Next Article in Journal
A Constraint Programming Approach for Discrete Time–Cost Tradeoff Problems in a Time-Constrained Activity Network
Previous Article in Journal
An Approach of BIM-Based Dynamic Adaptive Zoning for Group Piles Construction Multi-Work Areas
Previous Article in Special Issue
Applying Systems Thinking to Research into Risk Factors Influencing Earthmoving Equipment Operation Safety in Construction Sites
 
 
Article

Article Versions Notes

Buildings 2024, 14(7), 2072; https://doi.org/10.3390/buildings14072072
Action Date Notes Link
article pdf uploaded. 7 July 2024 09:46 CEST Version of Record https://www.mdpi.com/2075-5309/14/7/2072/pdf-vor
article pdf uploaded. 7 July 2024 10:33 CEST Updated version of record https://www.mdpi.com/2075-5309/14/7/2072/pdf-vor
article xml file uploaded 12 July 2024 11:31 CEST Original file -
article xml uploaded. 12 July 2024 11:31 CEST Update https://www.mdpi.com/2075-5309/14/7/2072/xml
article pdf uploaded. 12 July 2024 11:31 CEST Updated version of record https://www.mdpi.com/2075-5309/14/7/2072/pdf
article html file updated 12 July 2024 11:33 CEST Original file https://www.mdpi.com/2075-5309/14/7/2072/html
Back to TopTop