Next Article in Journal
Spectral Salt-and-Pepper Patch Masking for Self-Supervised Speech Representation Learning
Previous Article in Journal
Understanding In-Line Connections Behavior from Experimental and Numerical Analyses on Rectangular and Circular Hollow Section Elements
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing

1
Department of Mathematics, Sheoraphuli Surendranath Vidyaniketan for Girls’ High School, Hooghly 712223, West Bengal, India
2
Department of Industrial & Data Engineering, Hongik University, Wausan-ro 94, Mapo-gu, Seoul 04066, Republic of Korea
3
Department of Mathematics & Statistics, Banasthali Vidyapith, Banasthali 304022, Rajasthan, India
4
Department of Industrial Engineering, Yonsei University, 50 Yonsei-ro, Sinchon-dong, Seodaemun-gu, Seoul 03722, Republic of Korea
5
Center for Transdisciplinary Research (CFTR), Saveetha Dental College, Saveetha Institute of Medical and Technical Sciences, Saveetha University, Chennai 600077, Tamil Nadu, India
*
Author to whom correspondence should be addressed.
Mathematics 2023, 11(15), 3417; https://doi.org/10.3390/math11153417
Submission received: 29 May 2023 / Revised: 18 June 2023 / Accepted: 26 June 2023 / Published: 5 August 2023
(This article belongs to the Section Financial Mathematics)

Abstract

:
Several industries are facing many challenges in their production systems due to increasing customer demand. Customer demand is growing for products with innovative features that are flexible, good quality, and appealing. This paper presents a flexible production-inventory system that produces multiple parts of a product. Defective products may be produced during the production process. Those defective products are remanufactured immediately after inspection. Limited budget and space constraints are considered, along with product assembly. Based on different distribution functions, non-linear equations are calculated using the Kuhn–Tucker optimization technique. Numerical examples, a graphical representation, and sensitivity analysis are presented in this paper. The solution procedure evaluates the minimization of the total investment based on the χ 2 distribution. This study examines electronic products those are more likely to be defective rather than perfect during production.

1. Introduction

Initially, commercial entities are obliged to decrease costs and enhance their standards to ensure viability. In order to maintain their competitive position, they need to engage in such actions. Industries endeavor to decrease expenses while enhancing quality by directing their attention toward manufacturing activity (Taleizadeh et al. [1]). Hybrid remanufacturing is investigated for defective items to reduce only carbon emission costs. Taleizadeh et al. [1] enhanced quality improvement for a single-stage production. Several papers pertaining to production systems and supply chains are analyzed based on environmental issues. Collaboration between small and medium-sized industries was developed as a strategy for better feedback in the production and supply chain, and this approach was extended by the paper of Machado et al. [2]. They ignored possible extensions of assembly products. Mishra et al. [3] allowed backorders within the production-inventory model and ignored remanufacturing of defective products. They focused on controlling defective products. However, industries are always concerned for fulfilling customers’ requirements by maintaining the delivery of products to customers without disputes. Flexible production systems aim to improve the production process and offer flexibility in machine production. Flexibility refers to the extent to which a system can be changed to create the assembled product. This research aims to assist industries in progressing their businesses using the proposed strategy. Defective products are created during production, which is a major difficulty for industries. Remanufacturing defective products can be a solution to this. Hence, the proposed model reduces the waste represented by defective items by reworking the assembled product through flexible production.
The literature has the following research gaps:
  • In the existing literature, several authors have focused on the issues of traditional production policies, where single products/multiple products are manufactured. Still, no strategies have been discussed to improve the economy of production systems. Almost every industry focuses on enhancing the manufacturing systems for innovative products, but the production economics must also be kept in mind.
  • Previous models have focused on the effect of the total inventory cost when the defective rate is random for single-product manufacturing under single-stage production. Increasing customer expectations and producing assembled products through assembly processes are essential in competitive business markets. A research gap exists in considering that a single-product, manufactured under a traditional business plan, can increase the number of defective products returned by customers, which may decrease the sales and profit of the production system. Thus, the production economy may be hampered.
  • Every industry may be concerned about making innovative, assembled products through flexible production systems to improve their business and economic conditions. The proposed model encompasses product assembly, finished item inspection, remanufacturing, backorders, and reworking at multiple stages to prevent any efficiently loss and improves the economic status of the production system.

1.1. Research Contribution

The research gaps filled herein are as follows:
  • To fill the above-discussed research gap, the proposed model considers a flexible production system. Increasing production flexibility is a vital strategy for efficiently improving market responsibility under future demand uncertainty without any shortages. Production flexibility can allow the simultaneous building of different types of products in the same production facility. This model is designed for the assembly of products from multiple parts to fulfill customers’ distinct requirements. Customers’ expectations are always related to a variation of the product (this paper considers a specific electronic product) according to their own preferences. Only a product assembly technique based on a flexible production system can fulfill this requirement and increase the system profit.
  • To avoid a defective final product, an inspection strategy is applied in the proposed model. This strategy ensures great monetary benefits for the production system. The model reduces backorders from end-users after the sale of a product. The inspection strategy for defective assembled products is conducted after production but before selling to the end-user, and defective products are sent to be remanufactured. The remanufacturing policy can recover defective products before sale and reduce the number of backorders from end-users. This research gap related to flexible production system is not studied earlier in literature. The production-inventory model analyzes numerical studies based on five separate probability distributions (uniform, triangular, double-triangular, beta, and χ 2 distribution), and finds the minimum cost with χ 2 distribution. This strategy can improve economical benefit of the system.
  • Meeting end-users’ demands and increasing sales are highly important for the economic growth of a production system. By applying flexible production, an industry’s ability of quickly respond to end-users will increase. Assembly production for a single type of within a flexible production system is the contribution of this study.
  • Unwanted increases in cost for maintaining production systems are a problem in almost every product (electronic products) as it indicates that works-in-process inventory are under control. This is because the production of any product can be predicted, although the product-supplying process depends on market demand. This study considers an inspection policy for products assembly through a just-in-time production policy. In this policy, all defective products are sent for remanufacturing, but not before selling the finished products to the end-users, which is more fruitful than the traditional approach of inspection. This can prevent unnecessary costs and aid in an increase in sales and overall profit. This method provides benefits to industries by reducing the costs of holding space, because defective items are sent to be remanufactured and then make them ready for sell. Thus, less waste is produced in the form of defective products under flexible production and cost-effective production. The remanufacturing of defective products under flexible production can be controlled to increase the quality of the final assembled products. Further, increasing the production flexibility will prevent shortages, arising under smart production. Another major financial benefit for industries is the reduction in returned products, achieved by remanufacturing products; otherwise, industries can be forced to invest substantial maintenance costs for huge numbers of products returned by end-users.

1.2. Organization of the Paper

The paper is organized according to the following sections: Section 2 reviews the literature. The problem definition, notation, and basic assumptions of this study are presented in Section 3. Section 4 describes the mathematical model for the five distribution functions. The methodology for obtaining the solution is discussed in Section 5. A few numerical examples are discussed in Section 6, and the sensitivity analysis of the numerical examples is presented in Section 7. The managerial insights are provided in Section 8. Finally, the concluding remarks of this study are summarized in Section 9.

2. Literature Review

2.1. Production-Inventory System under Flexible Production

C á rdenas-Barr ó n [4] and Sarkar et al. [5] developed an imperfect production system with fixed setup costs and manual inspections to identify defective product, which led to larger total system costs and could deliver defective items to the market due to inspection errors. The closed-loop supply chain are accounted for the product return rate for remanufacturing, which was focused on the competition and coordination of manufacturers. Similarly, Aydin et al. [6] considered new and remanufactured products. Hariga et al. [7] minimized the total supply chain cost by optimizing newly manufactured and remanufactured batches. Consecutive remanufacturing batches were produced by following M manufacturing batches. Heydari et al. [7] proposed the remanufacturing capacity as a variable, and the uncertainty of remanufacturing was associated with a few unprocessed inspected items. Qingdi et al. [8] analyzed a time-dependent decision making system in manufacturing. Furthermore, predecisional remanufacturing through the timing-matching method was explained in that model.
Taleizadeh et al. [1] investigated the remanufacturing technique using two channels: A and B. The remanufacturing processes were introduced to reduce carbon emissions. Sivashankari and Panayappan [9] proposed a production-inventory model for a single item that considered reworking. They considered shortages for their model. However, the concept of an assembled item, where each part of the item is manufactured and remanufactured in the same generation cycle with a flexible production rate and different distributed defect rates, was neglected by Sivashankari and Panayappan [9], which increased the system cost tremendously. Similarly, Sanjai and Periyasamy [10] proposed a production-inventory system with imperfect generation under different delivery policies. They neglected the concepts of variable production rates and assembled products. Machado et al. [2] proposed a production system considering environmental issues based on the collaboration of small and medium-sized companies. In their paper, Gao et al. [11] developed a green supply chain policy to uphold environmental regulations. The impact of the eco-label system was extended in this paper, as the production of some products was not always effective. Sarkar et al. [12] proposed the concepts of a variable lead time and variance under a smart supply chain system. This paper quantified the benefits but was not interested in improving the quality of products for the industry. Lagoudakis [13] dealt with cross-price elasticity-dependent demand. Mukherjee et al. [14] discussed carbon controlling policy for a fashion industry without consideration of backorder and lost sale. In a similar direction, Yang et al. [15] developed a smart manufacturing system under digital technologies for small, medium, and micro enterprises.
Bazan et al. [16] proposed an inventory model considering manufacturing and remanufacturing. They developed their study in the context of carbon policies. However, they considered a single product type and a constant production rate for their study. Bhatia and Elsayed [17] designed a smart manufacturing network using a robust, flexible programming approach. They used a fuzzy TOPSIS method for multi-criteria decision making problem. The effect of government subsidies on a remanufacturing model was studied by Chai et al. [18]. They considered the environmental effect for their study. However, the impact of flexible production was not considered in their study. Similarly, a manufacturing–remanufacturing production inventory model considering quality constraints was developed by Assid et al. [19]. They developed integrated control policies for the returns and replenishment of the inventory. Sarkar and Park [20] proposed a flexible production system with the consideration of lead time reduction. They considered a multi-stage complex production system but avoided budget and space constraints for an assembled product. Zheng et al. [21] introduced smart technologies to solve unreliability issues in a supply chain using a robust distribution approach. To optimize the total cost, they used two metaheuristic optimization techniques, genetic algorithms (GAs) and particle swarm optimization (PSO). However, they did not consider the uncertainty of the environment. Saxena and Sarkar [22] focused on randomly misplaced products and constructed an production model with two-stage production for remanufacturing products and overcame this issue. Taleizadeh et al. [23] developed a production inventory model by considering reworking. This paper proposed subsidy and advertisement policies. The authors showed that the demand depends on the product’s selling price and green level. The model succeeded in maximizing the social impact and minimizing the environmental impact. Kanishka and Acherjee [24] reviewed 448 manuscripts based on additive manufacturing and remanufacturing. Kanishka and Acherjee’s [24] study presented a flexible imperfect production-inventory system for assembled products. But, imperfect items remanufacturing within the same production cycle subject to budget and space constraints have not been studied in the literature previously. Thus, a pioneering attempt is made to fill this research gap in this study.
On the other hand, Dey et al. [25] and Amrouche et al. [26] developed dual-channel retailing systems for imperfect products. Some investments were incorporated into the model to decrease the lead time and improve the service quality. Different services were provided for the clients through the product’s life cycle to maintain the company’s brand image. However, the remanufacturing of the defective products was not considered there. Zhu et al. [27] developed a supply chain model under different carbon reduction policies. Saxena and Sarkar [28] visualized a replenishment and production coordination policy via mathematical modelling. They compared the traditional supply chain with misplacement and a blockchain-based supply chain with radio frequency identification. The study proved that RFID technology is highly profitable for the supply chain management. Since it is challenging for industries to meet the increasing demand, remanufacturing defective products can be significantly beneficial. They controlled the deterioration of products by considering preservation techniques, but no remanufacturing concepts for a sustainable production system were explored.
Several production inventory models have been developed by considering the remanufacturing of defective items. However, the existing literature has not yet considered a production-inventory model for single-stage assembled items under a variable production rate. In this study, a production-inventory system is considered for a single-stage assembled item whose different parts are manufactured and remanufactured within the same generation cycle. Defective items are generated randomly due to the imperfection of the system.

2.2. Remanufacturing of Defective Assembled Items

C á rdenas-Barr ó n [4] developed a model with a cleaner production approach. Wee et al. [29] extended C á rdenas-Barr ó n’s [4] model with an alternative solution approach. Polotski et al. [30] evaluated the manufacturing model for raw materials and the remanufacturing model for returned products. The hypothesis of their model was developed based on a hybrid production process. M-Haidar and Nasr [31] discussed the reworking and screening processes at the end of production. Silva et al. [32] focused on the delivery performance of the TKS, GKS, and POLCA production systems and achieved short delivery times as well as on-time delivery. A make-to-stock strategy was adopted in the TKS system, directly related to the make-to-order policy. Kugele and Sarkar [33] extended Sarkar et al.’s [5] model by considering multi-item and multi-stage production processes. However, they considered a fixed production rate for their study. Mridha et al. [34] discussed the defective rate for a multi-item production model. The model proposed by Chen [35] implied that defective items affected supply chain performance. Thus, the impact of pricing, replenishment, and rework decisions were explained. Mtibaa and Erray [36] considered two types of non-defective products: first-rate products, which are high-quality items, and second-rate products, which are products of substandard quality. Reworking was provided for second-rate and non-conforming products, which improved the product quality, making it possible to sell the products at the best price. A simulation study of this model indicated that the performance of the POLCA system was inferior to that of the GKS system. Hage [37] proposed a dual-network model and explained the vocal flexibility that was observed. Chiu et al. [38] explored a multi-item stock by incorporating reworking along with a multiple-shipment plan. Li et al. [39] developed a dynamic intelligent manufacturing–remanufacturing system. After this, Polotski et al. [30] employed hybrid systems for manufacturing and remanufacturing while extending the feasibility conditions of deteriorating products. Their model yielded an optimal policy for maintenance and a joint production process. Asadi et al. [40] investigated the implications of realizing mix flexibility in an assembly system for the manufacturing of products. Their major finding was the low level of product modularity in mixed-product assembly lines (MPALs). Malik et al. [41] developed a multi-stage production system for defective items. The reworking process was designed according to a random defective rate in production, thereby reducing the waste generated by imperfect items. The purpose of their study was to retain the requisite standard quality and to reduce production costs.
Centobelli et al. [42] developed a model to explore the capabilities of green economic incentives and circular economy in maximizing the profitability of a production system. By remanufacturing, waste can be minimized along with costs. This paper applied confirmatory factor analysis (CFA) and structural equation modeling (SEM) to test the model. The findings showed the model’s positive effect on the supply chain’s economy. By considering remanufacturing and partial outsourcing, a smart manufacturing model was constructed by Li et al. [43]. Cifone et al. [44] developed a qualitative study based on a focus group design to explore how manufacturing and supply chain management professionals perceived the potential of digital technologies for increasing trade. The results showed that digital technologies could effectively improve the economy of production. Aslam et al. [45] examined the buyer–supplier relationship under a psychological contract breach. The inter-organizational and interpersonal impacts were examined in this paper to raise profits and enhance the economy of the production system. The findings of that study showed that the initial interpersonal and inter-organizational relationships influenced the buyer’s response. That was one of the most important factors for improving the economic conditions of a production system or supply chain. Chaudhari et al. [46] discussed the effect of carbon ejection in a smart production system.
Since the circumstances of production are uncertain, authors such as Sarkar and Guchhait [47] have discussed the effect of asymmetric information sharing under a random demand process. Zhang et al. [48] developed a dual channel with the blockchain within a supply chain. Profits were optimized for various cases by an analytic investigation of different parameters. Promotional efforts and cost efficiency were discussed in the model. Shortages and backorders may occur in a supply chain due to defective products. Therefore, Bachar et al. [49] developed a model for reworking and outsourcing defective products to prevent backlogging. They showed that a random percentage of the defective products were reworkable and could be remanufactured to increase the efficiency of the production system. Various decision-making strategies were applied to increase the model’s profitability, and classical optimization techniques achieved the optimal solutions.
Several manufacturing models have been developed by considering remanufacturing. Some have been developed by considering manufacturing and remanufacturing in the same production cycle. However, existing studies did not consider any single-stage production-inventory system for a single assembled item with a flexible production rate. Therefore, a pioneering attempt is made in this study to fill these gaps.

2.3. Minimum Backorders

The model proposed by Huang and Wu [50] considered the impact of backordering and batch demand on wholesalers. The paper minimized the total cost by deciding ordering and backordering quantities. Mittal et al. [51] presented an unreliable supply chain model, which indicated that inflation may influence the ordering policy. Xu et al. [52] proposed a stock inventory system with partial backlogging wherein the stochastic demand was utilized. In a similar direction, a cross-dock inventory system was proposed by Mukherjee et al. [53]. Bao et al. [54] studied an inventory model for single items with multiple demands and backorders. The corresponding demand classes were divided based on their unit backlogging costs. Kilic and Tunc [55] addressed the economic lot-sizing problem, and the total expected cost was optimized using the fixed production cost, holding cost, and backordering cost. Guo et al. [56] discussed a process for replenishing spare components by allowing dependent backorders. The isolated system of the model comprised backorders of distinct types of components. The dependent backorder Markov model was used for repairable isolated systems.
Bertazzi et al. [57] used a vendor-managed inventory (VMI) approach to design a periodic shipping policy that minimized the sum of transportation costs and inventory costs for a significant improvement in economy. Air freight shipments led to significant cost savings, both in the worst case and on average. Optimality was achieved using mixed-integer linear programming. Bi et al. [58] investigated the trade credit strategy and ordering policy for retailers. This paper aimed to find the optimal retailer decisions for the credit period, order quantity, and replenishment cycle to maximize the retailer’s profit. Charpin et al. [59] identified the facilitators and barriers of mobile procurement platforms. The findings exhibited a decrease in cost and an increase in supply chain collaboration.
Bouzekri et al. [60] introduced a decision support system (DSS) for planning actions to achieve maximum economic benefits from the supply chain. They designed a new storage model to obtain optimal solutions for production and port models. Buisman and Rohmer [61] studied inventory decisions for stochastic problems in a production system for ameliorating products. The outcomes showed the influence of profit margins on the optimal strategy and the economic growth of the producer.
Ashraf et al. [62] developed a study based on third-party logistics and explored how production systems could effectively achieve the maximum benefits for their economy. The outcomes ensured a significant improvement in production economy. A crisp model was developed and extended to a fuzzy model to incorporate the imprecise nature of demand, which significantly minimized backorders. The optimal solution for the model was obtained using three newly developed algorithms. Zhou et al. [63] proposed game-theoretic policies and different business strategies based on the production rate, variable demand, and revenue-sharing contracts. Two models were developed based on coordination, non-coordination, and revenue-sharing contracts, each with three sub-cases. The models showed demand dependency on the green degree, average selling price, and product quality in a contemporary socio-economic situation. Balter et al. [64] investigated the implications of a finite lifetime for optimal firm investments considering investment decisions dependent on the timing and size of investments. Moreover, they considered strategic implications by implementing the finite product-life assumption in a duopoly framework. Astvansh and Jindal [65] proposed suitable policies for trade-credit financing. A multiple-shipment policy was utilized to deliver inventory and minimize backorders. Recently, Shajalal et al. [66] developed an algorithm through a deep neural network to predict backorders of a product for imbalanced data.
Several studies have focused on minimizing backorders. However, linear and average backorders in an imperfect production inventory model for assembled products with flexible production rates have rarely been addressed in the literature. Therefore, a pioneering attempt is made in this study to express the effect of backorders in a production-inventory model under a flexible production system. Please refer to Table 1 for the contributions of previous studies.

3. Problem Definition, Notation, and Assumptions

The problem definition, notation, and assumptions of the model are discussed in this section.

3.1. Problem Definition

This study analyzes a single assembled product that is produced using different parts with a flexible production process. An imperfect manufacturing system often features variability in the production processes, equipment breakdowns, and quality issues. The proposed system allocates resources effectively to address these imperfections by implementing a variable production rate. Defective items are reworked in the same production cycle. To manage waste and provide a cost-effective production inventory model, the remanufacturing of the defective items is performed in the same production cycle. Imperfect items are generated randomly, following certain distribution patterns. The process starts with backorders and produces perfect and imperfect items simultaneously. Imperfect items are identified through human inspection and remanufactured within time T 3 . Due to the imperfection of production systems, shortages arise which are fully backlogged. In an imperfect manufacturing system, backorders can have several effects. A backorder occurs when a customer orders a product that is temporarily out of stock or not immediately available for delivery. Backorders in an imperfect manufacturing system can disrupt the customer experience, reduce sales, increase costs, and highlight underlying operational issues. Backorders can complicate inventory management. Manufacturers must balance the costs associated with carrying extra inventories to avoid backorders with the costs of lost sales of dissatisfied customers. Addressing the root causes of backorders and implementing strategies to minimize their occurrence are crucial for improving customer satisfaction and the overall efficiency of the manufacturing system. This study considers two backordering costs: the linear backordering cost and average backordering cost.
Budget and space constraints are common challenges when designing and implementing a production system. When working with a limited budget, focusing on cost-effective solutions is important. This may involve evaluating different equipment options, considering used or refurbished machinery, or exploring leasing or other financing arrangements. In this study, remanufacturing helped to minimize the wasting of material. One should optimize the production system layout to make the best use of the available space; consider factors such as workflow, material flow, and accessibility; and use techniques such as lean manufacturing principles to eliminate waste and improve space utilization. By considering budget and space constraints productively, engaging in thorough planning, and continuously monitoring and improving the production system, overcoming these challenges and achieving an effective and efficient production setup is possible. Our model is accounted for the restrictions of budget and space capacity. The total production-inventory cost is minimized by optimizing the production rate, the batch size of the item j used for assembly, and the quantity of backorders. A graphical diagram is presented in Figure 1.

3.2. Notation

Here, the notation used to explain the formulation of the model are described below.
Index
jNumber of parts required to manufacture a single assembled product, j = 1 , 2 , 3 , , m
Decision variables
PjProduction rate of item j (units/time)
QjProduction batch size of item j (units/cycle)
BjQuantity of backorders of item j (units)
Parameters
DjDemand rate of item j (units/time)
SjSetup cost of item j (USD/setup)
MjManufacturing cost of product j (USD/unit)
HjHolding cost of item j per unit per unit time (USD/unit/time)
BljLinear backorder cost of item j per unit backorder per unit time (USD/unit/time)
mNumber of batches (integer)
BcjFixed backorder cost of item j per unit backorder (USD/backorder)
ξjBackorder average of item j (units)
TCycle length (time units)
TCTotal cost per unit of time (units)
DrjCost of remanufacturing defective item j (USD/item)
VjBudget of item j (units)
fSpace capacity (units)
gTotal budget (USD)
I ¯ j Average inventory of item j (units)
I m a x j Maximum inventory, calculated as I m a x j = I 1 j + I 2 j (units)
β j Random proportion rate of defective products j in each cycle, following a probability distribution (uniform, triangular, double-triangular, beta, and χ 2 )
E [ β j ] Expected proportion of defective products j per cycle

3.3. Assumptions

The following assumptions for the model configuration are adopted in this study.
1.
The model considers the manufacture of a single type of assembled product under a flexible production system, where the assembled product (specifically, an electronic product) is produced from several electronic parts j according to the customer’s preference. The multiple parts j are sold separately from another warehouse. This study focuses on the effects of assembling products in a competitive market. Even though the demand remains fixed, a fixed demand under flexible production can be quickly fulfilled without any customer dissatisfaction.
2.
In this model, the production rate is variable, and it is always greater than the demand. The whole inventory system of the model is assumed based on an infinite planning horizon under a flexible production, and it is possible to find the minimum production-inventory cost under an infinite time horizon (Alexopoulos et al. [12]).
3.
Each assembled product is inspected after production, and defective products are quickly sent for remanufacturing within the same production cycle. The inspection cost for each product is fixed, even though this cost is adjusted according to the setup cost as it is significantly lower than the other costs. The rate of defective products under flexible production was allowed to be random (Dey et al. [25]). Thus, the optimum cost is evaluated separately based on five different distribution functions (uniform, triangular, double-triangular, beta, and χ 2 ).
4.
The model initially faces shortages after selling the finished assembled products, but all shortages are fully backlogged. There is no lost sales. In this model, there are two types of backorder costs, i.e., the linear backorder cost (the backorder cost applies to average backorders) and the fixed backorder cost (the backorder cost applies to the maximum backorder level). We proposes that the inventory holding costs are based on the average inventory and provided space and budget limitations as constraint types. The production rate is taken as a variable. Thus, a huge inventory during production, unexpected investment costs, and a large holding space will arise without space and budget constraints on the inventory (Sarkar et al. [5]).

4. Mathematical Model for the Innovative Production System

This paper considers the production of a single product assembled using different items. Under a flexible production system, the goal of this model is to minimize the damage to the assembled product and the inventory cost of the entire system while considering the restrictions of the space capacity and budget. The model is extended from the benchmark model of C á rdenas-Barr ó n [4] involving multi-item clean production and random defective rates.
Remark 1. 
The present model will converge to C á rdenas-Barr ó n’s [4] model if it considers only a single type of product with constant defective and production rates and without inspection.
Remark 2. 
If this model considers a random defective rate, a single type of item, a constant production rate without inspection, an assembled product, and budget & space constraints, then it will converge to the model of Sarkar et al. [5]
Flexible production is achieved with initial backorders in the interval [ 0 , T 1 ] to reach the zero-inventory level, and inventory is acquired at the rate P j ( 1 β j ) D j . After time t = T 2 , the imperfect products start to remanufactured at the rate ( P j D j ) in the interval [ T 2 , T 3 ] . Furthermore, the inventory reaches its maximum capacity I m a x at time T 3 . After that, it begins to decrease in the interval [ T 3 , T 4 ] at the rate D j to the zero level. In the interval [ T 4 , T 5 ] , the backorder rate is B j , and the demand is D j . Thus, total cycle length T = production time + remanufacturing time + non-production time, i.e, T = T P + T R M + T N P , where T P = T 1 + T 2 , T R M = T 3 , and T N P = T 4 + T 5 . Here, T 1 and T 5 are the times at which the system includes backorders, T 2 is the pure production time, T 3 is the pure remanufacturing time, and T 4 is the pure consumption time.
Therefore, as shown in Figure 2, the production time can be calculated as
T 1 + T 2 = ( I 1 j + B j ) ( P j ( 1 E [ β j ] ) D j ) = Q j P j , which gives , I 1 j = Q j ( 1 E [ β j ] ) D j P j B j .
Additionally, from Figure 2, the remanufacturing time can be determined as
T 3 = I 2 j ( P j D j ) , as T 3 = E [ β j ] Q j P j . Therefore E [ β j ] Q j P j = I 2 j ( P j D j ) , I 2 j = E [ β j ] Q j 1 D j P j .
The maximum inventory can be determined by solving the following equation:
I m a x j = I 1 j + I 2 j = Q j 1 D j P j ( 1 + E [ β j ] ) B j .
To determine the average inventory, it is necessary to calculate the entire inventory for the cycle time T and divide it by the cycle time. Thus, the average inventory is expressed as
I A V G j = 1 T 1 2 T 2 I 1 j + 1 2 T 3 I 1 j + 1 2 T 3 I m a x j + 1 2 T 4 I m a x j
(for the values of T 1 , T 2 , T 3 , T 4 , and T 5 , see Appendix A). Thus,
I A V G j = 1 2 Q j ( 1 E [ β j ] ) D j P j [ ( Q j 2 + B j 2 ) ( 1 E [ β j ] ) + Q j 2 D j 2 P j 2 ( 1 + E [ β j ] + ( E [ β j ] ) 2 ) + Q j 2 D j P j ( ( E [ β j ] ) 3 2 ) + 2 B j Q j D j P j + E [ β j ] 1 ] .
The average backorder inventory is determined as
I B A V G j = 1 T 1 2 B j T 1 + 1 2 B j 2 D j = B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j .
All costs related to this single-stage manufacturing–remanufacturing production-inventory system are tabulated in Table 2. Detailed explanations of each cost are provided under the Table.

4.1. Setup with Inspection Cost

After the production of a single type of assembled product by making j parts, the fixed setup cost is S j . The inspection strategy is applied just after production to separate out any defective products. Therefore, the model includes the inspection cost in the setup cost, as this inspection cost is much lower than any other cost. The cycle time is T = Q j D j . Thus, the per-cycle setup cost is calculated using the following formula:
S j D j Q j .

4.2. Manufacturing Cost

Throughout the production time, the manufacturing cost is evaluated as the per-unit manufacturing cost M j multiplied by the production rate P j at the early inventory level. In this inventory model, the expected value of defective products E [ β j ] is considered separately. Therefore, the per-cycle manufacturing cost is calculated as follows:
M j P j ( 1 + E [ β j ] ) P j D j .

4.3. Inventory Holding Cost

The model calculates the inventory holding cost based on the average inventory level, which is previously described. Thus, the per-cycle holding cost is determined as follows:
= H j T Q j ( 1 E [ β j ] ) D j P j B j 2 2 [ P j ( 1 E [ β j ] ) D j ] + E [ β j ] Q j Q j 1 E [ β j ] 2 ( 1 + E [ β j ] 2 ) D j P j B j P j + Q j 1 ( 1 + E [ β j ] ) D j P j B j 2 2 D j .

4.4. Backorder Cost

To determine the average backorder, we calculate the linear backorder cost as the per-unit linear backorder cost B l j multiplied by the average backorder inventory I B A V G j . Thus, the linear backorder cost is expressed as B l j I B A V G j . On the other hand, at the maximum backorder level, the fixed backorder cost B c j B j is calculated based on the backorder quantity B j . Therefore, the total backorder cost is expressed as
= B c j B j D j Q j + B l j I B A V G j = B c j B j D j Q j + B l j B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j .

4.5. Remanufacturing Cost

Defective products occur randomly in a flexible production system. Thus, to remanufacture these products, the model includes some additional cost for just-in-time remanufacturing. Hence, the average remanufacturing cost for the defective products is expressed as
D r j P j E [ β j ] D j Q j .
Therefore, the total cost of the production-inventory system consists of the setup with inspection cost, inventory holding cost, backorder cost, manufacturing cost, and remanufacturing cost. This can be expressed as
T C = j = 1 m S j D j Q j + H j I A V G j + B c j B j D j Q j + B l j I B A V G j + M j D j ( 1 + E [ β j ] ) + P j E [ β j ] D r j D j Q j .
Substituting the values of I A V G j , B c j , B l j , and I B A V G j into the total cost function, the resulting equation takes the form
T C ( P j , Q j , B j ) = j = 1 m [ S j D j Q j + H j [ 1 2 Q j ( 1 E [ β j ] ) D j P j [ ( Q j 2 + B j 2 ) ( 1 E [ β j ] ) + Q j 2 D j 2 P j 2 1 + E [ β j ] + ( E [ β j ] ) 2 + Q j 2 D j P j ( E [ β j ] ) 3 2 + 2 B j Q j D j P j + E [ β j ] 1 ] ] + B c j B j D j Q j + B l j B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j + M j D j ( 1 + E [ β j ] ) + P j E [ β j ] D r j D j Q j ] .

4.6. Budget and Space Constraints

Under flexible production, the production rate is not fixed. Therefore, to impose limitations on the inventory and to reduce the investments, budget and space capacity are proposed as boundary conditions. These are obtained as follows:
j = 1 m Q j V j g
j = 1 m Q j S c j f .
Equation (13) represents the total cost of the model, which is minimized based on three decision variables: P j , Q j , and B j .

5. Solution Methodology

There are three unknown variables P j , Q j , and B j in the cost function, and these variables needed to be optimized. The cost equation including the constraints presented in (13)–(15) is as follows:
M i n T C ( P j , Q j , B j ) = j = 1 m [ S j D j Q j + H j [ 1 2 Q j ( 1 E [ β j ] ) D j P j [ ( Q j 2 + B j 2 ) ( 1 E [ β j ] ) + Q j 2 D j 2 P j 2 1 + E [ β j ] + ( E [ β j ] ) 2 + Q j 2 D j P j ( E [ β j ] ) 3 2 + 2 B j Q j D j P j + E [ β j ] 1 ] ] + B c j B j D j Q j + B l j B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j + M j D j ( 1 + E [ β j ] ) + P j E [ β j ] D r j D j Q j ] subject to j = 1 m Q j V j g j = 1 m Q j S c j f
and P j , Q j , B j > 0 , j = 1 , 2 , , m .
This equation is a non-linear expression. To solve this non-linear expression, the Kuhn–Tucker condition is applied by determining the Lagrange multiplier equation for this expression. Two constraints are added to this expression by considering two Lagrange multiplier coefficients: λ 1 and λ 2 .
L ( P j , Q j , B j , λ 1 , λ 2 ) = j = 1 m [ S j D j Q j + H j [ 1 2 Q j ( 1 E [ β j ] ) D j P j [ ( Q j 2 + B j 2 ) ( 1 E [ β j ] ) + Q j 2 D j 2 P j 2 1 + E [ β j ] + ( E [ β j ] ) 2 + Q j 2 D j P j ( E [ β j ] ) 3 2 + 2 B j Q j D j P j + E [ β j ] 1 ] ] + B c j B j D j Q j + B l j B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j + M j D j ( 1 + E [ β j ] ) + P j E [ β j ] D r j D j Q j ] + λ 1 j = 1 m Q j V j g + λ 2 j = 1 m Q j S c j f .
After determining the Lagrange equation, four cases are considered along with this equation. For the case λ 1 = 0 , λ 2 = 0 , Q j has different values; therefore, this case is neglected. The value of Q j is differed for the other three cases: λ 1 0 , λ 2 = 0 ; λ 2 0 , λ 1 = 0 ; and λ 1 0 , λ 2 0 . We differentiate L ( P j , Q j , B j , λ 1 , λ 2 ) with respect to P j , Q j , B j , λ 1 , and λ 2 .
L ( P j , Q j , B j , λ 1 , λ 2 ) P j = E [ β j ] D r j D j Q j H j 2 Q j R 1 D j R * 2 P j 2 + R 2 2 R * P j 3 + D j R * 2 P j 4 + R 3 1 R * P j 2 + D j R * 2 P j 3
L ( P j , Q j , B j , λ 1 , λ 2 ) B j = 2 B j H j ( 1 E [ β j ] ) 2 Q j R * H j + B c j D j Q j + B j B l j ( 1 E [ β j ] ) 2 Q j R * .
Equating L ( P j , Q j , B j , λ 1 , λ 2 ) P j and L ( P j , Q j , B j , λ 1 , λ 2 ) B j to zero,
P j = R 2 E [ β j ] R 2 + R 2 E [ β j ] R 2 2 + R 2 D j R 3 E [ β j ] R 3 + R 1 R 3 E [ β j ] R 3 + R 1
B j = H j B c j D j Q j Q j 1 E [ β j ] D j P j 1 E [ β j ] [ H j + B l j ] .
Case I: λ 1 0 , λ 2 = 0
L ( P j , Q j , B j , λ 1 , λ 2 ) Q j = R 4 Q j 2 + H j R 5 + λ 1 V j Q j = R 4 H j R 5 + λ 1 V j 1 2
L ( P j , Q j , B j , λ 1 , λ 2 ) λ 1 = j = 1 m Q j V j g λ 1 = R 4 V j 2 H j R 5 g 2 V j g 2 .
Case II: λ 2 0 , λ 1 = 0
L ( P j , Q j , B j , λ 1 , λ 2 ) Q j = R 4 Q j 2 + H j R 5 + λ 2 S c j Q j = R 4 H j R 5 + λ 2 S c j 1 2
L ( P j , Q j , B j , λ 1 , λ 2 ) λ 2 = j = 1 m Q j S c j f λ 2 = R 4 S c j 2 H j R 5 f 2 S c j f 2 .
Case III: λ 1 0 , λ 2 0
L ( P j , Q j , B j , λ 1 , λ 2 ) Q j = R 4 Q j 2 + H j R 5 + λ 1 V j + λ 2 S c j ; Q j = R 4 H j R 5 + λ 1 V j + λ 2 S c j 1 2 .
Sufficient condition: The analytical solution is verified as the global solution by applying the Hessian matrix method, and it is observed that all minors of the Hessian matrix are positive. See Appendix B for this calculation.

6. Numerical Example

In this section, based on the model formulation, all the constant parameters for assembling items j = 2 and j = 3 are summarized in Table 3 and Table 4, respectively. Next, Table 5 presents the different formulas of the distribution functions. In each row, the expected values of the constant coefficients are provided for each distribution pattern in Table 6, and the last row of Table 6 presents the values of the coefficients that are applied to calculate the numerical solution along with these distribution functions.
In these formulas, a j , b j , c j , α j , β j , and κ j are the scaling parameters of different distribution patterns.
A comparison between the optimal solutions for both j = 2 and j = 3 is presented in Table 7 and Table 8, respectively. Each row of both tables considers variable parameters P j , Q j , and B j and their optimal values along with each distribution function. Further, we separately obtain the total inventory costs for these five distribution functions. In the following tables, it can be seen that the total cost is minimized under χ 2 distribution for both assembled items j = 2 and j = 3 .
In this model, budget and space are assumed to be limited, meaning that the setup cost is increased. Therefore, the production batch size tends to increase with the larger setup cost. Further, the increased production batch size causes an increase in the production rate per production run. Thus, the analysis of these graphics determines that when both the production rate and production batch size increase, the total inventory cost minimizes.

Comparison with Existing Literature

In this section, a numerical and theoretical comparison with the existing literature is conducted. A detailed comparison is presented in Table 9. Due to the use of a flexible production system, an assembled product, and single-stage manufacturing and remanufacturing, the present study reduces costs more than twenty times compared to the models of Sivashankari and Panayappan [9] and Sanjai and Periyasamy [10]. On the other hand, the cost of this study is more than seven times higher than that of C á rdenas-Barr ó n’s [4] and Sarkar et al.’s [5] models. However, C á rdenas-Barr ñ n’s [4] and Sarkar et al.’s [5] models considered only a single type of item, whereas the present study considers an assembled item with different parts. It is obvious that the setups of these models are different. However, the present study provides more realistic results due to the use of variable production rates in a single-stage manufacturing–remanufacturing process with budget and space constraints.

7. Sensitivity Analysis

A sensitivity analysis is performed for all parameters, including the two constraints, as shown in Table 10. The sensitivity values corresponding to the five different distribution patterns are calculated separately.
The values of each column for the parameter a j are equal but present opposite signs for each distribution pattern. This indicates that the total cost is proportionally affected by the change in the parameter a j . The total cost is slightly affected by the change in the value of parameter b j . c j is more effective under β and χ 2 distribution. Moreover, κ j has a smaller impact on the total cost than the other parameters.
The space and budget constraints with equivalent changes are more sensitive in this model. Based on Table 10, both constraints have a consistent effect on the total cost.
The changes in the two parameters, i.e., manufacturing cost and holding cost, are substantial for both negative and positive changes. Furthermore, a negative sign exists for each distribution, which implies that the total cost is not substantially affected by the changes in the two parameters.
In the 50 % to + 50 % range, minor changes in the setup cost, linear backorder cost, and fixed backorder cost parameters occurs at every stage of the distributions. Thus, these minor changes affects the total cost, indicating that the total costs changes with distributions.

8. Managerial Implications

This paper focuses on assembling products under variable production rates. Through the flexible production, production rates increases, and the number of products increases too. As a result, organizations need to manage large setup costs. A variable production rate can provide several benefits for an imperfect manufacturing system. An imperfect manufacturing system may experience unexpected disruptions. With a variable production rate, the system can quickly adapt to changes in demand by increasing or decreasing production levels accordingly. This flexibility helps to avoid overproduction or underproduction and optimizes the utilization of resources. Variable production rates allow a system to align the production level with demand by reducing inventory costs. By producing at a rate that matches demand, a system can minimize excess inventory holding costs, obsolescence risks, and storage expenses. This cost efficiency contributes to a better financial performance and profitability. Variable production rates can minimize wastes in an imperfect manufacturing system. By producing smaller batches or adjusting production levels based on the demand, a system can reduce defective or obsolete inventory accumulation. This leads to less waste generation, lower reworking costs, and improved overall process efficiency. A variable production rate can enhance the performance and resilience of an imperfect manufacturing system. Based on this study, managers can make the right decisions regarding production rates by making their systems cost-effective.
If a system consists of various components or sub-systems those are not well-integrated or coordinated, it can result in inefficiencies, misalignment, and operational challenges. A lack of synchronization between different parts of the manufacturing process can lead to delays, errors, and wasted resources. In this study, the manufacturing process of electronic goods such as mobile phone is considered, which involves less maintenance complexity. However, for a complex system such as car production assembly, some maintenance costs is needed to be included within the total cost functions. Thus, it is important for organizations to identify and address the imperfections in their manufacturing systems to improve the overall performance, productivity, and product quality. This may involve conducting a thorough analysis of the system, identifying the root causes of the issues, implementing corrective measures, and continuously monitoring & optimizing the manufacturing processes.
Many manufacturing organizations tend to increase production batch sizes to avoid unnecessary shortages. This means that the total investment increases. This model minimizes the total investment cost by introducing space and budget constraints. Numerical experiments are proposed to optimize the batch size of the assembled items that the manufacturing organization can store for future stock. The total cost is minimized separately under χ 2 distribution for two assembled items, j = 2 and j = 3 . By calculating a proper backorder size, managers can control shortages and earn more revenue. This study focuses on a planned backorder system, wherein linear and fixed backorders are considered for cost-effectiveness.
For an imperfect production inventory system, the generation of defective items is crucial, as these items cannot be sold on the market in order to preserve the company’s brand image. The number of defective items produced in a single stage is unpredictable. Therefore, in this study, five different types of distribution are considered and compared to determine the most cost-effective defect rate. The findings clearly shows that a χ 2 -distributed defective rate is more cost-effective for a single-stage manufacturing–remanufacturing system, whereas triangular distribution provides fruitful results for three-part items. Therefore, this study can be used to make several major decisions regarding single-stage manufacturing–remanufacturing production inventory systems with a single assembled item.

9. Conclusions

An inventory model for innovative production was proposed in this paper. In continuously changing business environments, flexible production must be sufficiently capable of meeting customer requirements. In the production process, defective items might be produced randomly, and this model considered a reworking strategy to be implemented after surveying such defective items. Thus, the assembled product could be remanufactured without any shortages. To reduce the manufacturing cost, the productivity variation was increased to improve the quality of the assembled products. The budget and space capacity were considered as constraints. The total inventory cost was calculated based on five different distribution functions, using the defined variable parameters of production rate, production batch size, and backorder quantity. A numerical study proved that χ 2 distribution yielded the global minimum total cost compared to all other distribution functions. Flexible production systems are becoming more and more essential to customers due to their innovative product requirements. Because these flexible production systems can handle variations in the assembled product, process sequence, and production volume, they provide several advantages for an industry by reworking defective items to reduce the size of the part inventory and the lead time. Indeed, this approach improves product quality and system reliability, leading to a more competitive business than under a traditional production system. On the other hand, there are some limitations to flexible production systems. As the model focused on reworking defective items, it mainly considered electronic parts as the assembled items, which could accurately be identified as defective during the production process. Since space and budget were limited, difficulties could arise due to increasing customer demand, even though flexible production systems should fulfill customers’ requirements.
In this study, some electronic goods like mobile phones were considered as assembled products. However, the system may change if one considers another complex production system like car production. For a car production system’s reliability, maintenance is essential. Future researcher may consider this type of complex system to extend this study. Human inspection of defective items is one of the limitations of this study, and autonomation policies can be adopted within the multiple-stage production process for the inspection. This study considered a single-stage production for all parts of the assembled items, which is another limitation of this study. This model can be considered for the multi-assembly production system, wherein the autonomation policy can be adopted for the trade-off between autonomation and inspection error costs. Different intelligent technology can make the manufacturing system smart. This model can be further extended by considering the random breakdowns within each production system. By considering deteriorating items, one can extend this study in the future (Mishra et al. [68]).

Author Contributions

Conceptualization, B.S., B.G.; methodology, B.G. and B.S.; software, B.S. and B.G.; validation, B.G., S.P. and B.S.; formal analysis, S.P. and B.S.; investigation, B.S. and S.P.; resources, B.S. and B.G.; data curation, B.S. and B.G.; writing—original draft preparation, B.G.; writing—review and editing, B.G., B.K.D., S.P. and B.S.; visualization, B.S. and B.G.; supervision, B.S. and S.P. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The data are available on request to the corresponding author.

Conflicts of Interest

The authors declare no conflict of interest.

Appendix A. Values of T1, T2, T3, T4, and T5

The values of the time T 1 T 5 are provided as follows:
T 1 = B j ( P j ( 1 E [ β j ] ) D j ) ; T 2 = Q j P j B j ( P j ( 1 E [ β j ] ) D j ) ; T 3 = Q j P j E [ β j ] ; T 4 = Q j 1 ( 1 + E [ β j ] ) D j P j B j D j ; T 5 = B j D j

Appendix B. Different Values for Optimality Calculation

R * = j = 1 m ( 1 E [ β j ] ) D j P j ; R 1 = j = 1 m ( Q j 2 + B j 2 ) ( 1 E [ β j ] ) ; R 2 = j = 1 m Q j 2 D j 2 1 + E [ β j ] + E [ β j ] 2 ; R 3 = j = 1 m Q j 2 D j E [ β j ] 3 2 ; R 4 = j = 1 m S j D j + B c j B j D j + P j E [ β j ] D r j D j + B l j B j 2 ( 1 E [ β j ] ) 2 R * + B j 2 ( 1 E [ β j ] ) H j 2 R * R 5 = j = 1 m 1 2 R * ( 1 E [ β j ] ) + D j 2 P j 2 1 + E [ β j ] + ( E [ β j ] ) 2 + D j P j ( E [ β j ] ) 3 2 ; R 6 = ( 1 E [ β j ] ) + D j 2 P j 2 1 + E [ β j ] + ( E [ β j ] ) 2 + D j P j ( E [ β j ] ) 3 2 R 7 = 2 R 1 D j 2 P j 3 R * 3 + 2 R 1 D j P j 3 R * 2 + 2 R 2 D j P j 4 R * 2 + 6 R 2 P j 4 R * + 4 R 2 D j P j 5 R * 2 + 2 R 2 D j 2 P j 5 R * 3 + R 3 D j P j 3 R * 2 + 2 R 3 P j 3 R * + 3 R 3 D j P j 4 R * 2 R 8 = 1 Q j 2 E [ β j ] D r j D j + B l j B j 2 ( 1 E [ β j ] ) D j 2 R * 2 P j 2 + B j 2 ( 1 E [ β j ] ) H j D j 22 R * 2 P j 2 ; R 9 = D j 2 R * 2 P j 2 R 6 ; R 10 = D j P j 2 2 ( E [ β j ] ) 3 2 D j 2 ( 1 + E [ β j ] + ( E [ β j ] ) 2 ) P j 3
2 L ( P j , Q j , B j , λ 1 , λ 2 ) P j 2 = H j R 7 2 Q j ; 2 L ( P j , Q j , B j , λ 1 , λ 2 ) Q j 2 = 2 R 4 Q j 3 ; 2 L ( P j , Q j , B j , λ 1 , λ 2 ) B j 2 = ( B l j + H j ) ( 1 E [ β j ] ) Q j R * 2 L ( P j , Q j , B j , λ 1 , λ 2 ) Q j B j = 2 L ( P j , Q j , B j , λ 1 , λ 2 ) B j Q j = B j ( B l j + H j ) ( E [ β j ] 1 ) Q j 2 R * B c j Q j 2 2 L ( P j , Q j , B j , λ 1 , λ 2 ) Q j P j = 2 L ( P j , Q j , B j , λ 1 , λ 2 ) P j Q j = R 8 Q j 2 + H j R 9 + R 10 H j 2 R * 2 L ( P j , Q j , B j , λ 1 , λ 2 ) P j B j = 2 L ( P j , Q j , B j , λ 1 , λ 2 ) B j P j = D j B j ( B l j + H j ) ( E [ β j ] 1 ) Q j R * 2 P j 2 H 22 ( P j , Q j ) = 2 L ( · ) Q j 2 2 L ( · ) P j 2 2 L ( · ) P j Q j 2 = 2 R 4 Q j 3 H j R 7 2 Q j R 8 Q j 2 + H j R 9 + R 10 H j 2 R * 2 > 0
According to the calculation, the first term is greater than the square term; thus, it is the positive part. The third-order principal minor of H is
H 33 ( P j , Q j , B j ) = 2 L ( · ) ( Q j ) 2 2 L ( · ) Q j P j 2 L ( · ) Q j B j 2 L ( · ) P j Q j 2 L ( · ) ( P j ) 2 2 L ( · ) P j B j 2 L ( · ) B j Q j 2 L ( · ) B j P j 2 L ( · ) B j 2 = 2 L ( · ) B j Q j 2 L ( · ) Q j P j 2 L ( · ) P j B j 2 L ( · ) Q j B j 2 L ( · ) ( P j ) 2 2 L ( · ) B j P j [ 2 L ( · ) ( Q j ) 2 2 L ( · ) P j B j 2 L ( · ) Q j B j 2 L ( · ) P j Q j ] + 2 L ( · ) ( B j ) 2 H 22 = B j ( B l j + H j ) ( E [ β j ] 1 ) Q j 2 R * B c j Q j 2 R 8 Q j 2 + H j R 9 + R 10 H j 2 R * D j B j ( B l j + H j ) ( E [ β j ] 1 ) Q j R * 2 P j 2 B j ( B l j + H j ) ( E [ β j ] 1 ) Q j 2 R * B c j Q j 2 2 H j R 7 2 Q j D j B j ( B l j + H j ) ( E [ β j ] 1 ) Q j R * 2 P j 2 2 2 R 4 Q j 3 + D j B j ( B l j + H j ) ( E [ β j ] 1 ) Q j R * 2 P j 2 B j ( B l j + H j ) ( E [ β j ] 1 ) Q j 2 R * B c j Q j 2 R 8 Q j 2 + H j R 9 + R 10 H j 2 R * + ( B l j + H j ) ( 1 E [ β j ] ) Q j R * H 22 > 0
[ L ( · ) = L ( P j , Q j , B j , λ 1 , λ 2 ) ] . Similarly, using these values, the third-order is greater than zero.
Hence, the optimum solutions of the decision variables are global solutions.

References

  1. Taleizadeh, A.A.; Alizadeh-Basban, N.; Niaki, S. A closed-loop supply chain considering carbon reduction, quality improvement effort, and return policy under two remanufacturing scenarios. J. Clean. Prod. 2019, 232, 1230–1250. [Google Scholar] [CrossRef]
  2. Machado, M.-C.; Vivaldini, M.; Oliveira, O.J. Production and supply-chain as the basis for SMEs’ environmental management development: A systematic literature review. J. Clean. Prod. 2020, 273, 123141. [Google Scholar] [CrossRef]
  3. Mishra, U.; Wu, J.Z.; Sarkar, B. Optimum sustainable inventory management with backorder and deterioration under controllable carbon emissions. J. Clean. Prod. 2021, 123699, 136539. [Google Scholar] [CrossRef]
  4. Cárdenas-Barrón, L.E. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comp. Indus. Eng. 2009, 57, 1105–1113. [Google Scholar]
  5. Sarkar, B.; Cárdenas-Barrón, L.E.; Sarkar, M.; Singgih, M.L. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 2014, 33, 423–435. [Google Scholar] [CrossRef]
  6. Aydin, R.; Kwong, C.K.; Ji, P. Coordination of the closed-loop supply chain for product line design with consideration of remanufactured products. J. Clean. Prod. 2016, 114, 286–298. [Google Scholar] [CrossRef]
  7. Hariga, M.; Asśad, R.; Khan, Z. Manufacturing-remanufacturing policies for a centralized two stage supply chain under consignment stock partnership. Int. J. Prod. Econ. 2017, 183, 362–374. [Google Scholar] [CrossRef]
  8. Qingdi, K.; Jie, L.; Song, S.; Wang, H. Timing Matching Method of Decision-Making in Predecisional Remanufacturing for Mechanical Products. Procedia CIRP 2019, 80, 566–571. [Google Scholar] [CrossRef]
  9. Sivashankari, C.K.; Panayappan, S. Production inventory model with reworking of imperfect production, scrap and shortages. Int. J. Manag. Sci. Eng. Manag. 2014, 1, 9–20. [Google Scholar] [CrossRef]
  10. Sanjai, M.; Periyasamy, S. Production inventory model with reworking of imperfect items and integrates cost reduction delivery policy. Int. J. Oper. Res. 2018, 32, 329–349. [Google Scholar] [CrossRef]
  11. Gao, J.; Xiao, Z.; Wei, H.; Zhou, G. Dual-channel green supply chain management with eco-label policy: A perspective of two types of green products. Comp. Indus. Eng. 2020, 146, 106613. [Google Scholar] [CrossRef]
  12. Alexopoulos, K.; Anagiannis, L.; Nikolakis, N.; Chryssolouris, G. A quantitative approach to resilience in manufacturing systems. Int. J. Prod. Res. 2022, 60, 7178–7193. [Google Scholar] [CrossRef]
  13. Lagoudakis, K.H. The effect of online shopping channels on brand choice, product exploration and price elasticities. Int. J. Ind. Organ. 2023, 87, 102918. [Google Scholar] [CrossRef]
  14. Mukherjee, T.; Sangal, I.; Sarkar, B.; Almaamari, Q.; Alkadash, T.M. How effective is reverse cross-docking and carbon policies in controlling carbon emission from the fashion industry? Mathematics 2023, 11, 2880. [Google Scholar] [CrossRef]
  15. Yang, L.; Zou, H.; Shang, C.; Ye, X.; Rani, P. Adoption of information and digital technologies for sustainable smart manufacturing systems for industry 4.0 in small, medium, and micro enterprises (SMMEs). Technol. Forecast. Soc. Chang. 2023, 188, 122308. [Google Scholar] [CrossRef]
  16. Bazan, E.; Jaber, M.Y.; El Saadany, A.M.A. Carbon emissions and energy effects on manufacturing–remanufacturing inventory models. Comp. Indus. Eng. 2015, 178, 109126. [Google Scholar] [CrossRef]
  17. Bhatia, P.; Elsayed, N.D. Facilitating decision-making for the adoption of smart manufacturing technologies by SMEs via fuzzy TOPSIS. Int. J. Prod. Econ. 2023, 257, 108762. [Google Scholar] [CrossRef]
  18. Chai, Q.; Sun, M.; Lai, K.; Xiao, Z. The effects of government subsidies and environmental regulation on remanufacturing. Comp. Indus. Eng. 2023, 178, 109126. [Google Scholar] [CrossRef]
  19. Assid, M.; Gharbi, A.; Hajji, A. Integrated control policies of production, returns’ replenishment and inspection for unreliable hybrid manufacturing-remanufacturing systems with a quality constraint. Comp. Indus. Eng. 2023, 176, 109000. [Google Scholar] [CrossRef]
  20. Sarkar, M.; Park, K.S. Reduction of makespan through flexible production and remanufacturing to maintain the multi-stage automated complex production system. Comp. Indus. Eng. 2023, 177, 108993. [Google Scholar] [CrossRef]
  21. Zheng, M.; Dong, S.; Zhou, Y.; Choi, T.M. Sourcing decisions with uncertain time-dependent supply from an unreliable supplier. Eur. J. Oper. Res. 2022, 308, 1365–1379. [Google Scholar] [CrossRef]
  22. Saxena, N.; Sarkar, B. Random misplacement and production process reliability: A sustainable industrial approach to deal with the discrepancy and deficiency. J. Indus. Manag. Optim. 2023, 19, 4844–4873. [Google Scholar] [CrossRef]
  23. Taleizadeh, A.A.; Moshtagh, M.S.; Vahedi-Nouri, B.; Sarkar, B. New products or remanufactured products: Which is consumer-friendly under a closed-loop multi-level supply chain? J. Retail. Consum. Serv. 2023, 73, 103295. [Google Scholar] [CrossRef]
  24. Kanishka, K.; Acherjee, B. A systematic review of additive manufacturing-based remanufacturing techniques for component repair and restoration. J. Manuf. Process. 2023, 89, 220–283. [Google Scholar] [CrossRef]
  25. Dey, B.K.; Sarkar, M.; Chaudhuri, K.; Sarkar, B. Do you think that the home delivery is good for retailing? J. Retail. Consum. Serv. 2023, 72, 103237. [Google Scholar] [CrossRef]
  26. Amrouche, N.; Pei, Z.; Yan, R. Service strategies and channel coordination in the age of E-commerce. Expert Syst. Appl. 2023, 214, 119135. [Google Scholar] [CrossRef]
  27. Zhu, S.; Li, J.; Wang, S.; Xia, Y.; Wang, Y. The role of blockchain technology in the dual-channel supply chain dominated by a brand owner. Int. J. Prod. Econ. 2023, 258, 108791. [Google Scholar] [CrossRef]
  28. Saxena, N.; Sarkar, B. How does the retailing industry decide the best replenishment strategy by utilizing technological support through blockchain? J. Retail. Consum. Serv. 2023, 71, 103151. [Google Scholar] [CrossRef]
  29. Wee, H.M.; Wang, W.T.; Cárdenas-Barrón, L.E. An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders. Comp. Indus. Eng. 2014, 33, 423–435. [Google Scholar] [CrossRef]
  30. Polotski, V.; Kenne, J.-P.; Gharbi, A. Joint production and maintenance optimization in flexible hybrid Manufacturing-Remanufacturing systems under age-dependent deterioration. Int. J. Prod. Econ. 2019, 216, 239–254. [Google Scholar] [CrossRef]
  31. M-Haidar, L.; Nasr, W. Production lot sizing with quality screening and rework. App. Math. Model. 2016, 40, 3242–3256. [Google Scholar] [CrossRef]
  32. Silva, C.; Reis, V.; C-Silva, S. A comparision of production control systems in a flexible flow shop. Procedia Manuf. 2017, 13, 1090–1095. [Google Scholar] [CrossRef]
  33. Kugele, A.S.H.; Sarkar, B. Reducing carbon emissions of a multi-stage smart production for biofuel towards sustainable development. Comp. Indus. Eng. 2023, 70, 93–113. [Google Scholar] [CrossRef]
  34. Mridha, B.; Ramana, G.V.; Pareek, S.; Sarkar, B. An efficient sustainable smart approach to biofuel production with emphasizing the environmental and energy aspects. Fuel 2023, 336, 126896. [Google Scholar] [CrossRef]
  35. Chen, T.-H. Optimizing pricing, replenishment and rework decision for imperfect and deteriorating items in a manufacturer-retailer channel. Int. J. Prod. Econ. 2017, 183, 539–550. [Google Scholar] [CrossRef]
  36. Mtibaa, G.; Erray, W. Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance. Rel. Eng. Sys. Saf. 2018, 173, 1–11. [Google Scholar] [CrossRef]
  37. Hage, S.-R. Dual neural network model of speech and language evolution: New insights on flexibility of vocal production systems and involvement of frontal cortex. Curr. Opin. Behav. Sci. 2018, 21, 80–87. [Google Scholar] [CrossRef]
  38. Chiu, S.W.; Wu, C.-S.; Tseng, C.-T. Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system. Oper. Res. Perspect. 2019, 6, 100–115. [Google Scholar] [CrossRef]
  39. Li, K.; Zhang, L.; Fu, H.; Liu, B. The effect of intelligent manufacturing on remanufacturing decisions. Comp. Indus. Eng. 2023, 178, 109114. [Google Scholar] [CrossRef]
  40. Asadi, N.; Jackson, M.; Fundin, A. Implications of realizing mix flexibility in assembly systems for product modularity-A case study. J. Manu. Sys. 2019, 52, 13–22. [Google Scholar] [CrossRef]
  41. Malik, A.I.; Sarkar, B.; Iqbal, M.W.; Ullah, M.; Khan, I.; Ramzan, M.B. Coordination supply chain management in flexible production system and service level constraint: A Nash bargaining model. Comp. Indus. Eng. 2023, 177, 109002. [Google Scholar] [CrossRef]
  42. Centobelli, P.; Cerchione, R.; Esposito, E.; Passaro, R. Determinants of the transition towards circular economy in SMEs: A sustainable supply chain management perspective. Int. J. Prod. Econ. 2021, 242, 108297. [Google Scholar] [CrossRef]
  43. Li, J.; Ou, J.; Cao, B. The roles of cooperative advertising and endogenous online price discount in a dual-channel supply chain. Comp. Indus. Eng. 2023, 176, 108980. [Google Scholar] [CrossRef]
  44. Cifone, F.D.; Hoberg, K.; Holweg, M.; Staudacher, A.P. ‘Lean 4.0’: How can digital technologies support lean practices? Int. J. Prod. Econ. 2021, 241, 108258. [Google Scholar] [CrossRef]
  45. Aslam, H.; Wanke, P.; Khalid, A.; Roubaud, D.; Waseem, M.; Jabbour, C.J.C.; Grebinevych, O.; de Sousa Jabbour, A.B.L. A scenario-based experimental study of buyer supplier relationship commitment in the context of a psychological contract breach: Implications for supply chain management. Int. J. Prod. Econ. 2022, 249, 108503. [Google Scholar] [CrossRef]
  46. Chaudhari, U.; Bhadoriya, A.; Jani, M.Y.; Sarkar, B. A generalized payment policy for deteriorating items when demand depends on price, stock, and advertisement under carbon tax regulations. Math. Comput. Simul. 2023, 207, 556–574. [Google Scholar] [CrossRef]
  47. Sarkar, B.; Guchhait, R. Ramification of information asymmetry on a green supply chain management with the cap-trade, service, and vendor-managed inventory strategies. Electron. Commer. Res. Appl. 2023, 60, 101274. [Google Scholar] [CrossRef]
  48. Zhang, T.; Dong, P.; Chen, X.; Gong, Y. The impacts of blockchain adoption on a dual-channel supply chain with risk-averse members. Omega 2023, 114, 102747. [Google Scholar] [CrossRef]
  49. Bachar, R.K.; Bhuniya, S.; Ghosh, S.K.; AlArjani, A.; Attia, E.; Uddin, M.S.; Sarkar, B. Product outsourcing policy for a sustainable flexible manufacturing system with reworking and green investment. Math. Biosci. Eng. 2023, 20, 1376–1401. [Google Scholar] [CrossRef]
  50. Huang, B.; Wu, A. EOQ model with batch demand and planned backorders. App. Math. Model. 2016, 40, 5482–5496. [Google Scholar] [CrossRef]
  51. Mittal, M.; Khanna, A.; Jaggi, C.K. Retailer’s ordering policy for deteriorating imperfect quality items when demand and price are time-dependent under inflationary conditions and permissible delay in payments. Int. J. Proc. Manag. 2017, 10, 142–149. [Google Scholar] [CrossRef]
  52. Xu, Y.; Bisi, A.; Dada, M. A finite-horizon inventory system with partial backorders and inventory holdback. Oper. Res. Lett. 2017, 45, 315–322. [Google Scholar] [CrossRef]
  53. Mukherjee, T.; Sangal, I.; Sarkar, B.; Almaamari, Q.A. Logistic models to minimize the material handling cost within a cross-dock. Math. Biosci. Eng. 2023, 20, 3099–3119. [Google Scholar] [CrossRef]
  54. Bao, L.; Liu, Z.; Yu, Y. On the decomposition property for a dynamic inventory rationing problem with multiple demand classes and backorder. Euro. J. Oper. Res. 2018, 265, 99–106. [Google Scholar] [CrossRef]
  55. Kilic, O.A.; Tunc, H. Heuristics for the stochastic economic lotsizing problem with remanufacturing under backordering costs. Euro. J. Oper. Res. 2019, 276, 880–892. [Google Scholar] [CrossRef]
  56. Guo, L.; Wang, Y.; Kong, D.; Zhang, Z.; Yang, Y.T. Decisions on spare parts allocation for repaiable isolated system with dependent backorders. Comp. Indus. Eng. 2019, 127, 8–20. [Google Scholar] [CrossRef]
  57. Bertazzi, L.; Moezi, S.D.; Maggioni, F. The value of integration of full container load, less than container load and air freight shipments in vendor–managed inventory systems. Int. J. Prod. Econ. 2021, 241, 108260. [Google Scholar] [CrossRef]
  58. Bi, G.; Wang, P.; Wang, D.; Yin, Y. Optimal credit period and ordering policy with credit-dependent demand under two-level trade credit. Int. J. Prod. Econ. 2021, 242, 108311. [Google Scholar] [CrossRef]
  59. Charpin, R.; Lee, M.K.; Wu, T. Mobile procurement platforms: Bridging the online and offline worlds in China’s restaurant industry. Int. J. Prod. Econ. 2021, 241, 108256. [Google Scholar] [CrossRef]
  60. Bouzekri, H.; Bara, N.; Alpan, G.; Giard, V. An integrated Decision Support System for planning production, storage and bulk port operations in a fertilizer supply chain. Int. J. Prod. Econ. 2022, 252, 108561. [Google Scholar] [CrossRef]
  61. Buisman, M.E.; Rohmer, S.U. Inventory decisions for ameliorating products under consideration of stochastic demand. Int. J. Prod. Econ. 2022, 252, 108595. [Google Scholar] [CrossRef]
  62. Ashraf, M.H.; Chen, Y.; Yalcin, M.G. Minding Braess Paradox amid third-party logistics hub capacity expansion triggered by demand surge. Int. J. Prod. Econ. 2022, 248, 108454. [Google Scholar] [CrossRef]
  63. Zhou, Q.; Meng, C.; Sheu, J.-B.; Yuen, K.F. Remanufacturing mode and strategic decision: A game-theoretic approach. Int. J. Prod. Econ. 2023, 260, 108841. [Google Scholar] [CrossRef]
  64. Balter, A.G.; Huisman, K.J.; Kort, P.M. Effects of creative destruction on the size and timing of an investment. Int. J. Prod. Econ. 2022, 252, 108572. [Google Scholar] [CrossRef]
  65. Astvansh, V.; Jindal, N. Differential Effects of Received Trade Credit and Provided Trade Credit on Firm Value. Prod. Oper. Manag. 2023, 31, 781–798. [Google Scholar] [CrossRef]
  66. Shajalal, M.; Hajek, P.; Abedin, M.Z. Product backorder prediction using deep neural network on imbalanced data. Int. J. Prod. Res. 2023, 61, 302–319. [Google Scholar] [CrossRef]
  67. Heydari, J.; Govindan, K.; Sadeghi, R. Reverse supply chain coordination under stochastic remanufacturing capacity. Int. J. Prod. Econ. 2018, 202, 1–11. [Google Scholar] [CrossRef]
  68. Mishra, U.; Mashud, A.H.M.; Roy, S.K.; Uddin, M.S. The effect of rebate value and selling price-dependent demand for a four-level production manufacturing system. J. Indus. Manag. Optim. 2023, 19, 1367–1394. [Google Scholar] [CrossRef]
Figure 1. Diagram of the research problem.
Figure 1. Diagram of the research problem.
Mathematics 11 03417 g001
Figure 2. Inventory position of final products (see Sarkar et al. [5]).
Figure 2. Inventory position of final products (see Sarkar et al. [5]).
Mathematics 11 03417 g002
Table 1. Contributions of previous authors.
Table 1. Contributions of previous authors.
Author(s)Production SystemProduction RateRemanufacturingBackordersDemand Type
Taleizadeh et al. [1]SCMConstantNANAReturned products
Machado et al. [2]Single-stageConstantNANANA
C á rdenas-Barr ó n [4]Single-stageConstantSingle itemPlannedConstant
Sarkar et al. [5]Single-stageConstantSingle itemPlannedConstant
Aydin et al. [6]Multi-stageConstantNANANA
Hariga et al. [7]SCMNANANANA
Qingdi et al. [8]NANANANAPredecisional
Gao et al. [11]TraditionalConstantNANANA
Alexopoulos et al. [12]SCMConstantNANASelling-price-dependent
Wee et al. [29]Single-stageConstantSingle itemPlannedConstant
Polotski et al. [30]Single-stageConstantNANANA
M-Haidar and Nasr [31]NAConstantFixedNANA
Silva et al. [32]Single-stageConstantNANANA
Chen [35]NAImperfect deteriorating itemsConstantNANA
Mtibaa and Erray [36]NAConstantPreventive maintenanceNANA
Hage [37]Single-stageConstnatNANANA
Chiu et al. [38]NAConstantFixedNANA
Asadi et al. [40]Multi-stageNANANA
Malik et al. [41]Multi-stageConstantDefective itemsNANA
Huang and Wu [50]NAConstantNAPlanned backorderNA
Mittal et al. [51]NAConstantNAInfluenced by inflationNA
Xu et al. [52]NAConstantNAPartialNA
Bao et al. [54]NAConstantNAPartialNA
Kilic and Tunc [55]NAConstantNAFixedFixed
Guo et al. [56]NAConstantNADependentNA
Heydari et al. [67]NAConstantNANAStocastic
This paperSingle-stage manufacturing and remanufacturingVariableDefective assembled itemsMinimumConstant
NA denotes ‘not applicable’.
Table 2. Different cost components for this single-stage production-inventory model.
Table 2. Different cost components for this single-stage production-inventory model.
CostReason for the CostTime PeriodExpression
Setup with inspection costTo set up the production and inspection processes0 S j D j Q j .
Manufacturing costTo manufacture the parts of the assembled products in a single-stage within the time interval T 1 + T 2 M j P j ( 1 + E [ β j ] ) P j D j .
Remanufacturing costTo remanufacture the imperfect items within the time interval T 3 D r j P j E [ β j ] D j Q j .
Holding costTo hold the parts of the assembled product for the entire cycleT H j I A V G j
Backorder costTo account for backorders due to imperfect manufacture through the entire cycleT B c j B j D j Q j + B l j B j 2 ( 1 E [ β j ] ) 2 Q j ( 1 E [ β j ] ) D j P j .
Table 3. Parametric values for assembled products with two spare parts.
Table 3. Parametric values for assembled products with two spare parts.
Parameters ( j = 2 ) ValuesParametersValues
m2 D j (units/time) 300 , 350
λ 2 18 B l j (USD/unit/
unit time)
10 , 11
λ 2 18 B l j (USD/unit/
unit time)
10 , 11
H j (USD/unit time) 50 , 55 B c j (USD/unit) 1 , 2
S j (USD/setup) 50.22 , 55.22 M j (USD/unit) 7 , 8
V j (USD/unit) 55 , 65 S c j (square meters) 3 , 4
D r j (USD/item) 5 , 7 g (USD) 33 , 000
f400 λ 1 15
Table 4. Parametric values.
Table 4. Parametric values.
Parameters ( j = 3 ) ValuesParametersValues
m3 D j (USD/unit/
unit time)
350 , 320 , 300
λ 2 0.008 B l j (USD/unit/
unit time)
10 , 10 , 10
H j (USD/unit time) 50 , 50 , 50 B c j (USD/unit) 1 , 1 , 1
S j (USD/setup) 50.22 , 50.22 , 50.22 M j (USD/unit) 7 , 7 , 7
V j (USD/unit) 60 , 60 , 60 S c j (square meters) 2 , 2 , 2
D r j (USD/item) 6 , 6 , 6 g (USD)58,000
f400 λ 1 0.009
Table 5. Formulas for determining the expected value with different distribution patterns.
Table 5. Formulas for determining the expected value with different distribution patterns.
DistributionFormula for Calculating the Expected Value E [ β j ]
Uniform distribution a j + b j 2
Triangular distribution a j + b j + c j 3
Double-triangular distribution a j + 4 b j + c j 6
Beta ( β ) distribution α j α j + β j
χ 2 distribution κ j
Table 6. Formulas for determining the expected value with different distribution patterns.
Table 6. Formulas for determining the expected value with different distribution patterns.
DistributionUniformTriangularDouble-TriangularBeta χ 2
( a j , b j ) ( a j , b j , c j ) ( a j , b j , c j ) ( α j , β j ) ( κ j )
( 0.03 , 0.07 ) ( 0.03 , 0.04 , 0.07 ) ( 0.03 , 0.04 , 0.07 ) ( 0.03 , 0.07 ) 0.03
( 0.03 , 0.07 ) ( 0.03 , 0.04 , 0.07 ) ( 0.03 , 0.04 , 0.07 ) ( 0.03 , 0.07 ) 0.03
( 0.04 , 0.08 ) ( 0.04 , 0.04 , 0.07 ) ( 0.04 , 0.04 , 0.08 ) ( 0.04 , 0.08 ) 0.04
0.03 , 0.04 , 0.05 0.047 , 0.047 , 0.05 0.043 , 0.043 , 0.047 0.3 , 0.3 , 0.33 0.03 , 0.03 , 0.04
Table 7. Optimal results for an assembled item with two spare parts.
Table 7. Optimal results for an assembled item with two spare parts.
DistributionProduction Rate ( P j ) (Units/Time)Production Batch Size Q j (Units/Year)Backorder Quantity B j (Units/Year)Total Cost (USD/Year)
Uniform distribution90, 23770, 67868, 57236,309
Triangular distribution91, 43800, 17880, 10832,652
Double-triangular distribution92, 199449, 31960.81, 30.6227,180
Beta distribution90.31, 43.9650, 41889, 112335,531
χ 2 -distribution39.28, 23.3164.44, 117.4855.62, 43.0322,641
Table 8. Optimal results for an assembled item with three spare parts.
Table 8. Optimal results for an assembled item with three spare parts.
DistributionProduction Rate ( P j ) (Units/Time)Production Batch Size Q j (Units/Year)Backorder Quantity B j (Units/Year)Total Cost (USD/Year)
Uniform distribution517.57, 572.91, 445.3936.105, 51.32, 68.578.74, 22.32, 26.9828,435
Triangular distribution663.76, 343.29, 373.3956.32, 61.95, 128.1618.32, 2.01, 27.6327,300
Double-triangular distribution685.7, 612.44, 628.643.48, 70.83, 68.1714.16, 21.46, 28.1030,377
Beta distribution545.12, 700.2, 70825.23, 91, 8298, 99, 9945,306
χ 2 -distribution485.99, 386.43, 404.3451.03, 26.44, 51.7324.06, 20.65, 21.9326,938
Table 9. Numerical and theoretical comparison with previous studies.
Table 9. Numerical and theoretical comparison with previous studies.
Existing LiteratureProduction RateProduct TypeDefective RateTotal Cost (USD/Year)
C á rdenas-Barr ó n [4]FixedSingleFixed rate3430
Sarkar et al. [5]FixedSingleRandom2629
Sivashankari and Panayappan [9]FixedSingleShortages455,185
Sanjai and Periyasamy [10]FixedSingleNot considered450,915
This studyVariableSingle assembledRandom22,641
Table 10. Sensitivity analysis.
Table 10. Sensitivity analysis.
ParameterChangesBDTDDTDUDCD
a j 50 35.77 47.35 45.87 47.15 50.72
25 17.88 23.68 22.94 23.57 25.36
+ 25 17.88 23.68 22.94 23.57 25.36
+ 50 35.77 47.35 45.87 47.15 50.72
b j 50 14.85 2.52 1.11 3.76 10.33
25 6.10 1.25 0.55 1.85 4.90
+ 25 4.53 1.22 0.55 1.79 4.50
+ 50 2.41 1.09 3.54 8.69
c j 50 8.65 5.48 10.21 8.30 8.55
25 4.71 2.68 4.87 3.99 0.99
+ 25 5.80 2.56 4.51 3.74 1.87
+ 50 5.02 8.71 7.28 1.34
κ j 50 0.08 0.66 0.61
25 0.068 0.80
+ 25 0.075 0.79
+ 50 0.045 0.050 0.004
f 50 + 13.72 + 29.31 + 27.88 + 22.25 + 24.75
25 + 6.86 + 14.66 + 13.94 + 10.96 + 12.38
+ 25 6.86 14.66 13.94 10.96 12.38
+ 50 13.72 + 29.31 27.88 22.25 24.75
g 50 + 0.21 + 0.41 + 0.39 + 0.35 + 0.38
25 + 0.10 + 0.21 + 0.20 + 0.17 + 0.19
+ 25 0.10 0.21 0.20 0.17 0.38
+ 50 0.21 0.41 0.39 0.35 0.19
M j * 50 11.45 22.33
25 21.28 31.41 11.65 15.77
+ 25 14.34 90.55 60.02 39.63 18.50
+ 50 17.80 27.45 68.33 57.59 65.48
S j 50 10.64 10.74 12.21 12.96 13.85
25 10.33 11.35 12.20 12.32 11.74
+ 25 10.31 10.32 11.17 12.29 10.67
+ 50 20.63 12.58 12.30 13.55 33.30
H j 50 7.51 1.73 2.70
25 2.74 3.34 3.37 3.34
+ 25 2.58 3.04 3.08 3.05 2.92
+ 50 5.03 5.88 5.96 5.64
B c j 50 0.034 0.32 0.25 1.30 1.44
25 0.17 0.064 0.61 0.64 0.70
+ 25 0.16 0.061 0.59 0.61 0.66
+ 50 0.33 0.09 1.14 0.18 0.27
B l j 50 0.49 0.62 0.65 0.63 0.55
25 0.24 0.29 0.31 0.30 0.26
+ 25 0.21 0.27 0.28 0.27 0.24
+ 50 0.41 0.51 0.54 0.51 0.46
BD: β distribution, TD: triangular distribution, DTD: double-triangular distribution, UD: uniform distribution, CD: χ2 distribution, “−” means ‘not feasible’.
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Ganguly, B.; Dey, B.K.; Pareek, S.; Sarkar, B. Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing. Mathematics 2023, 11, 3417. https://doi.org/10.3390/math11153417

AMA Style

Ganguly B, Dey BK, Pareek S, Sarkar B. Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing. Mathematics. 2023; 11(15):3417. https://doi.org/10.3390/math11153417

Chicago/Turabian Style

Ganguly, Baishakhi, Bikash Koli Dey, Sarla Pareek, and Biswajit Sarkar. 2023. "Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing" Mathematics 11, no. 15: 3417. https://doi.org/10.3390/math11153417

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop