Liu, Y.; Zhu, J.; Liu, Q.; Yuan, A.; He, S.; Bai, Y.
Mechanism Analysis of Delayed Water Inrush from Karst Collapse Column during Roadway Excavation Based on Seepage Transition Theory: A Case Study in PanEr Coal Mine. Energies 2022, 15, 4987.
https://doi.org/10.3390/en15144987
AMA Style
Liu Y, Zhu J, Liu Q, Yuan A, He S, Bai Y.
Mechanism Analysis of Delayed Water Inrush from Karst Collapse Column during Roadway Excavation Based on Seepage Transition Theory: A Case Study in PanEr Coal Mine. Energies. 2022; 15(14):4987.
https://doi.org/10.3390/en15144987
Chicago/Turabian Style
Liu, Yu, Jingzhong Zhu, Qimeng Liu, Anying Yuan, Shifang He, and Yisheng Bai.
2022. "Mechanism Analysis of Delayed Water Inrush from Karst Collapse Column during Roadway Excavation Based on Seepage Transition Theory: A Case Study in PanEr Coal Mine" Energies 15, no. 14: 4987.
https://doi.org/10.3390/en15144987
APA Style
Liu, Y., Zhu, J., Liu, Q., Yuan, A., He, S., & Bai, Y.
(2022). Mechanism Analysis of Delayed Water Inrush from Karst Collapse Column during Roadway Excavation Based on Seepage Transition Theory: A Case Study in PanEr Coal Mine. Energies, 15(14), 4987.
https://doi.org/10.3390/en15144987