Next Article in Journal
Research on Key Technologies of Data Processing Mechanisms in Ternary Optical Computer
Previous Article in Journal
Activated Biochar-Amended Phytoextraction of Selenium in Contaminated Soil under Cold Climate in Northern Québec (Canada)
Previous Article in Special Issue
A One-Step Methodology for Identifying Concrete Pathologies Using Neural Networks—Using YOLO v8 and Dataset Review
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Course of Cumulative Cost Curve (CCCC) as a Method of CAPEX Prediction in Selected Construction Projects

Department of Building Engineering, Faculty of Civil Engineering, Wroclaw University of Science and Technology, Wybrzeże Wyspiańskiego 27, 50-370 Wrocław, Poland
*
Author to whom correspondence should be addressed.
Appl. Sci. 2024, 14(13), 5597; https://doi.org/10.3390/app14135597
Submission received: 17 April 2024 / Revised: 6 June 2024 / Accepted: 25 June 2024 / Published: 27 June 2024

Abstract

Forecasting the actual cost of the implementation of a construction project is of great importance in the case of technical management and enables financial resources to be initially maintained in a controlled manner and in a way that is as close as possible to the actual state. Based on the analysis of the developed knowledge base, which contains data from 612 reports of the Bank Investment Supervision regarding 45 construction projects from 2006 to 2023 with a total value of over PLN 1,300,000,000, best-fit curves were determined, and the expected area of the cumulative actual cost of selected construction projects was specified. The obtained polynomial functions and graphs of real areas of cost curves (in the form of nomograms) constitute a reliable graphical representation that enables the application of research results in typologically similar groups/sectors of the construction industry. The elaborated course of the cumulative cost curve (CCCC) as a method of CAPEX prediction in selected construction projects stands for a combined approach of the S-curve, polynomial functions, and the best-fit area of cumulative earned cost. The research used scientific tools that can be practically and easily used by both managers and participants of the investment process.
Keywords: construction project; course of cumulative cost curve (CCCC); capital cost estimation (CAPEX); S-curve; EVM construction project; course of cumulative cost curve (CCCC); capital cost estimation (CAPEX); S-curve; EVM

Share and Cite

MDPI and ACS Style

Szóstak, M.; Stachoń, T.; Konior, J. Course of Cumulative Cost Curve (CCCC) as a Method of CAPEX Prediction in Selected Construction Projects. Appl. Sci. 2024, 14, 5597. https://doi.org/10.3390/app14135597

AMA Style

Szóstak M, Stachoń T, Konior J. Course of Cumulative Cost Curve (CCCC) as a Method of CAPEX Prediction in Selected Construction Projects. Applied Sciences. 2024; 14(13):5597. https://doi.org/10.3390/app14135597

Chicago/Turabian Style

Szóstak, Mariusz, Tomasz Stachoń, and Jarosław Konior. 2024. "Course of Cumulative Cost Curve (CCCC) as a Method of CAPEX Prediction in Selected Construction Projects" Applied Sciences 14, no. 13: 5597. https://doi.org/10.3390/app14135597

APA Style

Szóstak, M., Stachoń, T., & Konior, J. (2024). Course of Cumulative Cost Curve (CCCC) as a Method of CAPEX Prediction in Selected Construction Projects. Applied Sciences, 14(13), 5597. https://doi.org/10.3390/app14135597

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop