Next Article in Journal
Progressive Failure of Water-Resistant Stratum in Karst Tunnel Construction Using an Improved Meshfree Method Considering Fluid–Solid Interaction
Previous Article in Journal
Optimization Study on Stakeholder Capability Configuration in Green Construction
Previous Article in Special Issue
Risk Analysis in International Construction Projects: A Look at the Prefabricated Wood Construction Sector in the Province of Quebec
 
 
Article

Article Versions Notes

Buildings 2024, 14(10), 3139; https://doi.org/10.3390/buildings14103139
Action Date Notes Link
article xml file uploaded 1 October 2024 09:26 CEST Original file -
article xml uploaded. 1 October 2024 09:26 CEST Update https://www.mdpi.com/2075-5309/14/10/3139/xml
article pdf uploaded. 1 October 2024 09:26 CEST Version of Record https://www.mdpi.com/2075-5309/14/10/3139/pdf
article html file updated 1 October 2024 09:28 CEST Original file https://www.mdpi.com/2075-5309/14/10/3139/html
Back to TopTop