Abstract
Research concerning the chain effects and disaster mechanisms of landslides resulting from the combined influences of goaf and mining blasting is lacking. Goaf and mining blasting represent typical artificial disturbances that affect mine slopes. This paper focuses on the Jiweishan landslide in Wulong, Chongqing, as the primary case study. Through comprehensive geological investigation, numerical simulation, and theoretical analysis, the landslide disaster mechanism influenced by the combined effects of goaf and mining blasting was systematically examined. In this study, UDEC software was used to reveal the failure mechanism of Jiweishan landslide under the combined effects of goaf and mining blasting by using the global block discrete element method in the numerical model. Following the formation of extensive goaf areas from mining, the overlying strata lost support, resulting in uneven settlement. The potential sliding mass tended to experience slight subsidence and lateral deformation. The prescribed blasting input promoted progressive failure in the excavated slope model. Under the given blasting wave input, the Jiweishan landslide exhibited a progressive advancing failure trend: tensile fractures first initiated and developed at the trailing edge of the landslide. As the blasting process continued, the fractures at the rear edge expanded, extended, and connected, whereas the anti-sliding performance of the front-edge locking section progressively deteriorated. Ultimately, the entire front-edge sliding mass was sheared off, resulting in a debris flow disaster. The findings inform sustainable mining practice by highlighting the need to account for goaf-induced deformation in pre-blast slope assessments and by identifying priorities for long-term monitoring, including crack opening at the rear and displacement in the middle and at the front locking segment.
1. Introduction
China’s southwestern region is rich in mineral resources, but extensive mining activities have frequently led to landslides, resulting in significant casualties and economic losses. Given the severe consequences of such geological disasters, it is both urgent and necessary to investigate the relevant disaster mechanisms and implement timely preventive measures. The existing research on landslide disasters has primarily employed detailed geological field surveys, numerical simulations, physical model tests, integrated space–air–ground monitoring, theoretical calculations, and laboratory and in situ tests [1,2,3,4,5]. Through qualitative and quantitative analyses, various causative factors of landslide disasters have been systematically revealed, and the associated disaster mechanisms along with the entire deformation evolution process have been scientifically summarized [6,7,8,9].
Various triggering factors that are associated with mining operations can significantly impact the stability of a slope. Several typical landslide-related circumstances are presented in Table 1. Consequently, the formation of landslides results from multiple influencing factors, including mining activities, rainfall, blasting, and geological structures. These factors can be categorized into dominant internal causes and triggering external causes. For instance, karst structural planes provided favourable structural conditions for the Baiyan landslide to undergo deformation and failure due to mining disturbances [10]. Heavy rainfall increased the density and decreased the shear strength of the loose residual soil layer on the surface of the Niu’erwan landslide [11]. Under the combined effects of multilayer mining disturbances and rainfall, the Jianshanying landslide exhibited a “three-section” surface deformation pattern [12]. The Qinghai Copper Mine experienced a collapse failure under conditions of groundwater seepage and freeze–thaw cycles [13]. Under the influence of underground mining, the Jiguanling steeply dipping layered rock slope underwent a progressive failure process that was characterized by “bending deformation → interlayer dislocation → mining-accelerated toppling deformation → underlying rock mass resistance → shear failure of underlying rock mass → overall instability”, which represented the compound failure mode of toppling–sliding instability in layered rock masses [14]. The Kaiyang Phosphorite Mine employed the room-and-pillar method. The overall structure experienced a failure due to rainfall, which could be categorized into three distinct failure modes: a fracture-induced toppling failure, a fracture-induced sliding failure, and a fracture-induced collapse–sliding failure [15]. Rainfall led to increases in the water content and saturation level within the sliding mass soil of the Dawafang landslide, resulting in a decrease in the strength of the sliding zone. The landslide deformation effect intensified during the rainy summer season and diminished during the dry winter season. Mining activities directly disrupted the stress balance of the slope, and in conjunction with rainfall, they facilitated the landslide deformation process: the front soil body underwent active deformation, whereas the rear soil body moved forwards, resulting in a traction–push landslide [16].
Table 1.
Some typical underground-mining-induced landslides that have occurred in China.
Underground mining is an anthropogenic factor that leads to landslide instability. The goaf formed by underground mining causes the overlying strata to deform and fail, altering the stress conditions that propagate to the slope surface, thereby directly inducing slope deformation and instability. Furthermore, as critical triggering factors, blasting vibrations generate dynamic loads that significantly reduce the stability of rock masses, readily inducing slope failures. Unfortunately, the existing studies have largely overlooked the combined effects of mining disturbances and blast-induced vibration loads on slope bodies, focusing predominantly on factors such as mine unloading or other influences. The quantitative and refined research conducted on the disaster-causing mechanisms of such multifield combining effects remains insufficient. Therefore, this paper focuses on the Chongqing Jiweishan landslide as its research object, employing discrete element software (UDEC) to conduct numerical simulation. It comprehensively analyzes the entire process of instability, failure, and deformation evolution under the combined actions of goaf and mining blasting. Long-term slope stability is an important consideration for sustainable mining where underground excavations extend beneath rock slopes. Excavation can alter the deformation state of a slope before subsequent blasting takes place. Examining these disturbances in sequence can help identify which parts of the slope warrant monitoring and what deformation should be considered when reviewing blasting plans. The Jiweishan case is used here to examine this sequence and its implications for mine slope risk management.
2. Overview of the Jiweishan Landslide
On 5 June 2009, a large-scale landslide occurred on Jiweishan Mountain in Tiekuang Township, Wulong District, Chongqing. Approximately 5 million cubic metres of rock fell from a height of 1500 metres within a very short period. The sliding mass collided violently, scraped the ground, and eventually accumulated approximately 2200 metres (Figure 1b). This disaster resulted in 74 fatalities and 8 injuries, and was classified as an extremely large-scale geological disaster [19,20]. The Jiweishan landslide is located in Tiekuang Township (107°26′1.46″ E, 29°14′14.85″ N) (Figure 1a), which is generally characterized as high in the south and low in the north. The highest point of the peak is 1600 m, and the lowest point is 1000 m, which belongs to the middle mountain landform.
Figure 1.
The location and view of the Jiweishan landslide. (a) location of the Jiweishan landslide; (b) an overview of the Jiweishan landslide.
The volume of the Jiweishan landslide deposit is approximately 7 × 106 m3, with the length of the accumulation area being 2150 m (Figure 2a). The maximum thickness of the main accumulation area is about 55 m [21,22]. The geological engineering profile of the Jiweishan landslide is shown in Figure 3.
Figure 2.
Overview of the Jiweishan landslide: (a) UAV image of the landslide full view; (b) exposed strata in sliding source area; (c) large-scale structural planes and strata distribution.
Figure 3.
Geological profile of the Jiweishan landslide.
In general, the rock strata in the landslide area exhibit attitudes ranging from 332° to 355° in the dip direction and from 15° to 35° in the dip angle, indicating a monoclinic structure. Based on detailed geological field surveys and drilling results, the lithology of the original slope strata at the Jiweishan Mountain, from top to bottom, is as follows (Figure 2c): the Lower Permian Maokou Formation (P1m), which consists of thick limestone; the Lower Permian Qixia Formation (P1q), which is composed of medium-thickness bituminous limestone; the Lower Permian Liangshan Formation (P1l), which is characterized by haematite-bearing claystone; and the Middle Silurian Hanjiadian Formation (S2h), which is represented by silty shale [23,24].
The Lower Permian Maokou Formation (P1m) is composed mainly of grey–white thick-layered microcrystalline limestone, which is exposed at the top of the Jiweishan Mountain, and has a thickness of approximately 50 m. The karstification effect in this stratum is strong, and many vertically developed karst troughs are present.
The Lower Permian Qixia Formation (P1q) is divided into three sections: upper, middle and lower layers (P1q3, P1q2, and P1q1, respectively). The upper rock layer (P1q3) consists of dark grey limestone with a thickness of approximately 20 m. The middle rock layer (P1q2) also consists of dark grey limestone but is approximately 40 m thick. In the landslide source area, the steep cliff is exposed in the P1q2 strata, where a relatively gentle slope surface is locally developed. The slope is well covered with vegetation, which indicates poor rock mass integrity and low strength (Figure 2b). The lower rock layer (P1q1) consists of grey limestone and is about 90–95 m thick [25].
The Lower Permian Liangshan Formation (P1l): This formation is approximately 10–14 m thick, with the main lithology consisting of carbonaceous shale and grey and grey–black clayey shale. The mined iron ore is located within this layer.
The Middle Silurian Hanjiadian Formation (S2h): This formation is composed mainly of grey-green and grey shales interbedded with muddy limestone, and it has low strength.
3. Method
In this study, a detailed geological survey, discrete element numerical simulation (UDEC 7.0) and theoretical analysis were used to consider the influences of goaf and mining blasting trigger factors on the Jiweishan landslide. This research aimed to scientifically reveal both the internal and external factors that contributed to the occurrence of the Jiweishan landslide. Through the numerical simulation of the entire landslide failure process, the disaster mechanism and failure characteristics of the Jiweishan landslide were finally summarized.
4. Factors Influencing the Slope Stability
The factors influencing the stability of the Jiweishan landslide can be divided into two main groups: dominant factors and triggering factors. Dominant factors can be considered internal factors, such as the geological structure, rock mass structure and types of rock and soil, etc. In contrast, triggering factors can be considered external factors, such as rainfall infiltration, seismic dynamics, goaf and mining blasting, etc. The details are as follows.
4.1. Dominant Factors
The dominant factors contributing to the Jiweishan landslide can be categorized into lithological composition and slope structure. Together, these elements determine the geological stability of the slope. They represent the key internal geological conditions that triggered the Jiweishan landslide and form the foundational basis for analyzing its causes and stability.
4.1.1. Lithological Composition
The original slope of the Jiweishan Mountain showed the structural characteristics of upper hard and lower soft, upper steep and lower slow, that is, the middle and upper sections of the slope were composed of the limestone of the Lower Permian Maokou Formation and Qixia Formation. Specifically, the middle and upper sections of the slope were formed from limestone belonging to the Lower Permian Maokou Formation and Qixia Formation. This limestone is known for its integrity, hardness, and density. In contrast, the toe of the slope consists of relatively soft, low-density shale and mudstone derived from the Middle Silurian Hanjiadian Formation.
These soft rock masses are inherently loose, become easily softened and disintegrated upon their exposure to water, and exhibit low shear strength. From the perspective of stress analysis, this heterogeneous lithologic combination of “hard rock overlying soft rock” makes the toe of the slope prone to shear failures because of uneven stress distribution, thereby increasing the likelihood of shear failures. Consequently, the overall stress balance of the slope body is disrupted, which poses a risk to its stability.
4.1.2. Slope Structure
In the field of landslide instability mechanism research, the theory of dominant structural planes is among the key theories for explaining the failure modes and evolutionary mechanisms of rock slopes. This theory posits that the dominant structural planes determine the failure modes of rock slopes and play a primary role in controlling their stability. Such structural planes are characterized as weak structures within the target slope, possessing inferior mechanical properties that directly influence the stress distribution characteristics and instability process of the slope. Their controlling influence far surpasses that of ordinary secondary structural planes, making them the core factors that trigger slope instability. Through comprehensive geological survey data and field investigations of the Jiweishan landslide, it was found that the dominant structural planes consist of three components: the weak interlayer of the sliding surface, tectonic joints, and deep karst structural planes. These three types of structural planes exhibit spatial distribution and mechanical property variations, collectively governing the instability and failure processes of the Jiweishan landslide.
- Weak interlayer at the slip surface
The weak interlayer of the sliding surface primarily consists of carbonaceous and bituminous shale. It is situated between P1q2 and P1q3, is approximately 30 cm thick, and has a general strike of 345° ∠23°. This interlayer forms the basal sliding boundary of the landslide, along which the entire landslide mass has experienced bedding-parallel shear sliding.
- 2.
- Structural joints
Wulong Jiweishan Mountain is located on the northwestern limb of the Zhaojia Anticline, and has a monoclinic structure. The occurrence of the rock strata are 345°∠20°~32°. Through field geological survey, it is shown that there are multiple sets of structural joints in the slope body, among which two nearly orthogonal steep-dipping joints, J1 and J2, are pivotal for controlling the landslide formation. Both sets of joints originated in a structural manner, featuring planar and smooth surfaces with a uniform development density, and they extend throughout the entire slope, significantly compromising the integrity of the rock mass. J1 is a longitudinal steep-dipping joint that is nearly parallel to the rock strike, with an occurrence of 185° ∠ 75°, forming a tensile crack at the rear edge of the landslide (Figure 2b). Conversely, J2 is a transverse steep-dipping joint that is nearly perpendicular to the rock strike, with an occurrence of 77° ∠ 80°. It constitutes the western boundary of the landslide body and provides the boundary for the Jiweishan landslide to slide out from the northeast as a whole. The weak interlayer and the above two groups of structural joints are organically combined to cut the rock mass into building blocks that form the Jiweishan landslide body.
- 3.
- Karst deep structural plane
The Jiweishan Mountain is located in the mountainous region of Southwest China, which has a subtropical humid monsoon climate. The humid and rainy southwestern mountainous area provides favourable hydrodynamic conditions for the continuous development of karstification. The study area is dominated by limestone, and limestone is a type of carbonate rock. Its main mineral component is calcite (CaCO3). Calcite possesses unstable chemical properties, making it susceptible to chemical reactions with water. Karstification is a very significant deterioration method in carbonate rock.
The core mechanism of limestone is chemical dissolution. In essence, the CO3− in calcite reacts with the H+ in water. The calcite minerals contained in the limestone rock mass are continuously dissolved and lost, and the skeleton of the rock mass is continuously dissolved and destroyed. The upper rock mass of the Jiweishan Mountain experienced strong karstification, and the strength of the rock mass greatly decreased.
The deep and large dissolving structural planes in the mountain are shown as follows: T0, T1, and T2 (Figure 2c). These three groups of deep and large dissolving structural planes are cut and organically combined with each other, together constituting the complete boundary of the Jiweishan landslide.
The T0 crack is nearly vertical, with an overall trend of N50°~W70°, approximately 152 m long and 60~70 m deep, constituting the southern boundary of the landslide. The T1 crack is 530 m long and is 60~70 m deep, which constitutes the western boundary of the landslide. The length of the T2 fracture is approximately 150 m, and many vertically developed karst grooves are present at the interface between the karst zone and the stable mountain.
4.2. Triggering Factors
In addition to the above internal dominant factors, the occurrence of the Jiweishan landslide also depended on obvious external triggering factors, which mainly included the effects of goaf formed by underground iron mining and the vibration waves generated by blasting activities. Both types of external human-induced disturbances broke the original stress equilibrium state of the slope and became the direct cause of the landslide. They worked together with the internal geological conditions to trigger the slope instability.
4.2.1. Effect of Goaf
In addition to the above natural geological factors, unreasonable mining activities executed by humans were key factors in the occurrence of the Jiweishan landslide. They formed a superposition effect with natural geological deterioration, which further aggravated the instability of the slope. According to the existing data, since the beginning of the 20th century, the iron ore layer in P1l of the Jiweishan Mountain has been mined. The mining direction continued to develop from the upstream side (south side) to the downstream side (north side) of the mountain. The large-scale mined-out iron ore area is located approximately 78 m below the leading edge sliding body, and the mining area is 360 m long [26,27,28]. From the point of view of mining technology, the iron ore in this area was mined according to the room-and-pillar method, which generally supported the overall stability of the mountain. However, the actual situation of the iron ore at Jiweishan Gonghe involved over-exploitation. According to the information released by the Chongqing Municipal Government, the annual mining capacity of the Gonghe Iron Mine is 13,000 tons, which represents a small-scale iron ore mining enterprise. According to a conservative estimate of the first-line miners, the actual daily mining volume of the iron mine could reach 50 tons. Based on this calculation, the annual mining volume exceeded 18,000 tons, and the actual mining volume exceeded the approved mining capacity by approximately 38%. More seriously, during the process of mining the Jiweishan Mountain, in pursuit of maximizing economic gains, the mine owners ignored safety issues and illegally replaced the safety pillars. According to the imposed regulations, a sufficient number of ore pillars must be retained in the goaf as safety pillars. Each column is generally 2–3 metres high, the cross section is 5 × 5 m, and the distances between two pillars range from 5 to 8 m. However, to increase the attained mining profits, the mine owners resorted to bundling three to five pine trees together as makeshift safety pillars. Clearly, the safety of wood is not comparable to that of iron. The compressive strength, shear strength and durability of wood are significantly inferior to those of iron ore. Over-exploitation and the replacement of safety pillars were important factors that led to the occurrence of the Jiweishan landslide.
4.2.2. Vibrations During Mining Blasting
Notably, according to the recollections of local villagers, miners were actively engaged in drilling blast holes within the iron mine at approximately 7:00 the night before the landslide occurred on the Jiweishan Mountain. This operation served as a crucial preliminary step for the subsequent blasting mining process. The mechanical disturbances and stress release that were associated with the drilling process further exacerbated the instability of the rock mass. During this period, a large-scale rockfall occurred on the external slope, approximately more than 1000 cubic metres in volume. Despite the evident risks, the mine owners instructed the miners to persist with their drilling activities. At approximately 11:00 in the evening, small-scale sliding bodies fell on the external mountain. The continuous disturbance of the blasting operation resulted in the stability of the Jiweishan landslide being crushed.
The vibration waves generated by blasting had an impact and a shear effect on the mountain, causing strength attenuation for the landslide rock mass, which was not conducive to stability. In addition, the blasting effect caused the original joints and cracks in the rock mass to open and produce new cracks, destroying the integrity of the rock mass, and leading to a decrease in landslide stability. Based on the above analysis, the landslide was closely linked to underground blasting mining, that is, blasting mining was an important triggering factor for the Jiweishan landslide.
5. Numerical Modelling
5.1. Implementation of Discrete Element Numerical Model
Based on the geological engineering profile of the Jiweishan landslide (Figure 3), we constructed a numerical model as shown in Figure 4. The model was 1400 m long and 720 m high. The monitoring points were marked from 1 to 14, and were used to monitor the key parameters such as the horizontal and vertical displacement, velocity, and stress values. The red rectangular block in the local enlarged figure below denotes the ore room, and the blue rectangular block represents the pillar.
Figure 4.
Numerical model of the Jiweishan landslide.
The numerical model employed the global block-based discrete element method, where both the sliding mass and the sliding bed were discretized into noncontinuously deformable grids, effectively reflecting the large-scale discontinuous discretization of the model. In the numerical model of the Jiweishan landslide, the sliding body part was divided into Voronoi polygon grids (Figure 4, Subzone 1) to simulate the potential sliding body of the granular structure (using the constitutive Mohr–Coulomb model). Owing to the dense mesh of the sliding body, in the figure, we closed the zone division; that is, the sliding body part only showed the joints formed after the Voronoi cutting. It was beneficial to simulate the long-distance debris flow after the critical instability failure of the landslide. Brick-shaped grids were used in the upper-middle section (Figure 4, Subzone 2, which used the constitutive rigid body model). In addition, to facilitate the observation of the subsidence and deformation of the overlying strata after the iron ore layer was mined, the mesh size of the brick-shaped grids on the right was significantly smaller than that on the left. The lower-middle section of the sliding bed utilized triangular meshes (the bedrock in Figure 4 adopted an elastic constitutive model) to enable the setting of velocity boundaries during dynamic analysis. The sliding mass was discretized into Voronoi polygonal blocks with the maximum edge-length parameter set to 4 m. The central-left and central-right regions were divided into regular rectangular blocks measuring 16 m × 8 m and 8 m × 4 m, respectively. The underlying sliding bed was represented by deformable blocks with internal computational zones generated using an edge-length parameter of 20 m.
In the static calculations, the model adopted a fixed boundary setting. The boundary conditions of the model constrained horizontal and vertical displacements at the left and right. The boundary at the bottom of the model constrained the vertical displacement. The model first reached the initial equilibrium state under the condition of self-weight, and the unbalanced force ratio was reduced to 10−5 or less as the convergence criterion.
During dynamic loading, the left and right boundaries of the model were free-field boundaries, and the bottom boundary was applied with a viscous boundary. This reduced the impact of reflected waves. The mesh size must be less than 1/8~1/10 of the wavelength corresponding to the highest frequency of the input waveform. The maximum mesh size of the model was 20 m to meet the requirements. In the dynamic calculation of the model, local damping was used to consider energy dissipation, and the damping coefficient was 0.157.
5.2. Selection of Physical and Mechanical Parameters
The lithology of the original slope can be simplified as follows: from top to bottom, it comprises the limestone of the Lower Permian Maokou Formation, the limestone of the Lower Permian Qixia Formation, the ore bed of the Lower Permian Liangshan Formation, and the shale of the Middle Silurian Hanjiadian Formation.
The model parameters were determined primarily with reference to experimental results and numerical modelling parameters reported in previous studies of the Jiweishan landslide, taking into account the mechanical characteristics of the different strata and discontinuities. Yin et al. [19] investigated the apparent-dip sliding mechanism of the Jiweishan landslide using FLAC3D to simulate natural conditions and mining disturbances. They determined the mechanical parameters based on data from comparable rock masses and back-analysis. The densities of the Maokou and Qixia Formation limestones were approximately 2600 kg/m3, with internal friction angles ranging from 25° to 30°. The friction angle and cohesion of the sliding discontinuity were 20° and 0.2 MPa, respectively. Studies by Ge et al. [20] provided reference values for the limestone rock mass parameters: the tensile strength, bulk modulus, and shear modulus of the Maokou and Qixia Formation limestones ranged from 3.66 to 4.73 MPa, 16.21 to 25.10 GPa, and 9.50 to 14.20 GPa, respectively. Deng et al. [29] used X-ray diffraction, scanning electron microscopy, and direct shear creep tests to investigate the mineral composition, microstructure, and long-term shear strength of the soft rock within the sliding zone, obtaining a long-term cohesion of 1.12 MPa and an internal friction angle of 17°. The above research provides a reference for the selection of parameters of different strata and structural planes.
The primary structural planes were joint planes and bedding planes. The recommended values for the physical and mechanical parameters of the aforementioned lithology and structural planes are presented in Table 2 and Table 3, respectively.
Table 2.
Physical and mechanical parameters of the rock masses in different strata.
Table 3.
Mechanical parameters of the structural planes.
The sliding body element employed the constitutive Mohr–Coulomb model, adopting parameters such as density, the bulk modulus, the shear modulus, cohesion, the tensile strength, and the friction angle. In contrast, the middle and upper elements utilized the constitutive rigid body model, which relies solely on density parameters. The sliding bed element, as characterized by the elastic constitutive model, adopted density, the bulk modulus, and the shear modulus.
5.3. Simulation Analysis of Underground Mining
An iron mine in the Jiweishan Mountain was mined via the room-and-pillar method. This method involved dividing the orebody into rooms and pillars that were arranged in an alternating pattern. Initially, the rooms were mined, and the pillars were left in place to maintain stability. Once the rooms were extracted, the pillars were subsequently mined.
According to relevant reports [30], the Jiweishan iron mine initially adopted a room-and-pillar mining method, with mining rooms spaced approximately 6–8 m apart and natural ore pillars measuring 5 m × 5 m × 2.8 m. During the later mining stage, large-scale pillar extraction was conducted, reducing the pillar width from approximately 5 m to 1 m (removing about two-thirds of the original width), with bundled pine timber subsequently used for support. Previous studies reported that the iron ore seam was 0.96–1.35 m thick, with an average thickness of 1.12 m, and that mining progressed from south to north [25]. Based on these geological and mining conditions, the ore seam thickness was simplified to 2 m, and the average dimensions of the rooms and pillars approximately 6 × 2 m in numerical model, comprising 25 mining rooms and 24 pillars.
A total of 25 rooms were mined, and 24 pillars were recovered in four stages. In the first stage, 12 rooms were simultaneously excavated as a group; in the second stage, 13 rooms were excavated simultaneously. During the room mining process, the pillars temporarily supported the roof. In the third stage, the pillars formed in the first stage were mined; in the fourth stage, the pillars formed in the second stage were mined.
The present model adopted a simplified representation of the room-and-pillar mining system. The primary objective was to investigate the mechanical response and failure mechanism of the Jiweishan slope under specified room-and-pillar mining and blasting conditions, rather than to reconstruct the complete geometry of the underground mine.
5.3.1. Deformation Characteristics of the Overlying Strata After Mining
As the iron ore layers of the Jiweishan landslide were sequentially mined, the overlying strata above the goaf gradually deformed and were destroyed due to the redistribution of stress. The corresponding curves indicated that during the first two mining stages, the monitoring points exhibited essentially no vertical displacement, suggesting that the overlying strata remained relatively stable without subsidence. This stability was attributed to the retention of the pillars during the room-and-pillar mining method, which supported the roof and contributed to the stability of the overlying strata. In the mining stage III, the vertical displacements at monitoring points 1, 2, and 3 were approximately 0.07 m (Figure 5a), indicating that the mining process at this stage disturbed the overlying strata. After mining stage IV, all the pillars were completely extracted, resulting in the loss of support for the goaf, which led to significant subsidence in the overlying strata. The maximum vertical displacement at monitoring point 1 reached 0.42 m (Figure 5a), whereas the maximum vertical displacement at monitoring point 3 was 0.24 m (Figure 5a). This observation indicated that the displacement field gradually increased from the top to the bottom, with greater settlement occurring near the mining area and less settlement occurring farther away. Differential settlement occurred vertically in the overlying strata above the goaf, posing a significant risk to the stability of the mountain. The displacement contour (Figure 6d) further confirmed the occurrence of differential settlement in the overlying strata above the goaf. The primary reason for the varying vertical displacement values of the overlying strata in the model was that, as mining progressed, the roof continuously subsided to fill the goaf. Due to the fragmentation and expansion of the roof strata following the failure, the further the overlying strata were from the mined-out layer vertically, the less space was available for subsidence; that is, the available downwards subsidence space for the upper strata diminished, resulting in a smaller amount of vertical displacement.
Figure 5.
Displacement curves obtained from monitoring points during the mining process. (a) vertical displacement of overlying strata; (b) vertical displacement of potential sliding body; (c) horizontal displacement of potential sliding body. (I refers to mining first stage, II refers to mining second stage, III refers to mining third stage, IV refers to mining fourth stage).
Figure 6.
Total displacement cloud map of the mountain during mining activities. (a) first stage; (b) second stage; (c) third stage; (d) fourth stage.
Figure 6d shows that mining induced settlement of the overlying strata, with the displacement distribution exhibiting a subsidence basin centred on the mined-out area. The enlarged views show separation at some shallow block contacts, accompanied by local cracks distributed in a ladder shape, indicating differential deformation between adjacent blocks. In the absence of corresponding field fracture measurements and displacement monitoring data, these results primarily describe deformation characteristics within the model. Their actual magnitudes and the extent of fracture development require further validation.
5.3.2. Deformation Characteristics of the Slope After Mining
After the first and second stages of mining, no significant vertical settlement occurred in the Jiweishan slope because of the supporting effect of the pillars. However, following the partial extraction of the pillars in stage III, the slope lost some of its support, resulting in a maximum vertical displacement of 0.06 m at monitoring point 4 (Figure 5b). Upon the completion of the extraction procedure in the fourth stage, the support system of the goaf slope entirely failed, leading to the redistribution of stress in the overlying strata, which caused the maximum vertical displacement at monitoring point 4 to increase to 0.12 m (Figure 5b). In summary, as room-and-pillar mining progressed, the vertical displacement of the sliding mass of the Jiweishan Mountain continuously increased, indicating that the Jiweishan landslide experienced sustained settlement and deformation effects, with the degree of deformation intensifying as the mining intensity level increased. This poses significant slope stability risks. Additionally, according to the horizontal displacement monitoring curve shown in Figure 5c, the final horizontal displacements of monitoring points 4, 5, 6, and 7 were 0.032 m, 0.030 m, 0.029 m, and 0.027 m, respectively. The maximum horizontal displacement occurred at point 4, which was located near the right side of the front edge of the slope. In terms of the temporal evolution characteristics, the horizontal displacements at all four monitoring points gradually increased throughout the mining process, indicating that the slope clearly experienced lateral inclination. Ongoing mining activities disrupted the original stress equilibrium of the slope, accelerating the deformation of the Jiweishan landslide. The horizontal displacement and vertical displacement values at the top of the mountain indicate that the top of the mountain was dominated by longitudinal settlement under the action of mining.
5.3.3. Stress Evolution Process After Mining
The room-and-pillar mining process continuously altered the internal stress field of the Jiweishan slope. The shear strain increment contour under each mining condition clearly reflected the progressive evolution trend of shear damage within the slope. After the first stage, the entire profile predominantly exhibited a uniform blue colour, with the maximum shear strain increment occurring only at the crack on the rear edge of the landslide, which was manifested as an extremely faint, thin light-coloured band (Figure 7a). These observations indicated that the first mining operation caused a limited disturbance to the upper section of the slope, and that the slope remained generally stable at this stage. After the second mining operation, the shear strain increment contour map displayed no significant change compared to the first mining condition; thus, no further analysis was conducted (Figure 7b). Following the third mining operation, the light-coloured band at the rear crack extended to a certain degree, and a new light-coloured band emerged at the front cracks (Figure 7c). These findings suggested that mining had a relatively significant effect on fissure-type, loose structural planes with poor integrity. Consequently, the likelihood of a failure in both the rear-edge and front-edge fissures increased under the influence of mining activities. After the fourth mining operation, a notable peak shear strain increment of 1 × 10−3 was observed at the weak interlayer located at the bottom of the front edge (Figure 7d), indicating that this area was particularly susceptible to shear failure. Additionally, multiple fissures at the front edge exhibited varying degrees of high shear strain increment zones, which intensified the overall shear damage suffered within the karst locking segment at the front edge. Standard room-and-pillar mining requires pillars to support the overlying rock mass for ensuring slope safety. However, the Jiweishan landslide was caused by illegal mining, where many pillars were privately extracted. Combined with the above analysis, the response of the upper sliding mass of Jiweishan Mountain was relatively small after the first two mining stages, but relatively large after the latter two stages. This indicated that illegal mining had created adverse safety hazards for the Jiweishan landslide.
Figure 7.
Contour maps of the maximum shear strain increment after mining.
5.4. Simulation and Analysis of the Slope Failure Triggered by Mining Blasting
5.4.1. Dynamic Condition Input
According to the accident investigation report [31], the explosion was carried out every afternoon at the scene, which was divided into five classes, and the daily use of explosives in each class was about 15~18 kg—a total of 75–90 kg of explosives per day. Because no in situ vibration record corresponding to the actual blasting operations immediately before the landslide was available, a representative blasting velocity time history was adopted from reference [32,33]. Based on the Sadovsky formula, the rationality of the input speed is verified.
V: Peak particle vibration velocity, (cm/s) Q: Maximum single-stage charge, (Kg)
R: Distance from explosion source to measuring point, (m)
k, α: The coefficients and attenuation coefficients related to topography and geological conditions can be selected according to the Safety regulations for blasting (GB 6722-2014) [34].
In this study, the explosion source is approximately set at the mining face near the goaf. The distance R in the Sadovsky formula should correspond to the distance between the assumed explosion source and the representative position of the power input boundary. As the vertical distance from the base of the model to the goaf is approximately 250 m, the assumed explosion source to input boundary distance was R = 250 m. A total of 18 kg was used as the assumed upper limit scenario constrained by the single-shift dosage in this study to estimate the magnitude of vibration velocity. Thus, Q was taken as 18 kg, and k = 150 and α = 1.3 from the Safety regulations for blasting (GB 6722-2014). The calculated result is of the same order of magnitude as the maximum value of the input blast wave. It shows that the input conforms to the attenuation law of 15–18 kg small charge blasting in a single class at a distance of hundreds of metres. The main frequency amplitude of the blasting input is less than 10 Hz. According to the Safety regulations for blasting (GB 6722-2014) for permanent rock slopes with a dominant vibration frequency of less than 10 Hz, the allowable peak particle vibration velocity at the foundation of the protected object is 5–9 cm/s. The peak horizontal and vertical velocities prescribed in the model, 0.47 cm/s and 0.31 cm/s, respectively, are both substantially below the lower bound of 5 cm/s.
The total duration of this simulation was 60 s, with data input into the model in cycles lasting 6 s each, resulting in a total of ten cycles. The figure indicates that the peak horizontal velocity and peak vertical velocity were 0.0047 m/s (Figure 8a, Point A) and 0.0031 m/s (Figure 8b, Point B), respectively. During the dynamic modelling process, the velocity was converted into stress using a specified formula, which was subsequently input into the bottom of the numerical model.
where σn is the normal stress, ρ is the density, Cp is the P-wave velocity, vn is the vertical velocity, σs is the shear stress, Cs is the S-wave velocity, vs is the horizontal velocity, K is the bulk modulus, G is the shear modulus, E is the elastic modulus, μ is Poisson’s ratio.
σn = −2(ρCP)vn σs = −2(ρCs)vs
Cp = sqrt((K + 4G/3)/ρ) Cs = sqrt(G/ρ)
K = E/3(1 − 2μ) G = E/2(1 + μ)
Figure 8.
The time history curves of blasting velocity: (a) the horizontal velocity; (b) the vertical velocity.
This simulation primarily involved studying the critical failure state and failure mechanism. The time required for the sliding mass to form a debris flow was relatively long and was not the focus of this paper. Therefore, the subsequent debris flow process of the sliding mass was not emphasized. (The 60 s blasting process took nearly three months to run on the ByteDance Volcano Cloud Server (16 cores, 32 GB). The workload was immense. To conserve resources, from both economic and temporal perspectives, we will not simulate the subsequent motion process of the landslide under its self-stabilizing state).
5.4.2. Critical Failure of Slope Triggered by Blasting Vibrations
Numerical simulations indicated that the Jiweishan landslide reached a critical failure after 6 s of mining blasting vibrations (see the figure below). At the critical failure point, the vertical displacements at the rear, middle, and front sections of the Jiweishan sliding mass were 0.28 m, 0.41 m and 0.54 m, corresponding to points A, B, and C, respectively, shown in Figure 9a. It was evident that at the critical failure point, the landslide first failed at the rear, then propagated to the middle, and finally shifted to the front. In summary, the landslide was an advancing landslide [35]. Specifically, it first underwent tensile cracking at the rear, which gradually developed toward the middle and front until the entire weak interlayer sliding surface was connected, causing the landslide mass to move as a whole. Therefore, mining blasting was identified as the crucial factor that triggered the critical failure of the Jiweishan landslide.
Figure 9.
Key images from the six-second burst: (a) the vertical displacements at monitoring points 8–13; (b) the vertical velocity records at monitoring points 9, 11 and 13.
During the critical failure process of the Jiweishan landslide, the velocities observed at monitoring points 9, 11 and 13, which were located near the weak interlayer slip surface, were monitored to fully capture dynamic response. The monitored vertical velocity time-history curves are illustrated in Figure 9b, where the cyan, orange, and blue curves represent the vertical velocity time-history curves for monitoring points 9, 11 and 13, respectively. As the landslide approached the critical failure stage, the velocity at monitoring point 9 fluctuated mainly between −0.049 m/s and −1.616 m/s, with a peak value of −2.003 m/s at point a. The velocity at monitoring point 11 fluctuated mainly between −0.119 m/s and −1.465 m/s, reaching a peak value of −2.052 m/s at point b. The velocity at monitoring point 13 fluctuated predominantly between −0.007 m/s and −1.724 m/s, with the minimum value of −2.245 m/s at point c. Clearly, during the critical failure period, dynamic responses of the rear edge and middle part of the original slope were more intense, which aligned with the results of the displacement analysis.
The criteria for assessing the instability of a slope are outlined as follows: (1) the formation of a throughgoing plastic deformation zone; (2) a sudden increase in the displacement at a specific location on the slope surface; and (3) the nonconvergence of numerical calculations. The figure below illustrates the process of forming the throughgoing plastic zone. Initially, red cracks emerged near the crack location at the rear edge of the slope (Figure 10a). As the influence of the blasting wave continued, these red cracks progressively expanded at the rear edge, with the crack failure effects propagating toward the middle and front sections of the slope (Figure 10b). Ultimately, after one cycle of blasting, the landslide occurred (Figure 10c) and was characterized by the red crack area occupying a significant portion of the sliding mass, indicating that the slope had reached a critical state of collapse.
Figure 10.
Progressive failure of sliding body in the Jiweishan landslide numerical model.
5.4.3. Stress Analysis of the Blasting Effect
Based on the results of the previous analysis, the landslide reached the critical state within the sixth second of blasting, so we focused on analyzing the stress state from 0 to 6 s. Regarding the stress symbol, normal stress is positive in tension and negative in compression. The sign convention for the moment induced by shear stress is defined such that clockwise moments are positive, whereas counterclockwise moments are negative.
First, we obtained stress monitoring data in the xx, yy, and xy directions from UDEC. Employing Formula (1) for principal stress calculation purposes, σ1 and σ3 could be derived (τ corresponds to the xy stress). By utilizing Formulas (2) and (3) (where φ represents the friction angle), the shear stress τ and normal stress σ imposed on the failure surface could be calculated. According to Formula (4) [36], when the shear stress on any plane reaches the shear strength, a shear failure can occur at that point.
where σ is the normal stress, τ is the shear stress, φ is the angle of friction, P is the pore water pressure (seepage was not considered in this paper), μ is the friction coefficient (equivalent to tanφ), and c is the effective cohesion.
By using the above formula, the curves for σ, τ and σnew (where σnew = σ tanφ + c) could be obtained, as shown in Figure 11. Then, the curve of σ was hidden, and the average stress curves of τ and σnew were obtained through Welch’s t-test, as shown in Figure 12. In Figure 12a,b, the shear stresses were greater than the shear strengths at points A and B, indicating that the critical failure had been reached.
Figure 11.
Shear stress, normal stress and custom new normal stress time-history curves: (a) monitoring point 14; (b) monitoring point 9; (c) monitoring point 11; (d) monitoring point 13.
Figure 12.
Shear stress and custom new normal stress and the corresponding average stress time history curves: (a) monitoring point 14; (b) monitoring point 9; (c) monitoring point 11; (d) monitoring point 13.
The leading edge of the sliding mass is shown in Figure 12a, whereas the front-middle section of the sliding mass is shown in Figure 12b. The time corresponding to point B in Figure 12b is 0.49 s, and the time corresponding to point A in Figure 12a is 1.26 s. This observation indicates that the landslide failure propagated from the front-middle towards the front, thereby demonstrating the temporal–spatial evolution trend of the landslide failure process from the rear to the front. This finding corroborates the earlier conclusion regarding the nature of the advancing landslide. Conversely, Figure 12c,d exhibit no shear failures in accordance with Equation (4). The middle-to-rear section of the landslide is shown in Figure 12c, and the rear edge of the landslide is shown in Figure 12d. The shear stress of both remained low and was consistently below the shear strength. This phenomenon is not classified as a shear failure. The thrust originating from the rear of the landslide was continually transmitted forward and accumulated on the locking segment at the front, which experienced elevated shear stress. As observed in Figure 12a,b, when the failure occurred, the shear stress increased to 1.5 to 1.8 MPa, significantly exceeding the maximum shear stresses indicated in Figure 12c,d. This finding demonstrates that the front edge and the front-middle section of the landslide were subject to locked failures because of concentrated shear stress.
5.5. Analysis of the Slope Post-Failure
When the blasting load was applied for a duration of 6 s (Figure 13a), tensile cracks first emerged at the rear edge of the slope because of the influence of the longitudinal wave disturbance, leading to a tensile failure along the rear structural plane. At 24 s (Figure 13b), the tensile cracks at the rear edge continued to expand, with an increase in the deformation characteristics, whereas the potential sliding mass at the front edge exhibited slight deformation. By 30 s (Figure 13c), the cracks at the rear edge further propagated, causing movement in the middle and front sections, and resulting in the continuous disintegration of the sliding mass. At this stage, the rock mass structure of the sliding mass transitioned from an original blocky and layered configuration to a broken and loose state. This structural deterioration process was attributed primarily to two factors. First, the sliding mass suffered a significant impact with the sliding bed during its movement. Second, it was continuously affected by the vertical and horizontal blasting dynamic disturbances of the mine. Moreover, the mutual collision and extrusion among broken fragments exacerbated the fragmentation process of the rock mass. When it ran to 42 s (Figure 13d), the acceleration and velocity amplification effects of the blasting wave resulted in the formation of multiple cracks in the surface rock mass of the slope, with the sliding mass above the middle section exhibiting a fragmented state. At 54 s (Figure 13e), the rear edge of the sliding mass propelled the middle and front sections forward as a cohesive unit. By 60 s (Figure 13f), the rear edge region of the sliding mass was nearly entirely fractured and interconnected, creating a smooth, steep wall surface. The front edge of the slope experienced further intensification, which was characterized by more pronounced displacement features. The dynamic input derived from the blasting process concluded at 60 s, after which the slope system entered a self-stabilization adjustment stage under dynamic disturbances.
Figure 13.
The whole process of the Jiweishan landslide 60 s blasting.
6. Analysis of the Evolutionary Process of the Jiweishan Landslide
As illustrated in Figure 14a, during the long-term geological evolution of nature, the mountain naturally developed nearly two sets of steeply inclined, almost orthogonal structural joints, which segmented the sliding mass into block-like structures. The sliding mass, as a whole, existed in a discrete state, which posed a significant challenge to the stability of the mountain. In the initial stage of mining performed using the room-and-pillar method, the roof was supported by pillars, leading to displacement occurring only in a limited area of the overlying strata, resulting in the formation of minor fissures. As depicted in Figure 14b, after the complete mining procedure, owing to the complete mining of the room and pillars, the roof had no support, and the caving zone, fracture zone and bending subsidence zone appeared above the goaf. These fractures propagated upwards, inducing the redistribution of stress in the overlying rock mass, which transmitted from the bottom to the top to the vicinity of the sliding mass area. In this stage, the slope experienced the compounded effects of multifield coupling. The mechanical actions involved in this process included the self-weight stress of the natural slope, vertical and horizontal vibration stresses from blasting, unloading stress around the loosened area of the mined-out zone, and lateral stress resulting from the collapse and compaction of the overlying broken rock. As shown in Figure 14c, under the combined effects of underground mining and blasting vibrations, the internal damage within the rock mass of the Jiweishan slope accumulated, gradually deteriorating its mechanical properties and reaching the critical failure state. The blasting vibrations reduced the shear strength at the trailing edge of the sliding mass, compromising its structural integrity and leading to the emergence of notable tensile cracks. As illustrated in Figure 14d, under the influence of periodic blasting vibrations, the tensile cracks at the trailing edge of the sliding mass expanded and progressively advanced forward, thereby increasing the sliding force imposed at the leading edge of the sliding mass. When this sliding force surpassed the critical shear bearing capacity of the front rock mass, the front sliding mass experienced a significant shear-out failure, resulting in the formation of a throughgoing shear surface. Following this shear-out failure, the sliding mass rapidly descended along the sliding bed because of its own weight. During the sliding process, it exerted scraping and plowing effects on the rock mass of the sliding bed, entraining the fragmented rock mass on the surface and any potential loose deposits, ultimately leading to the formation of a debris flow and resulting in the landslide disaster.
Figure 14.
The Jiweishan landslide evolution process mechanism diagram.
7. Verification of Numerical Simulation
Many scholars have carried out detailed studies on the Jiweishan landslide, many of which have used physical tests to study its causes.
7.1. Comparison with Centrifuge Test Results
Deng Maolin investigated the Jiweishan landslide through centrifuge model tests. First, the model was constructed via the layered pouring of similar materials such as barite powder, quartz sand, gypsum, glycerin, cement and water. The geometric scale of the test was set to 1:800, and the gravity scale was set to 1:200. The centrifuge test results revealed that the instability of the landslide had obvious sequential failure characteristics. At the initial stage of loading, tensile cracks first appeared at the trailing edge of the landslide. With the gradual increase in centrifuge acceleration, the karst zone at the leading edge of the slope body experienced obvious bulging and uplift deformation effects. Under the condition of continuous loading, the crushing and uplifting of the front karst zone led to the collapse and sliding of the shear outlet. Finally, the leading edge of the sliding body disintegrated and slid out, and large-scale sliding occurred (Figure 15). The failure evolution process identified in this centrifuge test—specifically, “tensile cracking at the trailing edge, bulging deformation at the front edge, shear outlet penetration, and overall sliding”—aligned closely with the landslide instability failure and motion processes derived from the UDEC numerical simulation, thereby effectively validating the credibility and reliability of the numerical simulation results.
Figure 15.
Comparison chart with centrifuge test results: (a–d) the process of the Jiweishan landslide 60 s blasting; (e–h) reproduced with permission from Deng MaoLin [37].
7.2. Comparison with the Results Derived from a Similar Test Model
Peng Guoxi [38] conducted a study on the Jiweishan landslide, utilizing a combination of barite powder, quartz sand, gypsum, glycerin, and water to create bricks with specific proportions. A slope model was constructed on the basis of the “bottom-up, layered masonry” principle. The gypsum mortar served as the bonding material for the cracks above the sliding surface, whereas the sliding source area was formed using dry masonry techniques. To simulate room-and-pillar mining, several holes, each 1 m deep, were drilled at intervals of 5–10 cm within the mudstone layer using an electric drill, ensuring that the holes were not interconnected. The initial model exhibited no significant deformation; however, after connecting the scattered goaf areas into a continuous goaf trough, noticeable collapse and subsidence were observed in the model above the goaf within less than half a day of mining, accompanied by local tensile cracks. These experimental results suggested that mining the ore layer directly induced the collapse and subsidence of the overlying strata, leading to the formation of subsidence cracks. Moreover, this study effectively replicated the settlement and deformation processes of the overlying strata in the goaf through the UDEC numerical simulation, aligning closely with the deformation and failure characteristics that were observed in similar existing model experiments. This further substantiated the accuracy and scientific validity of the numerical simulation employed herein.
7.3. Comparative Analysis with the Actual Situation
According to previous studies [25], the T0 tension crack at the rear of the Jiweishan landslide has an overall strike of N50°–W70°, a length of approximately 152 m, and a depth of about 60–70 m. The crack is nearly vertical and forms the southern boundary of the landslide mass. The numerical simulation result showed that tensile cracking initiated in the region corresponding to T0, with a simulated crack depth of approximately 63 m (Figure 16a), which fell within the reported field-observed range. This agreement indicated that the numerical model reasonably reproduced the principal location and depth scale of the rear tension crack.
Figure 16.
(a) numerical simulation; (b) photo of the actual landslide; (c) progressive failure stage of the numerical simulation.
Furthermore, the post-failure topographic photo of the actual landslide (Figure 16b) was compared with the deformation and sliding configuration obtained during the progressive failure stage of the numerical simulation (Figure 16c). The comparison indicated that both the observed landslide and the simulated failure were controlled by the weak intercalated layer, showing consistency in the principal sliding surface. The comparison of the above T0 crack geometric parameters and the failure mode of the sliding surface provided quantitative and qualitative evidence supporting the model’s ability to reproduce the major failure characteristics of the Jiweishan landslide.
8. Discussion
8.1. Analysis of Displacement and Maximum Shear Strain Increment
The displacement cloud maps generated by mining and blasting disturbances lasting 6 s are shown in Figure 17a and Figure 17b, respectively. In Figure 17a, the deformation induced by mining was primarily concentrated in the overlying strata, with an overall displacement level that remained relatively small (≤0.8 m). Conversely, the displacement change caused by the blasting disturbance was significantly greater (0–4.5 m) (Figure 17b), and the maximum displacement was concentrated above the landslide and the overlying strata of the goaf. Figure 17c,d present the maximum shear strain increment contour map. As shown in Figure 17c, after room-and-pillar mining, varying degrees of shear strain increments were observed in the fractures located at both the rear and front edges of the landslide, as well as in the weak interlayer at the front edge, where the maximum shear strain increment was recorded. These findings indicated that mining caused varying degrees of disturbance to the slope body. There was clearly a large red area at the front edge of the landslide (Figure 17d). When combined with the previous displacement analysis, these findings suggested that a shear failure occurred at the front edge at this time. Additionally, a substantial amount of red indicates that the weak interlayer gradually became interconnected. Under the influence of the blasting wave, the cracks at the rear edge expanded. A comparison between the displacement and the maximum shear strain increment contour map clearly revealed the varying degrees of impact that mining and blasting have on the landslide.
Figure 17.
Displacement contour: (a) after mining excavation; (b) blasting 6 s. Maximum shear strain increment contour: (c) after mining excavation; (d) blasting 6 s.
Based on the above analysis, we generalized a displacement time-history curve (Figure 18). For the Jiweishan landslide, stage I (the AB segment) represents the creep occurring under its own gravity. Stage II (the BC segment) shows the gradual displacement changes induced by long-term mining activities. Stage III (the CD segment) signifies the exponential displacement increase resulting from blasting, with the critical failure occurring at yellow point C, which led to overall landslide instability. An essential difference was observed between stage III and stage II. During stage III, the landslide underwent global disintegration, and the blocks moved along the sliding surface, resulting in a complete loss of self-stabilization within the slope system.
Figure 18.
Evolution of displacement during rock mass failure.
8.2. Supplement to the Previous Study on Jiweishan Landslide
Previous studies have improved our understanding of the formation conditions and movement characteristics of the Jiweishan landslide from the aspects of geological structures, mining activities, depositional features, and scraping along the landslide path [20,25]. On this basis, this study used numerical simulation to further analyze the instability process of the landslide from two aspects: deformation evolution and triggering factors.
Regarding deformation evolution, under the prescribed model conditions, slope failure progressively developed from the rear toward the front. Deformation and failure first occurred at the rear and then propagated toward the middle and front of the slope, ultimately resulting in overall sliding. From the perspective of dynamic evolution, this result provides further insight into the roles of thrust transmission from the rear and failure of the front resisting structure in slope instability.
Regarding triggering factors, this study investigated the combined effects of the goaf and blasting disturbance on slope stability under the prescribed internal structural conditions. The simulation results indicated that, under the conditions considered, the mined-out area caused settlement of the slope, while blasting disturbance further promoted the development of slope deformation and failure. These findings provide numerical evidence for understanding the landslide failure mechanism under the combined effects of mining activities and blasting disturbance.
8.3. The Actual Impact on Mining Safety
The findings of this study have direct practical guiding significance for mining safety. For slopes affected by underground mining, the mining sequence and management of mined-out areas should be planned carefully to avoid excessive excavation beneath the slope. Given that deformation at the rear of the slope and its propagation through the slope are closely associated with the simulated failure process, field monitoring should focus on the development of rear cracks, slope displacement, and changes in displacement, while also monitoring deformation in the middle and front of the slope. For blasting operations, field vibration and displacement monitoring data can be used to assess the effects of blasting disturbances on slope response and to guide the optimization of blasting parameters and operational schedules. These recommendations should be applied in conjunction with site-specific geological conditions, monitoring data, and slope stability assessments.
8.4. Model Limitations and Future Work
- (1)
- The two-dimensional model was established along the main sliding direction. This section encompasses the key components controlling slope instability, including the trailing-edge crack, sliding mass, basal sliding surface, and leading-edge locked segment. It therefore provides a representative framework for investigating the failure mechanism induced by mining and blasting disturbances. However, the two-dimensional model cannot fully capture the three-dimensional intersections and connectivity of structural discontinuities, lateral constraints, or the spatial propagation and attenuation of blasting waves. Consequently, the simulated failure sequence and displacement results primarily represent the mechanical response within the selected section, rather than the complete three-dimensional behaviour of the landslide.
- (2)
- Rainfall totalled only 36.6 mm from 20 May to 5 June 2009, including 5.1 mm during 1–5 June [39]. In addition, the elevation of the sliding source area itself is very high, and there is no perennial stable karst water table within these limestone strata. The available rainfall records and hydrogeological evidence suggest that short-term rainfall infiltration and associated groundwater-pressure changes were unlikely to have been the immediate trigger of the Jiweishan landslide. Accordingly, these processes were not explicitly modelled in this study. However, this simplification does not exclude the potential long-term effects of groundwater flow, water–rock interactions, and karst dissolution on the weak interlayer and slope stability. These effects remain outside the scope of the present model. Future work will integrate hydrogeological investigations, monitoring data, and coupled seepage–mechanical modelling to assess the combined effects of hydrological processes, long-term deterioration, and mining and blasting disturbances.
9. Conclusions
The instability and failure mechanisms of landslides form a very complex core scientific problem that needs to be further explored in the fields of geotechnical engineering and geological disaster prevention. This complexity stems from the landslide evolution process, which is influenced by the combined interplay of both internal and external dynamic geological factors. Consequently, it is essential to consider a multitude of variables, including the inherent geological conditions of the target slope—such as its lithological assemblages and structural plane compositions—as well as external dynamic disturbances including mining activities and blasting dynamic loads. In this study, we employed the UDEC two-dimensional discrete element numerical simulation software to simulate and analyze the entire instability process of the Jiweishan landslide, considering the combined induced effects of mining disturbances and the blasting load. The simulation results effectively illustrated the key response characteristics, including the displacement, velocity, plastic zone, stress, and the maximum increment of shear strain. Furthermore, the simulated failure mode of the landslide instability aligned closely with the actual engineering conditions, thereby demonstrating a high level of credibility in the simulation results.
- (1)
- The critical failure of the Jiweishan landslide was controlled by the dominant internal factors and triggered external factors. Among them, the “upper hard and lower soft” lithologic combination and slope structure (the weak interlayer of the sliding surface, structural joints and deep structural planes of the karst) were the dominant internal factors of the instability and failure of the landslide. The external triggering factor of the landslide was the combined effects of the goaf and mining blasting. Illegal mining caused adverse effects on the slope of the Jiweishan landslide. The simulations show that the prescribed blasting motion could trigger failure in the excavated slope. Given the absence of a site vibration record immediately before the landslide, the evidence supports blasting as a plausible trigger of the 2009 event. On the basis of long-term mining, blasting disturbance is the important dynamic trigger factor to promote slope instability. The two constitute the disaster-causing mechanism of “mining inoculation and blasting acceleration”, which is indispensable.
- (2)
- The Jiweishan landslide predominantly exhibited a typical advancing failure. The evolution of the slope instability trend followed a pattern characterized by “initiation at the rear edge, transmission in the middle, penetration at the front edge, and overall sliding”. The failure initiated in the tension zone at the trailing edge of the slope, where tensile stress and shear deformation jointly led to the formation of tensile cracks and rock mass dislocation, resulting in the development of an active advancing body. The rock mass at the rear edge exerted significant pushing forces on the rock mass in the middle section of the slope, thereby inducing synchronous deformation, a shear failure, and a forwards movement of the middle rock mass. As the deformation and damage progressively propagated toward the front edge of the slope, the front-edge anti-sliding rock mass gradually experienced a compression–shear failure, culminating in the overall failure of the sliding-resistance structure. Ultimately, this process resulted in a large-scale overall sliding failure.
- (3)
- The simulated sequence of deformation and failure has implications for long-term slope risk management at mines with underground workings beneath rock slopes. The differential settlement following excavation suggests that pre-blast assessments should account for deformation associated with existing goafs. The simulated initiation of tensile cracking at the rear of the slope supports monitoring changes in rear-edge crack opening, while the subsequent progression of deformation toward the front supports monitoring displacement in the middle section and at the front locking segment. These observations can help prioritize monitoring locations and inform the review of blasting plans when signs of slope deformation are detected.
- (4)
- In future research, there are two problems to be addressed. First, the numerical simulation model utilized in this study has a prolonged computational cycle and low operational efficiency. It is necessary to further optimize the parameters and model settings to improve the calculation efficiency of the model. Second, the results of this study indicate that the landslide reached the critical instability state after only 6 s of blasting, which does not accurately reflect the actual evolutionary processes observed during onsite landslide failures. The model does not aim to reproduce the actual instability time. The verification object of the model is the failure mechanism and the influence of the combined action of mining and blasting on the landslide.
Author Contributions
Y.P.: Writing—original draft, software, investigation, validation F.C.: writing—review and editing, funding acquisition, supervision Q.W.: formal analysis, methodology P.F.: software, validation H.X.: data curation, validation C.X.: data curation, formal analysis. All authors have read and agreed to the published version of the manuscript.
Funding
This research was funded by the National Natural Science Foundation of China (Grant No. 42272335).
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The original contributions presented in the study are included in the article; further inquiries can be directed to the corresponding author.
Conflicts of Interest
The authors declare no conflicts of interest.
References
- Cui, H.; Pei, T.; Devineni, N.; Tian, Y.; Shen, C.; Ji, J. A multi-objective physics-informed machine learning framework for landslide susceptibility mapping. Georisk 2026, 20, 531–555. [Google Scholar] [CrossRef] [Scilit]
- Longoni, L.; Scaioli, A.; Panzeri, L.; Arosio, D.; Corti, M.; Hojat, A.; Papini, M. A new Landslide Investigation and Simulation Archive through downscaled landslide experiments. Sci. Data 2025, 12, 1668. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Castillo, E.M.D.; Borja, R.I.; Neto, A.H.F. A Coupled u–pw SPH Formulation for Hydromechanical Modeling of Retrogressive Landslides and Comparison with a Penalty-Based Approach. Int. J. Numer. Anal. Methods Geomech. 2026, 50, 4059–4089. [Google Scholar] [CrossRef] [Scilit]
- Wang, B.; Liu, T.; Li, Y. Stability Analysis and Treatment of Pebble Soil Slopes Under Rainfall and Earthquake Conditions. Sustainability 2025, 17, 10754. [Google Scholar] [CrossRef] [Scilit]
- Jia, J.; Pei, X.; Liu, G.; Cai, G.; Guo, X.; Hong, B. Failure Mechanism of Anti-Dip Layered Soft Rock Slope under Rainfall and Excavation Conditions. Sustainability 2023, 15, 9398. [Google Scholar] [CrossRef] [Scilit]
- Sheng, Q.; Yue, Z.Q.; Lee, C.F.; Tham, L.G.; Zhou, H. Estimating the excavation disturbed zone in the permanent shiplock slopes of the Three Gorges Project, China. Int. J. Rock Mech. Min. Sci. 2002, 39, 165–184. [Google Scholar] [CrossRef] [Scilit]
- Wang, B.; Zuo, Q.; Deng, M.; Yi, Q.; Liu, L.; Liu, Y. Deformation Characteristics and Chain Mechanism of the Tanjiahe Landslide in the Three Gorges Reservoir Area Under the Synergistic Effect of Rainfall, Reservoir Water, and Groundwater. Rock Mech. Rock Eng. 2025, 58, 5235–5254. [Google Scholar] [CrossRef] [Scilit]
- Xu, W.; Feng, W.; Yi, X.; Lu, S.; Zhou, Y.; Zhao, J. Insights into the deformation mechanisms of reservoir landslides: Multidimensional observations and UDEC numerical simulations related to the Tanjiahe landslide (China). Bull. Eng. Geol. Environ. 2026, 85, 259. [Google Scholar] [CrossRef] [Scilit]
- Zhang, H.; Gao, Y.; Chen, F.; Li, J.; Chen, B.; Wang, L.; Li, B. Numerical simulation of rock avalanche dynamics using a coupled fragmentation-flow model: Insights from the Liangshui Village landslide. Comput. Geotech. 2026, 195, 108087. [Google Scholar] [CrossRef] [Scilit]
- Li, B.; Zhao, C.; Li, J.; Chen, H.; Gao, Y.; Cui, F.; Wan, J. Mechanism of mining-induced landslides in the karst mountains of Southwestern China: A case study of the Baiyan landslide in Guizhou. Landslides 2023, 20, 1481–1495. [Google Scholar] [CrossRef] [Scilit]
- Gao, Y.; Li, J.; Liu, X.; Wu, W.; Zhang, H.; Liu, P. Deformation Monitoring and Dynamic Analysis of Long-Runout Bedding Landslide Based on InSAR and Particle Flow Code. Remote Sens. 2023, 15, 5105. [Google Scholar] [CrossRef] [Scilit]
- Chen, L.; Zhao, C.; Li, B.; He, K.; Ren, C.; Liu, X.; Liu, D. Deformation monitoring and failure mode research of mining-induced Jianshanying landslide in karst mountain area, China with ALOS/PALSAR-2 images. Landslides 2021, 18, 2739–2750. [Google Scholar] [CrossRef] [Scilit]
- Wang, F.; Ren, Q.; Jiang, X.; Niu, J.; Chen, B. Engineering geology and mechanism of multiple landslides in a large open-pit mine: The case of the Copper Mine in Qinghai Province, China. Bull. Eng. Geol. Environ. 2023, 82, 147. [Google Scholar] [CrossRef] [Scilit]
- Li, B.; Feng, Z.; Wang, G.; Wang, W. Processes and behaviors of block topple avalanches resulting from carbonate slope failures due to underground mining. Environ. Earth Sci. 2016, 75, 694. [Google Scholar] [CrossRef] [Scilit]
- Zheng, D.; Frost, J.D.; Huang, R.Q.; Liu, F.Z. Failure process and modes of rockfall induced by underground mining: A case study of Kaiyang Phosphorite Mine rockfalls. Eng. Geol. 2015, 197, 145–157. [Google Scholar] [CrossRef] [Scilit]
- Liu, Y.; Tu, G. Deformation Mechanism of Landslide Reactivation Triggered by Combined Effects of Rainfall and Excavation: A Case Study of the Dawafang Landslide in Chongqing. Landslides 2026, 23, 2687–2703. [Google Scholar] [CrossRef] [Scilit]
- Wang, Q.; Li, B.; Xing, A.; Liu, Y.; Zhuang, Y.; Bilal, M. Failure process analysis of a catastrophic landslide in Zhenxiong triggered by prolonged low-intensity rainfall using centrifuge tests. Eng. Geol. 2025, 351, 108044. [Google Scholar] [CrossRef] [Scilit]
- Tao, T.; Shi, W.; Xiong, S.; Liang, F.; Zhang, J. Experimental study on deformation and failure of a mining slope under the action of rainfall. Can. Geotech. J. 2024, 61, 1902–1919. [Google Scholar] [CrossRef] [Scilit]
- Yin, Y.; Sun, P.; Zhang, M.; Li, B. Mechanism on apparent dip sliding of oblique inclined bedding rockslide at Jiweishan, Chongqing, China. Landslides 2011, 8, 49–65. [Google Scholar] [CrossRef] [Scilit]
- Ge, Y.; Tang, H.; Ez Eldin, M.A.M.; Chen, H.; Zhong, P.; Zhang, L.; Fang, K. Deposit characteristics of the Jiweishan rapid long-runout landslide based on field investigation and numerical modeling. Bull. Eng. Geol. Environ. 2019, 78, 4383–4396. [Google Scholar] [CrossRef] [Scilit]
- Deng, Y.; Fan, X.; Scaringi, G.; Wang, D.; He, S. Assessing the Efficiency of Thermochemical Pressurization in the Jiweishan Rockslide. Rock Mech. Rock Eng. 2024, 57, 793–806. [Google Scholar] [CrossRef] [Scilit]
- Chen, G.; Zhang, Y.; Xu, Q.; Zhu, Z.; Zheng, X.; Wang, J.; Zou, M. Experimental Investigation on the Influence of Dip Angle and Layer Thickness of Overlying Rock Layers on the Failure Process of Bedding Slopes. Rock Mech. Rock Eng. 2025, 58, 8195–8220. [Google Scholar] [CrossRef] [Scilit]
- Tang, H.; Zou, Z.; Xiong, C.; Wu, Y.; Hu, X.; Wang, L.; Lu, S.; Criss, R.E.; Li, C. An evolution model of large consequent bedding rockslides, with particular reference to the Jiweishan rockslide in Southwest China. Eng. Geol. 2015, 186, 17–27. [Google Scholar] [CrossRef] [Scilit]
- Zou, Z.; Tang, H.; Xiong, C.; Su, A.; Criss, R.E. Kinetic characteristics of debris flows as exemplified by field investigations and discrete element simulation of the catastrophic Jiweishan rockslide, China. Geomorphology 2017, 295, 1–15. [Google Scholar] [CrossRef] [Scilit]
- Xu, Q.; Fan, X.; Huang, R.; Yin, Y.; Hou, S.; Dong, X.; Tang, M. A catastrophic rockslide-debris flow in Wulong, Chongqing, China in 2009: Background, characterization, and causes. Landslides 2010, 7, 75–87. [Google Scholar] [CrossRef] [Scilit]
- Yin, Y. Recent catastrophic landslides and mitigation in China. J. Rock Mech. Geotech. Eng. 2011, 3, 10–18. [Google Scholar] [CrossRef] [Scilit]
- Zhang, M.; McSaveney, M.; Shao, H.; Zhang, C. The 2009 Jiweishan rock avalanche, Wulong, China: Precursor conditions and factors leading to failure. Eng. Geol. 2018, 233, 225–230. [Google Scholar] [CrossRef] [Scilit]
- Li, B.; Gong, W.; Tang, H.; Zou, Z.; Bowa, V.M.; Juang, C.H. Probabilistic analysis of a discrete element modelling of the runout behavior of the Jiweishan landslide. Int. J. Numer. Anal. Methods Geomech. 2021, 45, 1120–1138. [Google Scholar] [CrossRef] [Scilit]
- Deng, M.; Xu, Q.; Han, B.; Zhu, X.; Cai, G.; Zheng, G. The microscopic structure and rheological characteristics of the slip zone soft rock of Jiweishan landslide in Wulong of Chongqing, China. Mt. Res. 2014, 32, 233–240. (In Chinese) [Google Scholar] [CrossRef]
- Investigation on the Collapse of Wulong Mountain in Chongqing. Available online: https://news.ifeng.com/mainland/special/chongqingshantihuapo/news/200906/0618_6824_1208845_2.shtml (accessed on 18 June 2009).
- Cheng Iron Ore Story Under Chongqing Wulong landslide. Available online: https://news.sina.com.cn/c/2009-06-10/014717984504.shtml (accessed on 10 June 2009).
- Xiong, C.; Wu, Q.; Cui, F.; Luo, W.; Li, H.; Chen, H. Damage features and dynamic triggering mechanism of the Jianshanying landslide induced by underground mining in Shuicheng County, Guizhou Province, China. Geomat. Nat. Hazards Risk 2024, 15, 2301060. [Google Scholar] [CrossRef] [Scilit]
- Cui, F.; Xiong, C.; Wu, Q.; Li, B.; Luo, W.; Pei, Y. Dynamic mechanism triggering an underground-mining-induced landslide in karst mountains, Southwest China. Bull. Eng. Geol. Environ. 2023, 82, 449. [Google Scholar] [CrossRef] [Scilit]
- GB 6722-2014; Safety Regulations for Blasting. Standards Press of China: Beijing, China, 2014.
- Hungr, O.; Leroueil, S.; Picarelli, L. The Varnes classification of landslide types, an update. Landslides 2014, 11, 167–194. [Google Scholar] [CrossRef] [Scilit]
- Finnegan, N.J.; Saffer, D.M. Seasonal slow slip in landslides as a window into the frictional rheology of creeping shear zones. Sci. Adv. 2024, 10, eadq9399. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Deng, M. Study on the Formation Conditions and Instability Mechanism of the Apparent Dip Slide Landslide-based on Jiweishan Landslide in Wulong, Chongqing. Doctor’s Thesis, Chengdu University of Technology, Chengdu, China, 2014. [Google Scholar]
- Peng, G. The Research of the Formative Condition and Instability Mechanism of the Landslide Controlled by the Key Blocks in Southwest Mountainous-The Cocktail Mountain Landslide in Chongqing Wulong, for example. Master’s Thesis, Chengdu University of Technology, Chengdu, China, 2011. [Google Scholar]
- Yi, L.; Li, Y. Effect analysis of karst and hydrodynamics on Jiweishan landslide. J. Eng. Geol. 2021, 29, 583–592. (In Chinese) [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.