Next Article in Journal
Is Probiotics Supplementation an Appropriate Strategy to Modulate Inflammation in Physically Active Healthy Adults or Athletes? A Systematic Review
Next Article in Special Issue
Seismotectonics, Geomorphology and Paleoseismology of the Doroud Fault, a Source of Seismic Hazard in Zagros
Previous Article in Journal
A CBCT Evaluation of the Proximity of Mandibular Molar Roots and Lingual Cortical Bone in Various Vertical Facial Patterns and Factors Related to Root-Cortical Bone Contact
Previous Article in Special Issue
3D Continuum Modelling of PDC Cutting of Rock with a Simple Contact-Erosion Scheme
 
 
Article
Peer-Review Record

Monitoring Method of Large Section Bifurcated Small Clear Distance Tunnel during Information Construction Control

Appl. Sci. 2023, 13(6), 3447; https://doi.org/10.3390/app13063447
by Jianxiu Wang 1,2,*, Ansheng Cao 1, Tao Cui 1, Zhao Wu 1, Zonghai Li 3, Lihua Lin 3,*, Huboqiang Li 1 and Yanxia Long 1
Reviewer 1:
Reviewer 2:
Appl. Sci. 2023, 13(6), 3447; https://doi.org/10.3390/app13063447
Submission received: 8 February 2023 / Revised: 28 February 2023 / Accepted: 7 March 2023 / Published: 8 March 2023
(This article belongs to the Special Issue Predictive Modeling in Mining and Geotechnical Engineering)

Round 1

Reviewer 1 Report

The manuscript discusses the optimization of a support system for large-span tunnel bifurcation. The analysis includes monitoring data. It claims to develop an automatic monitoring method to control rock pillars. The draft needs improvement before it can be processed further. Consider my comments in the attached file. Authors may try to improve it beyond the comments of all reviewers. 

Comments for author File: Comments.pdf

Author Response

Please see the attachment.

Author Response File: Author Response.docx

Reviewer 2 Report

Please refer to the attached Review and Evaluation.

Comments for author File: Comments.pdf

Author Response

Please see the attachment.

Author Response File: Author Response.docx

Back to TopTop