Next Article in Journal
Extending BIM Interoperability for Real-Time Concrete Formwork Process Monitoring
Next Article in Special Issue
Data Driven Water Surface Elevation Forecasting Model with Hybrid Activation Function—A Case Study for Hangang River, South Korea
Previous Article in Journal
GIS and BIM as Integrated Digital Environments for Modeling and Monitoring of Historic Buildings
Previous Article in Special Issue
Forecasting the Project Duration Average and Standard Deviation from Deterministic Schedule Information
 
 
Technical Note

Article Versions Notes

Appl. Sci. 2020, 10(3), 1084; https://doi.org/10.3390/app10031084
Action Date Notes Link
article xml file uploaded 6 February 2020 11:49 CET Original file -
article xml uploaded. 6 February 2020 11:49 CET Update https://www.mdpi.com/2076-3417/10/3/1084/xml
article pdf uploaded. 6 February 2020 11:49 CET Version of Record https://www.mdpi.com/2076-3417/10/3/1084/pdf
article html file updated 6 February 2020 11:51 CET Original file -
article html file updated 15 February 2020 08:14 CET Update -
article html file updated 20 February 2020 14:47 CET Update -
article html file updated 20 July 2022 19:24 CEST Update https://www.mdpi.com/2076-3417/10/3/1084/html
Back to TopTop