Next Article in Journal
Research on Fine Scheduling and Assembly Planning of Modular Integrated Building: A Case Study of the Baguang International Hotel Project
Next Article in Special Issue
Application of BRB to Seismic Mitigation of Steel Truss Arch Bridge Subjected to Near-Fault Ground Motions
Previous Article in Journal
Review on the Developments of Structure, Construction Automation, and Monitoring of Intelligent Construction
Previous Article in Special Issue
Selection of Ground Motion Intensity Measures in Fragility Analysis of a Mega-Scale Steel Frame Structure at Separate Limit States: A Case Study
 
 
Article

Article Versions Notes

Buildings 2022, 12(11), 1891; https://doi.org/10.3390/buildings12111891
Action Date Notes Link
article pdf uploaded. 4 November 2022 15:53 CET Version of Record https://www.mdpi.com/2075-5309/12/11/1891/pdf-vor
article xml file uploaded 14 November 2022 09:17 CET Original file -
article xml uploaded. 14 November 2022 09:17 CET Update https://www.mdpi.com/2075-5309/12/11/1891/xml
article pdf uploaded. 14 November 2022 09:17 CET Updated version of record https://www.mdpi.com/2075-5309/12/11/1891/pdf
article html file updated 14 November 2022 09:18 CET Original file -
article html file updated 28 February 2023 21:35 CET Update https://www.mdpi.com/2075-5309/12/11/1891/html
Back to TopTop