UKSBAS Testbed Performance Assessment of Two Years of Operations †
Abstract
:1. Introduction
2. UKSBAS Testbed Overview
2.1. UKSBAS Architecture Overview
2.2. Ground Segment
2.3. Space Segment
2.4. Support Segment
3. UKSBAS Performance Assessment
3.1. Signal-in-Space Availability
3.2. Service Volume Availability
3.3. Accuracy
4. UKSBAS Testbed Aviation Trials
4.1. Static Aviation Trials: Airports Study
4.2. Dynamic Trials
5. UKSBAS Testbed Maritime Trials
5.1. Maritime Trials Overview
5.2. Maritime Trials Performance Assessment
6. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- Hill, D.; Newton, G.; Soddu, C.; Dumville, M.; Easom, M.; Tiwari, S.; Roberts, W.; Lerma, J.B.; Pericacho, J.G.; Emes, C. A United Kingdom Space-Based Augmentation System Testbed Capability. In Proceedings of the 35th International Technical Meeting of the Satellite Division of The Institute of Navigation (ION GNSS+ 2022), Denver, CO, USA, 19–23 September 2022; pp. 714–724. [Google Scholar] [CrossRef]
- DO-229C; Minimum Operational Performance Standards for Global Positioning System/Wide Area Augmentation System Airborne Equipment. RTCA Inc.: Washington, DC, USA, 2001.
- ED-259; Minimum Operational Performance Standards for Galileo—Global Positioning System—Satellite-Based Augmentation System Airborne Equipment. EUROCAE: Saint-Denis, France, 2019.
- SISnet. Available online: http://www.egnos-pro.esa.int/sisnet/index.html (accessed on 8 May 2024).
- NRCAN. PPP. Available online: https://natural-resources.canada.ca/maps-tools-publications/data (accessed on 8 May 2024).
- CDDIS. Products. Available online: https://cddis.nasa.gov/Data_and_Derived_Products/GNSS/orbit_products.html (accessed on 8 May 2024).
UKSBAS Phase | Start–End | Number of Analyzed Days | SIS Availability |
---|---|---|---|
Phase 1 | 7 May 2022–20 December 2022 | 228 | 99.43% |
Phase 2A | 4 April 2023–31 March 2024 | 363 | 99.01% |
Airport Location | Start–End | SIS Availability |
---|---|---|
Exeter | 13 June 2023–23 June 2023 | 99.00% |
Norwich | 26 June 2023–6 July 2023 | 0% |
Derry | 25 July 2023–5 August 2023 | 74.56% |
Inverness | 1 August 2023–11 August 2023 | 98.55% |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
González Merino, J.; Bravo Llano, F.; Pattinson, M.; Easom, M.; Campano Hernández, J.R.; Sanz Palomar, I.; Romero Llapa, M.I.; Priya Ilamparithi, S.; Hill, D.; Newton, G. UKSBAS Testbed Performance Assessment of Two Years of Operations. Eng. Proc. 2025, 88, 35. https://doi.org/10.3390/engproc2025088035
González Merino J, Bravo Llano F, Pattinson M, Easom M, Campano Hernández JR, Sanz Palomar I, Romero Llapa MI, Priya Ilamparithi S, Hill D, Newton G. UKSBAS Testbed Performance Assessment of Two Years of Operations. Engineering Proceedings. 2025; 88(1):35. https://doi.org/10.3390/engproc2025088035
Chicago/Turabian StyleGonzález Merino, Javier, Fernando Bravo Llano, Michael Pattinson, Madeleine Easom, Juan Ramón Campano Hernández, Ignacio Sanz Palomar, María Isabel Romero Llapa, Sangeetha Priya Ilamparithi, David Hill, and George Newton. 2025. "UKSBAS Testbed Performance Assessment of Two Years of Operations" Engineering Proceedings 88, no. 1: 35. https://doi.org/10.3390/engproc2025088035
APA StyleGonzález Merino, J., Bravo Llano, F., Pattinson, M., Easom, M., Campano Hernández, J. R., Sanz Palomar, I., Romero Llapa, M. I., Priya Ilamparithi, S., Hill, D., & Newton, G. (2025). UKSBAS Testbed Performance Assessment of Two Years of Operations. Engineering Proceedings, 88(1), 35. https://doi.org/10.3390/engproc2025088035