Next Article in Journal
CEPS: An Open Access MATLAB Graphical User Interface (GUI) for the Analysis of Complexity and Entropy in Physiological Signals
Next Article in Special Issue
Dynamic Analyses of Contagion Risk and Module Evolution on the SSE A-Shares Market Based on Minimum Information Entropy
Previous Article in Journal
The 2-D Cluster Variation Method: Topography Illustrations and Their Enthalpy Parameter Correlations
Previous Article in Special Issue
The Effect of a Hidden Source on the Estimation of Connectivity Networks from Multivariate Time Series
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Performance Evaluation of Construction Companies Using Integrated Entropy–Fuzzy VIKOR Model

1
Department of Physical and Mathematical Science, Faculty of Science, Kampar Campus, Universiti Tunku Abdul Rahman, Jalan Universiti, Bandar Barat, Kampar 31900, Malaysia
2
Department of Mathematical Sciences, Faculty of Science and Technology, Universiti Kebangsaan Malaysia, UKM, Bangi 43600, Malaysia
*
Authors to whom correspondence should be addressed.
Entropy 2021, 23(3), 320; https://doi.org/10.3390/e23030320
Submission received: 22 January 2021 / Revised: 25 February 2021 / Accepted: 26 February 2021 / Published: 8 March 2021
(This article belongs to the Special Issue Information Theory and Economic Network)

Abstract

:
The construction sector plays an important role in a country’s economic development. The financial performance of a company is a good indicator of its financial health and status. In Malaysia, the government encourages the construction industry to develop an advanced infrastructure related to health, transport, education and housing. In view of the COVID-19 pandemic, the operations and financial performance of construction sector companies have been affected recently. Additionally, uncertainty plays a vital role in the multi-criteria decision-making (MCDM) process. Based on previous studies, there has been no comprehensive study conducted on the evaluation of the financial performance of construction companies by integrating entropy and fuzzy VIKOR models. Therefore, this paper aims to propose an MCDM model to evaluate and compare the financial performance of construction companies with an integrated entropy–fuzzy VIKOR model. A case study is carried out by evaluating the listed construction companies in Malaysia with the proposed model. The findings of this paper indicate that the company ECONBHD achieves the best financial performance over the study period. The significance of this paper is to determine the priority of the financial ratios and ranking of the construction companies with the proposed entropy–fuzzy VIKOR model.

1. Introduction

COVID-19, which was declared a pandemic by the World Health Organization (WHO) in March 2020 and is still tempestuous, has caused dramatic losses globally, both among humans and economically. Its unknown magnitude, impact and duration pose a vicious cycle of ousting businesses, jeopardizing consumer confidence and tightening financial conditions leading to losses in jobs and investment. Globally, nations reacted to the pandemic by taking precautionary measures, such as banning travelling and imposing certain kinds of movement control order (MCO), shutting down government and private premises and imposing total or partial lockdowns. Pre-pandemic, these revolutionary actions would be considered unthinkable, but it is now termed the “new normal”, where workers are forced to work from home, food is delivered and meetings and business dealings are conducted online.
The movement control order and social distancing observed have severely damaged the construction industry. For emerging nations, such as Malaysia, the construction sector plays a vital role in realizing their goals to become modernized and have a strong industrialized economy. The construction sector provides great support to the aggregate economy by forward and backward linkages with other sectors of the economy. It also contributes to generating huge employment in the economy [1]. In Malaysia, the construction industry contributed 5.9% to the gross domestic product (GDP) in 2017, whereas total industry growth for the year stood at 6.7%. The government’s vision 2020 project will also boost subsector construction projects in the coming years to improve the country’s tourism infrastructure and transport network and also increase the volume of renewable projects. In addition, the government strives to address the country’s housing shortage because it can assist the industry in expanding over the next five years [2]. During the period of 2016 to 2018, the construction industry suffered a decline of 60%. Moreover, in 2016, the industry’s annual turnover reached a peak of RM 273 billion, and this figure declined to RM 106 billion in 2018 [3]. According to a statistic reported, the movement control order’s impact would be immense to contractors [3]. Due to the MCO, projects are being halted, suspended, or even cancelled. Furthermore, the movement of workers at construction sites has been cited to be the main cause of COVID-19 transmission at some workplace clusters. The pandemic has also shown that the construction sector depends heavily on unskilled foreign labor due to low technology adoption.
The COVID-19 pandemic has immensely affected the financial performance of sectors such as tourism, travel, aviation, retail and construction [4]. It is crucial for companies and stakeholders to understand the financial impacts caused by the pandemic. For existing and potential investors, relevant decisions are made based on the understanding of published financial reports and industry hearsay. The financial data reported under GAAP or IFRS, such as operating income, reflect an accurate view of past performance. The industry unpublished hearsay provides the required additional information to understand the performance of key drivers as a basis to predict future performance. Studies at the microlevel are equally important to studies conducted at the macrolevel. Focusing on firm level financial data allows us to quantify the impact of the pandemic on the performance of individual companies and certain industries. Shen et al. [5] found that the COVID-19 outbreak has had a significant negative impact on the performance of Chinese firms, reducing total revenue and investment.
Financial performance evaluation is important for companies in a challenging and competitive environment, especially during the current COVID-19 pandemic. Construction companies should understand their current financial performance, because it is important to all companies in the same field. Financial ratio is a good indicator of the financial performance of companies, as it can disclose their financial strengths and weaknesses [6]. Financial ratios of return on equity (ROE), return on asset (ROA), earnings per share (EPS), debt to equity ratio (DER), debt to assets ratio (DAR) and current ratio (CR) are the important financial ratios used to measure the financial performance of companies [6,7,8,9]. The ranking of companies is significant and important in the financial performance evaluation because companies wish to know their ranking among their competitors in the same field or sector for benchmarking purposes [6]. Companies can implement the relevant strategies to improve their financial performance based on their current financial status and ranking.
Multi-criteria decision making (MCDM) is an important process of decision analysis to select the best alternative by considering multiple decision criteria or factors [10]. Decision criteria and decision alternatives are two important elements in determining the performance and ranking of alternatives. Evaluation of companies’ financial performance is an MCDM problem, since the decision-making process involves multiple financial ratios. Ginevicius and Podvezko [11] studied the financial performance of construction companies with the proposed VIseKriterijumska Optimizacija I Kompromisno Resenje (VIKOR) model. In their study, the financial performance of companies was evaluated based on the financial ratios. According to the result, the financial performance and ranking of construction companies can be determined based on the optimal solution of the VIKOR model. Abdel-Basset et al. [6] measured the financial performance of manufacturing companies in Egypt with the VIKOR model by focusing on multiple financial ratios, such as ROE, ROA, DER, DAR and CR.
In today’s challenging world, uncertainty plays a vital role in decision-making processes. Therefore, it is essential to handle uncertain information in data. The entropy weight method was introduced by Shannon, which assigns the objective weight for each decision criterion based on data analysis [12]. Due to the uncertainty of signals in information sources, Shannon considered the entropy into information theory [13]. The entropy weight method is an efficient tool to measure uncertain information [14]. Due to the importance of the entropy weight method in the decision-making process, the researchers considered the entropy weight method in the evaluation [15,16,17]. The entropy weight method was mainly used to calculate the relative weight between the decision criteria [18]. The entropy weight of the decision criteria can be determined based on the data obtained. The entropy weight method is important in obtaining the information entropy of the decision criteria and the degree of difference of the decision criteria. This information is required to measure the weight of the decision criteria and effective information contained in the known data. The entropy weight method has been applied in various fields, such as supplier selection [19], prediction of the unfrozen water content [20], building material supplier selection [18], jump volatility spillover network [21], children’s physical activity and human development index [22], fog-haze factor assessment [23] as well as test case prioritization [24].
The VIKOR model is adopted to measure the compromise solution that is the farthest from the negative ideal solution (NIS) and closest to the positive ideal solution (PIS) and rank the decision alternatives. Due to the ambiguity and uncertainty of the financial data [25], the fuzzy VIKOR model is proposed in this study to tackle the MCDM problem with non-commensurable and contradictory criteria in a fuzzy environment [26,27,28]. The fuzzy VIKOR model’s central idea is based on the ideal solution of merit function Q. The fuzzy VIKOR is a powerful and useful model in solving multi-criteria group decision-making problems. The fuzzy VIKOR model has outstanding advantages in evaluating the alternatives over conflicting criteria. Carlsson and Fuller [29] presented the fuzzy method in the evaluation and decision-making process. Since decision makers’ judgments are usually imprecise when choosing an alternative with respect to multiple decision criteria, the fuzzy concept is incorporated into the MCDM process [30,31]. The fuzzy method is robust because it helps to express the fuzziness, uncertainties, vagueness and imprecision during the decision-making process [32]. Hence, it is important that the fuzzy method is integrated with the entropy–VIKOR model in order to obtain more concrete and realistic results [33]. The fuzzy VIKOR model has been widely used in the field of development of indices and wells ranking systems [34], sustainable supplier selection [35], prioritization of watershed reforestation [36], energy systems assessment [37], water consumption pattern [38], construction project management [39], residential demand response [40] and water resource planning [41].
Many industries, including construction companies, have been greatly affected by the COVID-19 pandemic. According to previous studies, there is no research that has been carried out on the investigation of financial performance among construction companies by integrating entropy and fuzzy approaches into the VIKOR model. Previous studies have proposed the VIKOR model to assess the financial performance of construction companies without considering the entropy weight and fuzzy methods [6,11]. The VIKOR model has limitations in setting decision criteria weight, since its weight is subjectively judged by the decision maker. Hence, the literature left a research gap to incorporate the entropy weight and fuzzy methods for the evaluation of the financial performance of construction companies. The primary goal of this paper is to propose an MCDM model, namely, an entropy–fuzzy VIKOR model, to assess and compare the financial performance of construction companies. The proposed model is illustrated with a real case study in Malaysia by evaluating the financial performance of construction companies. Additionally, the comparison of empirical results is performed between the VIKOR model and the proposed model. The VIKOR model has been presented in previous studies for financial performance evaluation. Therefore, the reason for the comparison of empirical results is to study the impact of the integration of entropy and fuzzy approaches in the VIKOR model. The remainder of this manuscript is structured as follows. Section 2 presents the materials and methods, which include the research development and methodology of the proposed entropy–fuzzy VIKOR model as well as the VIKOR model. Section 3 demonstrates the empirical results of the proposed entropy–fuzzy VIKOR model. Next, we present the comparison of empirical results between the VIKOR model and the proposed model. Lastly, concluding remarks based on the research findings are enumerated in the last section of this article.

2. Materials and Methods

2.1. Research Development

In this research, we propose an MCDM model, namely, the entropy–fuzzy VIKOR model, to evaluate and compare the financial performance of construction companies. The proposed model consists of two stages as follows:
Stage 1: Determine the weights of decision criteria (financial ratios) with the entropy weighting method;
Stage 2: Compare and rank the decision alternatives (construction companies) with the fuzzy VIKOR model.
Table 1 depicts the proposed research framework to evaluate the financial performance of construction companies with the integrated entropy–fuzzy VIKOR model.
Table 1 depicts the proposed research framework, which comprises the main objective, decision criteria and decision alternatives for the assessment of construction companies in terms of financial performance. In this paper, important financial ratios, such as CR, DAR, DER, EPS, ROA and ROE, were considered as the decision criteria [42,43,44,45,46]. The proposed model is illustrated with a real case study by evaluating the listed construction companies in Malaysia [47] for the period of 2015 to 2019 with the proposed model. In addition, the comparison of empirical results was performed between the proposed model and VIKOR model. The VIKOR model has been employed by previous researchers to evaluate the financial performance of construction companies [11]. The methodology of the proposed model and VIKOR model is presented in the following Section 2.2 and Section 2.3, respectively.

2.2. Proposed Entropy–Fuzzy VIKOR Model

In the first stage, the entropy weight method was employed to identify the objective weights of the financial ratios because it can avoid the subjectivity of weight selection [48,49,50]. Moreover, the entropy weight method is able to fully utilize the sample data to obtain the importance weight of the financial ratios [37].
In the second stage, the fuzzy VIKOR model was proposed to evaluate, compare and rank the decision alternatives (construction companies). The Fuzzy VIKOR model is a decision tool that deals with decision problems with non-commensurable and contradictory attributes by considering fuzziness and uncertainty. Moreover, the fuzzy VIKOR model was adopted to obtain the compromise solution that is the farthest from the NIS and closest to the PIS and determine the ranking of the decision alternatives by using the individual maximum regret value and group utility value. The merits of the fuzzy VIKOR model are to rank and select the alternatives with conflicting and inconsistent criteria [51,52,53,54]. Assuming that each decision alternative is assessed based on multi-criteria functions, the compromise ranking was identified by comparing the measure of closeness to the ideal [26,27,55]. The fuzzy set theory was firstly proposed by Zadeh to describe fuzziness and uncertainty [56]. The entropy–fuzzy VIKOR model is presented as follows:
Step 1: Computation of financial ratio weight via the entropy weight method. Calculate the proportion “pij” of the index value of alternative m under criterion n.
p i j = x i j i = 1 m x i j , i = 1 , 2 , , m , j = 1 , 2 , , n
where x i j represents the jth criterion value of the ith alternative of the initial matrix D.
Step 2: Determination of the entropy “ej” of criterion n.
e j = k i = 1 m p i j . ln ( p i j ) , j = 1 , 2 , , n
where k = 1 ln ( m ) .
Step 3: Calculation of the entropy weight “wj” of criterion n.
w j = 1 e j j = 1 n ( 1 e j ) , j = 1 , 2 , , n
Step 4: Establish the fuzzy decision matrix on the basis of triangular fuzzy numbers for the decision alternatives with respect to the criteria [57,58,59].
D = [ x ˜ 11 x ˜ 1 j x ˜ 1 n x ˜ i 1 x ˜ i j x ˜ i n x ˜ m 1 x ˜ m j x ˜ m n ]
where x ˜ i j = ( a i j , b i j , c i j ) , i = 1 , , m , j = 1 , , n . m refers to the number of decision alternatives. n refers to the number of decision criteria.
aij is the lowest ratio from the period of study for alternative i with respect to criterion j.
bij is the average ratio from the period of study for alternative i with respect to criterion j.
cij is the highest ratio from the period of study for alternative i with respect to criterion j.
Step 5: Define the worst value f j and the best value f j * of criterion j (financial ratio), where j = 1 , 2 , , n . The worst value f j and the best value f j * of criterion j are identified based on the respective criterion j. The financial ratios of CR, EPS, ROA and ROE seek to find the largest value for aij, bij and cij. DAR and DER should be minimized by assigning the smallest value for aij, bij and cij.
Step 6: Compute the evaluation value of criterion j for alternative i (Sij) for i = 1 , , m , j = 1 , , n . f i j refers to the score for alternative i with criterion j. The normalized fuzzy decision matrix is formed, and the equation to determine the new score of the alternative i with criterion j is shown below:
S i j = w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m , j = 1 , , n
where w j is the weight of criterion j.
Step 7: Calculate the utility (Si), regret (Ri) and VIKOR indices (Qi) values, i = 1 , , m . v refers to the strategy of maximum group utility weight, while 1-v refers to the individual regret weight. When v = 0.5, the strategy could be compromised.
S i = j = 1 n w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m
R i = max w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m
Q i = v ( S i S * ) ( S S * ) + ( 1 v ) ( R i R * ) ( R R * )
where
S * = min ( S i , i = 1 , , m )
S = max ( S i , i = 1 , , m )
R * = min ( R i , i = 1 , , m )
R = max ( R i , i = 1 , , m )
Step 8: Rank the decision alternatives according to the Q values [53,60]. The Q value is in the range of 0 to 1. A score of zero denotes the most favorable value for a parameter. In contrast, a score of 1 implies the most unfavorable value for a parameter. Select the best alternative by choosing the smallest Q value. The alternative with the lowest Q value is the closest alternative to the ideal solution.

2.3. VIKOR Model

The VIKOR model was introduced to evaluate the financial performance of construction companies [11]. Therefore, the comparison of empirical results was performed between the VIKOR model and the proposed entropy–fuzzy VIKOR model in this study. The VIKOR model is presented as follows [61,62,63]:
Step 1: Establish the decision matrix for the decision alternatives with respect to the criteria.
D = [ x 11 x 1 j x 1 n x i 1 x i j x i n x m 1 x m j x m n ]
where x i j represents the jth criterion value of the ith alternative of the initial matrix D, i = 1 , , m , j = 1 , , n . m refers to the number of decision alternatives. n refers to the number of decision criteria.
Step 2: Define the worst value f j and the best value f j * of criterion j (financial ratio), where j = 1 , 2 , , n . The worst value f j and the best value f j * of criterion j are identified based on the respective criterion j.
Step 3: Compute the evaluation value of criterion j for alternative i (Sij) for i = 1 , , m , j = 1 , , n . f i j refers to the score for alternative i with criterion j. The normalized decision matrix is formed, and the equation to determine the new score of the alternative i with criterion j is shown below:
S i j = w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m , j = 1 , , n
where w j is the weight of criterion j.
Step 4: Calculate the utility (Si), regret (Ri) and VIKOR indices (Qi) values, i = 1 , , m . v refers to the strategy of maximum group utility weight, while 1-v refers to the individual regret weight. When v = 0.5, the strategy could be compromised.
S i = j = 1 n w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m
R i = max w j ( f j * f i j ) ( f j * f j ) , i = 1 , , m
Q i = v ( S i S * ) ( S S * ) + ( 1 v ) ( R i R * ) ( R R * )
where
S * = min ( S i , i = 1 , , m )
S = max ( S i , i = 1 , , m )
R * = min ( R i , i = 1 , , m )
R = max ( R i , i = 1 , , m )
Step 5: Rank the decision alternatives according to the Q values. The Q value is in the range of 0 to 1. A score of zero denotes the most favorable value for a parameter. In contrast, a score of 1 implies the most unfavorable value for a parameter. Select the best alternative by choosing the smallest Q value.
The VIKOR model has limitations in the setting weight of the decision criteria because the weight is subjectively judged by the decision maker. In this study, equal weight was applied to the financial ratios for the computation of the Q value.

3. Empirical Results

Based on the entropy weighting method in the first stage, the weights of financial ratios for the performance evaluation of construction companies are presented in Figure 1.
As presented in Figure 1, CR (0.3883) obtained the largest weight among the other financial ratios, followed by DER (0.2713), DAR (0.1644), EPS (0.0794), ROE (0.0562) and finally ROA (0.0405). Based on the analysis using the entropy weight method, CR, DER and DAR were the most influential financial ratios to be considered for the performance evaluation of construction companies in this study.
Table 2 presents the fuzzy decision matrix of the construction companies with respect to financial ratios.
Based on the fuzzy decision matrix, the worst f j and the best f j * of alternatives with respect to each criterion were identified. Table 3 presents the worst f j and the best f j * values with respect to each criterion.
In this paper, the financial ratios of ROE, ROA, EPS and CR needed to be maximized. On the other hand, DER and DAR needed to be minimized. Based on Table 3, the best f j * for CR, DAR, DER, EPS, ROA and ROE were 40.845, 393.668 and 1044.293; 0.000, 0.001 and 0.002; 0.000, 0.001 and 0.002; 0.094, 0.248 and 0.498; 5.755, 12.112 and 23.721; and 12.438, 23.787 and 37.165, respectively. In contrast, the worst f j for CR, DAR, DER, EPS, ROA and ROE were 0.116, 1.076 and 1.200; 0.667, 0.745 and 0.811; 2.003, 3.079 and 4.302; 0.000, 0.015 and 0.038; 0.014, 0.297 and 1.322; and 0.015, 0.534 and 2.397, respectively. According to Equation (5), the new score of the alternative i with criterion j was calculated. Next, the normalized fuzzy decision matrix for the companies with respect to financial ratios is depicted in Table 4.
Based on the normalized fuzzy decision matrix, the triangular fuzzy numbers (TFNs) to measure the construction companies were identified, and the results are summarized in Table 5. The values of utility (Si) and regret (Ri) were determined by exploiting Equations (6) and (7), respectively.
After that, the values of S * ,   S ,   R *   and   R were determined and tabulated in Table 6.
Based on the result, S * = 0.07189, 0.10573 and 0.12119; S = 0.94510, 0.90708 and 0.85570; R * = 0.03930, 0.07757 and 0.07856; and R = 0.38831, 0.38831 and 0.38831. In this study, the weight of maximum group utility v was assumed to be 0.50 to perform the performance analysis of construction companies. v denotes the weight of the strategy “of the majority of criteria”, and it also plays a vital role in the ranking of the alternatives [26].
Table 7 presents the entropy–fuzzy VIKOR scores and optimal ranking for the construction companies. The values of Qi were determined by using Equation (8). Based on the obtained entropy–fuzzy VIKOR scores (Qi), the alternative with the smallest Qi value was specified to be the best construction company.
As shown in Table 7, the values of entropy–fuzzy VIKOR scores (Qi) and the ranking of the companies were identified based on the proposed model. The Qi ranged from 0.090 to 0.998 according to the optimal solution of the proposed model that integrates the entropy weight and fuzzy VIKOR model. According to the proposed entropy–fuzzy VIKOR model, the decision alternative with the lowest Q value was determined as the best alternative or best construction company. Table 7 shows the results and findings generated by the proposed entropy–fuzzy VIKOR model. The ranking depicts that the best construction company in terms of financial performance was ECONBHD, followed by GADANG, KIMLUN, DKLS, KERJAYA, PTARAS, MITRA, MELATI, PRTASCO, GBGAQRS, BREM, HSL, GAMUDA, IJM, CRESBLD, EKOVEST, GKENT, HOHUP, WCT and lastly MUHIBAH. In this study, ECONBHD achieved the lowest value of Q, and thus ECONBHD outperformed the other construction companies in terms of financial performance. The results of this study show that the proposed model is applicable to solve the MCDM problems as illustrated by previous studies, such as the selection of sustainable third-party reverse logistics providers [10] and multi-criteria inventory classification problems [64] using the VIKOR model. The ranking of the companies was important in the financial performance evaluation because it helped the companies to identify their ranking among the competitors in the same field for benchmarking purposes [6].
Finally, the comparison of the scores (Qi) and optimal ranking of construction companies between the VIKOR model and entropy–fuzzy VIKOR model was performed and presented in Table 8.
As shown in Table 8, both the VIKOR model and entropy–fuzzy VIKOR model obtained different Q values or scores. Therefore, the optimal ranking for 90% of the construction companies between the VIKOR model and entropy–fuzzy VIKOR model was significantly different. This implies that the integration of entropy and fuzzy approaches in the VIKOR model has a significant impact on the financial performance evaluation and ranking of construction companies. The integration of the entropy method in the proposed model helps to identify the objective weight of financial ratios, which can avoid the subjectivity of weight selection as compared to the VIKOR model. Furthermore, the integration of the fuzzy approach is able to express the fuzziness, uncertainties, vagueness and imprecision in the evaluation of financial performance.
In summary, the proposed entropy–fuzzy VIKOR model helps to determine the weight of the financial ratios as well as the ranking of construction companies. The findings of this study provide insight into the construction companies for benchmarking based on their current financial status and ranking. For example, the low-ranking companies, such as MUHIBAH and WCT, can improve their financial performance based on the top influential financial ratios, namely CR, DER and DAR. Due to the recent impact of the COVID-19 pandemic, the construction companies should understand their current financial status and ranking in order to sustain, improve and compete with other companies in the same sector. Additionally, this study helped to identify the most influential financial ratios in the financial performance evaluation based on the proposed entropy–fuzzy VIKOR model.

4. Conclusions

This paper aims to propose an MDCM model, namely, the entropy–fuzzy VIKOR model, to evaluate and compare the financial performance of construction companies. The proposed model consists of two stages. In the first stage, the entropy weight method is proposed to identify the objective weights of the financial ratios, because it can avoid the subjectivity of weight selection. Based on the analysis using the entropy weight method, CR, DER and DAR are the top three influential financial ratios to be considered for the performance evaluation of construction companies in this study. In the second stage, the fuzzy VIKOR model is proposed to evaluate, compare and rank the construction companies. In this paper, the listed construction companies were evaluated with respect to multiple financial ratios of CR, DAR, DER, EPS, ROA and ROE. This study indicates that ECONBHD achieved the lowest value of Q compared to the other construction companies. Therefore, ECONBHD was identified as the best construction company in terms of financial performance, followed by GADANG, KIMLUN, DKLS, KERJAYA, PTARAS, MITRA, MELATI, PRTASCO, GBGAQRS, BREM, HSL, GAMUDA, IJM, CRESBLD, EKOVEST, GKENT, HOHUP, WCT and finally MUHIBAH. As compared to the traditional VIKOR model, the integration of entropy and fuzzy approaches in the VIKOR model has a significant impact on the financial performance evaluation and ranking of construction companies.
This study proposed an integrated entropy–fuzzy VIKOR model to evaluate, compare and rank the financial performance of construction companies based on multiple financial ratios. The proposed entropy–fuzzy VIKOR model is able to determine the weight of financial ratios objectively based on the financial data and, therefore, it helps to replace the subjective weight set by the decision maker using the VIKOR model in previous studies. In addition, the incorporation of the fuzzy method helps to express the fuzziness, uncertainties, vagueness and imprecision in the evaluation of financial performance. Due to the recent impact of the COVID-19 pandemic, the analysis of financial performance using the proposed model will help companies to identify improvement plans by understanding their current financial status and ranking, as well as influential financial ratios.
For future research, the integrated entropy–fuzzy VIKOR model could be considered to evaluate the financial performance of different economic sectors in other countries. Furthermore, the application of the proposed model can be extended to other MCDM problems, such as supplier selection.

Author Contributions

Conceptualization, W.S.L. and W.H.L.; methodology, W.S.L. and W.H.L.; software, K.F.L.; validation, W.S.L. and W.H.L.; formal analysis, W.S.L. and W.H.L.; investigation, K.F.L.; resources, W.S.L. and S.H.J.; data curation, W.H.L. and S.H.J.; writing—original draft preparation, W.S.L., W.H.L., S.H.J. and K.F.L.; writing—review and editing, W.S.L., W.H.L. and S.H.J., supervision, W.S.L., W.H.L. and S.H.J. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by research grant provided by Universiti Kebangsaan Malaysia, GUP-2019-038.

Acknowledgments

This research is supported by Universiti Kebangsaan Malaysia grant GUP-2019-038.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Khan, R.A.; Liew, M.S.; Ghazali, Z.B. Malaysian construction sector and Malaysia vision 2020: Developed nation status. Procedia Soc. Behav. Sci. 2014, 109, 507–513. [Google Scholar] [CrossRef] [Green Version]
  2. Malaysia Construction Market-Growth, Trends, and Forecast (2020–2025). Available online: https://www.mordorintelligence.com/industry-reports/malaysia-construction-market-growth-trends-and-forecast-2019-2024?cv=1 (accessed on 19 August 2020).
  3. What Is the Impact of COVID-19 on Malaysia’s Construction Industry & What Can Be Done? Available online: https://www.iproperty.com.my/news/covid-19-impact-malaysia-construction-industry-what-can-be-done/?cv=1 (accessed on 19 August 2020).
  4. Malaysia: Survival of Companies Impacted by the COVID-19 Outbreak. Available online: https://www.bakermckenzie.com/en/insight/publications/2020/03/survival-of-companies-impacted-by-covid19 (accessed on 19 August 2020).
  5. Shen, H.; Fu, M.; Pan, H.; Yu, Z.; Chen, Y. The impact of COVID-19 pandemic on firm performance. Emerg. Mark. Financ. Trade 2020, 56, 2213–2230. [Google Scholar] [CrossRef]
  6. Abdel-Basset, M.; Ding, W.; Mohamed, R.; Metawa, N. An integrated plithogenic MCDM approach for financial performance evaluation of manufacturing industries. Risk Manag. 2020, 22, 192–218. [Google Scholar] [CrossRef]
  7. Dalfard, V.M.; Sohrabian, A.; Najafabadi, A.M.; Alvani, J. Performance evaluation and prioritization of leasing companies using the super efficiency Data Envelopment Analysis model. Acta Polytech. Hung. 2012, 9, 183–194. [Google Scholar]
  8. Hasanloo, S.; Karim, E.; Mehregan, M.R.; Tehrani, R. Evaluating performance of companies by new management tools. J. Nat. Soc. Sci. 2013, 2, 165–169. [Google Scholar]
  9. Zamani, L.; Beegam, R.; Borzoian, S. Portfolio selection using Data Envelopment Analysis (DEA): A case of select Indian investment companies. Int. J. Curr. Res. Acad. Rev. 2014, 2, 50–55. [Google Scholar]
  10. Wen, Z.; Liao, H.; Zavadskas, E.K. MACONT: Mixed aggregation by comprehensive normalization technique for multi-criteria analysis. Informatica 2020, 31, 857–880. [Google Scholar]
  11. Ginevičius, R.; Podvezko, V. Assessing the financial state of construction enterprises. Technol. Econ. Dev. Econ. 2006, 12, 188–194. [Google Scholar] [CrossRef]
  12. Shannon, C.E.; Weaver, W. The Mathematical Theory of Communication; The University of Illinios Press: Urbana, AL, USA, 1947. [Google Scholar]
  13. Shannon, C.E. A mathematical theory of communication. Bell Syst. Tech. 1948, 27, 379–423. [Google Scholar] [CrossRef] [Green Version]
  14. Lu, J.; Wei, C.; Wu, J.; Wei, G. TOPSIS method for probabilistic linguistic MAGDM with entropy weight and its application to supplier selection of new agricultural machinery products. Entropy 2019, 21, 953. [Google Scholar] [CrossRef] [Green Version]
  15. Furtan, W.H. Entropy, information and economics in firm decision making. Int. J. Syst. Sci. 1977, 8, 1105–1112. [Google Scholar] [CrossRef]
  16. Yang, J.; Qiu, W. A measure of risk and a decision-making model based on expected utility and entropy. Eur. J. Oper. Res. 2005, 164, 792–799. [Google Scholar] [CrossRef]
  17. Muley, A.A.; Bajaj, V.H. Fuzzy multiple attribute decision making by utilizing entropy-based approach. Int. J. Agric. Stat. Sci. 2009, 5, 613–621. [Google Scholar]
  18. Chen, C.H. A novel multi-criteria decision-making model for building material supplier selection based on entropy-AHP weighted TOPSIS. Entropy 2020, 22, 259. [Google Scholar] [CrossRef] [PubMed] [Green Version]
  19. Yan, Z.; Yang, W.; Huang, X.; Shi, X.; Zhang, W.; Zhang, S. A reputation-enhanced hybrid approach for supplier selection with intuitionistic fuzzy evaluation information. Mathematics 2019, 7, 298. [Google Scholar] [CrossRef] [Green Version]
  20. Wang, Q.; Liu, Y.; Zhang, X.; Fu, H.; Lin, S.; Song, S.; Niu, C. Study on an AHP-entropy-ANFIS model for the prediction of the unfrozen water content of sodium-bicarbonate-type salinization frozen soil. Mathematics 2020, 8, 1209. [Google Scholar] [CrossRef]
  21. Yang, X.; Zhao, X.; Gong, X.; Yang, X.; Huang, C. Systemic importance of China’s financial institutions: A jump volatility spillover network review. Entropy 2020, 22, 588. [Google Scholar] [CrossRef]
  22. Krylovas, A.; Kosareva, N.; Dadelo, S. European countries ranking and clustering solution by children’s physical activity and human development index using entropy-based methods. Mathematics 2020, 8, 1705. [Google Scholar] [CrossRef]
  23. Batool, B.; Ahmad, M.; Abdullah, S.; Ashraf, S.; Chinram, R. Entropy based Pythagorean probabilistic hesitant fuzzy decision making technique and its application for fog-haze factor assessment problem. Entropy 2020, 22, 318. [Google Scholar] [CrossRef] [Green Version]
  24. Shrivathsan, A.D.; Krishankumar, R.; Mishra, A.R.; Ravichandran, K.S.; Kar, S.; Badrinath, V. An integrated decision approach with probabilistic linguistic information for test case prioritization. Mathematics 2020, 8, 1857. [Google Scholar] [CrossRef]
  25. Abidin, S.N.Z.; Jaaman, S.H.; Ismail, M.; Bakar, A.S.A. Clustering stock performance considering investor preferences using a fuzzy inference system. Symmetry 2020, 12, 1148. [Google Scholar] [CrossRef]
  26. Opricovic, S.; Tzeng, G.H. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. Eur. J. Oper. Res. 2004, 156, 445–455. [Google Scholar] [CrossRef]
  27. Opricovic, S. Multi-Criteria Optimization of Civil Engineering Systems; Faculty of Civil Engineering: Belgrade, Serbia, 1998. [Google Scholar]
  28. Tzeng, G.H.; Lin, C.W.; Opricovic, S. Multi-criteria analysis of alternative-fuel buses for public transportation. Energy Policy 2005, 33, 1373–1383. [Google Scholar] [CrossRef]
  29. Carlsson, C.; Fullér, R. Fuzzy multiple criteria decision making: Recent developments. Fuzzy Sets Syst. 1996, 78, 139–153. [Google Scholar] [CrossRef] [Green Version]
  30. Zhou, W.; Xu, Z. Extended intuitionistic fuzzy sets based on the hesitant fuzzy membership and their application in decision making with risk preference. Int. J. Intell. Syst. 2018, 33, 417–443. [Google Scholar] [CrossRef]
  31. Memari, A.; Dargi, A.; Jokar, M.R.A.; Ahmad, R.; Rahim, A.R.A. Sustainable supplier selection: A multi-criteria intuitionistic fuzzy TOPSIS method. J. Manuf. Syst. 2019, 50, 9–24. [Google Scholar] [CrossRef]
  32. Petrović, G.; Mihajlović, J.; Ćojbašić, Ž.; Madić, M.; Marinković, D. Comparison of three fuzzy MCDM methods for solving the supplier selection problem. Facta Univ. Ser. Mech. Eng. 2019, 17, 455–469. [Google Scholar] [CrossRef]
  33. Kaya, İ.; Çolak, M.; Terzi, F. A comprehensive review of fuzzy multi criteria decision making methodologies for energy policy making. Energy Strategy Rev. 2019, 24, 207–228. [Google Scholar] [CrossRef]
  34. Haider, H.; Ghumman, A.R.; Al-Salamah, I.S.; Thabit, H. Assessment framework for natural groundwater contamination in arid regions: Development of indices and wells ranking system using fuzzy VIKOR method. Water 2020, 12, 423. [Google Scholar] [CrossRef] [Green Version]
  35. Meksavang, P.; Shi, H.; Lin, S.M.; Liu, H.C. An extended picture fuzzy VIKOR approach for sustainable supplier management and its application in the beef industry. Symmetry 2019, 11, 468. [Google Scholar] [CrossRef] [Green Version]
  36. Sunarsih, S.; Pamurti, R.D.; Khabibah, S.; Hadiyanto, H. Analysis of priority scale for watershed reforestation using trapezoidal fuzzy VIKOR method: A case study in Semarang, Central Java Indonesia. Symmetry 2020, 12, 507. [Google Scholar] [CrossRef] [Green Version]
  37. Taylan, O.; Alamoudi, R.; Kabli, M.; AlJifri, A.; Ramzi, F.; Herrera-Viedma, E. Assessment of energy systems using extended fuzzy AHP, fuzzy VIKOR, and TOPSIS approaches to manage non-cooperative opinions. Sustainability 2020, 12, 2745. [Google Scholar] [CrossRef] [Green Version]
  38. Salimi, A.H.; Noori, A.; Bonakdari, H.; Masoompour Samakosh, J.; Sharifi, E.; Hassanvand, M.; Gharabaghi, B.; Agharazi, M. Exploring the role of advertising types on improving the water consumption behavior: An application of integrated fuzzy AHP and fuzzy VIKOR method. Sustainability 2020, 12, 1232. [Google Scholar] [CrossRef] [Green Version]
  39. He, T.; Wei, G.; Lu, J.; Wei, C.; Lin, R. Pythagorean 2-tuple linguistic VIKOR method for evaluating human factors in construction project management. Mathematics 2019, 7, 1149. [Google Scholar] [CrossRef] [Green Version]
  40. Dong, J.; Li, R.; Huang, H. Performance evaluation of residential demand response based on a modified fuzzy VIKOR and scalable computing method. Energies 2018, 11, 1097. [Google Scholar] [CrossRef] [Green Version]
  41. Opricovic, S. Fuzzy VIKOR with an application to water resources planning. Expert Syst. Appl. 2011, 38, 12983–12990. [Google Scholar] [CrossRef]
  42. Price, J.E.; Haddock, M.D.; Brock, H.R. College Accounting, 10th ed.; Macmillan/McGraw-Hill: New York, NY, USA, 1993. [Google Scholar]
  43. Akguc, O. Financial Statement Analysis, 13th ed.; Arayis Publication: Istanbul, Turkey, 2010. [Google Scholar]
  44. Khrawish, H.A. Determinants of commercial banks performance: Evidence from Jordan. Int. J. Financ. Econ. 2011, 81, 148–159. [Google Scholar]
  45. Liew, K.F.; Lam, W.S.; Lam, W.H. An empirical evaluation on the efficiency of the companies in Malaysia with Data Envelopment Analysis model. Adv. Sci. Lett. 2017, 23, 8264–8267. [Google Scholar]
  46. Lam, W.S.; Liew, K.F.; Lam, W.H. An optimal control on the efficiency of technology companies in Malaysia with Data Envelopment Analysis model. J. Telecommun. Electron. Comput. Eng. 2018, 10, 107–111. [Google Scholar]
  47. Company Announcements|Bursa Malaysia Market. Available online: http://www.bursamalaysia.com/market/listed-companies/company-announcements/#/?category=all (accessed on 19 August 2020).
  48. Li, X.X.; Wang, K.S.; Liu, L.W.; Xin, J.; Yang, H.R.; Gao, C.Y. Application of the entropy weight and TOPSIS method in safety evaluation of coal mines. Procedia Eng. 2011, 26, 2085–2091. [Google Scholar] [CrossRef] [Green Version]
  49. Onar, S.C.; Oztaysi, B.; Kahraman, C. Strategic decision selection using hesitant fuzzy TOPSIS and interval type-2 fuzzy AHP: A case study. Int. J. Comput. Intell. Syst. 2014, 7, 1002–1021. [Google Scholar] [CrossRef] [Green Version]
  50. Kim, A.R. A study on competitiveness analysis of ports in Korea and China by entropy weight TOPSIS. Asian J. Shipp. Logist. 2016, 32, 187–194. [Google Scholar] [CrossRef]
  51. Opricovic, S.; Tzeng, G.H. Multicriteria planning of post-earthquake sustainable reconstruction. Comput.-Aided Civ. Infrastruct. Eng. 2002, 17, 211–220. [Google Scholar] [CrossRef]
  52. Opricovic, S.; Tzeng, G.H. Fuzzy multicriteria model for post-earthquake land-use planning. Nat. Hazards Rev. 2003, 4, 59–64. [Google Scholar] [CrossRef]
  53. Opricovic, S.; Tzeng, G.H. Extended VIKOR method in comparison with outranking methods. Eur. J. Oper. Res. 2007, 178, 514–529. [Google Scholar] [CrossRef]
  54. Ou Yang, Y.P.; Shieh, H.M.; Leu, J.D. A VIKOR-based multiple criteria decision method for improving information security risk. Int. J. Inf. Technol. Decis. Mak. 2009, 8, 267–287. [Google Scholar] [CrossRef]
  55. Tzeng, G.H.; Teng, M.H.; Chen, J.J.; Opricovic, S. Multicriteria selection for a restaurant location in Taipei. Int. J. Hosp. Manag. 2002, 21, 171–187. [Google Scholar] [CrossRef]
  56. Zadeh, L.A. Fuzzy sets. Inf. Control 1965, 8, 338–356. [Google Scholar] [CrossRef] [Green Version]
  57. Perçin, S.; Aldalou, E. Financial performance evaluation of Turkish airline companies using integrated fuzzy AHP fuzzy TOPSIS model. Int. J. Econ. Adm. Stu. 2018, 18, 583–598. [Google Scholar] [CrossRef]
  58. Kuo, M.S.; Tzeng, G.H.; Huang, W.C. Group decision-making based on concepts of ideal and anti-ideal points in a fuzzy environment. Math. Comput. Model. 2007, 45, 324–339. [Google Scholar] [CrossRef]
  59. Sun, C.C. A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert Syst. Appl. 2010, 37, 7745–7754. [Google Scholar] [CrossRef]
  60. Tong, L.I.; Chen, C.C.; Wang, C.H. Optimization of multi-response processes using the VIKOR method. Int. J. Adv. Manuf. Technol. 2007, 31, 1049–1057. [Google Scholar] [CrossRef]
  61. Chang, C.L.; Hsu, C.H. Multi-criteria analysis via the VIKOR method for prioritizing land-use restraint strategies in the Tseng-Wen reservoir watershed. J. Environ. Manag. 2009, 90, 3226–3230. [Google Scholar] [CrossRef]
  62. Radhika, S.; Kumar, D.S.; Swapna, D. VIKOR method for multi criteria decision making in academic staff selection. J. Prod. Res. Manag. 2013, 3, 30–35. [Google Scholar]
  63. Ali, M.; Yadav, A.; Anis, M.; Shah, R.K. Evaluation of hazardous waste management by using VIKOR: A case study of USA States. Mod. Appl. Sci. 2017, 11, 180–187. [Google Scholar] [CrossRef]
  64. Keshavarz Ghorabaee, M.; Zavadskas, E.K.; Olfat, L.; Turskis, Z. Multi-criteria inventory classification using a new method of evaluation based on distance from average solution (EDAS). Informatica 2015, 26, 435–451. [Google Scholar] [CrossRef]
Figure 1. Weights of financial ratios for the performance evaluation of construction companies.
Figure 1. Weights of financial ratios for the performance evaluation of construction companies.
Entropy 23 00320 g001
Table 1. Proposed research framework.
Table 1. Proposed research framework.
Level
ObjectiveEvaluation of the Financial Performance of Construction Companies
Decision CriteriaReturn on equity (ROE)
(Financial Ratios)Return on asset (ROA)
Earnings per share (EPS)
Debt to equity ratio (DER)
Debt to assets ratio (DAR)
Current ratio (CR)
Decision AlternativesBREM
(ConstructionCRESBLD
Companies)DKLS
ECONBHD
EKOVEST
GADANG
GAMUDA
GBGAQRS
GKENT
HOHUP
HSL
IJM
KERJAYA
KIMLUN
MELATI
MITRA
MUHIBAH
PRTASCO
PTARAS
WCT
Table 2. Fuzzy decision matrix of the construction companies with respect to financial ratios.
Table 2. Fuzzy decision matrix of the construction companies with respect to financial ratios.
CompaniesCRDARDEREPSROAROE
BREM(2.467, 4.694, 7.132)(0.077, 0.132, 0.240)(0.083, 0.157, 0.316)(0.026, 0.063, 0.130)(1.745, 5.043, 11.186)(2.296, 5.664, 12.117)
CRESBLD(0.615, 1.643, 4.115)(0.235, 0.276, 0.360)(0.307, 0.387, 0.563)(0.037, 0.046, 0.050)(2.358, 2.770, 3.098)(3.150, 3.830, 4.123)
DKLS(37.573, 68.835, 114.062)(0.003, 0.004, 0.004)(0.003, 0.004, 0.004)(0.094, 0.147, 0.185)(3.732, 5.809, 7.722)(3.745, 5.832, 7.750)
ECONBHD(10.872, 393.668, 1044.293)(0.000, 0.001, 0.002)(0.000, 0.001, 0.002)(0.005, 0.020, 0.043)(4.809, 12.112, 17.601)(4.818, 12.126, 17.617)
EKOVEST(0.692, 1.123, 1.837)(0.205, 0.406, 0.555)(0.258, 0.783, 1.245)(0.010, 0.065, 0.192)(0.785, 5.702, 16.555)(0.988, 11.907, 37.165)
GADANG(19.045, 175.893, 409.196)(0.001, 0.006, 0.020)(0.001, 0.006, 0.020)(0.020, 0.043, 0.066)(3.502, 6.671, 11.924)(3.572, 6.699, 11.953)
GAMUDA(1.087, 1.629, 2.054)(0.357, 0.385, 0.403)(0.555, 0.626, 0.676)(0.092, 0.248, 0.498)(2.970, 7.266, 12.883)(4.619, 11.857, 20.772)
GBGAQRS(1.007, 15.843, 67.467)(0.009, 0.124, 0.237)(0.009, 0.151, 0.310)(0.007, 0.020, 0.038)(1.068, 2.775, 5.957)(1.287, 3.122, 6.881)
GKENT(1.275, 1.464, 1.871)(0.420, 0.562, 0.618)(0.723, 1.342, 1.621)(0.082, 0.152, 0.226)(4.780, 10.416, 14.886)(12.438, 23.787, 34.063)
HOHUP(1.931, 2.429, 2.794)(0.360, 0.431, 0.489)(0.562, 0.775, 0.957)(0.005, 0.059, 0.179)(0.330, 4.892, 14.369)(0.613, 7.907, 22.441)
HSL(2.234, 2.764, 3.394)(0.188, 0.241, 0.308)(0.231, 0.322, 0.445)(0.064, 0.084, 0.125)(4.386, 5.769, 9.699)(5.744, 7.532, 12.169)
IJM(1.399, 2.273, 3.011)(0.305, 0.324, 0.341)(0.438, 0.480, 0.517)(0.054, 0.082, 0.111)(2.144, 3.039, 4.015)(3.084, 4.518, 6.040)
KERJAYA(8.762, 65.731, 171.582)(0.005, 0.013, 0.042)(0.005, 0.014, 0.044)(0.030, 0.058, 0.101)(3.640, 7.323, 11.589)(3.659, 7.414, 11.688)
KIMLUN(40.845, 78.293, 102.539)(0.002, 0.003, 0.006)(0.002, 0.003, 0.006)(0.045, 0.057, 0.072)(5.755, 6.958, 8.172)(5.792, 6.977, 8.184)
MELATI(0.508, 14.647, 37.898)(0.011, 0.046, 0.163)(0.011, 0.053, 0.194)(0.013, 0.070, 0.247)(0.781, 4.426, 15.612)(0.801, 4.588, 15.782)
MITRA(0.116, 42.494, 128.804)(0.002, 0.072, 0.143)(0.002, 0.082, 0.166)(0.009, 0.033, 0.052)(1.451, 5.059, 8.293)(1.615, 5.358, 8.312)
MUHIBAH(0.951, 1.076, 1.200)(0.667, 0.745, 0.811)(2.003, 3.079, 4.302)(0.033, 0.153, 0.440)(0.803, 4.072, 12.201)(3.108, 14.210, 36.642)
PRTASCO(5.442, 6.604, 8.688)(0.046, 0.064, 0.078)(0.048, 0.068, 0.084)(0.000, 0.048, 0.076)(0.014, 7.628, 11.783)(0.015, 8.189, 12.673)
PTARAS(7.606, 10.674, 11.892)(0.094, 0.098, 0.103)(0.103, 0.109, 0.115)(0.028, 0.181, 0.405)(2.021, 10.805, 23.721)(2.230, 12.002, 26.368)
WCT(2.125, 7.311, 25.602)(0.274, 0.385, 0.459)(0.377, 0.645, 0.847)(0.001, 0.015, 0.067)(0.025, 0.297, 1.322)(0.034, 0.534, 2.397)
Table 3. The best f j * and the worst f j values for each criterion function.
Table 3. The best f j * and the worst f j values for each criterion function.
Financial RatiosBest ( f j * )Worst ( f j )
CR(40.845, 393.668, 1044.293)(0.116, 1.076, 1.200)
DAR(0.000, 0.001, 0.002)(0.667, 0.745, 0.811)
DER(0.000, 0.001, 0.002)(2.003, 3.079, 4.302)
EPS(0.094, 0.248, 0.498)(0.000, 0.015, 0.038)
ROA(5.755, 12.112, 23.721)(0.014, 0.297, 1.322)
ROE(12.438, 23.787, 37.165)(0.015, 0.534, 2.397)
Table 4. The normalized fuzzy decision matrix for the companies with respect to all financial ratios.
Table 4. The normalized fuzzy decision matrix for the companies with respect to all financial ratios.
CompaniesCRDARDEREPSROAROE
BREM(0.366, 0.385, 0.386)(0.019, 0.029, 0.048)(0.011, 0.014, 0.020)(0.058, 0.063, 0.064)(0.028, 0.024, 0.023)(0.046, 0.044, 0.040)
CRESBLD(0.384, 0.388, 0.387)(0.058, 0.061, 0.073)(0.042, 0.034, 0.035)(0.048, 0.069, 0.077)(0.024, 0.032, 0.037)(0.042, 0.048, 0.053)
DKLS(0.031, 0.321, 0.346)(0.001, 0.001, 0.000)(0.000, 0.000, 0.000)(0.000, 0.034, 0.054)(0.014, 0.022, 0.029)(0.039, 0.043, 0.048)
ECONBHD(0.286, 0.000, 0.000)(0.000, 0.000, 0.000)(0.000, 0.000, 0.000)(0.075, 0.078, 0.079)(0.007, 0.000, 0.011)(0.034, 0.028, 0.032)
EKOVEST(0.383, 0.388, 0.388)(0.051, 0.089, 0.112)(0.035, 0.069, 0.078)(0.071, 0.062, 0.053)(0.035, 0.022, 0.013)(0.052, 0.029, 0.000)
GADANG(0.208, 0.215, 0.236)(0.000, 0.001, 0.004)(0.000, 0.000, 0.001)(0.063, 0.070, 0.075)(0.016, 0.019, 0.021)(0.040, 0.041, 0.041)
GAMUDA(0.379, 0.388, 0.388)(0.088, 0.085, 0.082)(0.075, 0.055, 0.043)(0.002, 0.000, 0.000)(0.020, 0.017, 0.020)(0.035, 0.029, 0.026)
GBGAQRS(0.380, 0.374, 0.364)(0.002, 0.027, 0.048)(0.001, 0.013, 0.019)(0.073, 0.078, 0.079)(0.033, 0.032, 0.032)(0.050, 0.050, 0.049)
GKENT(0.377, 0.388, 0.388)(0.103, 0.124, 0.125)(0.098, 0.118, 0.102)(0.011, 0.033, 0.047)(0.007, 0.006, 0.016)(0.000, 0.000, 0.005)
HOHUP(0.371, 0.387, 0.388)(0.089, 0.095, 0.099)(0.076, 0.068, 0.060)(0.075, 0.064, 0.055)(0.038, 0.025, 0.017)(0.053, 0.038, 0.024)
HSL(0.368, 0.387, 0.387)(0.046, 0.053, 0.062)(0.031, 0.028, 0.028)(0.025, 0.056, 0.064)(0.010, 0.022, 0.025)(0.030, 0.039, 0.040)
IJM(0.376, 0.387, 0.388)(0.075, 0.071, 0.069)(0.059, 0.042, 0.032)(0.034, 0.057, 0.067)(0.025, 0.031, 0.036)(0.042, 0.047, 0.050)
KERJAYA(0.306, 0.324, 0.325)(0.001, 0.003, 0.008)(0.001, 0.001, 0.003)(0.054, 0.064, 0.069)(0.015, 0.016, 0.022)(0.040, 0.040, 0.041)
KIMLUN(0.000, 0.312, 0.351)(0.000, 0.000, 0.001)(0.000, 0.000, 0.000)(0.041, 0.065, 0.074)(0.000, 0.018, 0.028)(0.030, 0.041, 0.047)
MELATI(0.385, 0.375, 0.375)(0.003, 0.010, 0.033)(0.001, 0.005, 0.012)(0.069, 0.060, 0.043)(0.035, 0.026, 0.015)(0.053, 0.046, 0.035)
MITRA(0.388, 0.347, 0.341)(0.000, 0.016, 0.029)(0.000, 0.007, 0.010)(0.072, 0.073, 0.077)(0.030, 0.024, 0.028)(0.049, 0.045, 0.047)
MUHIBAH(0.380, 0.388, 0.388)(0.164, 0.164, 0.164)(0.271, 0.271, 0.271)(0.052, 0.032, 0.010)(0.035, 0.028, 0.021)(0.042, 0.023, 0.001)
PRTASCO(0.338, 0.383, 0.386)(0.011, 0.014, 0.015)(0.006, 0.006, 0.005)(0.079, 0.068, 0.073)(0.040, 0.015, 0.022)(0.056, 0.038, 0.040)
PTARAS(0.317, 0.379, 0.384)(0.023, 0.021, 0.021)(0.014, 0.009, 0.007)(0.056, 0.023, 0.016)(0.026, 0.004, 0.000)(0.046, 0.028, 0.017)
WCT(0.369, 0.382, 0.379)(0.067, 0.085, 0.093)(0.051, 0.057, 0.053)(0.079, 0.079, 0.074)(0.040, 0.040, 0.040)(0.056, 0.056, 0.056)
Table 5. The triangular fuzzy numbers (TFNs) to measure the construction companies.
Table 5. The triangular fuzzy numbers (TFNs) to measure the construction companies.
CompaniesSiRi
BREM(0.528, 0.558, 0.581)(0.366, 0.385, 0.386)
CRESBLD(0.597, 0.631, 0.663)(0.384, 0.388, 0.387)
DKLS(0.086, 0.421, 0.477)(0.039, 0.321, 0.346)
ECONBHD(0.402, 0.106, 0.121)(0.286, 0.078, 0.079)
EKOVEST(0.626, 0.659, 0.645)(0.383, 0.388, 0.388)
GADANG(0.327, 0.346, 0.378)(0.208, 0.215, 0.236)
GAMUDA(0.599, 0.573, 0.558)(0.379, 0.388, 0.388)
GBGAQRS(0.540, 0.574, 0.591)(0.380, 0.374, 0.364)
GKENT(0.596, 0.668, 0.683)(0.377, 0.388, 0.388)
HOHUP(0.703, 0.677, 0.643)(0.371, 0.387, 0.388)
HSL(0.511, 0.585, 0.608)(0.368, 0.387, 0.387)
IJM(0.612, 0.635, 0.641)(0.376, 0.387, 0.388)
KERJAYA(0.416, 0.449, 0.467)(0.306, 0.324, 0.325)
KIMLUN(0.072, 0.436, 0.500)(0.041, 0.312, 0.351)
MELATI(0.545, 0.523, 0.512)(0.385, 0.375, 0.375)
MITRA(0.540, 0.512, 0.531)(0.388, 0.347, 0.341)
MUHIBAH(0.945, 0.907, 0.856)(0.380, 0.388, 0.388)
PRTASCO(0.531, 0.524, 0.540)(0.338, 0.383, 0.386)
PTARAS(0.482, 0.465, 0.446)(0.317, 0.379, 0.384)
WCT(0.663, 0.700, 0.696)(0.369, 0.382, 0.379)
Table 6. The fuzzy values for the grading of alternatives.
Table 6. The fuzzy values for the grading of alternatives.
S * (0.07189, 0.10573, 0.12119)
S (0.94510, 0.90708, 0.85570)
R * (0.03930, 0.07757, 0.07856)
R (0.38831, 0.38831, 0.38831)
Table 7. The entropy–fuzzy VIKOR scores (Qi) and optimal ranking of construction companies.
Table 7. The entropy–fuzzy VIKOR scores (Qi) and optimal ranking of construction companies.
CompaniesEntropy-Fuzzy VIKOR Scores (Qi)Optimal Ranking
BREM0.77411
CRESBLD0.82815
DKLS0.5064
ECONBHD0.0901
EKOVEST0.84116
GADANG0.3842
GAMUDA0.79113
GBGAQRS0.76810
GKENT0.84517
HOHUP0.85118
HSL0.78912
IJM0.82614
KERJAYA0.6095
KIMLUN0.5053
MELATI0.7448
MITRA0.7047
MUHIBAH0.99820
PRTASCO0.7479
PTARAS0.6976
WCT0.85519
Table 8. The comparison of the scores (Qi) and optimal ranking of construction companies between the VIKOR model and entropy–fuzzy VIKOR model.
Table 8. The comparison of the scores (Qi) and optimal ranking of construction companies between the VIKOR model and entropy–fuzzy VIKOR model.
Entropy-Fuzzy VIKOR ModelVIKOR Model
CompaniesScores (Qi)Optimal RankingScores (Qi)Optimal Ranking
BREM0.774110.77012
CRESBLD0.828150.88818
DKLS0.50640.1941
ECONBHD0.09010.4375
EKOVEST0.841160.83315
GADANG0.38420.3454
GAMUDA0.791130.6768
GBGAQRS0.768100.80814
GKENT0.845170.69310
HOHUP0.851180.87017
HSL0.789120.78013
IJM0.826140.86616
KERJAYA0.60950.2483
KIMLUN0.50530.2022
MELATI0.74480.6849
MITRA0.70470.5737
MUHIBAH0.998200.96819
PRTASCO0.74790.69711
PTARAS0.69760.5216
WCT0.855191.00020
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Lam, W.S.; Lam, W.H.; Jaaman, S.H.; Liew, K.F. Performance Evaluation of Construction Companies Using Integrated Entropy–Fuzzy VIKOR Model. Entropy 2021, 23, 320. https://doi.org/10.3390/e23030320

AMA Style

Lam WS, Lam WH, Jaaman SH, Liew KF. Performance Evaluation of Construction Companies Using Integrated Entropy–Fuzzy VIKOR Model. Entropy. 2021; 23(3):320. https://doi.org/10.3390/e23030320

Chicago/Turabian Style

Lam, Weng Siew, Weng Hoe Lam, Saiful Hafizah Jaaman, and Kah Fai Liew. 2021. "Performance Evaluation of Construction Companies Using Integrated Entropy–Fuzzy VIKOR Model" Entropy 23, no. 3: 320. https://doi.org/10.3390/e23030320

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop