1. Introduction
Renewable energy is no longer an unusual source but is an inevitable transformation path that has become a focal point for almost all countries around the world. The advantages of renewable sources over conventional energy sources have been debated and proved in many platforms up to now. The major pros of hydrocarbons—lower price—are vanishing at a high pace with the technological development pushing green energy prices lower. As per the latest figures, high-efficiency solar and wind-based generation undercuts even the cheapest fossil-based generation plants in terms of levelized cost of electricity (LCOE) in 2020 [
1]. According to the International Renewable Energy Agency (IRENA), wind and solar installation costs have seen up to an 81% decrease during 2010–2020, while the LCOE for those sources became cheaper by up to 85% (see
Table 1).
Meanwhile, the share of renewables in global energy generation increased to 29% in 2020, a 2% increase in comparison to 2019 [
2].
Azerbaijan’s renewable energy journey is relatively new as its abundant fossil fuel reserves have long been serving as the main raw material for energy generation. Low production price, high energy security in terms of resource supply, and huge capital investments in the oil and gas industry have resulted in a long-standing focus on hydrocarbons as the sole resource to generate energy. Thus, the momentum of transition to carbon-zero energy generation in Azerbaijan is challenged by a lack of solid legal framework, no expertise on the matter, and low private and public capital investments. Since its independence, the shift to renewables has been obscured by the comfort of the immense domestic hydrocarbon resources of Azerbaijan. Nonetheless, understanding the scarcity of resources in lieu of decreasing extraction levels makes it clear that long-term reliance on hydrocarbons as the sole option to generate energy is unsustainable. The BP report presented figures showing the reserves-to-production (R/P) ratio of oil in Azerbaijan is around 24 years. The same indicator for natural gas is around 117 years though [
3].
The shift to renewables accelerated during the last two decades with a number of renewable projects implemented and announced to be accomplished in the near future. Limited expertise in the industry, insufficient legal framework, and low public awareness on the topic are some of the challenges the country is facing. The major document to boost the green energy program, the State Program on the Use of Alternative and Renewable Energy Sources in the Republic of Azerbaijan, was adopted in 2004 with a clear-cut action plan defining relevant state entities responsible for implementation and setting timeframes for each of them [
4]. The 2004 Program specifically listed wind, solar, hydro, biomass, and geothermal power accentuating existing privilege in terms of the abundance of mentioned resources. Nonetheless, no specific measures to attract private capital, liberate the energy market, incentivize ownership of green resources as the main source of energy generation were introduced.
2. Materials and Methods
The rationale of this review is to make the assessment of the readiness of the analyzed country to introduce energy policy shift towards renewable energy with special emphasis placed on solar and wind energy. The requirements for systematic reviews are shaped for qualitative and quantitative data with a special stress placed on the assessment of quantitative results which typically justify the final conclusion of the review in the environment of the large number of available statistical data. Here, due to qualitative character of this study and relatively limited number of reports (56 analyzed positions), we used a simplified methodology adjusted to the review needs and relevance of the collected materials to the analyzed topic. The main objective of the article is to explore the potential of renewable energy source development in Azerbaijan—with the main focus on solar and wind power over the next twenty years. Our hypothesis is that Azerbaijan has unused development potential in this area. The paper will analyze opportunities for development considering the existing potential, discuss the legal framework, and suggest mechanisms to boost the renewable energy industry (REI).
The data collected for the review were grouped in the following dimensions: (1) energy infrastructure, production and consumption in Azerbaijan; (2) potential of renewable energy in Azerbaijan; (3) legal framework regulating renewables and incentivization; (4) conclusions and recommendations. The search strategy was focused on assuring maximum relevance of the collected data to the review topic and its dimensions. The search strategy was also aimed at providing updates to the present situation. The selection criteria preferred the first resort sources (e.g., created by public bodies or international organization), scientific materials created with participation of local authors, and other scientific materials which revealed facts important for the study. We excluded materials providing general information or brief insights and all confusing materials which contained all the keywords but concerned other areas. The data collection process was done by three authors who divided duties into local sources, sources from public bodies and international organizations and scientific publications publicized in English, Russian or Azerbaijani languages. The results were cross-checked by partner authors.
Data points were sought for the following outcomes: diagnosis of the present stage of renewable energy development in Azerbaijan, the list and justification of existing potentials for renewable energy developments, assessment of the legal framework to facilitate the renewable energy development, recognition of policy gaps and analysis on how to fix them. We reduced the number of observable variables to those which had critical importance for the research. It means that there were several issues which were unclear during the research, such as the detailed strategy of the change towards renewable energy and legislation framework final outline. However, those issues were addressed by authors in the form of propositions and recommendations. We also assessed the risk of bias in the used studies by specifying the distance of the analyses and proposed tools to the existing energy policy. It revealed that the energy policy is in a stage of change and any definite final solutions were not completed. On the other side, an update of Azerbaijan’s energy policy requires new insights which this publication will reveal.
We specified for each outcome the effect measure including: (1) diagnosis—statement of the up-to-date development of renewable energy in Azerbaijan, (2) analysis of potentials—qualitative assessment of potentials for renewable energy, (3) legal framework assessment—statement on the quality of legal framework, (4) policy recommendations aimed at elimination of energy policy gaps—gap elimination opportunities. Syntheses of the reviews were placed at the end of each point and were based on summarizing the key observations. We used all relevant materials and based our synthetic conclusions on all eligible reports.
We made a reporting biases assessment taking into consideration that they arise when the dissemination of research findings is influenced by the nature and direction of results [
5]. Our review considered mostly the projections of future policies and, in many areas, such projections are shaped by a wishful thinking approach which indicates what should be done in the absence of confronting it with existing potentials. Our goal in this study was to eliminate all provisions of projections which were not backed by evidenced potentials. Besides, we also checked whether all envisaged investments in REI are possible to be realized (e.g., the space provided for them was used for a different investment). Typically, the certainty assessment is done on the basis of factors that reduce the risk of bias, inconsistency, indirectness, imprecision, and reporting bias [
6]. Due to the relatively low number of reports and data and controlling all the above-mentioned risk factors, we performed a certainty assessment by assessing the quality of the collected evidence to the planned outcomes.
Overall, we assessed the evidences as acceptable and of satisfactory quality but not necessarily at the highest possible level. All selected studies were cited in the publication and study characteristics were only described when research results were discussed. Authors skipped characterizing studies when only facts and field information were cited. We briefly described pioneer studies undertaken for the first time. We decided to include in our research only the studies with low risk of bias and excluded all studies with substantial risk. A table with individual risks indications was not necessary. The authors presented results of individual studies included in the review using a score from 1 to 5. The research team did not include any evidence which would have limitations important for the review. Due to the qualitative nature of the data included in the research and their focus on future projections, the review process methodology was using the fundamental elements of the systematic review methodology characteristic for qualitative studies and omitted, e.g., statistical elements which are characteristic for quantitative studies. Due to the thematic area (non-medical), the registration and protocol were not applied. The authors did not receive any support for the review, declare no competing interests, the rejected reports were removed.
As mentioned before, the existing literature assessing the renewable potential of Azerbaijan is relatively weak. A handful of studies have been carried out in this direction, mainly by the National Academy of Sciences and a few scholars, such as Nijat Imamverdiyev, Rovshan Karimov, Rustam Shafagatov, and others. The only publicly available data collection on wind potential was carried out by Nijat Imamverdiyev in his 2004 study [
7]. A similar dataset on solar potential is not available. Thus, the scarcity of reliable and valid data remains the main limitation of this study.
The world hosts nearly two hundred countries at the moment with dozens of them located approximately at the same latitude as Azerbaijan. Similarly, numerous countries have close to Azerbaijan weather conditions, including sunlight and wind resources for production purposes. Trying to look for the countries with the best REI, this study will focus on the ones with not only close to Azerbaijan climate and geographical conditions, which directly affects the amount of sunlight and has an impact on the wind potential, but also considers factors such as population and territory size. Though deviation, especially in relation to the latest two indicators are present. Nonetheless, the whole purpose of this analysis lies behind defining the legal framework approach in support of renewable resources. Thus, the geographical location remains the major factor for selecting the countries, along with achieved successes in the penetrating the green energy into utilization. The reason for considering territory size and population is to avoid a possible level of analysis problem. In the below analysis, the following countries—Austria, Portugal, Greece, Croatia will be taken into consideration (see
Table 2).
China, the United States, Brazil, Germany, and India are in the top five in terms of total installed renewable capacity [
10]. Germany, United Kingdom, Sweden, Spain, and Italy lead the ranking in the list of countries with the highest share of renewables in energy utilization [
11].
Azerbaijan has begun to explore renewable energy opportunities to increase its energy security, utilize hydrocarbon resources differently, diversify the energy market. Besides, due the expectation that hydrocarbons will become more scarce in the future, such an orientation can free some hydrocarbon resources used for energy production in Azerbaijan to utilize them in more processed ways which can assure an increased value than using them for energy production. The following paragraphs of the article deal with the current energy infrastructure, solar and wind potential, legal framework, and incentivization. The article will be concluded with the main recommendations that could be put in place to speed up the transformation process and how to utilize opportunities which will arise with freeing hydrocarbons used for energy production.
3. Energy Infrastructure, Production and Consumption in Azerbaijan
Oil and gas have historically been the main commodity in Azerbaijan to produce income, generate energy, open workplaces, and develop the economy. The first industrial oil well was drilled in Bibi-Heybat, Azerbaijan in 1848. Local sources claim it was the first-ever industrial well [
12,
13]. The next fully industrial well in Azerbaijan was built in 1871 in Balakhani. As of 1872, Azerbaijan was already extracting more than a million poods (pood is a unit of mass measurement equivalent to 16.38 kg; Yakovlev, Development of Wrought Iron Production, Metallurgist press, 1957) of oil and reached a hallmark of 500 million poods in 1899 [
14]. The historical expertise and loyalty to conventional resources, which became the main revenue generator in the late 1800s, transformed into a developed industry after the 1960s. All these combined with a relatively low level of development of REI, paved the path for fossils to become the cornerstone of the energy infrastructure in Azerbaijan.
Thus, the current energy infrastructure of Azerbaijan is heavily dependent on fossils, as 5550.5 MW out of 6721.5 total installed capacity relies on hydrocarbons to produce electricity. Hydropower plants are the second major contributor to the overall generation with an installed capacity of 1.171 MW (for the major power generating plants see
Table 3).
Not surprisingly, fossils remain the major shareholder in electricity production by resource type indicator. Hydrocarbon-based power and thermal power plants generate 22,290 million kWh out of the total of 26,072 million kWh electricity in 2019 (see
Figure 1).
Oil and gas extracted from various spots, but mainly from the Caspian basin, helped not only with power generation, but became the main locomotive of the economy since the “Contract of the Century” was signed in 1994, three years after Azerbaijan declared its independence. Eleven global scale companies from seven countries have signed joint development and production sharing agreement that opened doors for cash flow into the hydrocarbon industry (see
Figure 2).
Soon after revenues from the sales of oil and gas resources started flowing, it became the major contributor to the economy of Azerbaijan. The share of oil- and gas-related income in gross domestic production (GDP) yielded significantly after the Baku-Tbilisi Jeyhan oil pipeline was set for operation in 2005 (see
Figure 3).
The utilization of sunlight and wind as energy generation resources started a decade ago. Though in low capacity, wind and solar farms are not a rarity anymore. The State Agency for Alternative and Renewable Energy (SAARE) has implemented and drafted a number of wind and solar farm projects. The 2014 report of the SAARE included information about 12 wind plants with a total installed capacity of 402.94 MW (see
Table 4). The 2018 presentation of the Ministry of Energy envisioned the development of 6 wind plants without giving detailed information on the earlier announced wind plants (see
Table 5).
The total installed solar capacity was 40 MW across 11 plants, as per the Ministry of Energy of Azerbaijan in 2020 [
20].
Unfortunately, there is not much publicly available information on solar plants in operation, though the SAARE and the Ministry of Energy claim a total generation capacity of 37 MW. One of the SAARE reports enlisted a number of solar projects implemented as of 2020 with a total installed capacity of 50 MW (see
Table 6).
Despite abundant sunlight, much attention is paid to the development of wind electricity production if to analyze the number of envisaged solar projects in comparison to the prospective wind farms announced.
In 2019, the government of Azerbaijan struck a deal with well-established companies to set up solar and wind plants. A solar plant with a total output capacity of 200 MW is agreed to be set up in Azerbaijan jointly with Abu Dhabi Future Energy Company “Masdar”. The annual electricity generation capacity of the plant is estimated to be around 410,000 MWh. The estimated cost of the project is USD 120 million. The LCOE of solar electricity generated in the mentioned projects will be approximately equal to USD 0.031 per kWh, as per available information (the calculation is carried out based on the exchange rate provided by the Central Bank of Azerbaijan for 14 August 2021; 1 USD equals 1.7000 AZN (
www.cbar.az, accessed on 14 August 2021)). In the same year, the government signed a contract with the “ACWA Power” company of the United Arab Emirates on the construction of a wind energy plant with an output capacity of 240 MW. The anticipated yearly electricity output of the project is equal to 1 million MWh. The construction cost is estimated to be around USD 280 million. The LCOE of electricity generated in these plants will approximately equal to USD 0.032 per kWh. The energy market remains monopolized by public entities, although existing legislation allows private generators to become an actor. The main actors in the energy market are listed in
Table 7.
Own Elaboration
The transmission grid infrastructure is also under the complete control of public entities. Requirements and necessary licenses to connect to the grid are available in various legal documents. The development of publicly available tools is needed to be put in place to increase awareness of the private generation opportunities.
Summarizing, it can be admitted that the review of relevant reports and publications indicates that the role of renewable energy in Azerbaijan is still placed on the stable low level. The authorities of Azerbaijan undertook several undertakings in wind and solar energy, but the main source of renewable energy was up to date hydro energy strongly dependent on the volume of water in rivers. We assess those conclusions as certain and with low-risk bias.
4. Potential of Renewable Energy in Azerbaijan and Its Integration into the Energy System
For more than a hundred years, hydropower was the major renewable source of energy in Azerbaijan. The first hydropower plant (HP) was constructed in 1883 in Galakend village in the Gedebey district. That plant was designed to supply electricity to the residents, and also to the industrial infrastructures of the community [
21]. In the 1950s, Varvara HP and Mingachevir HP boosted the generation levels marking the next stage of the development for the hydropower industry. Mingachevir HP remains one of the biggest hydropower plants in Azerbaijan to date. Until 2009, when the first kW of wind electricity was produced, water remained the only source of renewable energy. Below is the
Figure 4, demonstrating overall electricity generation and the share of hydropower plants in it.
Though Azerbaijan is located in a favorable geographical location to farm solar and wind power, its renewable potential has never been fully studied until recently. In 2002 and 2009, a few studies were conducted by the members of the Azerbaijan National Academy of Sciences to assess the wind energy potential [
7]. As of 2019, the Ministry of Energy of Azerbaijan started collecting more data on the renewable potential of the country. The major research in this direction was concluded in 2020 by IRENA who indicated high solar and wind potential in the final report.
Table 8 shows the renewable resources potential in Azerbaijan.
4.1. Solar Potential
Azerbaijan has enough annual sunlight volume to generate significant energy from it. IRENA’s assessment of the solar potential of Azerbaijan discovered the 23,000 MW potential [
23]. As per governmental records, the amount of solar energy per square meter is somewhere around 1.5–2.0 MWh [
24]. The SAARE reports indicate 170 to 260 W/m
2 radiation levels in the country. The World Bank’s Global Solar Atlas confirms that the specific photovoltaic power output (SPPO) indicator for Azerbaijan ranges between 3.21–4.48 kWh/kWp (specific photovoltaic power output indicates how much electricity can be produced for every kWp of the module capacity over a course of year [
25]). The Direct Normal Irradiation (DNI) and Global Horizontal Irradiation (GHI) indicators are in the range of 2.71–4.84 kWh/m
2 and 3.44–4.80 kWh/m
2 per day, respectively [
26].
The above maps in the
Figure 5,
Figure 6 and
Figure 7 indicate adequate sunlight to invest in solar farms as alternative energy. Hence, the government has already presented three large-scale potential solar farm projects with a total of 2825 MW installed capacity (see
Table 9).
Calculation estimations conducted by Feyruz Mustafayev have revealed other potential projects that could be implemented in the Nakhichevan Autonomous Republic, where solar indicators are even higher in comparison with the rest of the country (see
Table 10) [
28].
Industrial-sized plants require huge upfront investments and carry enormous technical/administrative burdens and business risks. Nonetheless, large-scale solar plants are not the only option for sunlight farming. The specifications of photovoltaic panels and technological developments open doors to develop private small- or community-scale generation sites. Besides, the opportunity of roof-top installation creates significantly high generation potential without sacrificing large territories under plants. According to the Ministry of Energy and various foreign open sources, daily sunny hours in Azerbaijan average at 7–8 h (average number is derived from available documents of the Ministry of Energy of Azerbaijan,
www.worlddata.info, and
www.weather-and-climate.com websites. All sources were accessed on 10 October 2021). Considering 1.6 m
2 250 W monocrystalline photovoltaic panels with a 20% efficiency rate (the most widely used and accessible panels [
29]), the output of 0.375 kWh/day or 11.25 kWh/month can be obtained from a single panel installed privately (the calculation is made based on the following formula: E = (H × W × 20)/100). Obviously, the lack of a number of factors, such as tilt degree, air temperature, shade, precipitation, etc., decreases the validity of the calculations. Nonetheless, it puts the perspective of private utilization potential on the surface. Observing the
Figure 7, it must be noted that the areas with the highest solar potentials are located far from the economic centers of Azerbaijan (such as Baku), which will create a challenge for the transmission of this energy to the center. On the other side, providing autonomous renewable energy system for the Nakhichevan Autonomous Republic can reduce the present tension for limited access to energy in this region. The development of solar energy installations in this region would also increase the energy security for the Republic of Azerbaijan.
Summing up, Azerbaijan has notable sunlight energy potential, especially in regions with extraordinary conditions for photovoltaic farms location (Nakhichevan AR) and, therefore, solar energy is the first natural direction of renewable energy development in the country. We assess those findings as significant and with low-risk bias.
4.2. Wind Potential
Although the estimated wind potential in Azerbaijan is lower in comparison to the solar potential (see
Table 8), many efforts are being put into the development of wind electricity production. The decreasing price of wind electricity farming is another factor stimulating interest in this industry. In 2018, wind electricity generation costs went lower in comparison to conventional generation, as per Forbes [
30]. The current generation capacity of WEPs in Azerbaijan is around 66 MW [
20].
The IRENA’s assessment of the wind potential of Azerbaijan does not include data on annual average wind speed and the number of windy days based on months and different regions. The only available dataset on this indicator was presented in 2014 by Nijat Imamverdiyev in his “Azerbaijan’s Wind Energy Potential and its Utilization Perspectives” study (see
Table 11). This study, however, provides enough insight for the assessment of investment opportunities in this area in Azerbaijan.
The Absheron peninsula and the surrounding areas have high wind energy generation potential with an annual average wind speed of 6–8 m/s and up to 145 windy days per year. The majority of widely used industrial-size wind turbines operate at minimums of 3–5 m/s wind speed (information is obtained from official web sites of Siemens and Vesta, global scale wind turbine manufacturers [
31,
32]). The data available at the website of the World Bank’s Global Wind Atlas indicate 8 m/s mean wind speed and 810 W/m
2 power density at 50-m altitude in the Absheron peninsula and its outskirts. At a 100-m height, the indicators reach 9.1 m/s and 1026 W/m
2, respectively [
33].
Absheron peninsula is not the only region with enough wind potential to produce power. As
Figure 8 and
Figure 9 demonstrate, the Northern Sumgait and Khizi districts, Kalbajar-Lachin and Ganja-Gazakh territories have enough wind to generate electricity. At a 100-m altitude, the mean wind speed around Khizi district is >9 m/s, and the power density can peak 1000 W/m
2. In the Kalbajar-Lachin zone, results are 8 m/s and >700 W/m
2, respectively. The latter zone is mainly a mountainous territory which makes wind farming challenging. Nonetheless, the successful experience of Switzerland and technological advancements open the door for the establishment of community-sized WEPs in the mentioned area. The same can be applied in the Ganja-Gazakh economic zone where the mean wind speed is at around 5.45 m/s, perfectly suitable for utilization of mid-sized turbines.
The Ministry of Energy of Azerbaijan has presented five potential WEPs that could be set up with a total installed capacity of 442.5 MW (see
Table 12).
Potential utilization of territories other than the Absheron peninsula for wind farming purposes was suggested by F. Mustafayev in his study (2021). Two prospective WEPs could be set up in the Kalbajar-Lachin and Ganja-Gazakh territories with a total installed capacity of 207 MW (see
Table 13).
The off-shore potential of the Caspian Sea is as attractive as the on-shore potential of the territories mentioned above. The World Bank study of the technical potential of the Caspian Sea indicates more than 7.5 m/s mean wind speed in the basin around the Absheron peninsula and northern part of Azerbaijan at the depth of fewer than 50 m (see
Figure 10) [
35].
In 2019, Florin Onea and Eugen Rusu carried out estimations to test the feasibility of wind electricity farming in the Caspian Sea, and the results were not satisfying. Based on the data obtained from the European Centre for Medium-Range Weather Forecasts and the AVISO+ (Archiving, Validation, and Interpretation of Satellite Oceanographic Data), Onea and Rusu have concluded that the only acceptable results could be achieved through the utilization of capable Siemens turbines at the 140-m altitude (results showed estimated production of 19.29 GW/h) [
36]. Back in 2004, the National Academy of Sciences of Azerbaijan drafted a project in the Caspian Sea where an output capacity of 1800 MW was envisaged to be achieved through the installation of 3000 turbines in the area of 180 km
2 [
37]. Nonetheless, the reliability of the mentioned study is questionable since the technological opportunities at the time were behind the current advancement.
Summing up, from a technical and organizational point of view, it looks as if locating wind farms in Azerbaijan could be easier due to the proximity to consumers and a market. The most proposed locations for WEPs are near Baku conurbation (main centers of the country) and the transfer of energy for short distances cannot be a problem. The successful realization of the Contract of the Century in petrochemical industry can be an example that Azerbaijan can be a good partner for such collaboration. The collected evidence is assessed as highly certain with low-risk of bias.
5. Legal Framework Regulating Renewables and Incentivization
The current legal framework regulating the energy market is mainly built with a focus on the role of the government (through public utilities) as the key actor and the other role being played by the hydrocarbon resources. Below are the five main laws which can be considered as the cornerstone of all programs and strategies adopted related to the energy industry:
The Law on Energy (Law 541-IQ, 1998);
The Law on Electrical Power (Law 459-IQ, 1998);
The Law on Electrical and Thermal Power Plants (Law 784-IQ, 1999);
The Law on Utilization of Renewable Sources in the Electricity Production (Law 339-VIQ, 2021);
The Law on Efficient Use of Energy Resources and Effectiveness of Energy (Law 359-VIQ, 2021).
In 1998, the Law on Energy was adopted where special focus on the development of renewables and minimizing the carbon footprint in energy generation were set as targets to achieve. At the same time, the government was declared to be the sole grantor of special permissions and licenses to any actor who would like to be present in the energy market (Law 541-IQ, 1998). The Law on the Electrical Power adopted in 1998 was the first-ever legal act where private generators were mentioned as energy market actors, and even encouraged the liberalization of the market (Law 459-IQ, 1998). Law 459-IQ defined the following actors of the energy market:
State utilities;
Private generators—these actors possess rights to sell generated electricity to the state utility or the supply company (monopolized by public utilities). The excess volume of the generated electricity should be bought by state utilities;
Energy supply companies (public utilities only);
End consumers.
Following the Law 459-IQ, the Law on Electricity and Thermal Power Plants have reiterated the position of the state to welcome the private generators to participate in the market given they operate in their private property and can either sell the energy to public utilities or use it for private purposes only (Law 784-IQ, 1998).
In 2021, two new laws were adopted. The most important one for the development of the REI is the Law on Utilization of Renewable Sources in the Electricity Production (Law 339-VIQ). This became the very first act exclusively focusing on the renewables. The Law 339-VIQ defines roles and responsibilities of the state and generators, enlists support mechanisms to be offered, and principles of the regulation of REI.
Following the law 339-VIQ, the Law on Efficient Use of Energy Resources and Effectiveness of Energy (Law 359-VIQ) was adopted where renewable energy resources were included into the list of resources which should be stimulated in the future. Nonetheless, the law itself has a very low focus on renewable energy resources. In fact, the word “renewables” is used only twice in the document, in general lists only (Law 359-VIQ, 2021). The Law 359-VIQ has replaced the Law on the Utilization of Energy Resources (94-IQ) which had more provisions about renewables, including the idea of the establishment of a special fund to support the utilization of energy resources, including renewables.
To summarize, the fundamentals of the legal framework regulating the energy market notes the renewables as an alternative source to hydrocarbons, expresses importance to develop renewables, allows private actors to participate in the energy market, and declares the state’s will to introduce special mechanisms to boost all the aforementioned. Nonetheless, the realization of all these provisions still has room to improve, e.g., very few small private actors are currently present in the energy market.
Apart from the mentioned laws, two state programs were adopted with the aim to boost developments in the renewables industry. In 2004, the State Program on Utilization of Alternative and Renewable Energy Sources in Azerbaijan was adopted which defined the assessment of the country’s renewable potential, its incorporation into the energy system, development of the legal framework regulating the renewables industry, and took measures to accelerate the privatization of small-scale generation plants, including renewables as key targets among others [
4]. In 2011, the government adopted the 2012–2020 State Strategy on Utilization of the Alternative and Renewable Energy Sources in Azerbaijan as another attempt to boost the REI. The third document where the development of the REI was highlighted as important and strategic came in 2014 with the 2015–2020 State Program for the Development of Industry in Azerbaijan.
Nonetheless, the REI’s development in Azerbaijan has not actually accelerated until the end of the 2010s and the beginning of the 2020s. Despite a number of legal acts noting the importance of the renewables and liberal energy market, the situation has not changed due to a number of reasons related to energy security, abundant fossil reserves where a huge amount of investment is attracted with long-term contracts on the exploration, extraction, and utilization, less liberal nature of the market, blurry mechanisms of entering the energy market, unavailability or deficiency of publicly available information on requirements, obtaining necessary permissions and licenses to become an actor in the energy market, etc. In 2020, the Ministry of Energy has presented a developed model of the energy market with private actors being involved in generation and supply to the end-users (see
Table 14).
The main difference of the new model presented by the Ministry of Energy, in comparison to the earlier mentioned legal regulation, is that private companies will now be able to sell the generated electricity to consumers.
The experience of countries with successful shift paths to renewables demonstrates the importance of supporting mechanisms in attracting private investment into the energy market. This is another aspect that historically lacked in Azerbaijan, although back in the 1990s, the idea of introducing incentivizing schemes was mentioned (see laws 94-IQ, and 459-IQ). Interestingly, the Ministry of Energy has presented two different documents announcing different support mechanisms to the development of the energy market and renewables (see
Table 15).
Feed-in-Tariffs (FITs) are the only support mechanism widely used in countries with successful REI development. In 2018, the Council of European Energy Regulators (CEER) presented its Status Review of Renewable Support Schemes in Europe for 2016 and 2017 where the following policies were highlighted as the most commonly adopted in European countries:
A lack of a robust legal framework is the major obstacle in the way of the development of the REI. Despite numerous documents and laws, attention to renewables has not been that much of a priority until recent years. The implementation rate of the newly proposed regulatory acts, energy market models, and supportive policies is yet to be seen. However, positive momentum towards the green energy adoption is in place, and the volume of efforts and resources spent in this direction is increasing. At the end of 2019, the government reported about an intensified partnership with various companies to gain experience in the development of a regular framework regulating the renewables industry. A contract was signed with Norwegian DNV Energy Advisory LTD with an aim to receive expertise on: (a) the attraction of private investment into renewables; (b) the preparation of incentivization mechanisms for private actors; (c) to achieve the increased share of renewables in electricity consumption [
40]. At the same time, the Ministry of Energy announced that work is being done on the preparation of tendering mechanisms to attract private investors into the energy market [
41].
Taking into account that Azerbaijan is a relatively small energy market (with around 6 thousand MW of installed energy power) and less than 2 thousand MW potential of renewable energy installations, it is questionable whether there is a need to develop sophisticated legislation similar to those in bigger countries by population, economy and with big and diversified energy sectors. For Azerbaijan, immediately, two simpler solutions come to mind. The first one is to establish a contractual basis similar to that on petrochemical industry reconstruction (Contract of the Century), which for many reasons could be considered as a perfect tool for both: assuring national energy security and development of the industry. The second solution is the creation of a simple auction framework like many countries, which assures the low cost of supplied green energy and the possibility to fulfill the project as a joint venture. According to the authors’ opinion, a contractual basis can work better in the case of Azerbaijan, due to their experience in implementation of the Contract of the Century, possibilities to simplify the consortium to reduce the number of partners and building simple framing conditions which express together the national economic interests of Azerbaijan and the interests of partners involved in the project. Such a project could be implemented as a joint venture with the leading Azerbaijan energy company.
The evidences collected in the area of legal framework for renewal energy implementation are characterized by the overall assessment that they represent the early stage of development, and their functioning is not as certain as the assessment of evidence in the diagnostic part and in assessing the potential for renewable energy in Azerbaijan. This situation creates both challenges but also opportunities for the future, which can be used by the regulatory authorities.