, K.; Rajendran, S. Fuzzy Axiomatic Design approach based green supplier selection: A case study from Singapore. J. Clean. Prod. 2015, 96, 194–208. [Google Scholar] [CrossRef]
  17. Rezaei, J. Best-worst multi-criteria decision-making method: Some properties and a linear model. Omega 2016, 64, 126–130. [Google Scholar] [CrossRef]
  18. Govindan, K.; Sivakumar, R. Green supplier selection and order allocation in a low-carbon paper industry: Integrated multi-criteria heterogeneous decision making and multi-objective linear programming approaches. Ann. Oper. Res. 2016, 238, 243–276. [Google Scholar] [CrossRef]
  19. Yazdani, M.; Chatterjee, P.; Zavadskas, E.K.; Zolfani, S.H. Integrated QFD-MCDM framework for green supplier selection. J. Clean. Prod. 2017, 142, 3728–3740. [Google Scholar] [CrossRef]
  20. Hu, Z.; Rao, C.; Zheng, Y.; Huang, D. Optimization decision of supplier selection in green procurement under the mode of low carbon economy. Int. J. Comput. Intell. Syst. 2015, 8, 407–421. [Google Scholar] [CrossRef]
  21. Shabanpour, H.; Yousefi, S.; Saen, R.F. Forecasting efficiency of green suppliers by dynamic data envelopment analysis and artificial neural networks. J. Clean. Prod. 2017, 142, 1098–1107. [Google Scholar] [CrossRef]
  22. Quan, M.Y.; Wang, Z.L.; Liu, H.C.; Shi, H. A hybrid MCDM approach for large group green supplier selection with uncertain linguistic information. IEEE Access 2018, 6, 50372–50383. [Google Scholar] [CrossRef]
  23. Dou, Y.; Zhu, Q.; Sarkis, J. Evaluating green supplier development programs with a grey-analytical network process-based methodology. Eur. J. Oper. Res. 2014, 233, 420–431. [Google Scholar] [CrossRef]
  24. Tsui, C.W.; Tzeng, G.H.; Wen, U.P. A hybrid MCDM approach for improving the performance of green suppliers in the TFT-LCD industry. Int. J. Prod. Res. 2015, 53, 6436–6454. [Google Scholar] [CrossRef]
  25. Hashemi, S.H.; Karimi, A.; Tavana, M. An integrated green supplier selection approach with analytic network process and improved Grey relational analysis. Int. J. Prod. Econ. 2015, 159, 178–191. [Google Scholar] [CrossRef]
  26. Uygun, Ö.; Dede, A. Performance evaluation of green supply chain management using integrated fuzzy multi-criteria decision making techniques. Comput. Ind. Eng. 2016, 102, 502–511. [Google Scholar] [CrossRef]
  27. Govindan, K.; Rajendran, S.; Sarkis, J.; Murugesan, P. Multi criteria decision making approaches for green supplier evaluation and selection: A literature review. J. Clean. Prod. 2015, 98, 66–83. [Google Scholar] [CrossRef]
  28. Malviya, R.K.; Kant, R. Green supply chain management (GSCM): A structured literature review and research implications. Benchmark. Int. J. 2015, 22, 1360–1394. [Google Scholar] [CrossRef]
  29. Rezaei, J. Best-worst multi-criteria decision-making method. Omega 2015, 53, 49–57. [Google Scholar] [CrossRef]
  30. Rezaei, J.; Wang, J.; Tavasszy, L. Linking supplier development to supplier segmentation using Best Worst Method. Expert Syst. Appl. 2015, 42, 9152–9164. [Google Scholar] [CrossRef]
  31. Rezaei, J.; Nispeling, T.; Sarkis, J.; Tavasszy, L. A supplier selection life cycle approach integrating traditional and environmental criteria using the best worst method. J. Clean. Prod. 2016, 135, 577–588. [Google Scholar] [CrossRef]
  32. Gupta, H.; Barua, M.K. Supplier selection among SMEs on the basis of their green innovation ability using BWM and fuzzy TOPSIS. J. Clean. Prod. 2017, 152, 242–258. [Google Scholar] [CrossRef]
  33. Mou, Q.; Xu, Z.; Liao, H. An intuitionistic fuzzy multiplicative best-worst method for multi-criteria group decision making. Inf. Sci. 2016, 374, 224–239. [Google Scholar] [CrossRef]
  34. Rezaei, J.; Hemmes, A.; Tavasszy, L. Multi-criteria decision-making for complex bundling configurations in surface transportation of air freight. J. Air Transp. Manag. 2017, 61, 95–105. [Google Scholar] [CrossRef]
  35. Ahmad, W.N.K.W.; Rezaei, J.; Sadaghiani, S.; Tavasszy, L.A. Evaluation of the external forces affecting the sustainability of oil and gas supply chain using best worst method. J. Clean. Prod. 2017, 153, 242–252. [Google Scholar] [CrossRef]
  36. Guo, S.; Zhao, H. Fuzzy best-worst multi-criteria decision-making method and its applications. Knowl. -Based Syst. 2017, 121, 23–31. [Google Scholar] [CrossRef]
  37. Van de Kaa, G.; Kamp, L.; Rezaei, J. Selection of biomass thermochemical conversion technology in the Netherlands: A best worst method approach. J. Clean. Prod. 2017, 166, 32–39. [Google Scholar] [CrossRef]
  38. Omrani, H.; Alizadeh, A.; Emrouznejad, A. Finding the optimal combination of power plants alternatives: A multi response Taguchi-neural network using TOPSIS and fuzzy best-worst method. J. Clean. Prod. 2018, 203, 210–223. [Google Scholar] [CrossRef]
  39. Nielsen, I.E.; Banaeian, N.; Golińska, P.; Mobli, H.; Omid, M. Green supplier selection criteria: From a literature review to a flexible framework for determination of suitable criteria. In Logistics Operations, Supply Chain Management and Sustainability; Springer: Cham, Switzerland, 2014; pp. 79–99. [Google Scholar]
  40. Kahraman, C.; Engin, O.; Kabak, Ö.; Kaya, İ. Information systems outsourcing decisions using a group decision-making approach. Eng. Appl. Artif. Intell. 2009, 22, 832–841. [Google Scholar] [CrossRef]
  41. Büyüközkan, G.; Çifçi, G. A novel fuzzy multi-criteria decision framework for sustainable supplier selection with incomplete information. Comput. Ind. 2010, 62, 164–174. [Google Scholar] [CrossRef]
  42. Chiou, C.Y.; Hsu, C.W.; Hwang, W.Y. Comparative investigation on green supplier selection of the American, Japanese and Taiwanese electronics industry in China. In Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2008), Singapore, 8–11 December 2008; pp. 1909–1914. [Google Scholar]
  43. Demirtas, E.A.; Ustun, O. Analytic network process and multi-period goal programming integration in purchasing decisions. Comput. Ind. Eng. 2009, 56, 677–690. [Google Scholar] [CrossRef]
  44. Lee, A.H. A fuzzy supplier selection model with the consideration of benefits, opportunities, costs and risks. Expert Syst. Appl. 2009, 36, 2879–2893. [Google Scholar] [CrossRef]
  45. Lin, Y.T.; Lin, C.L.; Yu, H.C.; Tzeng, G.H. A novel hybrid MCDM approach for outsourcing vendor selection: A case study for a semiconductor company in Taiwan. Expert Syst. Appl. 2010, 37, 4796–4804. [Google Scholar] [CrossRef]
  46. Liou, J.J.; Chuang, Y.T. Developing a hybrid multi-criteria model for selection of outsourcing providers. Expert Syst. Appl. 2010, 37, 3755–3761. [Google Scholar] [CrossRef]
  47. Liu, J.; Ding, F.Y.; Lall, V. Using data envelopment analysis to compare suppliers for supplier selection and performance improvement. Supply Chain Manag. Int. J. 2000, 5, 143–150. [Google Scholar] [CrossRef]
  48. Liu, T.; Deng, Y.; Chan, F. Evidential supplier selection based on DEMATEL and game theory. Int. J. Fuzzy Syst. 2018, 20, 1321–1333. [Google Scholar] [CrossRef]
  49. Luthra, S.; Govindan, K.; Kannan, D.; Mangla, S.K.; Garg, C.P. An integrated framework for sustainable supplier selection and evaluation in supply chains. J. Clean. Prod. 2017, 140, 1686–1698. [Google Scholar] [CrossRef]
  50. Malmir, R.; Hamzehi, E.; Farsijani, H. A Multi stage decision making model to evaluate suppliers by using MOLP and ANP in a strategic approach. Int. J. Appl. Innov. Eng. Manag. 2013, 2, 563–577. [Google Scholar]
  51. Razmi, J.; Rafiei, H.; Hashemi, M. Designing a decision support system to evaluate and select suppliers using fuzzy analytic network process. Comput. Ind. Eng. 2009, 57, 1282–1290. [Google Scholar] [CrossRef]
  52. Da Silva, A.S.; Nascimento, L.P.A.; Ribeiro, J.R.; Belderrain, M.C.N. ANP and ratings model applied to supplier selection problem. In Proceedings of the International Symposium on the AHP, Pittsburgh, PA, USA, 29 July–1 August 2009; pp. 1–14. [Google Scholar]
  53. Vinodh, S.; Ramiya, R.A.; Gautham, S.G. Application of fuzzy analytic network process for supplier selection in a manufacturing organisation. Expert Syst. Appl. 2011, 38, 272–280. [Google Scholar] [CrossRef]
  54. Wadhwa, V.; Ravindran, A.R. Vendor selection in outsourcing. Comput. Oper. Res. 2007, 34, 3725–3737. [Google Scholar] [CrossRef]
  55. Wang, J.W.; Cheng, C.H.; Huang, K.C. Fuzzy hierarchical TOPSIS for supplier selection. Appl. Soft Comput. 2009, 9, 377–386. [Google Scholar] [CrossRef]
  56. Attari, M.Y.N.; Bagheri, M.; Jami, E.N. A decision making model for outsourcing of manufacturing activities by ANP and DEMATEL under fuzzy environment. Int. J. Ind. Eng. 2012, 23, 163–174. [Google Scholar]
  57. Haq, A.N.; Kannan, G. Fuzzy analytical hierarchy process for evaluating and selecting a vendor in a supply chain model. Int. J. Adv. Manuf. Technol. 2006, 29, 826–835. [Google Scholar]
  58. Prahinski, C.; Benton, W.C. Supplier evaluations: Communication strategies to improve supplier performance. J. Oper. Manag. 2004, 22, 39–62. [Google Scholar] [CrossRef]
  59. Freeman, J.; Chen, T. Green supplier selection using an AHP-Entropy-TOPSIS framework. Supply Chain Manag. Int. J. 2015, 20, 327–340. [Google Scholar] [CrossRef]
  60. Hsu, C.W.; Kuo, T.C.; Chen, S.H.; Hu, A.H. Using DEMATEL to develop a carbon management model of supplier selection in green supply chain management. J. Clean. Prod. 2013, 56, 164–172. [Google Scholar] [CrossRef]
  61. Kuo, R.J.; Wang, Y.C.; Tien, F.C. Integration of artificial neural network and MADA methods for green supplier selection. J. Clean. Prod. 2010, 18, 1161–1170. [Google Scholar] [CrossRef]
  62. Celik, E.; Gul, M.; Gumus, A.T.; Guneri, A.F. A fuzzy TOPSIS approach based on trapezoidal numbers to material selection problem. J. Inf. Technol. Appl. Manag. 2012, 19, 19–30. [Google Scholar]
  63. Behzadian, M.; Otaghsara, S.K.; Yazdani, M.; Ignatius, J. A state-of the-art survey of TOPSIS applications. Expert Syst. Appl. 2012, 39, 13051–13069. [Google Scholar] [CrossRef]
  64. Yoon, K.P.; Hwang, C.L. Multiple Attribute Decision Making: An Introduction; Sage Publications: Thousand Oaks, CA, USA, 1995; Volume 104. [Google Scholar]
  65. Chen, S.M.; Lee, L.W. Fuzzy multiple attributes group decision-making based on the interval type-2 TOPSIS method. Expert Syst. Appl. 2010, 37, 2790–2798. [Google Scholar] [CrossRef]
  66. Oz, N.E.; Mete, S.; Serin, F.; Gul, M. Risk assessment for clearing and grading process of a natural gas pipeline project: An extended TOPSIS model with Pythagorean fuzzy sets for prioritizing hazards. Hum. Ecol. Risk Assess. Int. J. 2018, 1–18. [Google Scholar] [CrossRef]
  67. Ak, M.F.; Gul, M. AHP-TOPSIS integration extended with Pythagorean fuzzy sets for information security risk analysis. Complex Intell. Syst. 2018. [Google Scholar] [CrossRef]
  68. Celik, E.; Bilisik, O.N.; Erdogan, M.; Gumus, A.T.; Baracli, H. An integrated novel interval type-2 fuzzy MCDM method to improve customer satisfaction in public transportation for Istanbul. Transp. Res. Part E: Logist. Transp. Rev. 2013, 58, 28–51. [Google Scholar] [CrossRef]
  69. Celik, E.; Aydin, N.; Gumus, A.T. A multiattribute customer satisfaction evaluation approach for rail transit network: A real case study for Istanbul, Turkey. Transp. Policy 2014, 36, 283–293. [Google Scholar] [CrossRef]
  70. Celik, E.; Gumus, A.T.; Alegoz, M. A trapezoidal type-2 fuzzy MCDM method to identify and evaluate critical success factors for humanitarian relief logistics management. J. Intell. Fuzzy Syst. 2014, 27, 2847–2855. [Google Scholar]
  71. Celik, E.; Gul, M.; Aydin, N.; Gumus, A.T.; Guneri, A.F. A comprehensive review of multi criteria decision making approaches based on interval type-2 fuzzy sets. Knowl.-Based Syst. 2015, 85, 329–341. [Google Scholar] [CrossRef]
  72. Celik, E.; Gumus, A.T. An assessment approach for non-governmental organizations in humanitarian relief logistics and an application in Turkey. Technol. Econ. Dev. Econ. 2018, 24, 1–26. [Google Scholar] [CrossRef]
  73. Madan, J.; Mani, M.; Lee, J.H.; Lyons, K.W. Energy performance evaluation and improvement of unit-manufacturing processes: Injection molding case study. J. Clean. Prod. 2015, 105, 157–170. [Google Scholar] [CrossRef]
Figure 1. Stages of an injection molding process.
Figure 1. Stages of an injection molding process.
Mathematics 07 00182 g001
Table 1. The used criteria in literature for supplier selection.
Table 1. The used criteria in literature for supplier selection.
Study/CriteriaC1-Environmental. C2-Social C3-Quality C4-ServiceC5-RiskC6-Cost/PriceC7-CapabilityC8-Business structure
Kahraman et al. [40] XX X
Büyüközkan and Çiftçi [41] XX X
Chiou et al. [42] XXX
Demirtas and Ustun [43] XX XX
Lee [44] XXXXX
Lin et al. [45] XX X
Liou and Chuang [46] XX X
Liu et al. [47] XXXXX
Liu et al. [48] XXXX
Luthra et al. [49] XX XX
Malmir et al. [50] XXXXX
Razmi et al. [51] XXXXXX
Da Silva et al. [52] XX XX
Vinodh et al. [53] XXXX
Wadhwa and Ravindran [54] X XX X
Wang et al. [55] X X
Attari et al. [56] X X X
Haq and Kannan [57] X X X
Prahinsk and Benton [58] X X
Chiou et al. [42]XXX X
Freeman and chen [59]XXX XX
Hsu et al. [60]XXX X
Kuo et al. [61] XXX X X
Table 2. Consistency Index.
Table 2. Consistency Index.
a B W 123456789
consistency index0.000.441.001.632.303.003.734.475.23
Table 3. The local and global weights.
Table 3. The local and global weights.
Criteria Expert 1Expert 2Expert 3Expert 4Expert 5Local WeightsGlobal WeightsRanking Order
C1: Environmental0.10.1590.0860.1970.2204 0.152
C11: Environment management systems0.0730.0910.090.1070.06830.0860.01321
C12: Green design and purchasing0.050.0240.0250.0780.02490.0410.00635
C13: Green manufacturing0.3270.2490.2330.2930.23060.2670.04112
C14: Green management0.1290.0670.1450.0290.14670.1030.01618
C15: Green packing and labeling0.1230.2250.2090.1360.18080.1750.02715
C16: Waste management and pollution prevention0.2240.2010.2330.1640.09320.1830.02814
C17: Environmental competencies0.0730.1430.0650.1930.25550.1460.02216
C2: Social0.0350.1020.050.0430.049 0.056
C21: Occupational Health and Safety Systems0.3760.290.3460.2430.33020.3170.01817
C22: The interests and rights of employees0.0840.2260.2310.2770.19670.2030.01125
C23: The rights of stakeholders0.1420.0970.0770.0970.11570.1060.00636
C24: Information Disclosure0.0840.0970.1150.1410.07960.1030.00637
C25: Labor relation records0.0570.0320.0380.0340.04050.0410.00240
C26: training aids0.2570.2580.1920.2090.23730.2310.01323
C3: Quality0.2050.1960.1910.140.1959 0.186
C31: Low defect rate0.4550.3880.4190.3830.53670.4360.0812
C32: Inspections methods and plans0.350.1840.150.2130.23170.2260.0429
C33: Adherence to quality tools0.1230.3260.3490.3190.16180.2560.0476
C34: Quality systems0.0720.1020.0830.0850.06980.0820.01519
C4: Service0.170.0850.1360.0910.1224 0.121
C41: Quick Responsiveness0.10.10.10.1250.11110.1070.01322
C42: Flexibility and Agility0.4160.30.2540.3990.31430.3370.04111
C43: After sales service0.4840.60.6460.4760.57460.5560.0673
C5: Risk0.1350.1770.2140.2210.0816 0.166
C51: Supply Constraint0.2250.2470.2810.2690.17220.2390.0413
C52: Buyer Supplier Constraint0.0350.0350.030.030.03530.0330.00538
C53: Bad Performance History and Reputation of supplier0.0510.070.0470.0470.06620.0560.00929
C54: Variation in price0.3330.3510.3110.3110.32260.3260.0545
C55: Supplier’s production limitations0.0450.0440.0430.0430.03970.0430.00731
C56: amount of past business0.0510.0390.0370.0370.04130.0410.00732
C57: Uncompleted orders0.260.2120.2510.2530.32260.260.0437
C6: Cost/Price0.2850.2150.2370.2440.2449 0.245
C61: Transportation Cost0.1960.1760.1230.1780.19580.1740.0438
C62: Purchase Cost0.2510.2420.2050.2320.25110.2360.0584
C63: Quantity discount0.0550.0530.0360.0540.05530.0510.01224
C64: Payment terms0.1410.1230.0860.1240.35720.1660.04110
C65: Profit on Product0.3570.4070.550.4120.14050.3730.0921
C7: Capability of supplier0.0350.0470.0630.0240.0612 0.046
C71: Financial capability0.1280.2030.1410.1250.09120.1380.00633
C72: Change order capability0.1820.170.2870.1780.19850.2030.00928
C73: Technical capability0.2780.2860.120.270.21920.2340.01126
C74: Understanding of technology0.1280.1070.1410.1510.1560.1370.00634
C75: Engineering/technical support resources0.0270.0280.0310.0990.02070.0410.00242
C76: Technical know how0.1010.0780.110.0260.13650.090.00439
C77: Distribution capability0.1550.1290.1710.1510.17790.1570.00730
C8: Business structure of supplier0.0350.0190.0280.0430.0245 0.03
C81: Knowledge of market0.0470.051240.05580.03870.04650.0480.00144
C82: Information systems0.0520.058550.06320.04530.0410.0520.00243
C83: Communication system0.0410.040050.06320.02920.05250.0450.00145
C84: Desire for business0.3690.369570.36640.26610.36860.3480.0127
C85: Management and organizations0.410.409620.41040.56610.40950.4410.01320
C86: Market share0.0820.070970.04090.05460.08190.0660.00241
Table 4. The consistency for all experts.
Table 4. The consistency for all experts.
CriteriaExpert 1Expert 2Expert 3Expert 4Expert 5
Main criteria0.30700.47210.24060.24060.1912
Sub criteria of C10.17860.22750.31200.24060.2406
Sub criteria of C20.17860.22370.22370.30720.3072
Sub criteria of C30.09950.11810.08700.21740.1832
Sub criteria of C40.07060.00000.15290.11810.1716
Sub criteria of C50.10300.19120.27100.19120.2521
Sub criteria of C60.15290.18320.20920.18320.1529
Sub criteria of C70.24060.25280.26660.24060.3049
Sub criteria of C80.19120.23480.10090.21550.1912
Table 5. The aggregated evaluation matrix.
Table 5. The aggregated evaluation matrix.
CriteriaSupplier 1Supplier 2Supplier 3
C1
C11((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.5;0.7;0.7;0.85;1;1),(0.6;0.7;0.7;0.78;0.9;0.9))
C12((0;0.1;0.1;0.3;1;1),(0.05;0.1;0.1;0.2;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))
C13((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.4;0.6;0.6;0.75;1;1),(0.5;0.6;0.6;0.68;0.9;0.9))
C14((0;0.1;0.1;0.3;1;1),(0.05;0.1;0.1;0.2;0.9;0.9))((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))
C15((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))
C16((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C17((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))
C2((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C21((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.9;1;1;1;1;1),(0.95;1;1;1;0.9;0.9))
C22((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C23((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))((0.5;0.7;0.7;0.85;1;1),(0.6;0.7;0.7;0.78;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))
C24((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))
C25((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))
C26((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.9;1;1;1;1;1),(0.95;1;1;1;0.9;0.9))((0.8;0.95;0.95;1;1;1),(0.88;0.95;0.95;0.98;0.9;0.9))
C3((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C31((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))
C33((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))
C34((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C35((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))
C4((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C41((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.8;0.95;0.95;1;1;1),(0.88;0.95;0.95;0.98;0.9;0.9))((0.7;0.9;0.9;1;1;1),(0.8;0.9;0.9;0.95;0.9;0.9))
C42((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C44((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))
C5((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C51((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))((0.25;0.4;0.4;0.6;1;1),(0.33;0.4;0.4;0.5;0.9;0.9))
C52((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))
C54((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))
C56((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))
C57((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.05;0.15;0.15;0.3;1;1),(0.1;0.15;0.15;0.23;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))
C58((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.8;0.95;0.95;1;1;1),(0.88;0.95;0.95;0.98;0.9;0.9))((0.8;0.95;0.95;1;1;1),(0.88;0.95;0.95;0.98;0.9;0.9))
C59((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))
C6((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C61((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C62((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))((0.5;0.7;0.7;0.85;1;1),(0.6;0.7;0.7;0.78;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C63((0.15;0.3;0.3;0.5;1;1),(0.23;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))
C64((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C65((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C7((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C71((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))
C72((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))
C73((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))
C74((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C75((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))((0.7;0.9;0.9;1;1;1),(0.8;0.9;0.9;0.95;0.9;0.9))
C76((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.9;1;1;1;1;1),(0.95;1;1;1;0.9;0.9))((0.8;0.95;0.95;1;1;1),(0.88;0.95;0.95;0.98;0.9;0.9))
C77((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.5;0.7;0.7;0.9;1;1),(0.6;0.7;0.7;0.8;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))
C8((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))((0;0;0;0;0;0),(0;0;0;0;0;0))
C81((0.6;0.75;0.75;0.85;1;1),(0.68;0.75;0.75;0.8;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))((0.6;0.8;0.8;0.95;1;1),(0.7;0.8;0.8;0.88;0.9;0.9))
C82((0;0.05;0.05;0.2;1;1),(0.03;0.05;0.05;0.13;0.9;0.9))((0;0.1;0.1;0.3;1;1),(0.05;0.1;0.1;0.2;0.9;0.9))((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))
C83((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.1;0.3;0.3;0.5;1;1),(0.2;0.3;0.3;0.4;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C84((0.7;0.85;0.85;0.95;1;1),(0.78;0.85;0.85;0.9;0.9;0.9))((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
C85((0.05;0.2;0.2;0.4;1;1),(0.13;0.2;0.2;0.3;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.3;0.5;0.5;0.7;1;1),(0.4;0.5;0.5;0.6;0.9;0.9))
C86((0.4;0.6;0.6;0.8;1;1),(0.5;0.6;0.6;0.7;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))((0.2;0.4;0.4;0.6;1;1),(0.3;0.4;0.4;0.5;0.9;0.9))
Table 6. The weighted evaluation matrix.
Table 6. The weighted evaluation matrix.
CriteriaSupplier 1Supplier 2Supplier 3
C1
C11((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C12((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C13((0;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.02;0.9;0.9))((0.02;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.03;0.9;0.9))
C14((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C15((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C16((0.01;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.02;0.9;0.9))((0.02;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.02;0.9;0.9))
C17((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C2
C21((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.02;0.02;0.02;0.02;1;1),(0.02;0.02;0.02;0.02;0.9;0.9))
C22((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C23((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))
C24((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C25((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C26((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C3
C31((0.02;0.03;0.03;0.05;1;1),(0.02;0.03;0.03;0.04;0.9;0.9))((0.03;0.05;0.05;0.06;1;1),(0.04;0.05;0.05;0.06;0.9;0.9))((0.06;0.07;0.07;0.08;1;1),(0.06;0.07;0.07;0.07;0.9;0.9))
C33((0;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.02;0.9;0.9))((0.02;0.03;0.03;0.03;1;1),(0.02;0.03;0.03;0.03;0.9;0.9))((0.03;0.04;0.04;0.04;1;1),(0.03;0.04;0.04;0.04;0.9;0.9))
C34((0.01;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.03;0.9;0.9))((0.02;0.03;0.03;0.04;1;1),(0.03;0.03;0.03;0.04;0.9;0.9))((0.03;0.04;0.04;0.05;1;1),(0.03;0.04;0.04;0.04;0.9;0.9))
C35((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C4
C41((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C42((0.01;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.02;0.9;0.9))((0.02;0.03;0.03;0.04;1;1),(0.02;0.03;0.03;0.03;0.9;0.9))((0.02;0.03;0.03;0.04;1;1),(0.03;0.03;0.03;0.04;0.9;0.9))
C44((0.02;0.03;0.03;0.05;1;1),(0.03;0.03;0.03;0.04;0.9;0.9))((0.01;0.03;0.03;0.04;1;1),(0.02;0.03;0.03;0.03;0.9;0.9))((0.03;0.05;0.05;0.06;1;1),(0.04;0.05;0.05;0.05;0.9;0.9))
C5
C51((0.02;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.03;0.9;0.9))((0.02;0.03;0.03;0.04;1;1),(0.03;0.03;0.03;0.03;0.9;0.9))((0.01;0.02;0.02;0.02;1;1),(0.01;0.02;0.02;0.02;0.9;0.9))
C52((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C54((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C56((0.02;0.03;0.03;0.04;1;1),(0.02;0.03;0.03;0.03;0.9;0.9))((0.01;0.02;0.02;0.03;1;1),(0.01;0.02;0.02;0.02;0.9;0.9))((0;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.02;0.9;0.9))
C57((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C58((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C59((0.01;0.02;0.02;0.03;1;1),(0.01;0.02;0.02;0.02;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C6
C61((0;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.02;1;1),(0.01;0.01;0.01;0.02;0.9;0.9))((0.01;0.02;0.02;0.03;1;1),(0.01;0.02;0.02;0.02;0.9;0.9))
C62((0.02;0.03;0.03;0.04;1;1),(0.02;0.03;0.03;0.03;0.9;0.9))((0.03;0.04;0.04;0.05;1;1),(0.03;0.04;0.04;0.04;0.9;0.9))((0.03;0.05;0.05;0.05;1;1),(0.04;0.05;0.05;0.05;0.9;0.9))
C63((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))
C64((0.02;0.03;0.03;0.04;1;1),(0.03;0.03;0.03;0.04;0.9;0.9))((0.02;0.02;0.02;0.03;1;1),(0.02;0.02;0.02;0.03;0.9;0.9))((0.01;0.02;0.02;0.02;1;1),(0.01;0.02;0.02;0.02;0.9;0.9))
C65((0.04;0.05;0.05;0.07;1;1),(0.05;0.05;0.05;0.06;0.9;0.9))((0.01;0.03;0.03;0.05;1;1),(0.02;0.03;0.03;0.04;0.9;0.9))((0.02;0.04;0.04;0.05;1;1),(0.03;0.04;0.04;0.05;0.9;0.9))
C7
C71((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C72((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C73((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C74((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))
C75((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C76((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C77((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C8
C81((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C82((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C83((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
C84((0.01;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))((0;0;0;0.01;1;1),(0;0;0;0.01;0.9;0.9))
C85((0;0;0;0.01;1;1),(0;0;0;0;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0;0.01;0.01;0.01;0.9;0.9))((0;0.01;0.01;0.01;1;1),(0.01;0.01;0.01;0.01;0.9;0.9))
C86((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))((0;0;0;0;1;1),(0;0;0;0;0.9;0.9))
Table 7. The rank values.
Table 7. The rank values.
CriteriaSupplier 1Supplier 2Supplier 3
C1
C113.81473.83763.8530
C123.80363.81773.8177
C133.84583.91683.9403
C143.80913.82633.8263
C153.83003.84593.8459
C163.86343.91363.9297
C173.83723.85053.8639
C2
C213.85083.87203.9042
C223.81273.81893.8257
C233.82933.82393.8240
C243.80653.80183.8018
C253.80393.80253.8025
C263.82223.87583.8715
C3
C313.98394.08114.2033
C323.87003.94544.0087
C333.93623.99324.0206
C343.83483.87623.8762
C4
C413.84503.87213.8678
C423.91693.96583.9893
C433.99313.95274.0737
C5
C513.93733.98393.8920
C523.81243.80173.8094
C533.82683.81053.8029
C543.95483.89303.8607
C553.81623.80613.8123
C563.82373.83793.8379
C573.89773.81333.8133
C6
C613.84793.87343.8967
C623.96634.03454.0692
C633.82153.82833.8357
C643.98953.94153.8926
C654.11793.95314.0080
C7
C713.81443.82203.8258
C723.83823.83253.8269
C733.81813.83763.8539
C743.81433.82573.8293
C753.80433.80943.8099
C763.80953.82463.8232
C773.81653.82953.8252
C8
C813.80623.80663.8066
C823.80053.80093.8017
C833.80313.80223.8031
C843.85163.83603.8235
C853.81483.82983.8377
C863.80683.80453.8045
Table 8. The ranking of the supplier.
Table 8. The ranking of the supplier.
SupplierSupplier 1Supplier 2Supplier 3
d+0.35910.28390.2181
d0.24080.23340.3705
CC0.40140.45120.6295
Rank321
Table 9. Q values and rankings for each supplier in terms of v value change.
Table 9. Q values and rankings for each supplier in terms of v value change.
Maximum Group Utility Value (v) in VIKORQ ValueRank
Supplier 1Supplier 2Supplier 3Supplier 1Supplier 2Supplier 3
v = 0.10.4501.0000.000231
v = 0.10.5050.9340.000231
v = 0.20.5600.8690.000231
v = 0.30.6150.8030.000231
v = 0.40.6700.7380.000231
v = 0.50.7250.6720.000321
v = 0.60.7800.6070.000321
v = 0.70.8350.5410.000321
v = 0.80.8900.4750.000321
v = 0.90.9450.4100.000321
v = 1.01.0000.3440.000321

Share and Cite

MDPI and ACS Style

Yucesan, M.; Mete, S.; Serin, F.; Celik, E.; Gul, M. An Integrated Best-Worst and Interval Type-2 Fuzzy TOPSIS Methodology for Green Supplier Selection. Mathematics 2019, 7, 182. https://doi.org/10.3390/math7020182

AMA Style

Yucesan M, Mete S, Serin F, Celik E, Gul M. An Integrated Best-Worst and Interval Type-2 Fuzzy TOPSIS Methodology for Green Supplier Selection. Mathematics. 2019; 7(2):182. https://doi.org/10.3390/math7020182

Chicago/Turabian Style

Yucesan, Melih, Suleyman Mete, Faruk Serin, Erkan Celik, and Muhammet Gul. 2019. "An Integrated Best-Worst and Interval Type-2 Fuzzy TOPSIS Methodology for Green Supplier Selection" Mathematics 7, no. 2: 182. https://doi.org/10.3390/math7020182

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop