Next Article in Journal
Preparation Method and Benefit Analysis for Unburned Brick Using Construction Solid Waste from Residue Soil
Previous Article in Journal
Management Model Using Standardized Contracts and BIM Tools for the Optimization of PPP Projects in Peru
 
 
Article

Article Versions Notes

Buildings 2024, 14(10), 3212; https://doi.org/10.3390/buildings14103212
Action Date Notes Link
article pdf uploaded. 9 October 2024 17:47 CEST Version of Record https://www.mdpi.com/2075-5309/14/10/3212/pdf
Back to TopTop