Next Article in Journal
Prioritization of Contracting Methods for Water and Wastewater Projects Using the Fuzzy Analytic Hierarchy Process Method
Next Article in Special Issue
Comparison of AC Losses in the Winding of Electrical Machines with Fixed Strands Positions, Fixed Conductor Shapes and Random Winding
Previous Article in Journal
Long-Term Expansion Planning of the Transmission Network in India under Multi-Dimensional Uncertainty
Previous Article in Special Issue
Magnetic FEA Direct Optimization of High-Power Density, Halbach Array Permanent Magnet Electric Motors
 
 
Article

Article Versions Notes

Energies 2021, 14(22), 7816; https://doi.org/10.3390/en14227816
Action Date Notes Link
article pdf uploaded. 22 November 2021 13:09 CET Version of Record https://www.mdpi.com/1996-1073/14/22/7816/pdf-vor
article xml file uploaded 23 November 2021 04:18 CET Original file -
article xml uploaded. 23 November 2021 04:18 CET Update https://www.mdpi.com/1996-1073/14/22/7816/xml
article pdf uploaded. 23 November 2021 04:18 CET Updated version of record https://www.mdpi.com/1996-1073/14/22/7816/pdf
article html file updated 23 November 2021 04:20 CET Original file -
article html file updated 30 July 2022 18:02 CEST Update https://www.mdpi.com/1996-1073/14/22/7816/html
Back to TopTop