Next Article in Journal
The Estimation of Centrifugal Pump Flow Rate Based on the Power–Speed Curve Interpolation Method
Next Article in Special Issue
A Study on the Application of Recycled Concrete Powder in an Alkali-Activated Cementitious System
Previous Article in Journal
Assessment and Removal of Heavy Metals and Other Ions from the Industrial Wastewater of Faisalabad, Pakistan
Previous Article in Special Issue
Calcined Coal Gangue Fines as the Substitute for Slag in the Production of Alkali-Activated Cements and Its Mechanism
 
 
Article

Article Versions Notes

Processes 2022, 10(11), 2166; https://doi.org/10.3390/pr10112166
Action Date Notes Link
article xml file uploaded 22 October 2022 11:40 CEST Original file -
article xml uploaded. 22 October 2022 11:40 CEST Update https://www.mdpi.com/2227-9717/10/11/2166/xml
article pdf uploaded. 22 October 2022 11:40 CEST Version of Record https://www.mdpi.com/2227-9717/10/11/2166/pdf
article html file updated 22 October 2022 11:42 CEST Original file -
article html file updated 28 February 2023 19:28 CET Update -
article html file updated 1 March 2023 23:48 CET Update https://www.mdpi.com/2227-9717/10/11/2166/html
Back to TopTop