1. Introduction
The construction and operation of dams have led to significant changes in the downstream hydrological regimes of alluvial rivers, including the magnitude of floods and the decline in sediment load [
1,
2,
3,
4]. Correspondingly, these altered flow and sediment conditions have profound impacts on the river geomorphology [
5,
6,
7,
8,
9,
10]. However, due to the regional climate environment, the intricacy of the riverbed morphology, and the diverse reservoir operating modes, the geomorphic responses to damming are diverse. Riverbed adjustments include longitudinal erosion and down-cutting, cross-sectional widening or narrowing. Therefore, the fluvial processes in response to hydraulic engineering are complicated, and the dynamic adjustment downstream of the dam may last for several decades.
In general, the downstream reaches located close to a dam are more sensitive to changes in flow–sediment conditions, and the first to undergo responsive geomorphological evolution. For instance, within 20 km downstream of large dams in the Morvan massif, phenomena such as sediment deficiency, riverbed coarsening, and vegetation encroachment were observed in gravel-bed rivers [
11]. After the construction of the E.B. Campbell Dam on the Saskatchewan River, cross sections up to 81 km downstream experienced coarsening and enlargement [
12]. Downstream of the Livingston Dam in Texas, erosion has led to riverbed degradation, the steepening of channel banks, and reduced lateral migration rates in river bends [
13]. However, the factors influencing the riverbed evolution immediately downstream of these dams are multifaceted. For example, there is an incision of about 0.45 m below the Aswan Dam due to the diversion of water for irrigation [
14], and a flow capacity that is insufficient to transport the bed material, resulting in little incision downstream of the Eildon Reservoir [
15].
With the continuous scouring after damming, the channel may form an armor layer of coarse-grained sediments, limiting the distance and degree of channel incision [
16,
17,
18,
19,
20]. Thus, the riverbed may eventually stabilize at a quasi-equilibrium elevation [
21]. For the Colorado River below Glen Canyon Dam, Pemberton [
22] predicted that the bed incision would not stabilize until between 2023 and 2113, while Grams et al. [
23] explained that the alluvial river had transformed into a channel with a stable bed that is rarely mobilized, considering the increase in the bed material grain size. Since the Xiaolangdi Reservoir was put into use in 2000, the downstream riverbed has begun to experience erosion. However, a significant decrease in the erosion flux has been observed since 2005 due to the formation of an armor layer [
24]. Also, the exposure of an underlying gravel layer has affected the propagation of the erosion center along the Yichang to Chenglingji reach [
25]. The intense evolution of the riverbed downstream of dams can significantly impact flood control safety, navigation conditions, and the ecological environment [
26,
27,
28,
29]. This is mainly manifested in riverbank retreat, endangering the safety of levees, decreased low water levels, affecting navigation conditions, and bar dynamics, disturbing biological habitats. Thus, it is increasingly necessary to evaluate the stability of river channels after damming [
30,
31,
32,
33]. However, there is great diversity in the channel erosion below dams in relation to regional geographical conditions, and the years required to achieve a new hydro-morphological equilibrium are uncertain [
34].
The Yangtze River, regarded as the largest river in Asia, has experienced extensive periods of erosion and sedimentation. However, the flow and sediment regimes have undergone significant changes following the systematic construction and operation of reservoirs, resulting in responsive morphological evolutions downstream of the dams. Since the TGD was put into operation, there have been notable adjustments in spatial and temporal scales downstream. These adjustments are characterized by channel down-cutting along the thalweg, bank retreat, and sandbar deformation [
35,
36]. The coarsening of bed materials has restricted channel erosion, and it appears that a new equilibrium has been reached considering the weaker sensitivity of channel modifications to flow–sediment conditions in the gravel–sand reach immediately downstream of the TGD [
37]. Similarly, the construction of cascade dams in the Jinsha River, such as Xiangjiaba, Xiluodu, Wudongde, and Baihetan, has led to a total sediment erosion of 1202×10
4 m
3 downstream of the Xiangjiaba reservoir to Yibin from 2012 to 2020 [
38]. Nevertheless, the reach experienced sedimentation for the first time in 2020 [
39]. Currently, numerous studies have analyzed the fluvial geomorphological response to upstream damming. However, there seem to be some similarities and differences among the reaches near the dams under various natural conditions and human activities, including river boundary conditions, tributary inflow, and sand mining. Therefore, systematic investigations are necessary to further reveal the influencing factors and the hydro-morphological equilibrium states of the reaches immediately downstream of the dams for sustainable management considerations.
In this study, the Xiangjiaba to Zhutuo reach (XZR) and Yizhi reach (YZR), located immediately downstream of the Xiangjiaba reservoir (XJB) and the Three Gorges Dam (TGD), respectively, were selected as the study regions in order to investigate the similarities and dissimilarities of the channel adjustments. Both reaches exhibited intense scouring following the reservoir impoundments, with their riverbed adjustments being closely tied to river functions. For instance, the reduced water level during the dry season as a consequence of scouring impacts the water depth of the approach channel below the Gezhouba shiplock and the shoals within the YZR. Similarly, navigation conditions downstream of the XJB influence the operational modes of the power station. Regarding ecological impacts, the XZR is a national nature reserve for endemic fish species in the upper Yangtze River, while the YZR hosts a provincial nature reserve for the Chinese sturgeon. The riverbed adjustments and beach stability play a crucial role in the formation, evolution, and restoration of habitats. Furthermore, bridges and docks are situated along both reaches. The local scouring around existing structures is connected to the stability of these projects, and the lower water levels during the dry season can affect the safety of water intake. Consequently, it is essential to study the riverbed evolution and assess the equilibrium states of these two reaches. The study aimed to (1) calculate the reach-scale morphological changes and quantify the annual quantity of erosion–deposition after damming; (2) evaluate the time in which the reaches immediately downstream of the dams reach new equilibrium states; and (3) illustrate the reasons for different fluvial responses in downstream reaches from the perspectives of flow–sediment conditions, riverbed boundary conditions, and human activities. These analyses not only lay a foundation for scientifically evaluating the effects of hydropower development, but also offer a basis for formulating comprehensive river management strategies aimed at ensuring the sustainable development of the social economy and ecological environment in the downstream regions.
3. Results
3.1. Variations in Cross-Sectional Morphology
The cross-sectional morphology in XZR, immediately downstream of the XJB, predominantly exhibits “U” and “V” shapes. Influenced by the altered flow–sediment regimes, the complicated riverbed boundary conditions and human activities, significant sectional deformations are primarily observed in the main channel and bars. For example, the section J16 located near the Xiangjiaba hydrological station occupies a riverbed composed of gravel, sand and rock. The concrete revetment on the left bank and the concrete fortress on the right bank make both sides relatively stable, with a scouring depth of nearly 3 m occurring in the main channel since the impoundment of XJB (
Figure 2a). Additionally, the right bank of the section JY04 located 26.1 km downstream of the dam has been engineered to advance into the river, with a maximum elevation increase of 7.4 m (
Figure 2b). And the main channel has experienced degradation by a maximum of 6 m during the post-dam period. Furthermore, section CJ82, 102.4 km downstream of the dam, is selected as an example of the meandering river pattern. The riverbed deformation is characterized by the erosion of the convex bank, with a maximum erosion depth of 8m (
Figure 2c). In summary, intensive channel adjustments have occurred in the XZR following the construction of the dam. However, human activities primarily lead to sudden changes in the riverbank or fluvial channel morphology, and a significant reduction in sediment load has resulted in severe channel erosion, predominantly during the initial impoundment period.
In comparison, the cross sections in the YZR are mainly characterized by longitudinal scouring, with minimal transverse deformation due to the strong scour resistance of the riverbanks. For example, section Yi43 is located in the braided channel, with the right branch relatively stable and the left branch experiencing erosion (
Figure 3a). Section Yi47, located in the straight channel, experienced degradation in the initial years following the TGD impoundment (
Figure 3b). However, between 2014 and 2023, little erosion or deposition has occurred. Section Yi73, located in a curved channel, has mainly experienced the incision of the convex bank (
Figure 3c). It is evident that the adjustment of channel erosion predominantly occurred in the early stage of the TGD impoundment as well.
3.2. Longitudinal Variation in Reach-Scale Bankfull Channel Geometry
This study calculated the reach-scale channel dimensions to illustrate the temporal variations following dam construction. The results indicate a significant increase in the area and depth of the bankfull channel dimensions, with minimal changes in width for the two studied reaches located immediately downstream of the XJB and TGD.
As for the XZR located immediately downstream of the XJB, the depth increased from 17.18 m in 2012 to 17.74 m in 2023, while the area expanded from 11.97 × 10
3 m
2 to 12.35 × 10
3 m
2, with an increase of 3% (
Figure 4). During the early stage of XJB impoundment, the bankfull channel geometry, encompassing both depth and area, presented a significant increase during the first 6 years after damming, and remained relatively stable afterwards. However, there were some slight fluctuations between the years due to the flow and sediment dynamics during the relatively stable period. For example, compared with 2019, the bankfull area experienced a decrease of approximately 0.3% in 2020. Nonetheless, the reach-scale morphological parameters recovered during the following two years.
After the construction of the TGD, the YZR has undergone significant channel adjustment as well. Specifically, the bankfull area expanded from 17.80 × 10
3 m
2 in 2003 to 19.77 × 10
3 m
2 in 2023, representing an 11.1% increase. Additionally, the bankfull depth increased by 11.7%, while the width decreased by less than 1% (
Figure 5). During the first 13 years of the TGD impoundment, the reach-scale bankfull cross-sectional depth and area increased by about 11.3% and 12.0%, respectively. Considering the rapid coarsening of bed material, then the hydraulic geometry parameters of the bankfull channel changed little and have tended to stabilize. Even when encountering the basin flood in 2020, there was no significant increase in the bankfull area or depth.
Compared to the temporal variations in the reach-scale bankfull channel morphology of the two studied reaches, it is evident that in the initial stage of the dam impoundment, the bankfull channel depth and area showed significant increases, and the strong anti-scourability of the riverbanks has limited transverse deformation. It takes 6 to 13 years for the two gravel–sand riverbeds to reach new equilibria with the coarsening process of the bed material. However, there seem to be some fluctuations in the riverbed morphology of the XZR, while the reach-scale channel dimensions of the YZR are more stable after reaching a relative equilibrium states.
3.3. Amount of Erosion and Deposition After Damming
The progressive construction and joint operation of the cascade hydropower stations on the main stem of the Jinsha River, including Xiangjiaba, Xiluodu, Wudongde, and Baihetan, have exerted profound influences on both reservoir sedimentation and downstream erosion. After the impoundment of XJB in 2012, a total of 8718 × 10
4 m
3 sediment scouring (including the amount of sand excavation) has occurred in XZR (
Figure 6).
From a temporal perspective, erosion predominantly occurred in the initial stage of the Xiangjiaba Reservoir’s operation. The cumulative scouring amount from 2012 to 2016 was approximately 9979 × 104 m3, with an average annual erosion intensity of 8.8 × 104 m3/km for the river sections from Xiangjiaba to Yibin and 9.6 × 104 m3/km from Yibin to Zhutuo. Since 2017, with the implementation of regulations prohibiting sand excavation and the sharp decrease in washable sediment on the riverbed downstream of the dam, the erosion intensity of XZR has significantly decreased and the cumulative erosion amount has not shown a trend of growth. Notably, in certain years, significant sedimentation occurred immediately downstream of the dam. In 2020, 1751 × 104 m3 of sediment was deposited in the mainstem of XZR for the first time after damming. However, continued scouring was observed in the subsequent two years, with a cumulative scour of 904 × 104 m3, indicating a considerable amount of erosion compared with the deposition amount in 2020. Similarly, 1132 × 104 m3 of sediment was deposited again in 2023. Thus, the average annual deposition intensity of XZR was 0.69 × 104 m3/km from 2016 to 2023.
In summary, due to multiple factors, including the substantial decrease in sediment discharge and sand excavation, the XZR immediately downstream of the dam presented a state of erosion, with an average annual erosion intensity of about 9.5 × 104 m3/km from 2012 to 2016. However, there has been no further increase in the cumulative erosion since 2017. In certain years, the cumulative erosion amount actually decreased as a result of channel sedimentation, followed by periods of erosion that ultimately led to a state of relative equilibrium.
In comparison, the YZR located immediately downstream of the TGD has experienced a total sediment erosion of 1.664 × 10
8 m
3, with an average annual erosion of 0.079 × 10
8 m
3 per year from 2003 to 2023 (
Figure 7). During the initial impoundment of the TGD (2003 to 2006), the amount of scoured sediment from YZR was 0.814 × 10
8 m
3, accounting for 49% of the total erosion since impoundment, with an average annual erosion intensity of 34.5 × 10
4 m
3/km. Between 2007 to 2008, the cumulative scouring amount was 0.223 × 10
8 m
3, averaging an annual erosion intensity of 18.9×10
4 m
3/km. However, due to the 175 m experimental storage level of the TGD, the erosion intensity in the YZR has further weakened. From 2009 to 2023, the average annual erosion intensity of the YZR was 7.1 × 10
4 m
3/km per year.
It can be seen that, as the years that the TGD is in operation increase, the erosion intensity of the YZR immediately downstream of the dam gradually weaken. Since 2016, the cumulative amount of riverbed erosion has substantially approached a constant value, with little variation during the years.
In comparison, there are some similarities and dissimilarities in the morphodynamic impacts downstream of the XJB and the TGD. Initially, both the XZR and the YZR experienced a high erosion intensity in response to damming. Then, as the years of the dams’ impoundment have increased, the processes of bed material coarsening have weakened the post-scouring intensity, and the gravel–sand riverbeds require a response time of 6 to 13 years to reach new equilibrium. However, in certain years after reaching equilibrium, the XZR has undergone significant sedimentation, and a considerable amount of erosion occurred. In contrast, the YZR downstream of the TGD has remained in a relatively stable state, with little erosion or deposition occurring.
4. Discussion
Following the impoundment of large reservoirs, downstream riverbed adjustment is a complex, long-term process. Numerous factors influence the fluvial responses in the downstream reaches, primarily including flow–sediment dynamics, riverbed boundaries, and human activities.
4.1. Channel Adjustments Response to the Flow and Sediment Conditions
Downstream reaches generally experience erosion and deposition adjustments in response to the altered flow–sediment dynamics following dam construction, a phenomenon commonly observed in large rivers [
45,
46,
47,
48].
After the construction of the XJB in the lower reaches of Jinsha River, the average annual runoff at the Xiangjiaba Station was 1352 × 10
8 m
3, representing only a 7.5% reduction compared to the pre-dam period (
Figure 8). Considering the confluence of multiple tributaries, the average annual runoff at the Zhutuo station that reflected the outlet of the XZR was 2610 × 10
8 m
3. According to the water balance principle, the total annual runoff from the tributaries in this reach is estimated to be 1300 × 10
8 m
3, which is close to the runoff at the Xiangjiaba station. However, the sediment transport at the two stations has exhibited a prominent decrease compared to the annual runoff. This reduction is attributed to the sediment trapping in upstream cascade reservoirs. The average annual sediment load at the Xiangjiaba station and Zhutuo station dropped to 134 × 10
4 t and 4030 × 10
4 t after damming, respectively. In comparison, due to the effects of riverbed scouring and the input of sediment from tributaries along the river, the sediment load reduction at the Zhutuo Station was 83.2%, which is less pronounced than the 99.4% reduction observed at the Xiangjiaba Station. Consequently, the inflowing tributaries significantly contribute to the flow–sediment conditions of the XZR.
The proportion of annual runoff from the three major tributaries, named the Heng River, Min River and Tuo River, accounted for 40% after the operation of the XJB, with a small increase of 2% compared to the pre-dam period. However, the combined average annual sediment load of these tributaries is a staggering 25 times that of the Xiangjiaba station. Their contribution to the sediment transport at the Zhutuo station increased from 20% to 82% after damming. Generally, mountain rivers possess the capacity to carry high-intensity sediment yields during intense rainfalls and floods [
49,
50]. The observational data reveal that the inflow from tributaries supplies the sediment sources for substantial downstream deposition in certain years, such as 2020 and 2023. In August 2020, the primary sediment-producing areas within the Min and Tuo river basins experienced consecutive rainfalls that were notable for their concentration, intensity, and extensive coverage. The annual sediment transport of these two tributaries reached 6630 × 10
4 t and 2100 × 10
4 t, showing increases of 238% and 144%, respectively, compared to the post-dam annual averages (
Figure 9a,b). Other tributaries, such as the Chishui River, also experienced significant floods, transporting substantial amounts of sediment into the reaches downstream of the XJB [
39]. From April to October, the cross-sections with considerable deposition were located immediately downstream of the confluences of the Min, Changning, Yongning, and Tuo rivers (
Figure 9c).
Also, in 2023, the Chishui River was hit by a flood event on July 27, which had an average sediment concentration of 5.81 kg/m
3 and led to a daily sediment load of 114 × 10
4 t. The recorded peak discharge and sediment concentration reached 4380 m
3/s and 14.2 kg/m
3, respectively (
Figure 10a). On the same day, the Yongning River also encountered a large flood, with a maximum discharge of 727 m
3/s and a sediment concentration of 4.21 kg/m
3, leading to a daily sediment load of 3 × 10
4 t (
Figure 10b). The intense sediment production and transport during these floods in the Chishui and Yongning rivers served as substantial sources for sediment deposition downstream of the XJB (
Figure 10c). Channel adjustments during the flood season further indicated that the cross-sections from Yibin to Zhutuo are predominantly characterized by deposition, particularly in the wide valley sections downstream of the confluences of the Yongning and Chishui rivers.
In comparison, for the YZR immediately downstream of the TGD, the average annual runoff at the Yichang and Zhicheng stations was 4150 × 10
8 m
3 and 4250 × 10
8 m
3, respectively, after damming, with a relatively small reduction of less than 3% (
Figure 11a,b). It can be calculated that the tributary inflows between Yichang and Zhicheng contribute only about 2% to the annual runoff at the Zhicheng Station. However, the average annual sediment transport at the Yichang and Zhicheng stations was 3070 × 10
4 t and 3710 × 10
4 t after the TGD impoundment, showing a significant decrease of more than 90% compared with the pre-dam period. The sediment supply from Yichang to Zhicheng primarily originates from the riverbed scouring, considering the low sediment concentration in the tributary of the Qing River.
From the perspective of incoming flow and sediment dynamics, there are many tributaries in the XZR and the majority of them experience intense erosion due to gravitational and hydrological forces. During flood events, these tributaries transport substantial and concentrated sediment loads, which subsequently become the predominant sources of sediment deposition in the downstream reaches following dam construction. In contrast, the tributary inflows of the Qing River, characterized by a low sediment concentration, have little impact on the riverbed evolution of the YZR downstream of the TGD.
4.2. Effects of Riverbed Boundary Conditions on Channel Adjustments
Riverbed boundary conditions also play a crucial role in influencing channel erosion and deposition adjustments. The XZR and YZR, situated immediately downstream of the dam, have both undergone significant erosion due to changes in flow duration and sediment deficiency. However, the high resistance provided by hills, levees, and bank protection works has constrained the lateral deformation of the riverbed. As a result, the adjustments in erosion and deposition have primarily manifested as vertical incision, with varying degrees of thalweg cutting down along the reach. The changes in the longitudinal thalweg indicate that certain cross-sections have remained relatively stable, with little erosion. These cross-sections effectively control the channel boundaries in both the XZR and YZR downstream of the dams (
Figure 12).
The riverbed downstream of the dam has also undergone a significant coarsening process due to the deficiency in sediment transport. Fifteen bed material samples immediately downstream of the XJB indicated that the median diameters (D
50) of the particles in three cross-sections were less than 1 mm during the initial impoundment in 2013. However, by the end of the post-flood period in 2023, the smallest D
50 among the 15 measured cross-sections had increased to 39.3 mm, indicating a transition from a sand–gravel riverbed to a predominantly gravel bed. For example, at the JY01 cross section, located 31.9 km downstream of the dam, the proportion of riverbed particles smaller than 1 mm decreased from 98.7% to 72.4% over the five years following damming (
Figure 13a). However, no particles smaller than 32 mm were detected on the riverbed of the mentioned cross-section in 2023, and the D
50 had increased to 110 mm (
Figure 13b). This demonstrates that the degree of bed material coarsening downstream of the XJB is substantial, with a notable reduction in washable sediment on the riverbed.
Similarly, the reaches immediately downstream of the TGD have also undergone bed material coarsening after damming [
37]. For example, the median diameters (D
50) of the particles at three representative cross-sections (Chang13, Yi55, and Yi63) ranged between 28.1 × 10
−3 and 31.1 × 10
−3 m in 2007. However, the D
50 values had more than doubled by 2021, ranging between 59.4 × 10
−3 and 65.5 × 10
−3 m (
Figure 14). At the cross-section Chang13, the maximum sampled grain size was 44.5 mm and the proportion of sediment with particles smaller than 32 mm was 54.7% in 2007. By 2022, sediments with grain sizes between 64 mm and 128 mm had become dominant, accounting for 90.8% of the riverbed composition. Additionally, the coarsening of the bed material has inhibited further erosion, with the sediment replenishment from the riverbed progressively going downstream. The average annual erosion of sediment with particles larger than 0.125 mm from Yichang to Shashi was 2125 × 10
4 t in 2003–2008, fairly evenly distributed between the reaches of Yichang to Zhicheng and Zhicheng to Shashi. However, the average annual sediment replenishment (d > 0.125 mm) decreased to 672 × 10
4 t in 2009–2023, with a distribution ratio of 1:9 between the two reaches.
Thus, the process of bed material coarsening, which leads to the formation of an armor layer, is also a critical factor in weakening riverbed erosion. The XZR and YZR immediately downstream of the dams have already reached a state of equilibrium, with little potential for further erosion.
4.3. Impact of Human Activities
Human activities, including river sand extraction, waterway management, and other various engineering constructions, can dramatically reshape the cross-sectional morphology of rivers within a brief timeframe. The calculated amounts of erosion and deposition capture not only the natural riverbed adjustments but also the consequences of human interventions, such as the scale of sand mining activities.
The observational data and field surveys reveal that the channel adjustments downstream of the XJB are the result of interplay between altered flow–sediment dynamics and human activities. At the representative cross-section JY13, situated 8.2 km downstream of the dam, the floodplain elevation has decreased by up to 5.6 m due to sand extraction, while the deep trench has seen a maximum deposition of 4.3 m from abandoned mining backfill between 2008 and 2013. Following the reservoir’s operation, sand mining from the floodplain on the right side resulted in a maximum incision of 8 m from 2013 to 2023 (
Figure 15). It can be seen that the riverbed has undergone pit-like deformations as a consequence of localized sand mining, which in turn affects the calculation of sediment scour and deposition amounts. Since 2016, Sichuan Province has intensified its management of illegal sand mining, leading to a marked decline in these activities. Moreover, slight deposition has been observed in some sand mining pits, and the calculated erosion amounts have decreased significantly compared to the initial years of the reservoir’s operation.
In comparison, while there are no designated sand mining areas in the YZR downstream of the TGD, illegal mining persists. According to incomplete survey statistics, the amount of sand extracted from prohibited mining zones in the YZR ranges from 2070 × 10
4 t to 3830 × 10
4 t [
51]. Since 2017, sand mining activities have drastically decreased as a result of the strengthening of management measures. Consequently, the impact of sand mining on riverbed deformation has been considerably reduced. Additionally, a series of waterway improvement works dominated by beach protection have been implemented in the YZR to improve navigation conditions. Between 2013 and 2017, a navigational channel improvement project was undertaken in the stretches from Yichang to Changmenxi, effectively protecting the sandbars and increasing the roughness of the riverbed. Measurements indicated slight depositions in the bars from 2016 to 2021, such as the expansion of the 35m contour area from 0.064 km
2 to 0.12 km
2 at Nanyangzhi sandbar. Currently, there is little washable sediment on the riverbed of the YZR, and the implementations of waterway regulation works do not alter the integral erosion–deposition characteristics of the river section.
4.4. Analysis of the Relative Importance of the Influencing Factors
During the different phases of riverbed adjustment, there is a notable variation in the relative importance of influencing factors. In the initial stages of reservoir operation, the riverbed undergoes substantial scouring due to a significant reduction in upstream sediment load. The reduced sediment concentration in the discharge flow increases the probability of movement for fine-grained sediments within the riverbed, while significant scouring and sediment replenishment take place along the channel. Coarse suspended sediments in the waterbody exchange with the bed materials. The incoming flow–sediment dynamics, in conjunction with the riverbed boundary conditions, collectively determine the extent of sediment recovery and the severity of scouring. Moreover, human activities, such as frequent sand mining in the river channel during this period, exacerbate the coarsening of the riverbed. However, as the bed material coarsens, the riverbed’s capacity to replenish sediment decreases.
Once a relative equilibrium state is reached, the intensity of scouring in both reaches is primarily constrained by riverbed boundary conditions. Insufficient sediment supply and the formation of an armor layer have weakened riverbed erosion. In contrast to the YZR, the tributary inflows downstream of the XJB provide a source of sediment deposition. Additionally, variations in flow dynamics at widening and narrowing sections result in sediment deposition in the wider areas downstream of the confluences. During this period, the impact of human activities on riverbed adjustment is comparatively minor.
5. Conclusions
The operation and impoundment of large reservoirs have substantially altered flow–sediment regimes, with the reaches immediately downstream of dams being the first to undergo channel adjustment in response. Gravel–sand bed reaches, including Xiangjiaba to Zhutuo (XZR) and Yichang to Zhicheng (YZR), which are situated immediately downstream of the XJB and TGD, predominantly exhibit vertical scouring considering the strong scour resistance of riverbanks. However, severe erosion was primarily observed during the initial years of reservoir operation, followed by a significant weakening of the erosion intensity, with a prominent reduction in washable sediment on the riverbed. It typically takes 6 to 13 years for these two study reaches to approach a state of relative equilibrium, without evidence of significant channel erosion or obvious variations in reach-scale channel geometry.
However, different phenomena emerge after the relative equilibrium state is reached. Reaches with tributaries carrying a large amount of sediment may experience siltation in some years, followed by a considerable magnitude of erosion. Otherwise, these reaches remain in a relatively stable state, with little erosion or deposition. Located in a mountainous area, there are many tributaries with a large amount of sediment transport during floods in the XZR. Sediment from these tributary inflows predominantly deposits in the wide valley sections downstream of the confluences, which is a key factor driving the alternating dynamics of erosion and deposition. In contrast, the sediment transport from the Qing River is negligible, having little impact on the riverbed evolution of the YZR downstream of the TGD.