MejÃa-Giraldo, D.; Velásquez-Gomez, G.; Muñoz-Galeano, N.; Cano-Quintero, J.B.; Lemos-Cano, S.
A BESS Sizing Strategy for Primary Frequency Regulation Support of Solar Photovoltaic Plants. Energies 2019, 12, 317.
https://doi.org/10.3390/en12020317
AMA Style
MejÃa-Giraldo D, Velásquez-Gomez G, Muñoz-Galeano N, Cano-Quintero JB, Lemos-Cano S.
A BESS Sizing Strategy for Primary Frequency Regulation Support of Solar Photovoltaic Plants. Energies. 2019; 12(2):317.
https://doi.org/10.3390/en12020317
Chicago/Turabian Style
MejÃa-Giraldo, Diego, Gregorio Velásquez-Gomez, Nicolás Muñoz-Galeano, Juan Bernardo Cano-Quintero, and Santiago Lemos-Cano.
2019. "A BESS Sizing Strategy for Primary Frequency Regulation Support of Solar Photovoltaic Plants" Energies 12, no. 2: 317.
https://doi.org/10.3390/en12020317
APA Style
MejÃa-Giraldo, D., Velásquez-Gomez, G., Muñoz-Galeano, N., Cano-Quintero, J. B., & Lemos-Cano, S.
(2019). A BESS Sizing Strategy for Primary Frequency Regulation Support of Solar Photovoltaic Plants. Energies, 12(2), 317.
https://doi.org/10.3390/en12020317